一种站台雨棚智能建造台车

By combining hydraulic lifting components and a formwork early stripping system, the problems of heavy formwork weight and installation hazards in the construction of high-speed railway platform canopies have been solved, achieving efficient and safe canopy construction.

CN117108005BActive Publication Date: 2026-07-17CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP
Filing Date
2023-09-08
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In the construction of existing high-speed railway platform canopies, the formwork is heavy, the installation and dismantling are dangerous, and there are problems such as misalignment of formwork joints and grout leakage, resulting in high costs and low efficiency.

Method used

The hydraulic lifting assembly drives the formwork lifting platform, which, combined with the early formwork removal system, enables the closing and unclosing of the canopy formwork. The positioning and telescopic components improve stability and reduce manual labor requirements.

Benefits of technology

It improved the efficiency of canopy construction, avoided problems such as misaligned formwork joints and grout leakage, reduced formwork costs and labor requirements, and ensured construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117108005B_ABST
    Figure CN117108005B_ABST
Patent Text Reader

Abstract

本发明涉及高铁站混凝土雨棚建造技术领域,且公开了一种站台雨棚智能建造台车,包括两个建造台车本体,两个建造台车本体呈对称设置,建造台车本体包括可移动的底盘总成,底盘总成具有行走功能,固定支撑模架功能,底盘总成的顶部设置有若干组液压升降组件。该站台雨棚智能建造台车,通过设置的早拆固定支撑体系,可实现台车模板早拆退模功能,整体台车退模后的通过台车行走功能,达到雨棚台车模板整体快速循环周转使用,不仅提高了雨棚建造效率,而且不容易出现模板接缝处存在错台现象,进而避免了跑浆问题,同时降低了投入模板的成本,而且降低了人工成本以及拆装过程中的危险,具有一定经济效益与社会效益。
Need to check novelty before this filing date? Find Prior Art