Construction method of overpass wind bridge based on auxiliary main roadway two sides chamber

By constructing foundations at the chambers on both sides of the auxiliary haulage roadway and backfilling the chambers on the side of the coal pillars, an overpass ventilation bridge was formed, which solved the problems of roof damage and unreasonable drainage system after the underground coal seam working face was mined, and achieved roof stability and convenient coal slime transportation.

CN117189173BActive Publication Date: 2026-11-20SHENMU LONGDE MINING IND
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202311247610.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-25
Publication Date
2026-11-20
Estimated Expiration
2043-09-25

AI Technical Summary

Technical Problem

After the coal seam working face is mined underground, the conveyor belt frame of the conveyor head is idle, the head shift chamber is connected to the auxiliary haulage roadway, resulting in damage to the integrity of the roof, the coal pillar side chamber is idle, the drainage system is not properly arranged, and the transportation of coal slurry is inconvenient, posing safety hazards.

Method used

Foundations were built at the chambers on both sides of the auxiliary haulage roadway, the coal pillar side chambers were backfilled, and a bridge was built between the foundations to form an overpass, which was supported on the foundations and drainage pipes and conveying equipment were arranged.

Benefits of technology

It improved the stability of the roof of the auxiliary haulage roadway, facilitated the connection of the drainage system, promoted the transportation of coal slurry, and solved the problems of safety hazards and unreasonable layout.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117189173B_ABST
    Figure CN117189173B_ABST
Patent Text Reader

Abstract

The application discloses a construction method of an overpass air bridge based on auxiliary transport large roadways two-side chambers, and the method comprises the following steps: laying the first foundation at the machine head shift chamber on one side of the auxiliary transport large roadway; laying the second foundation at the coal column side chamber on the other side of the auxiliary transport large roadway, and the second foundation separates the coal column chamber and the auxiliary transport large roadway; backfilling the coal column side chamber; laying the bridge body between the first foundation and the second foundation, and making the two ends of the bridge body support on the first foundation and the second foundation respectively to form the overpass air bridge. The construction method of the overpass air bridge can improve the roof stability of the auxiliary transport large roadway, and is convenient for the connection of the drainage systems on the two sides of the auxiliary transport large roadway and the transportation of the coal slurry on the two sides of the auxiliary transport large roadway.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of underground roadway construction technology, specifically relating to a method for constructing an overpass wind bridge based on the chambers on both sides of the auxiliary haulage roadway. Background Technology

[0002] In related technologies, after the coal seam working face is mined underground, the corresponding conveyor belt frame of the conveyor roadway is idle for a long time, resulting in waste. The head shift chamber located on one side of the auxiliary haulage roadway is connected to the auxiliary haulage roadway. The opening area of ​​the head shift chamber damages the integrity of the roof of the auxiliary haulage roadway. If the support is not reinforced for a long time, there will be certain safety hazards. The coal pillar side chamber located on the other side of the auxiliary haulage roadway is also idle. In addition, the drainage pipeline in the drainage system needs to be laid across the auxiliary haulage roadway, resulting in unreasonable layout of the drainage pipeline. The transportation of coal slurry after cleaning and compression of the water sump also needs to be carried across the auxiliary haulage roadway, which is inconvenient for turnover. Summary of the Invention

[0003] The present invention aims to at least partially solve one of the technical problems in the related art.

[0004] Therefore, embodiments of the present invention propose a method for constructing an overpass ventilation bridge based on the chambers on both sides of the auxiliary haulage roadway. This method can improve the stability of the roof of the auxiliary haulage roadway, facilitate the connection of the drainage systems on both sides of the auxiliary haulage roadway, and also facilitate the transportation of coal slurry on both sides of the auxiliary haulage roadway.

[0005] The construction method for an overpass ventilation bridge based on chambers on both sides of the auxiliary transport roadway according to an embodiment of the present invention includes the following steps:

[0006] The first foundation was built at the machine head shift chamber located on one side of the auxiliary transport roadway;

[0007] A second foundation is constructed at the coal pillar side chamber located on the other side of the auxiliary haulage roadway, the second foundation isolating the coal pillar chamber from the auxiliary haulage roadway;

[0008] Backfill the coal pillar side chamber;

[0009] A bridge structure is constructed between the first foundation and the second foundation, with both ends of the bridge structure supported on the first foundation and the second foundation respectively, to form an overpass.

[0010] The present invention provides a method for constructing an overpass wind bridge based on the chambers on both sides of the auxiliary haulage roadway. This method can improve the stability of the roof of the auxiliary haulage roadway, facilitate the connection of the drainage systems on both sides of the auxiliary haulage roadway, and also facilitate the transportation of coal slurry on both sides of the auxiliary haulage roadway.

[0011] In some embodiments, the construction of the first foundation at the machine head shift chamber located on one side of the auxiliary transport roadway includes:

[0012] The first wall was built on the steps of the machine head shift chamber;

[0013] A first mold is installed on the side of the step of the machine head shifting chamber, so that the first mold forms a first casting cavity between the side of the step of the machine head shifting chamber and the first wall.

[0014] Concrete is poured into the first casting cavity to form the first foundation.

[0015] In some embodiments, the first wall is a brick wall with a thickness of 400mm-600mm, and the first casting cavity has a thickness of 600mm-800mm; and / or

[0016] The first casting cavity is provided with at least one of anchor rods, steel strands, and metal mesh.

[0017] In some embodiments, constructing a second foundation at the coal pillar side chamber located on the other side of the auxiliary haulage roadway includes:

[0018] A second wall and a third wall are constructed along the width of the auxiliary haulage roadway at the side chamber of the coal pillar, and a second casting cavity is formed between the second wall and the third wall;

[0019] Concrete is poured into the second casting cavity to form the second foundation.

[0020] In some embodiments, both the second wall and the third wall are brick walls, the thickness of the second wall and the third wall is 300mm-450mm, and the thickness of the second casting cavity is 400mm-600mm; and / or

[0021] The second casting cavity is provided with at least one of anchor rods, steel strands, and metal mesh.

[0022] In some embodiments, backfilling the coal pillar side chamber includes: filling and compacting the coal pillar side chamber with underground solid waste, and applying cement mortar to the upper surface of the solid waste filling layer in the coal pillar side chamber.

[0023] In some embodiments, constructing the bridge structure between the first foundation and the second foundation includes:

[0024] Multiple I-beams are arranged parallel to each other and spaced apart along the length of the auxiliary haulage roadway, with the two ends of each I-beam supported on the first foundation and the second foundation, respectively.

[0025] A second mold is set up below the multiple I-beams, and concrete is poured on the second mold so that the I-beams are embedded in the concrete pouring layer.

[0026] In some embodiments, the overlap length between the I-beam and the first foundation, and the overlap length between the I-beam and the second foundation, are both greater than or equal to 600 mm; and / or

[0027] The spacing between two adjacent I-beams is 250mm-350mm; and / or

[0028] The bridge body has a length of 6000mm-7500mm along the auxiliary haulage roadway; and / or

[0029] The thickness of the concrete pouring layer is 200mm-400mm; and / or

[0030] A steel mesh is laid on the I-beam, with an overlap length of 60mm or more between adjacent steel meshes, and the steel mesh is tied and fixed to the I-beam.

[0031] In some embodiments, the sides of the first foundation and the second foundation are flush with the corresponding sidewalls of the auxiliary haulage roadway, and the lower end face of the bridge body is flush with the top slab of the auxiliary haulage roadway; and / or

[0032] Pedestrian steps are provided at both ends of the bridge; and / or

[0033] It also includes a shotcrete process, in which the first foundation, the second foundation, and the bridge body are shotcreted across their entire cross-section after the bridge body is constructed.

[0034] In some embodiments, it also includes:

[0035] Drainage pipes are installed on the overpass to connect to the sewage systems on both sides of the auxiliary transport roadway; and / or

[0036] Conveying equipment is installed on the overpass, and the conveying equipment is used to transport materials on both sides of the auxiliary transport roadway. Attached Figure Description

[0037] Figure 1 This is a flowchart of the construction method of the overpass wind bridge based on the chambers on both sides of the auxiliary transport roadway according to an embodiment of the present invention.

[0038] Figure 2 This is a structural schematic diagram of the overpass wind bridge in an embodiment of the present invention.

[0039] Figure 3 yes Figure 2 Schematic diagram of the cross-sectional structure along the central II direction.

[0040] Figure label:

[0041] 100. Head shifting chamber;

[0042] 200. Auxiliary transport main road;

[0043] 300. Coal pillar side chamber; 301. Solid waste;

[0044] 1. First foundation; 11. First wall;

[0045] 2. Second foundation; 21. Second wall; 22. Third wall; 23. Anchor bolt;

[0046] 3. Bridge body; 31. I-beams; 32. Concrete pouring layer;

[0047] 4. Pedestrian steps. Detailed Implementation

[0048] Embodiments of the present invention are described in detail below, examples of which are illustrated in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain the present invention, and should not be construed as limiting the present invention.

[0049] The construction method of the grade-separated ventilation bridge based on the chambers on both sides of the auxiliary transport roadway 200 according to an embodiment of the present invention includes the following steps:

[0050] S101. Construct the first foundation 1 at the machine head shift chamber 100 located on one side of the auxiliary transport roadway 200.

[0051] S102. Construct a second foundation 2 at the coal pillar side chamber 300 on the other side of the auxiliary haulage roadway 200. The second foundation 2 isolates the coal pillar chamber from the auxiliary haulage roadway 200.

[0052] S103, Backfill coal pillar side chamber 300.

[0053] S104. Construct a bridge body 3 between the first foundation 1 and the second foundation 2, so that both ends of the bridge body 3 are supported on the first foundation 1 and the second foundation 2 respectively to form an overpass.

[0054] It should be noted that, in this embodiment of the invention, the machine head shift chamber 100 and the coal pillar side chamber 300 of the auxiliary haulage roadway 200 are used for the construction of the overpass ventilation bridge. The machine head shift chamber 100 and the auxiliary haulage roadway 200 are stepped. The bottom plate of the machine head shift chamber 100 is higher than the bottom plate of the auxiliary haulage roadway 200 but lower than the top plate of the auxiliary haulage roadway 200. The top plate of the auxiliary haulage roadway 200 has an opening at this point, which disrupts the integrity of the top plate. The coal pillar side chamber 300 is connected to the auxiliary haulage roadway 200, and the bottom plate of the coal pillar side chamber 300 is basically flush with the bottom plate of the auxiliary haulage roadway 200. If the overpass ventilation bridge is constructed at a height close to the top plate of the auxiliary haulage roadway 200, there will be a large height difference. Therefore, it is necessary to carry out targeted treatment on the different chambers on both sides of the auxiliary haulage roadway 200 to meet the construction requirements of the overpass ventilation bridge.

[0055] Specifically, there is a platform between the machine head shift chamber 100 and the auxiliary haulage roadway 200, so the first foundation 1 can be constructed based on the platform. The coal pillar side chamber 300 is connected to the auxiliary haulage roadway 200, so a second foundation 2 needs to be built between them from the bottom slab. In order to ensure the stability of the second foundation 2 and improve the practicality of the overpass after construction, the coal pillar side chamber 300 is backfilled. The construction of the bridge body 3 connects the two sides of the auxiliary haulage roadway 200, which facilitates the arrangement of drainage pipes on the bridge body 3, facilitates pedestrian passage, and facilitates the transportation of materials on both sides of the auxiliary haulage roadway 200. At the same time, the bridge body 3 can make up for the opening of the auxiliary haulage roadway 200 at this point, making the roof of the auxiliary haulage roadway 200 more integral, improving the support strength of the area, and solving the safety hazards of the corresponding area where the support was not reinforced.

[0056] The construction method of the overpass wind bridge based on the chambers on both sides of the auxiliary haulage roadway 200 of the present invention can improve the stability of the roof of the auxiliary haulage roadway 200, facilitate the connection of the drainage system on both sides of the auxiliary haulage roadway 200, and also facilitate the transportation of coal slurry on both sides of the auxiliary haulage roadway 200.

[0057] In some embodiments, a first foundation 1 is constructed at the machine head shift chamber 100 located on one side of the auxiliary transport roadway 200, including:

[0058] S201. Construct the first wall 11 on the steps of the machine head shift chamber 100.

[0059] S202. A first mold is installed on the side of the step of the machine head shift chamber 100, so that the first mold and the side of the step of the machine head shift chamber 100 and the first wall 11 form a first casting cavity.

[0060] S203. Pour concrete into the first pouring cavity to form the first foundation 1.

[0061] Since the bottom plate of the machine head transfer chamber 100 is located between the bottom plate and the top plate of the auxiliary haulage roadway 200, in order to make the bridge body 3 flush with the top plate of the auxiliary haulage roadway 200 and ensure that the bottom of the bridge body 3 has sufficient clearance, it is necessary to arrange the first foundation 1 at the machine head transfer chamber 100 so that the first foundation 1 is roughly level with the top plate of the auxiliary haulage roadway 200.

[0062] The first foundation 1 is constructed by building on the stepped side of the machine head transfer chamber 100. The top of the first foundation 1 is made high enough by building the first wall 11. The first mold is erected and concrete is poured between the first mold, the stepped side of the machine head transfer chamber 100 and the first wall 11. While forming the first foundation 1, the stepped side of the machine head transfer chamber 100 is reinforced to ensure the structural stability of the first foundation 1.

[0063] Optionally, when the distance between the bottom plate of the machine head transfer chamber 100 and the top plate of the auxiliary haulage roadway 200 is too large, the machine head transfer chamber 100 needs to be backfilled. For example, when the distance between the bottom plate of the machine head transfer chamber 100 and the top plate of the auxiliary haulage roadway 200 exceeds 1500mm, the machine head transfer chamber 100 is backfilled after the first foundation 1 is completed, and the bottom plate of the machine head transfer chamber 100 is backfilled until the distance between it and the top plate of the auxiliary haulage roadway 200 is within 1000mm.

[0064] In some embodiments, the first wall 11 is a brick wall with a thickness of 400mm-600mm and the first pouring cavity has a thickness of 600mm-800mm. If the thickness of the first wall 11 is less than 400mm and the thickness of the first pouring cavity is less than 600mm, the structural stability of the first foundation 1 will be poor, and it will not be able to reinforce the stepped side of the machine head shift chamber 100. If the thickness of the first wall 11 exceeds 600mm and the thickness of the first pouring cavity is greater than 800mm, it will result in material waste. Therefore, by analyzing the force exerted by the bridge body 3 on the first foundation 1, the thickness of the brick wall and concrete wall can be reasonably selected to improve the structural stability of the first foundation 1 and control the construction cost of the overpass.

[0065] In some embodiments, the first casting cavity is provided with at least one of anchor rods, steel strands, and metal mesh.

[0066] To achieve an effective connection between the first foundation 1 and the existing foundation, and to form a structurally stable whole between the first foundation 1 and the existing foundation, at least one of anchor rods, steel strands, and metal mesh is installed in the first pouring cavity. For example, MSGLW-335 / 18×2100 left-handed threaded steel resin anchor rods without longitudinal reinforcement are arranged in the first pouring cavity to reinforce and support the step side, and at the same time serve to fix the mold. C20 concrete is poured layer by layer from bottom to top inside the mold until the false roof steel plate, thus forming a whole with the step side. On the one hand, it can effectively support the false roof, and on the other hand, it serves as the foundation for the construction of the wind bridge.

[0067] In some embodiments, a second foundation 2 is constructed at the coal pillar side chamber 300 located on the other side of the auxiliary haulage roadway 200, including:

[0068] S301. A second wall 21 and a third wall 22 are constructed at the coal pillar side chamber 300 along the width of the auxiliary haulage roadway 200, forming a second casting cavity between the second wall 21 and the third wall 22.

[0069] S302. Pour concrete into the second pouring cavity to form the second foundation 2.

[0070] The coal pillar side chamber 300 is connected to the auxiliary haulage roadway 200. The bottom plate of the coal pillar side chamber 300 is basically flush with the bottom plate of the auxiliary haulage roadway 200. In order to facilitate the use of the overpass ventilation bridge and reduce the height difference between the end of the overpass ventilation bridge and the bottom plate of the corresponding coal pillar side chamber 300, the coal pillar side chamber 300 needs to be backfilled. After backfilling, the stability of the second foundation 2 can also be improved, so that the second foundation 2 and the backfilled coal pillar side chamber 300 form a structurally stable whole.

[0071] Specifically, the second foundation 2 includes a second wall 21 and a third wall 22 arranged side by side. The second wall 21 and the third wall 22 are built along the width direction of the auxiliary haulage roadway 200. A second pouring cavity is formed between the second wall 21 and the third wall 22. The second foundation 2 is formed by pouring concrete into the second pouring cavity. The height of the second foundation 2 is basically the same as the top slab of the auxiliary haulage roadway 200.

[0072] In some embodiments, the second wall 21 and the third wall 22 are both brick walls, the thickness of the second wall 21 and the third wall 22 is 300mm-450mm, and the thickness of the second casting cavity is 400mm-600mm.

[0073] If the thickness of the second wall 21 and the third wall 22 is less than 300mm and the thickness of the second pouring cavity is less than 400mm, the structural stability of the second foundation 2 will be poor, and it will not be able to support the bridge body 3. If the thickness of the second wall 21 and the third wall 22 exceeds 450mm and the thickness of the second pouring cavity is greater than 600mm, although the structural strength meets the requirements for supporting the overpass, it will result in material waste and increased construction costs. Therefore, by analyzing the forces exerted by the bridge body 3 on the second foundation 2, the thickness of the brick wall and concrete wall can be reasonably selected to improve the structural stability of the second foundation 2 and control the construction cost of the overpass.

[0074] Since the first foundation 1 and the second foundation 2 rely on different chamber structures, the masonry methods of the first foundation 1 and the second foundation 2 are also different. Based on the stress conditions and the original foundation structure, the present invention makes targeted designs for the first foundation 1 and the second foundation 2 respectively.

[0075] In some embodiments, the second casting cavity is provided with at least one of anchor rods, steel strands, and metal mesh.

[0076] For example, a row of MSGLW-335 / 18×2100 left-handed threaded steel resin anchors without longitudinal reinforcement is installed on each side of the chamber entrance, with a spacing of 1m. During construction, the anchors can be installed first, and then the second wall 21 and the third wall 22 of the second foundation 2 can be constructed.

[0077] In some embodiments, backfilling the coal pillar side chamber 300 includes: filling and compacting the coal pillar side chamber 300 with underground solid waste 301, and applying cement mortar to smooth the upper surface of the solid waste 301 filling layer in the coal pillar side chamber 300.

[0078] Specifically, the coal pillar side chamber 300 is filled and compacted using underground coal gangue and other solid waste 301. Sand can also be used for filling, and M10 cement mortar is used to smooth the surface and make it flush with the top of the original coal pillar. The solid waste 301 can be coal gangue, etc.

[0079] In some embodiments, constructing a bridge body 3 between the first foundation 1 and the second foundation 2 includes:

[0080] S401. Arrange multiple I-beams 31, which are parallel and spaced apart along the length of the auxiliary haulage roadway 200. The two ends of the I-beams 31 are supported on the first foundation 1 and the second foundation 2, respectively.

[0081] S402. A second mold is set up below multiple I-beams 31, and concrete is poured on the second mold so that the I-beams 31 are embedded in the concrete pouring layer 32.

[0082] In this embodiment of the invention, the wind bridge is formed by casting, and multiple I-beams 31 are arranged and cast into the concrete layer 32 to improve the structural stability of the wind bridge. This allows the wind bridge to serve as part of the roof of the auxiliary haulage roadway 200, thus completing the roof and solving the safety hazards caused by the lack of support in the roof opening area of ​​the auxiliary haulage roadway 200 for a long time.

[0083] Furthermore, the overlap length between the I-beam 31 and the first foundation 1, and the overlap length between the I-beam 31 and the second foundation 2, are both greater than or equal to 600mm, ensuring sufficient overlap length between the I-beam 31 and the first foundation 1 and the second foundation 2. When the bridge body 3 is under stress, the force borne by the bridge body 3 can be shared by the first foundation 1 and the second foundation 2, avoiding stress concentration between the bridge body 3 and the first foundation 1 and the second foundation 2, and preventing cracking or breakage in the first foundation 1 and the second foundation 2.

[0084] In other words, when the overlap length between the I-beam 31 and the first foundation 1 or the second foundation 2 is less than 600mm, it will cause stress concentration at local locations of the bridge body 3, the first foundation 1 or the second foundation 2 when the bridge body 3 is under stress, which may lead to cracking or breakage at the corresponding locations, posing a safety hazard. This invention analyzes the stress situation of the wind bridge and reasonably optimizes the overlap length between the I-beam 31 and the first foundation 1 and the second foundation 2 to solve the problem of unstable stress between the bridge body 3 and the first foundation 1 and the second foundation 2.

[0085] Optionally, the spacing between two adjacent I-beams 31 is 250mm-350mm, the thickness of the concrete pouring layer 32 is 200mm-400mm, a steel mesh is laid on the I-beams 31, the overlap length between adjacent steel meshes is greater than or equal to 60mm, and the steel mesh is tied and fixed to the I-beams 31.

[0086] To improve the structural strength of the bridge body 3, the spacing between the I-beams 31 and the thickness of the concrete pouring layer 32 are subject to corresponding dimensional restrictions in this embodiment of the invention. This ensures that the formed bridge body 3 has sufficient structural strength while reducing manufacturing costs. Further improving the structural strength of the bridge body 3 can be achieved by laying steel mesh on the I-beams 31.

[0087] Optionally, the bridge body 3 has a length of 6000mm-7500mm along the auxiliary haulage roadway 200, that is, the width of the bridge body 3 is 6000mm-7500mm. On the one hand, this can ensure the integrity of the roof of the auxiliary haulage roadway 200, and on the other hand, it can meet the layout of the drainage system on both sides of the auxiliary haulage roadway 200, as well as the layout of the material transportation system, so as to realize the grade separation between the rubber transport roadway and the auxiliary haulage roadway 200.

[0088] In some embodiments, the sides of the first foundation 1 and the second foundation 2 are flush with the corresponding sidewalls of the auxiliary haulage roadway 200, and the lower end face of the bridge body 3 is flush with the top plate of the auxiliary haulage roadway 200. The sides of the first foundation 1 and the second foundation 2 can serve as the sidewalls of the auxiliary haulage roadway 200, and the bridge body 3 can serve as the top plate of the auxiliary haulage roadway 200, thereby realizing the repair of this section of the auxiliary haulage roadway 200 and solving the problem of long-term lack of support and incomplete structure of the original auxiliary haulage roadway 200 at this location.

[0089] Furthermore, pedestrian steps 4 are provided at both ends of the bridge body 3. The pedestrian steps 4 allow workers to move between the bridge deck of the bridge body 3 and the bottom plate of the machine head transfer chamber 100, and also between the bridge deck of the bridge body 3 and the backfilled bottom plate of the coal pillar side chamber 300, thus improving the practicality of the bridge body 3.

[0090] In some embodiments, the construction method for the grade-separated wind bridge based on the chambers on both sides of the auxiliary haulage roadway 200 further includes a shotcrete process. After the bridge body 3 is constructed, the first foundation 1, the second foundation 2, and the bridge body 3 are shotcreted across their entire cross-section. This makes the interior of the auxiliary haulage roadway 200 a unified whole, improving the strength of the support.

[0091] In some embodiments, the construction method of the overpass ventilation bridge based on the chambers on both sides of the auxiliary transport roadway 200 further includes arranging drainage pipes on the overpass ventilation bridge to connect the sewage systems on both sides of the auxiliary transport roadway 200, and arranging conveying equipment on the overpass ventilation bridge for conveying materials on both sides of the auxiliary transport roadway 200.

[0092] After the completion or during the construction of the overpass ventilation bridge, drainage pipes and conveying equipment can be arranged so that they are supported on the bridge body 3, allowing them to cross the auxiliary haulage roadway 200 without affecting it. At the same time, this reduces the layout cost and the cost of the drainage and material conveying systems. For example, by optimizing the layout of drainage pipes, the water tank is located on one side of the auxiliary haulage roadway 200, and the sewage pipe on the other side of the auxiliary haulage roadway 200 does not need to be laid across the roof of the auxiliary haulage roadway 200; it can be laid to the water tank using the ventilation bridge. Another example is that the ventilation bridge enables continuous transportation of the cleaning machine. The cleaning machine compresses coal sludge without the need for vehicle transportation; it can be transported to the conveyor belt using the ventilation bridge, thereby saving approximately 2 million yuan per year in cleaning water tanks.

[0093] The following is a detailed description of the construction of the overpass ventilation bridge on the 200-meter auxiliary haulage roadway in a certain mine:

[0094] With the completion of the longwall face mining, the conveyor belt frame of the conveyor head has been idle for a long time, resulting in waste; the head shift chamber 100 is connected to the auxiliary haulage roadway 200, and the opening area damages the integrity of the roof. The lack of reinforcement support for a long time poses certain safety hazards. The coal pillar side chamber 300 of the auxiliary haulage roadway 200 is idle. The sewage pipeline of the conveyor headway located on one side of the auxiliary haulage roadway 200 is laid across the roof of the auxiliary haulage roadway 200 to the No. 1 water sump located on the other side of the auxiliary haulage roadway 200, which greatly affects the standardized image of the bottom yard.

[0095] Among them, 80m of belt conveyor was installed across the auxiliary haulage roadway 200m of the head section of the conveyor roadway. The idle belt conveyor was recycled and can be reused in other working faces in the future. At the same time, it provides a working site for the renovation of the head section 100.

[0096] At the junction of the machine head shift chamber 100 and the auxiliary haulage roadway 200, the dimensions of the suspended steps on the top slabs on the left and right sides are 3.2m wide × 1m deep × 1.6m high and 2.8m wide × 1.2m deep × 1.6m high, respectively. A 10mm thick steel plate is laid along the top slab of the auxiliary haulage roadway 200 below it to form a false roof. MSGLW-335 / 18×2100 left-handed threaded steel resin anchor rods without longitudinal reinforcement and SKP17.8-7 / 1860 steel strand (6.5m in length) are used to reinforce and support the suspended steps, and at the same time, they also serve to fix the false roof. After the mold is erected above the false roof, C20 concrete is poured to form an integral whole with the suspended steps on the top slab, ensuring the integrity of the top slab of the auxiliary haulage roadway 200.

[0097] The machine head shift chamber has a 100-step side wall that is 25m wide and 4m high. A brick wall with a height of 1.3m and a thickness of 0.5m is built on the upper part of the step, flush with the top slab of the auxiliary haulage roadway 200. The formwork is erected perpendicular to the bottom slab of the auxiliary haulage roadway 200 along the side wall of the step. MSGLW-335 / 18×2100 left-handed threaded steel resin anchor rods without longitudinal reinforcement are used to reinforce and support the side wall, and at the same time, they also serve to fix the formwork. C20 concrete is poured layer by layer from bottom to top inside the formwork until the false roof steel plate, thus forming an integral whole with the side wall of the step. On the one hand, it can effectively support the false roof, and on the other hand, it serves as the foundation for the construction of the wind bridge (i.e., the first foundation 1).

[0098] The auxiliary haulage roadway 200 coal pillar side chamber 300, directly opposite the machine head shift chamber 100, is 5.6m wide, 3.1m high, and 12m deep. It was filled and compacted using underground coal gangue and sand, and finished with M10 cement mortar flush with the top of the original coal pillar. A row of MSGLW-335 / 18×2100 left-handed threaded steel resin anchor bolts without longitudinal reinforcement was installed on each side of the chamber entrance, spaced 1m apart. Then, a sealed wall 6m wide, 4.2m high, and 1.24m thick was constructed. The sealed wall has 370mm brick walls on both sides and a 500mm thick C20 concrete core in the middle, forming a unified structure with the anchor bolts on both sides and the main roadway coal sidewalls. The height of the sealed wall is flush with the top slab of the auxiliary haulage roadway 200, and the width is flush with the coal sidewalls of both main roadways, serving as the foundation for the wind bridge (i.e., the second foundation 2).

[0099] The ventilation bridge is constructed using a combination of brick walls, I-beams (31), metal mesh, and concrete. The auxiliary haulage roadway 200 is 5.6m wide. Twenty 6.8m long No. 11 mining I-beams (31) span the auxiliary haulage roadway 200, laid across the foundation of the ventilation bridges on both sides. The center-to-center spacing of the I-beams is 300mm. Molds are erected along the bottom of the I-beams, and then 200mm thick C20 concrete is poured from bottom to top to embed the I-beams, forming the ventilation bridge. The bottom of the ventilation bridge is flush with the top slab of the auxiliary haulage roadway 200, thus achieving a grade separation between the conveyor head and the auxiliary haulage roadway 200.

[0100] After the wind bridge is completed, pedestrian steps 4 are built on both sides of the wind bridge. At the same time, full-section shotcrete is carried out in the interchange area between the machine head transfer chamber 100 and the auxiliary haulage roadway 200 to ensure that it forms an integral whole with the original auxiliary haulage roadway 200 and improve the support strength.

[0101] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," and "circumferential" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this invention and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0102] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this invention, "a plurality of" means at least two, such as two, three, etc., unless otherwise explicitly specified.

[0103] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection, an electrical connection, or a connection that allows communication between them; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components, unless otherwise explicitly limited. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0104] In this invention, unless otherwise explicitly specified and limited, "above" or "below" the second feature can mean that the first feature is in direct contact with the second feature, or that the first feature is in indirect contact with the second feature through an intermediate medium. Furthermore, "above," "over," and "on top" of the second feature can mean that the first feature is directly above or diagonally above the second feature, or simply that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature can mean that the first feature is directly below or diagonally below the second feature, or simply that the first feature is at a lower horizontal level than the second feature.

[0105] In this invention, the terms "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., refer to a specific feature, structure, material, or characteristic described in connection with that embodiment or example, which is included in at least one embodiment or example of the invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0106] Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments within the scope of the present invention.

Claims

1. A construction method for an overpass ventilation bridge based on chambers on both sides of an auxiliary haulage roadway, characterized in that, Includes the following steps: The first foundation was built at the machine head shift chamber located on one side of the auxiliary transport roadway; A second foundation is constructed at the coal pillar side chamber located on the other side of the auxiliary haulage roadway, the second foundation isolating the coal pillar side chamber from the auxiliary haulage roadway; Backfill the coal pillar side chamber; A bridge structure is constructed between the first foundation and the second foundation, with both ends of the bridge structure supported on the first foundation and the second foundation respectively to form an overpass. The machine head shifting chamber and the auxiliary haulage roadway are stepped, and the construction of the first foundation at the machine head shifting chamber located on one side of the auxiliary haulage roadway includes: The first wall was built on the steps of the machine head shift chamber; A first mold is installed on the side of the step of the machine head shifting chamber, so that the first mold forms a first casting cavity between the side of the step of the machine head shifting chamber and the first wall. Concrete is poured into the first casting cavity to form the first foundation; The construction of the second foundation at the coal pillar side chamber located on the other side of the auxiliary haulage roadway includes: A second wall and a third wall are constructed along the width of the auxiliary haulage roadway at the side chamber of the coal pillar, and a second casting cavity is formed between the second wall and the third wall; Concrete is poured into the second casting cavity to form the second foundation.

2. The construction method for the grade-separated ventilation bridge based on the chambers on both sides of the auxiliary haulage roadway according to claim 1, characterized in that, The first wall is a brick wall with a thickness of 400mm-600mm, and the first casting cavity has a thickness of 600mm-800mm; and / or The first casting cavity is provided with at least one of anchor rods, steel strands, and metal mesh.

3. The construction method for the grade-separated ventilation bridge based on the chambers on both sides of the auxiliary haulage roadway according to claim 1, characterized in that, Both the second and third walls are brick walls, with a thickness of 300mm-450mm, and the second casting cavity has a thickness of 400mm-600mm; and / or The second casting cavity is provided with at least one of anchor rods, steel strands, and metal mesh.

4. The construction method for the grade-separated ventilation bridge based on the chambers on both sides of the auxiliary haulage roadway according to claim 1, characterized in that, The backfilling of the coal pillar side chamber includes: filling and compacting the coal pillar side chamber with underground solid waste, and applying cement mortar to smooth the upper surface of the solid waste filling layer in the coal pillar side chamber.

5. The construction method for the grade-separated ventilation bridge based on the chambers on both sides of the auxiliary haulage roadway according to claim 1, characterized in that, The construction of the bridge structure between the first foundation and the second foundation includes: Multiple I-beams are arranged parallel to each other and spaced apart along the length of the auxiliary haulage roadway, with the two ends of each I-beam supported on the first foundation and the second foundation, respectively. A second mold is set up below the multiple I-beams, and concrete is poured on the second mold so that the I-beams are embedded in the concrete pouring layer.

6. The construction method for the grade-separated ventilation bridge based on the chambers on both sides of the auxiliary haulage roadway according to claim 5, characterized in that, The overlap length between the I-beam and the first foundation, and the overlap length between the I-beam and the second foundation, are both greater than or equal to 600 mm; and / or The spacing between two adjacent I-beams is 250mm-350mm; and / or The bridge body has a length of 6000mm-7500mm along the auxiliary haulage roadway; and / or The thickness of the concrete pouring layer is 200mm-400mm; and / or A steel mesh is laid on the I-beam, with an overlap length of 60mm or more between adjacent steel meshes, and the steel mesh is tied and fixed to the I-beam.

7. The construction method for the grade-separated ventilation bridge based on the chambers on both sides of the auxiliary haulage roadway according to any one of claims 1-6, characterized in that, The sides of both the first and second foundations are flush with the corresponding sidewalls of the auxiliary haulage roadway, and the lower end face of the bridge body is flush with the top slab of the auxiliary haulage roadway; and / or Pedestrian steps are provided at both ends of the bridge; and / or It also includes a shotcrete process, in which the first foundation, the second foundation, and the bridge body are shotcreted across their entire cross-section after the bridge body is constructed.

8. The construction method for the grade-separated ventilation bridge based on the chambers on both sides of the auxiliary haulage roadway according to claim 1, characterized in that, Also includes: Drainage pipes are installed on the overpass to connect the sewage systems on both sides of the auxiliary transport roadway; and / or Conveying equipment is installed on the overpass, and the conveying equipment is used to transport materials on both sides of the auxiliary transport roadway.