Unmanned aerial vehicle high-voltage direct current power supply testing method
The automated testing of UAV high-voltage DC power supply systems is achieved through automatic testing devices and adapter boxes, solving the problems of low efficiency and safety hazards of traditional testing methods and ensuring the accuracy and completeness of the tests.
Patent Information
- Application Number
- CN202310935443.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-28
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2043-07-28
AI Technical Summary
Existing testing methods for high-voltage DC power supply systems for UAVs are not applicable to the new 270V high-voltage DC power supply system, resulting in low testing efficiency, susceptibility to human error and omissions, and inability to fully detect signal anomalies.
An automated testing device and an automated transfer device that do not require adapter cables are used to perform cable testing and signal testing respectively. The robotic arm and replacement pins automatically identify the plug model to achieve automated testing, and the signal transfer and identification are performed through the adapter box.
It has enabled automated testing of UAV high-voltage DC power supply systems, reducing manual intervention, improving testing efficiency, avoiding safety risks, ensuring the accuracy and integrity of test data, and ensuring the integrity of aircraft cables and signals.
Smart Images

Figure CN117110932B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of aviation manufacturing engineering / aircraft assembly and debugging, and relates to a test method for high voltage DC power supply of UAVs, specifically the process method for testing the 270V high voltage DC power supply system of UAVs during the assembly stage. Background Technology
[0002] Unmanned aerial vehicles (UAVs), under the command and control of shipboard or ground systems and supported by support and training systems, perform equipment combat missions. They are an important component of the equipment system and complex cyber-physical system entities that carry out combat missions. A UAV consists of an airframe, aircraft management system, propulsion system, mission system, takeoff and landing system, and electrical interconnection system. The propulsion system, aircraft management system, takeoff and landing system, and mission system exchange information and data through the electrical interconnection system to collaboratively complete the aircraft's functions.
[0003] To meet these requirements, for the first time on a drone, a dual main power supply system was adopted, consisting of a 270V high-voltage DC power supply and a 28V DC power supply. The secondary power supply uses a 270V / 28V power converter to convert the 270V high-voltage DC to 28V DC. Compared to the traditional 115V AC power supply system, the 270V high-voltage DC power supply system offers advantages such as simpler structure, more reliable operation, higher efficiency, lighter weight, lower cost, easier uninterrupted power supply, and safer operation. In the secondary power supply stage, the DC-DC converter used in the high-voltage DC power supply system is smaller and lighter than that of the AC power supply system, and is more efficient. It can be integrated to form a distributed power supply system, effectively improving the power density and reliability of the power supply system.
[0004] Therefore, as the first UAV to participate in the production of a high-voltage DC power supply system, it not only lacks a cockpit and display and control system compared to previously produced aircraft, but also has a completely changed power supply system. Previous testing methods are no longer applicable. In order to ensure the smooth delivery of the UAV project, relevant research on the UAV high-voltage DC power supply system was carried out, and a brand-new testing method was designed. Summary of the Invention
[0005] In order to complete the high-voltage DC power supply debugging work during the final assembly process of UAVs, this invention provides a method for testing the high-voltage DC power supply of UAVs.
[0006] The technical solution adopted in this invention is as follows:
[0007] A method for testing the high-voltage DC power supply of a drone, wherein the testing method is divided into cable testing and signal testing according to the test items, and the tests are performed by an automatic testing device that does not require the use of adapter cables and an automatic adapter device, respectively. The specific steps are as follows:
[0008] Step 1: Prepare an automatic testing device that does not require adapter cables for cable testing.
[0009] The automatic testing device that does not require the use of adapter cables includes two identical test benches and several different types of replacement pins.
[0010] The test bench includes a main unit cable 1, a base 2, a clamp 3, a support rod 4, a spring 5, a slide rail 6, a turntable base 7, a robotic arm 8, a threaded head 9, and replacement pin storage slots 10. The two test benches are used to fix the plugs at both ends of the cable under test and to perform automatic testing via the main unit. The base 2 is the supporting component of the entire test bench, used to fix other components. One side of its upper surface has several replacement pin storage slots 10 for storing different types of replacement pins. Each replacement pin storage slot 10 is a cylindrical slot with ear slots on both sides of the slot opening. One end of the main unit cable 1 is connected to the threaded head 9 via the robotic arm 8, and the other end is connected to the main unit, used to control the robotic arm 8 to work automatically and complete the test. The clamp 3 is fixed to the upper surface of the base 2 via the support rod 4. One end of the support rod 4 is used to fix the plug and ensure that the plug socket faces upward. The upper surface of the support rod 4 is marked to determine the fixing direction of the plug. A spring 5 is installed inside the clamp 3 to spring back and lock the plug. The slide rail 6 is set in the middle of the upper surface of the base 2. The lower end of the turntable seat 7 is placed in the slide rail 6 so that it can move along the slide rail 6. The upper end of the turntable seat 7 is connected to the robotic arm 8. The slide rail 6 and the turntable seat 7 cooperate to realize the left and right movement and 360° lateral rotation of the robotic arm 8. The robotic arm 8 is a three-section robotic arm including three rotating shafts. The rotating shaft at its end is rotatably connected to the turntable seat 7, so that the robotic arm 8 can move freely on the plane it is in. The threaded head 9 is fixed to the front end of the robotic arm 8 and can rotate relative to the robotic arm 8 for connecting and replacing pins.
[0011] The replacement pin includes a threaded hole 11, an ear piece 12, and a pin 13. The replacement pin is cylindrical in shape, with an axial threaded hole 11 on its upper end face for connecting with the threaded head 9 of the test bench, and a pin 13 on its lower end face. The pin 13 is a pin or a pin hole for mate with different types of pins in the plug. The threaded head 9 is in communication with the pin 13 for plug testing. The opposite side walls of the cylindrical part of the replacement pin have ear pieces 12 along the length direction. When the replacement pin is placed in the replacement pin storage slot 10 of the test bench, the ear pieces 12 fall into the ear piece slot to prevent the replacement pin from rotating in the replacement pin storage slot 10.
[0012] Step 2: Place the two test stands on both ends of the first cable to be tested. Press the tail of the clamp 3 on the test stand to open its front end. Place the plugs at both ends of the cable to be tested into the open front ends of the clamp 3 on the two test stands, with the upper surface of the plug flush with the upper surface of the clamp 3. At the same time, adjust the direction of the plug so that the "No. 1" pin inside the plug is aligned with the mark on the upper surface of the support rod 4. Then release the tail of the clamp 3 and lock the plug.
[0013] Step 3: Connect the main unit cables 1 of the two test benches to the main unit at the same time, start the main unit system, enter the wiring relationship of the cable to be tested, and enter the plug model of the cable to be tested on the system interface as prompted. Since the aircraft uses standard aviation plugs, the main unit system can directly identify the pin model and distribution position inside the plug according to the plug model, and at the same time open the distribution matching verification interface.
[0014] Step four: The host system uses the slide rail 6, turntable base 7, and the rotating shaft of the robotic arm 8 to control the movement of the robotic arm 8. A suitable replacement pin is selected from the replacement pin storage slot 10. The threaded head 9 is placed in the threaded hole 11 of the replacement pin. The threaded head 9 rotates. Because the lugs 12 on the replacement pin are stuck in the lug slots on both sides of the replacement pin storage slot 10, the replacement pin cannot rotate relative to the replacement pin storage slot 10. As the threaded head 9 rotates, it gradually enters the threaded hole 11 until the connection is secure. The robotic arm 8 is lifted to bring the replacement pin out and moves it above the plug, gradually lowering it until it lightly touches the inner pin of the plug. The system observes whether the identification position displayed on the verification interface is accurate. If accurate, click to confirm that the robotic arm 8 continues to descend and connect with the inner pin of the plug. If it deviates, manually control the robotic arm 8 to fine-tune it on the host system interface until the position is accurate. After confirmation, the host system selects the next feature position for identification. The host system selects different numbers of feature positions for identification according to the plug size to ensure that the replacement pin can accurately connect with the inner pin of the plug during subsequent tests.
[0015] Step 5: After the distribution matching verification in Step 4 is completed, the host system automatically switches to the test interface to start the test. After one type of pin is used up, the robotic arm 8 returns to the replacement pin storage slot 10, puts the replacement pin back into the original slot, the threaded head 9 rotates in the reverse direction, exits the threaded hole 11, and then moves to the replacement pin of the next type. The robotic arm 8 automatically selects and replaces the appropriate replacement pin, and tests all the conduction combinations of the pins in the two plugs one by one. After the test is completed, the host system automatically generates a test report and saves it. Based on the wiring relationship entered in Step 2, it judges and displays whether the overall test is qualified. If there is an abnormality in a certain item, it will directly prompt the specific abnormal content.
[0016] Step six: After the test is passed, press the end of clamp 3 to release the plug, replace the next cable to be tested, and repeat steps two to five until all tests are completed. If an emergency occurs during the test, the host system will be stopped immediately to interrupt the movement of the robotic arm 8 and the test.
[0017] Step 7: After all cable tests are completed, remove the test bench and restore the cable connections on the machine.
[0018] Step 8: Prepare the automatic switching device and conduct signal testing preparations.
[0019] The automatic transfer device is composed of the following components: Figure 4 As shown, it includes adapter box 14, cable I 15, main control cable 16, and cable II 17.
[0020] The adapter box 14 is the core control unit. Its three sides are connected to cable I 15, main control cable 16, and cable II 17, respectively. Cable I 15 connects to the aircraft's integrated unit (RIU), cable II 17 connects to the RIU's docking cable, and main control cable 16 connects to the main unit. The adapter box 14 has a built-in relay module that can receive control signals from the main control cable 16, freely switch the connection between each wire of cable I 15 and the corresponding wire in cable II 17 or main control cable 16, and freely switch the connection between cable II 15 and main control cable 16. Each wire of cable 17 is connected to the corresponding wire in cable I 15 or main control cable 16. That is, by default, each wire in cable I 15 is connected to each wire in cable II 17. However, by receiving the control signal from main control cable 16, adapter box 14 can disconnect any one or more wires connected in cable I 15 and cable II 17, and connect any one end or all of them to the wires in main control cable 16, so as to realize the connection between cable I 15 or cable II 17 and main control cable 16.
[0021] Step 9: Connect cable 15 (I) and cable 17 (II) of the adapter to the finished product RIU on the machine, respectively.
[0022] Step 10: Connect the main control cable 16 of the adapter to the host, enter the qualification standard in the host system, select the signal test interface, and connect all the wires of cables I and II in the wiring relationship of the adapter to the main control cable 16.
[0023] Step 11: After the aircraft is powered on, when the main system recognizes the signal, it automatically compares it with the pass / fail criteria entered in Step 10 to determine whether the test item is qualified.
[0024] If the test item passes, the system proceeds to the next test. The system automatically begins to gradually restore the connection between the conductors in cable 15 and cable 17 that have been tested. At the same time, it continues to test the new signals that are triggered by the restoration of the connection and output by the aircraft. The system compares these signals with the passing standard to determine whether the signal quality and timing of their occurrence are correct.
[0025] If any non-compliance is found, the system will automatically stop the test and display a warning about the abnormal item and content, prompting the aircraft to be inspected and troubleshooted.
[0026] Step 12: If all test items pass until the test ends, the test will be completed, and you will be prompted to remove the adapter and proceed with the next steps.
[0027] The beneficial effects of this invention are:
[0028] This invention first automates cable testing using a testing device, solving the problems of traditional methods that require manual testing of each wire in the cable using a multimeter. This method is inefficient, prone to human error or omissions, and lacks data recording capabilities. The testing device automates the process, is not limited by plug type, eliminates the need for adapter cables, and transmits test data to the system in real-time. After ensuring the aircraft cable's integrity, the adapter transfers the aircraft signal to the system for identification, real-time monitoring of the signal's correctness. This prevents safety risks caused by signal anomalies and addresses the issue of traditional methods where disconnecting the plug only measures the initial signal, failing to measure secondary and subsequent signals generated by the initial signal within the same plug. The system is fully automated, avoiding safety risks associated with manual operation. After cable and signal testing, the aircraft's assembly is considered intact, eliminating safety hazards during operation. The aircraft's power-on operation and self-test further verify functionality, ensuring the overall integrity of the aircraft's high-voltage DC power supply.
[0029] After the application of this invention, the testing work of the high-voltage DC power supply of UAVs can be effectively completed in the final assembly stage. The cable test and signal test during the assembly and debugging process are completed by automated means, ensuring that the aircraft can be powered on without safety risks. It fully avoids safety hazards such as errors and omissions that may occur during human operation, as well as problems such as incomplete test items. At the same time, it greatly improves the testing efficiency, reduces the testing difficulty, improves the professional technical level, and optimizes the testing process, generating high economic, military and social benefits for military aircraft research and production. Attached Figure Description
[0030] Figure 1 This is a schematic diagram of the test bench;
[0031] Figure 2 This is a top-down view of the test stand;
[0032] Figure 3 Diagram showing pin replacement;
[0033] Figure 4 This is a schematic diagram of the adapter.
[0034] In the diagram: 1. Main unit cable; 2. Base; 3. Clip; 4. Support rod; 5. Spring; 6. Slide rail; 7. Turntable base; 8. Robotic arm; 9. Threaded head; 10. Replacement pin storage slot; 11. Threaded hole; 12. Ear; 13. Pin or pin hole; 14. Adapter box; 15. Cable I; 16. Main control cable; 17. Cable II. Detailed Implementation
[0035] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be described in detail below with reference to the accompanying drawings.
[0036] A method for testing the high-voltage DC power supply of a drone, wherein the testing method is divided into cable testing and signal testing according to the test items, and the tests are performed by an automatic testing device that does not require the use of adapter cables and an automatic adapter device, respectively. The specific steps are as follows:
[0037] Step 1: Prepare an automatic testing device that does not require adapter cables for cable testing.
[0038] like Figure 1 and Figure 2 As shown, the automatic testing device that does not require the use of adapter cables includes two identical test benches and several different types of replacement pins.
[0039] The test bench includes a main unit cable 1, a base 2, a clamp 3, a support rod 4, a spring 5, a slide rail 6, a turntable base 7, a robotic arm 8, a threaded head 9, and replacement pin storage slots 10. The two test benches are used to fix the plugs at both ends of the cable under test and to perform automatic testing via the main unit. The base 2 is the supporting component of the entire test bench, used to fix other components. One side of its upper surface has several replacement pin storage slots 10 for storing different types of replacement pins. Each replacement pin storage slot 10 is a cylindrical slot with ear slots on both sides of the slot opening. One end of the main unit cable 1 is connected to the threaded head 9 via the robotic arm 8, and the other end is connected to the main unit, used to control the robotic arm 8 to work automatically and complete the test. The clamp 3 is fixed to the upper surface of the base 2 via the support rod 4. One end of the support rod 4 is used to fix the plug and ensure that the plug socket faces upward. The upper surface of the support rod 4 is marked to determine the fixing direction of the plug. A spring 5 is installed inside the clamp 3 to spring back and lock the plug. The slide rail 6 is set in the middle of the upper surface of the base 2. The lower end of the turntable seat 7 is placed in the slide rail 6 so that it can move along the slide rail 6. The upper end of the turntable seat 7 is connected to the robotic arm 8. The slide rail 6 and the turntable seat 7 cooperate to realize the left and right movement and 360° lateral rotation of the robotic arm 8. The robotic arm 8 is a three-section robotic arm including three rotating shafts. The rotating shaft at its end is rotatably connected to the turntable seat 7, so that the robotic arm 8 can move freely on the plane it is in. The threaded head 9 is fixed to the front end of the robotic arm 8 and can rotate relative to the robotic arm 8 for connecting and replacing pins.
[0040] like Figure 3 As shown, the replacement pin includes a threaded hole 11, an ear piece 12, and a pin 13. The replacement pin is cylindrical in shape, with an axial threaded hole 11 on its upper end face for connecting with the threaded head 9 of the test bench, and a pin 13 on its lower end face. The pin 13 is a pin or a pin hole for mates with different types of pins in the plug. The threaded head 9 is in communication with the pin 13 for plug testing. The opposite side walls of the cylindrical part of the replacement pin have ear pieces 12 along the length direction. When the replacement pin is placed in the replacement pin storage slot 10 of the test bench, the ear pieces 12 fall into the ear piece slot to prevent the replacement pin from rotating in the replacement pin storage slot 10.
[0041] Step 2: Place the two test stands on both ends of the first cable to be tested, press down the tail of the clip 3 on the test stand, and place the plugs at both ends of the cable to be tested into the front end of the open clip 3 on the two test stands. The upper surface of the plug should be flush with the upper surface of the clip 3. At the same time, observe the position of the "No. 1" pin inside the plug, align it with the mark on the upper surface of the support rod 4, and then release the tail of the clip 3.
[0042] Step 3: Connect the main unit cables 1 of both test benches to the main unit at the same time, start the main unit system, and enter the plug model on the system interface as prompted. Since the aircraft uses standard aviation plugs, the system will directly identify the pin model and distribution position inside the plug based on the plug model, and open the distribution matching verification interface at the same time.
[0043] Step 4: The system controls the robotic arm 8 to select a suitable replacement pin and move it above the plug, gradually lowering it until it lightly touches the inner pin of the plug and stops. At this time, the operator needs to observe whether the recognition position displayed on the verification interface is accurate. If it is accurate, click to confirm that the robotic arm 8 continues to descend and connect with the inner pin of the plug. If it deviates, the operator can manually control the robotic arm 8 to make fine adjustments on the interface until the position is accurate and then confirm. After that, the system selects the next feature position for recognition. Depending on the plug size, the system will select different numbers of feature positions for recognition to ensure that the replacement pin can accurately connect with the inner pin of the plug during subsequent testing.
[0044] Step 5: After verification, the system automatically switches to the test interface to start the test. At this time, the operator no longer needs to operate. The robotic arm 8 automatically selects and replaces the appropriate replacement pins, and tests all the conduction combinations of the inner pins of the two plugs one by one. The operator only needs to observe the test results displayed on the interface. After the test is completed, the system automatically generates a test report and saves it. Based on the entered wiring relationship, it judges and displays whether the overall test is qualified. If there is an abnormality in a certain item, it will directly prompt the specific abnormal content.
[0045] Step Six: After the test is passed, press the end of clamp 3 to release the plug, replace the next cable to be tested, and repeat steps two to five until all tests are completed. If there is an emergency during the test, the system can be stopped immediately to interrupt the movement of the robotic arm 8 and the test.
[0046] Step 7: After all cable tests are completed, remove the test bench and restore the cable connections on the machine.
[0047] Step 8: Prepare the automatic switching device and conduct signal testing preparations.
[0048] The automatic transfer device is composed of the following components: Figure 4 As shown, it includes adapter box 14, cable I 15, main control cable 16, and cable II 17.
[0049] The adapter box 14 is the core control unit. Its three sides are connected to cable I 15, main control cable 16, and cable II 17, respectively. Cable I 15 connects to the aircraft's integrated unit (RIU), cable II 17 connects to the RIU's docking cable, and main control cable 16 connects to the main unit. The adapter box 14 has a built-in relay module that can receive control signals from the main control cable 16, freely switch the connection between each wire of cable I 15 and the corresponding wire in cable II 17 or main control cable 16, and freely switch the connection between cable II 15 and main control cable 16. Each wire of cable 17 is connected to the corresponding wire in cable I 15 or main control cable 16. That is, by default, each wire in cable I 15 is connected to each wire in cable II 17. However, by receiving the control signal from main control cable 16, adapter box 14 can disconnect any one or more wires connected in cable I 15 and cable II 17, and connect any one end or all of them to the wires in main control cable 16, so as to realize the connection between cable I 15 or cable II 17 and main control cable 16.
[0050] Step 9: Connect cable 15 (I) and cable 17 (II) of the adapter to the finished RIU on the machine, respectively.
[0051] Step 10: Connect the main control cable 16 of the adapter to the host, select the signal test interface, and connect all the wires of cables I and II in the wiring relationship of the adapter to the main control cable 16.
[0052] Step 11: After the aircraft is powered on, when the system recognizes the signal, it automatically compares it with the entered pass / fail standards to determine whether the test item is qualified.
[0053] Step 12: If all test items pass, proceed to the next test. The system will automatically begin to gradually restore the connection between the conductors in cable 15 and cable 17 after the test is completed. At the same time, it will continue to test the new signals that are triggered by the restoration of the connection and output by the aircraft. The signals will be compared with the pass standard to determine whether the signal quality and timing of occurrence are correct.
[0054] Step 13: If any non-compliance occurs, the system will automatically stop the test and display a warning about the abnormal items and contents, prompting the operator to check and troubleshoot the aircraft.
[0055] Step Fourteen: If the test items are all qualified until the test ends, the test will be completed. The operator will be prompted to remove the adapter, indicating that the aircraft can be powered on normally and perform subsequent work such as self-test.
[0056] The above-described embodiments are merely illustrative of the implementation methods of the present invention, but should not be construed as limiting the scope of the present invention. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of the present invention, and these modifications and improvements all fall within the protection scope of the present invention.
Claims
1. A method for testing the high-voltage DC power supply of an unmanned aerial vehicle (UAV), characterized in that, The testing method includes the following steps: Step 1: Prepare an automatic testing device that does not require adapter cables for cable testing. The automatic testing device that does not require the use of adapter cables includes two identical test benches and several different types of replacement pins; The test bench includes a host cable (1), a base (2), a clamp (3), a support rod (4), a slide rail (6), a turntable seat (7), a robotic arm (8), a threaded head (9), and a replacement pin storage slot (10); The base (2) is the supporting component of the entire test bench. Several replacement pin storage slots (10) are provided on one side of its upper surface for storing replacement pins of different models. One end of the main unit cable (1) is connected to the threaded head (9) via the robotic arm (8), and the other end is connected to the main unit to control the robotic arm (8) to work automatically and complete the test. The clamp (3) is fixed to one end of the upper surface of the base (2) via the support rod (4) for fixing the plug. The slide rail (6) is located in the middle of the upper surface of the base (2), and the lower end of the turntable seat (7) is placed... The slide rail (6) is inside the slide rail (6) so that it can move along the slide rail (6). The upper end of the turntable seat (7) is connected to the robotic arm (8). The slide rail (6) and the turntable seat (7) cooperate to realize the left and right movement and 360° lateral rotation of the robotic arm (8). The robotic arm (8) is a three-section robotic arm including three rotating shafts. The rotating shaft at the end is rotatably connected to the turntable seat (7) so that the robotic arm (8) can move freely on the plane it is in. The threaded head (9) is fixed at the front end of the robotic arm (8) and can rotate relative to the robotic arm (8) for connecting and replacing pins. The replacement pin includes a threaded hole (11) and a pin (13); the replacement pin is cylindrical in shape, with an axial threaded hole (11) on its upper end face for connecting with the threaded head (9) of the test bench, and a pin (13) on its lower end face. The pin (13) is a pin or a pin hole for connecting different types of pins in the plug. The threaded head (9) and the pin (13) are connected for plug testing. Step 2: Place the two test benches at both ends of the first cable to be tested, place the plugs at both ends of the cable to be tested into the clamps (3) of the two test benches, adjust the plug orientation and lock them. Step 3: Connect the main unit cables (1) of the two test benches to the main unit at the same time, start the main unit system, enter the wiring relationship of the cable under test, enter the plug model of the cable under test, and start the distribution matching verification. Step 4: The host system controls the movement of the robotic arm (8), selects a suitable replacement pin in the replacement pin storage slot (10), places the threaded head (9) in the threaded hole (11) of the replacement pin, rotates the threaded head (9) until the connection is tight, lifts the robotic arm (8) to bring out the replacement pin and moves it above the plug, gradually lowers it until it lightly touches the inner pin of the plug and stops, observe whether the identification position displayed by the host system on the verification interface is accurate. If it is accurate, the robotic arm (8) continues to lower and connects with the inner pin of the plug. If it deviates, manually control the robotic arm (8) to fine-tune it until the position is accurate. The host system selects the next feature position for identification. The host system selects different numbers of feature positions for identification according to the plug size to ensure that the replacement pin can accurately connect with the inner pin of the plug during subsequent testing. Step 5: After the distribution matching verification in Step 4 is completed, the test begins. After one type of pin is used up, the robotic arm (8) puts the replacement pin back into the slot, automatically selects and replaces the appropriate replacement pin, and tests all the conduction combinations of the pins in the two plugs one by one. The host system displays the test results. Step 6: After the test is passed, loosen the plug, replace the next cable to be tested, and repeat steps 2 to 5 until all tests are completed. If there is an emergency during the test, the host system will be stopped immediately to interrupt the movement and testing of the robotic arm (8). Step 7: After all cable tests are completed, remove the test bench and restore the cable connections on the machine. Step 8: Prepare the automatic switching device and conduct signal testing preparations; The automatic switching device includes a switching box (14), cable I (15), main control cable (16), and cable II (17); The adapter box (14) is the core control part. Its three sides are connected to cable I (15), main control cable (16) and cable II (17), respectively. Cable I (15) is used to connect to the finished RIU of the aircraft, cable II (17) is used to connect to the docking cable of the RIU, and main control cable (16) is used to connect to the host. The adapter box (14) has a built-in relay module, which can receive the control signal of the main control cable (16), freely switch the connection of each wire of cable I (15) with the corresponding wire of cable II (17) or main control cable (16), and freely switch the connection of each wire of cable II (17) with the corresponding wire of cable I (15) or main control cable (16). Step 9: Connect cable I (15) and cable II (17) of the adapter to the finished RIU on the machine, respectively; Step 10: Connect the main control cable (16) of the adapter to the host and enter the qualification standard into the host system; Step 11: After the aircraft is powered on, when the main system recognizes the signal, it automatically compares it with the pass / fail standard entered in Step 10 to determine whether the test item is qualified. Step 12: If all test items pass until the test ends, the test will be completed, and you will be prompted to remove the adapter and proceed with the next steps.
2. The method for testing a high-voltage DC power supply for a UAV according to claim 1, characterized in that, In step one, a spring (5) is installed inside the clamp (3) of the test bench to spring back and lock the plug.
3. The method for testing a high-voltage DC power supply for a UAV according to claim 1, characterized in that, In step one, the upper surface of the support rod (4) of the test bench is marked with points to determine the fixing direction of the plug.
4. The method for testing a high-voltage DC power supply for a UAV according to claim 1, characterized in that, In step one, the replacement pin storage slot (10) of the test bench is a cylindrical slot, and ear slots communicating with the slot are provided on both sides of the slot opening; the cylindrical side walls of the replacement pin are provided with ear pieces (12) along the length direction. When the replacement pin is placed in the replacement pin storage slot (10) of the test bench, the ear pieces (12) fall into the ear piece slots to prevent the replacement pin from rotating in the replacement pin storage slot (10).
5. The method for testing a high-voltage DC power supply for a UAV according to claim 1, characterized in that, Step eleven specifically involves: If the test item is qualified, the next test will be carried out. The system will automatically start to gradually restore the connection between the conductors in the I cable (15) and II cable (17) after the test is completed. At the same time, it will continue to test the new signals that the aircraft will output due to the restoration of the connection, compare them with the qualified standard, and judge whether the signal quality and the timing of the occurrence are correct. If any non-compliance is found, the system will automatically stop the test and display a warning about the abnormal item and content, prompting the aircraft to be inspected and troubleshooted.
Citation Information
Patent Citations
Tool equipment of automatic testing of whole machine cables of small general airplane
CN203502520U
Spring moment of torsion frock
CN204944820U