AI Technical Summary

Technical Problem

[0005]有鉴于此,本申请实施例提供了一种数控模组、工程渣土的含砂率检测方法、装置及设备,解决了现有对于含砂率的检测方法难以保证检测准确性和难以具备时效性的技术问题

Benefits of technology

[0039]上述技术方案中的一个技术方案具有如下优点及效果:

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117169067B_ABST
    Figure CN117169067B_ABST
Patent Text Reader

Abstract

The embodiment of the application discloses a numerical control module, a sand content detection method, device and equipment of engineering slag, wherein the detection method comprises the following steps: S1, obtaining the temperature of a mixed solution, wherein the mixed solution is prepared by mixing the engineering slag to be detected and water; S2, determining the turbidity detection position of the engineering slag in the mixed solution according to the temperature based on a temperature-detection position calculation formula; S3, when a plurality of turbidity values measured at the turbidity detection position are obtained, determining the sand content of the engineering slag according to the plurality of turbidity values based on a turbidity-sand content calculation formula. The technical problems that the existing sand content detection method is difficult to guarantee detection accuracy and timeliness are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of engineering waste resource utilization technology, specifically a CNC module, a method, device and equipment for detecting the sand content of engineering waste. Background Technology

[0002] With the acceleration of urbanization, the construction industry has also developed rapidly, resulting in a surge in construction waste. As a type of construction waste, the treatment of construction waste has attracted considerable attention.

[0003] The screening and washing of construction waste to prepare recycled sand can effectively utilize construction waste, but this process incurs costs and environmental hazards. Therefore, the construction waste must be tested before screening and washing, and a comprehensive assessment of its economic and environmental benefits must be conducted based on the results. Among the many testing indicators for construction waste, sand content is a key indicator for the comprehensive assessment of economic and environmental benefits.

[0004] One existing method for detecting sand content involves slurrying the soil sample, allowing it to stand, and then visually observing the interface between sand and clay particles. However, because this method relies on visual inspection of the sand-clay particle interface, the process is difficult to quantify, thus compromising accuracy. Another method involves sampling, repeated washing, drying, and weighing. This method is cumbersome, requiring steps such as sieving and drying, is time-consuming, and the testing process is difficult to complete on-site, resulting in untimely results. Summary of the Invention

[0005] In view of this, the embodiments of this application provide a CNC module, a method, device and equipment for detecting the sand content of engineering waste soil, which solves the technical problems that existing methods for detecting sand content are difficult to guarantee detection accuracy and timeliness.

[0006] The first aspect of this application provides a method for detecting the sand content of engineering waste soil, including:

[0007] Step S1: Obtain the temperature of the mixed solution, wherein the mixed solution is prepared by mixing the engineering waste soil to be tested with water;

[0008] Step S2: Based on the temperature-detection location calculation formula, determine the turbidity detection location of the engineering waste soil in the mixed solution according to the temperature;

[0009] Step S3: When multiple turbidity values ​​measured at the turbidity detection location are obtained, the sand content of the engineering waste soil is determined based on the turbidity-sand content calculation formula and the multiple turbidity values.

[0010] Furthermore, the temperature-detection location calculation formula includes:

[0011] y = ax 2 +bx+c;

[0012] In the formula, y is the turbidity detection location, x is the temperature, and a, b and c are all constants. The value range of a is 0.015 to 0.03, the value range of b is 2.5 to 5, and the value range of c is 80 to 150.

[0013] Furthermore, the turbidity-sand content calculation formula includes:

[0014]

[0015] In the formula, η is the sand content; p is a constant, with a value ranging from 600 to 650; V is the volume of the mixed solution; T1 is the turbidity value measured after the mixed solution has been allowed to stand for t1 seconds, with a value ranging from 30 to 50; m is the air-dried mass of the engineering waste; and q is an adjustment coefficient. T2 is the turbidity value measured after the mixed solution has been allowed to stand for t2 seconds, with a value ranging from 120 to 200. T3 is the turbidity value measured after the mixed solution has been allowed to stand for t3 seconds, with a value ranging from 270 to 450. r, s, n, and e are all constants, with r ranging from 5 to 8, s ranging from 4 to 7, e ranging from 0.8 to 1.5, and n ranging from 0.6 to 0.8.

[0016] Furthermore, after step S3, the method further includes:

[0017] Step S4: Repeat steps S1 to S3 N times to obtain N+1 sand content rates, where N is a natural number;

[0018] Step S5: Combine N+1 sand content rates to obtain the optimized sand content of the engineering waste soil, and use the optimized sand content rate as the target sand content of the engineering waste soil.

[0019] A second aspect of this application provides a numerical control module, comprising: an acquisition module configured to acquire the temperature of a mixed solution, wherein the mixed solution is prepared by mixing engineering waste soil to be detected with water;

[0020] The location calculation module is configured to determine the turbidity detection location of the engineering waste soil in the mixed solution based on the temperature-detection location calculation formula.

[0021] The sand content calculation module is configured to determine the sand content of the engineering waste soil based on the turbidity-sand content calculation formula when multiple turbidity values ​​measured at the turbidity detection location are obtained.

[0022] Furthermore, the temperature-detection location calculation formula includes:

[0023] y = ax 2 +bx+c;

[0024] In the formula, y is the turbidity detection location, x is the temperature, and a, b and c are all constants. The value range of a is 0.015 to 0.03, the value range of b is 2.5 to 5, and the value range of c is 80 to 150.

[0025] Furthermore, the turbidity-sand content calculation formula includes:

[0026]

[0027] In the formula, η is the sand content; p is a constant, with a value ranging from 600 to 650; V is the volume of the mixed solution; T1 is the turbidity value measured after the mixed solution has been allowed to stand for t1 seconds, with a value ranging from 30 to 50; m is the air-dried mass of the engineering waste; and q is an adjustment coefficient. T2 is the turbidity value measured after the mixed solution has been allowed to stand for t2 seconds, with a value ranging from 120 to 200. T3 is the turbidity value measured after the mixed solution has been allowed to stand for t3 seconds, with a value ranging from 270 to 450. r, s, n, and e are all constants, with r ranging from 5 to 8, s ranging from 4 to 7, e ranging from 0.8 to 1.5, and n ranging from 0.6 to 0.8.

[0028] Furthermore, the CNC module also includes:

[0029] The polling module is configured to repeatedly trigger the acquisition module, the location calculation module, and the sand content calculation module N times to obtain N+1 sand content values, where N is a natural number;

[0030] An optimization module is used to integrate N+1 sand content values ​​to obtain the optimized sand content of the engineering waste soil, and to use the optimized sand content as the target sand content of the engineering waste soil.

[0031] The third aspect of this application provides a device for detecting the sand content of engineering waste soil, comprising: a mixing container, a temperature detection unit, a turbidity detection unit, a transmission unit, and any of the CNC modules described in the second aspect;

[0032] The mixing container is used to mix the engineering waste and water to be tested to prepare a mixed solution;

[0033] The temperature detection unit is used to detect the temperature of the mixed solution;

[0034] The turbidity detection unit is used to detect the turbidity of the mixed solution;

[0035] The CNC module is used to determine the turbidity detection position of the engineering waste soil in the mixed solution based on the temperature-detection position calculation formula; it is also used to determine the sand content of the engineering waste soil based on the multiple turbidity values ​​measured at the turbidity detection position when multiple turbidity values ​​are obtained, based on the turbidity-sand content calculation formula.

[0036] The fourth aspect of this application provides a device for detecting the sand content of engineering waste soil, the device including a processor and a memory;

[0037] The memory is used to store program code and transmit the program code to the processor;

[0038] The processor is used to execute any of the sand content detection methods for engineering waste soil described in the first aspect according to the instructions in the program code.

[0039] One of the above technical solutions has the following advantages and effects:

[0040] The above-mentioned scheme includes a method for detecting the sand content of engineering waste soil, comprising: step S1, obtaining the temperature of a mixed solution, wherein the mixed solution is prepared by mixing the engineering waste soil to be tested with water; step S2, determining the turbidity detection position of the engineering waste soil in the mixed solution based on the temperature-detection position calculation formula; and step S3, when multiple turbidity values ​​measured at the turbidity detection position are obtained, determining the sand content of the engineering waste soil based on the multiple turbidity values ​​according to the turbidity-sand content calculation formula.

[0041] As can be seen from the above scheme, the above-mentioned method for detecting the sand content of engineering waste soil utilizes the principle that the sedimentation rate of particles of different sizes is different. Starting from the perspective of the turbidity change of the solution after the engineering waste soil is slurryed, the turbidity detection position is calculated by the temperature of the solution, and the sand content of the engineering waste soil is directly quantitatively calculated from the turbidity detection results. Compared with the method of observing the mud and sand boundary after standing by the naked eye, the accuracy is significantly improved. Compared with the test method of repeated rinsing, drying and weighing, the test steps are greatly reduced, the limitation of the measurement environment is eliminated, the test time is shortened, and the timeliness is significantly improved. It solves the technical problems of existing sand content detection methods that are difficult to guarantee detection accuracy and timeliness. Attached Figure Description

[0042] The accompanying drawings, which are included to provide a further understanding of this application and form part of this application, illustrate exemplary embodiments and are used to explain this application, but do not constitute an undue limitation of this application. In the drawings:

[0043] Figure 1This is a schematic diagram of an embodiment of a method for detecting the sand content of engineering waste provided in this application.

[0044] Figure 2 This is a schematic diagram of a second embodiment of a method for detecting the sand content of engineering waste provided in this application.

[0045] Figure 3 This is a schematic diagram of the structure of an embodiment of a CNC module provided in this application;

[0046] Figure 4 This is a schematic diagram of the structure of an embodiment of a sand content detection device for engineering waste provided in this application. Figure 1 ;

[0047] Figure 5 This is a schematic diagram of the structure of an embodiment of a sand content detection device for engineering waste provided in this application. Figure 2 ;

[0048] Figure 6 This is a schematic diagram of an embodiment of a sand content testing device for engineering waste provided in this application. Detailed Implementation

[0049] This application provides a CNC module, a method, apparatus, and equipment for detecting the sand content of engineering waste soil, which solves the technical problem that existing methods for detecting sand content are difficult to guarantee accuracy.

[0050] The technical solutions in the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of this application.

[0051] For easier understanding, please refer to Figure 1 , Figure 1 This is a flowchart of a method for detecting the sand content of engineering waste soil according to an embodiment of this application. Figure 1 As shown, the method for detecting the sand content of engineering waste soil in this embodiment specifically includes:

[0052] Step 101: Obtain the temperature of the mixed solution, wherein the mixed solution is prepared by mixing the engineering waste soil to be tested with water.

[0053] It should be noted that the method in this embodiment can be executed by a CNC module, and the temperature of the mixed solution can be measured by a temperature detection unit such as a temperature sensor. Therefore, after the temperature sensor measures the temperature of the mixed solution, it can send the temperature to the CNC module, which will then execute the detection step of determining the sand content of the engineering slag based on the temperature.

[0054] The mixed solution is prepared from the engineering waste soil to be tested and water. Therefore, in this step, the air-dried mass of the engineering waste soil should be weighed before the mixed solution is prepared, and the volume of the mixed solution should be compatible with the size of the container used to ensure the operability of subsequent turbidity measurement.

[0055] Step 102: Based on the temperature-detection location calculation formula, determine the turbidity detection location of the engineering waste soil in the mixed solution according to the temperature.

[0056] It should be noted that different particles settle at different rates in water. When engineering waste with different sand contents (the mass ratio of particles larger than 0.075 mm to all particles) is uniformly mixed in an aqueous solution, the settling rate varies significantly depending on particle size and solution temperature. Furthermore, the density of particles still suspended in the solution has a quantitative relationship with the turbidity of the solution. Therefore, in this embodiment, after obtaining the temperature of the mixed solution, the turbidity detection location of the engineering waste in the mixed solution is determined based on the temperature-detection location calculation formula. It is understood that the temperature value used to calculate the detection location should be the actual temperature measured after the mixed solution temperature has stabilized.

[0057] Step 103: When multiple turbidity values ​​measured at the turbidity detection location are obtained, the sand content of the engineering waste soil is determined based on the turbidity-sand content calculation formula.

[0058] It should be noted that after calculating and determining the turbidity detection location for the construction waste, the turbidity of the mixed solution can be detected at the corresponding location using a turbidity sensor or other turbidity detection unit. In this step, the construction waste needs to be evenly dispersed in the water by repeatedly inverting or stirring the mixed solution. Then, the mixed solution is allowed to stand, and the turbidity is measured when the predetermined standing time has elapsed.

[0059] The sand content detection method for engineering waste soil in this embodiment utilizes the principle that different particle sizes have different sedimentation rates. Starting from the turbidity change of the solution after engineering waste soil slurry formation, the turbidity detection location is calculated based on the solution temperature, and the sand content of the engineering waste soil is directly and quantitatively calculated from the turbidity detection results. Specifically, this embodiment detects the turbidity of the solution at a specific depth at a specific moment during the settling process of the mixed solution, thereby obtaining the sand content of the engineering waste soil. Compared to the method of visually observing the mud-sand boundary after settling, the accuracy is significantly improved. Compared to the testing method of repeated rinsing, drying, and weighing, this method greatly reduces testing steps, eliminates the limitations of the measurement environment, shortens the testing time, and significantly improves timeliness. It solves the technical problems of existing sand content detection methods that are difficult to guarantee accuracy and timeliness.

[0060] The above is a first embodiment of a method for detecting the sand content of engineering waste soil provided in this application. The following is a second embodiment of a method for detecting the sand content of engineering waste soil provided in this application.

[0061] Please see Figure 2 , Figure 2 This is a flowchart of another method for detecting the sand content of engineering waste soil according to an embodiment of this application, as shown below. Figure 2 As shown, the method for detecting the sand content of engineering waste soil in this embodiment specifically includes:

[0062] Step 201: Obtain the temperature of the mixed solution, wherein the mixed solution is prepared by mixing the engineering waste soil to be tested and water.

[0063] It should be noted that step 201 is described in the same way as step 101 in Embodiment 1. For details, please refer to the description of step 101 above, which will not be repeated here.

[0064] Step 202: Based on the temperature-detection location calculation formula, determine the turbidity detection location of the engineering waste soil in the mixed solution according to the temperature.

[0065] It should be noted that the temperature-detection location calculation formula in this step includes:

[0066] y = ax 2 +bx+c;

[0067] In the formula, y represents the turbidity detection location in mm, x represents the temperature in °C, and a, b, and c are constants, with a ranging from 0.015 to 0.03, b ranging from 2.5 to 5, and c ranging from 80 to 150. This formula is derived by fitting calculations based on Stoke's law, considering particle size and the average unit weight of common clay minerals.

[0068] Step 203: When multiple turbidity values ​​measured at the turbidity detection location are obtained, the sand content of the engineering waste soil is determined based on the turbidity-sand content calculation formula.

[0069] It should be noted that the turbidity-sand content calculation formula in this step includes:

[0070]

[0071] In the formula, η is the sand content; p is a constant, with a value ranging from 600 to 650; V is the volume of the mixed solution; T1 is the turbidity value measured after standing for t1 seconds, with a value ranging from 30 to 50; m is the air-dried mass of the engineering waste to be tested; and q is an adjustment coefficient. T2 is the turbidity value measured after standing for t2 seconds, with a value ranging from 120 to 200. T3 is the turbidity value measured after standing for t3 seconds, with a value ranging from 270 to 450. r, s, and e are all constants, with values ​​ranging from 5 to 8 for r, 4 to 7 for s, 0.8 to 1.5 for e, and 0.6 to 0.8 for n. This formula is based on the quantitative relationship between turbidity and particle specific surface area, and is adjusted using turbidity results from multiple measurements.

[0072] Step 204: Repeat steps 201 to 203 N times to obtain N+1 sand content rates, where N is a natural number.

[0073] It should be noted that, in order to ensure the accuracy of the calculation results, this embodiment measures the sand content multiple times and finally combines the sand content from multiple measurements to obtain the target sand content of the engineering waste soil.

[0074] Step 205: Combine N+1 sand content values ​​to obtain the optimized sand content of the engineering waste soil, and use the optimized sand content as the target sand content of the engineering waste soil.

[0075] It is understandable that, by combining N+1 sand content values, the optimal sand content of the engineering waste soil can be obtained by using the average of the N+1 sand content values ​​as the optimal sand content, or by using the median of the N+1 sand content values ​​as the optimal sand content. It should be noted that the above example is merely an illustrative example, and those skilled in the art can make corresponding settings as needed.

[0076] The sand content detection method for engineering waste soil in this embodiment utilizes the principle that different particle sizes have different sedimentation rates. Starting from the turbidity change of the solution after the engineering waste soil sample is slurried, the turbidity detection location is calculated by the temperature of the solution, and the sand content of the engineering waste soil is directly quantitatively calculated from the turbidity detection results. Compared with the method of visually observing the mud-sand boundary after standing, the accuracy is significantly improved. Compared with the test method of repeated rinsing, drying and weighing, the test steps are greatly reduced, the limitation of the measurement environment is eliminated, the test time is shortened, and the timeliness is significantly improved. It solves the technical problems of existing sand content detection methods that are difficult to guarantee detection accuracy and timeliness.

[0077] The above is a second embodiment of a method for detecting the sand content of engineering waste soil provided in this application. The following is an embodiment of a CNC module provided in this application.

[0078] Please see Figure 3 The specific embodiments of the CNC module in this example include:

[0079] The acquisition module 301 is configured to acquire the temperature of the mixed solution, wherein the mixed solution is prepared by mixing the engineering waste to be tested and water;

[0080] The location calculation module 302 is configured to determine the turbidity detection location of the engineering waste soil in the mixed solution based on the temperature-detection location calculation formula.

[0081] The sand content calculation module 303 is configured to determine the sand content of the engineering waste soil based on the turbidity-sand content calculation formula when multiple turbidity values ​​measured at the turbidity detection location are obtained.

[0082] In one alternative implementation, the temperature-detection location calculation formula includes:

[0083] y = ax 2 +bx+c;

[0084] In the formula, y represents the detection location, x represents the temperature, and a, b, and c are all constants. The value of a ranges from 0.015 to 0.03, the value of b ranges from 2.5 to 5, and the value of c ranges from 80 to 150. In an exemplary embodiment, the turbidity-sand content calculation formula includes:

[0085]

[0086] In the formula, η is the sand content; p is a constant, with a value ranging from 600 to 650; V is the volume of the mixed solution; T1 is the turbidity value measured after standing for t1 seconds, with a value ranging from 30 to 50; m is the air-dried mass of the engineering waste to be tested; and q is an adjustment coefficient. T2 is the turbidity value measured after standing for t2 seconds, with a value ranging from 120 to 200. T3 is the turbidity value measured after standing for t3 seconds, with a value ranging from 270 to 450. r, s, and e are all constants, with r ranging from 5 to 8, s ranging from 4 to 7, e ranging from 0.8 to 1.5, and n ranging from 0.6 to 0.8.

[0087] Furthermore, the CNC module in this embodiment also includes:

[0088] The polling module 304 is configured to repeatedly trigger the acquisition module 301, the location calculation module 302, and the sand content calculation module 303 N times to acquire N+1 sand content values, where N is a natural number.

[0089] The optimization module 305 is used to integrate N+1 sand content values ​​to obtain the optimized sand content of the engineering waste soil, and to use the optimized sand content as the target sand content of the engineering waste soil.

[0090] The CNC module in this embodiment utilizes the principle that different particle sizes have different sedimentation rates. Starting from the turbidity change of the solution after the engineering waste slurry is slurryed, it calculates the turbidity detection location by the temperature of the solution and directly calculates the sand content of the engineering waste slurry quantitatively from the turbidity detection results. Compared with the method of visually observing the mud-sand boundary after standing, the accuracy is significantly improved. Compared with the test method of repeated rinsing, drying and weighing, the test steps are greatly reduced, the limitation of the measurement environment is eliminated, the test time is shortened, and the timeliness is significantly improved. It solves the technical problems of existing sand content detection methods that are difficult to guarantee detection accuracy and timeliness.

[0091] The above is an embodiment of a CNC module provided in this application. The following is an embodiment of a sand content detection device for engineering waste soil provided in this application.

[0092] Please see Figure 4 and Figure 5 This embodiment of a device for detecting the sand content of engineering waste soil specifically includes:

[0093] The mixing container 1, temperature detection unit 4, turbidity detection unit 6, transmission unit, and CNC module 2 from the aforementioned embodiments;

[0094] Mixing container 1 is used to mix the engineering waste and water to be tested to prepare a mixed solution;

[0095] Temperature detection unit 4 is used to detect the temperature of the mixed solution;

[0096] Turbidity detection unit 6 is used to detect the turbidity of the mixed solution;

[0097] The CNC module 2 is used to determine the turbidity detection position of the engineering waste soil in the mixed solution based on the temperature-detection position calculation formula; it is also used to determine the sand content of the engineering waste soil based on the turbidity-sand content calculation formula when multiple turbidity values ​​measured at the turbidity detection position are obtained.

[0098] The sand content detection device for construction waste in this embodiment utilizes the principle that different particle sizes have different sedimentation rates. Starting from the turbidity change of the solution after the construction waste has been slurried, it calculates the turbidity detection location based on the solution temperature and directly calculates the sand content of the construction waste quantitatively from the turbidity detection results. Compared to the method of visually observing the mud-sand boundary after settling, the accuracy is significantly improved. Compared to the testing method of repeated rinsing, drying, and weighing, it greatly reduces the testing steps, eliminates the limitations of the measurement environment, shortens the testing time, and significantly improves timeliness. It solves the technical problems of existing sand content detection methods that are difficult to guarantee accuracy and timeliness.

[0099] Please see Figure 6 This application also provides a device for detecting the sand content of engineering waste soil, the device including a processor 601 and a memory 602:

[0100] The memory 602 is used to store program code and transfer the program code to the processor 601;

[0101] The processor 601 is used to execute the steps of the method for detecting the sand content of engineering waste soil in the foregoing embodiments according to the instructions in the program code.

[0102] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the specific working processes of the systems, devices, and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here.

[0103] The terms “first,” “second,” “third,” “fourth,” etc. (if present) in the specification and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of this application described herein can be implemented, for example, in orders other than those illustrated or described herein. Furthermore, the terms “comprising” and “having,” and any variations thereof, are intended to cover a non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.

[0104] It should be understood that in this application, "at least one (item)" means one or more, and "more than" means two or more. "And / or" is used to describe the relationship between related objects, indicating that three relationships can exist. For example, "A and / or B" can represent three cases: only A exists, only B exists, and both A and B exist simultaneously, where A and B can be singular or plural. The character " / " generally indicates that the preceding and following related objects are in an "or" relationship. "At least one (item) of the following" or similar expressions refer to any combination of these items, including any combination of single or plural items. For example, at least one (item) of a, b, or c can represent: a, b, c, "a and b", "a and c", "b and c", or "a and b and c", where a, b, and c can be single or multiple.

[0105] In the several embodiments provided in this application, it should be understood that the disclosed systems, apparatuses, and methods can be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative; for instance, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be an indirect coupling or communication connection between apparatuses or units through some interfaces, and may be electrical, mechanical, or other forms.

[0106] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.

[0107] Furthermore, the functional units in the various embodiments of this application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or as a software functional unit.

[0108] If the integrated unit is implemented as a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of this application. The aforementioned storage medium includes: USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, optical disks, and other media capable of storing program code.

[0109] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application.

Claims

1. A method for detecting the sand content of construction waste soil, characterized in that, include: Step S1: Obtain the temperature of the mixed solution, wherein the mixed solution is prepared by mixing the engineering waste soil to be tested with water; Step S2: Calculation based on temperature-detection location formula y = ax 2 + bx + c The turbidity detection location of the engineering waste soil in the mixed solution is determined based on the temperature; where, y This is the location for turbidity detection. x For temperature, a、b and c All are constants. a The value range is 0.015~0.

03. b The value range is 2.5~5. c The value range is 80~150; Step S3: When multiple turbidity values ​​measured at the turbidity detection location are obtained, the turbidity-sand content calculation formula is used. The sand content of the engineering waste soil is determined based on multiple turbidity values; where, Sand content; p It is a constant. p The value range is 600~650; V The volume of the mixed solution; T 1. Let the mixed solution stand and wait. t The turbidity value was measured after 1 second. t The value of 1 is in the range of 30~50; m The air-dried quality of the engineering waste soil; q To adjust the coefficient, , T 2. Let the mixed solution stand and wait. t The turbidity value was measured over 2 seconds. t The value of 2 is in the range of 120~200. T 3. Let the mixed solution stand and wait. t The turbidity value was measured after 3 seconds. t The value of 3 ranges from 270 to 450; r , s、 n and e All are constants. r The value range is 5~8. s The value range is 4~7. e The value range is 0.8~1.

5. n The value range is 0.6 to 0.

8.

2. The method for detecting the sand content of engineering waste soil according to claim 1, characterized in that, Following step S3, the following is also included: Step S4: Repeat steps S1 to S3 N times to obtain N+1 sand content rates, where N is a natural number; Step S5: Combine N+1 sand content rates to obtain the optimized sand content of the engineering waste soil, and use the optimized sand content rate as the target sand content of the engineering waste soil.

3. A CNC module, characterized in that, include: An acquisition module is configured to acquire the temperature of a mixed solution, wherein the mixed solution is prepared by mixing engineering waste and water to be tested; The position calculation module is configured to calculate the position based on the temperature-detection position formula. y = ax 2 + bx + c The turbidity detection location of the engineering waste soil in the mixed solution is determined based on the temperature; where, y This is the location for turbidity detection. x For temperature, a、b and c All are constants. a The value range is 0.015~0.

03. b The value range is 2.5~5. c The value range is 80~150; The sand content calculation module is configured to calculate the sand content based on the turbidity-sand content formula when multiple turbidity values ​​measured at the turbidity detection location are obtained. The sand content of the engineering waste soil is determined based on multiple turbidity values; where, Sand content; p It is a constant. p The value range is 600~650; V The volume of the mixed solution; T 1. Let the mixed solution stand and wait. t The turbidity value was measured after 1 second. t The value of 1 is in the range of 30~50; m The air-dried quality of the engineering waste soil; q To adjust the coefficient, , T 2. Let the mixed solution stand and wait. t The turbidity value was measured over 2 seconds. t The value of 2 is in the range of 120~200. T 3. Let the mixed solution stand and wait. t The turbidity value was measured after 3 seconds. t The value of 3 ranges from 270 to 450; r , s, n and e All are constants. r The value range is 5~8. s The value range is 4~7. e The value range is 0.8~1.

5. n The value range is 0.6 to 0.

8.

4. The CNC module according to claim 3, characterized in that, Also includes: The polling module is configured to repeatedly trigger the acquisition module, the location calculation module, and the sand content calculation module N times to obtain N+1 sand content values, where N is a natural number; An optimization module is used to integrate N+1 sand content values ​​to obtain the optimized sand content of the engineering waste soil, and to use the optimized sand content as the target sand content of the engineering waste soil.

5. A device for detecting the sand content of construction waste, characterized in that, The device includes a processor and a memory; The memory is used to store program code and transmit the program code to the processor; The processor is used to execute the method for detecting the sand content of engineering waste soil according to any one of claims 1 to 2, based on the instructions in the program code.

Citation Information

Patent Citations

  • Engineering muck sand content detection device and detection method

    CN117192072A