Shield tunnel flue plate prefabricated bracket bolt type connecting structure

By using a prefabricated corbel pin-type connection structure for the shield tunnel flue slab, and utilizing pin-type connections and grout filling gaps, the problems of complex construction and connection reliability in existing technologies are solved, improving construction efficiency and connection quality, and ensuring the stability and safety of the tunnel.

CN117189243BActive Publication Date: 2026-11-20CHINA RAILWAY LIUYUAN GRP CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202311250793.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-26
Publication Date
2026-11-20
Estimated Expiration
2043-09-26

AI Technical Summary

Technical Problem

The existing connection methods for shield tunnel flue slabs have problems such as complex construction, low efficiency, and connection reliability being affected by the rebar installation effect.

Method used

The shield tunnel flue slab prefabricated corbel pin-type connection structure is adopted. By pre-embedding a convex plug on one side of the tunnel segment and a concave interface on the other side of the corbel, and using a pin-type connection, combined with grout filling the gap, the connection between the corbel and the tunnel segment is achieved.

Benefits of technology

This reduces damage to the tunnel segments caused by rebar installation, improves construction efficiency, saves labor and equipment costs, and ensures connection quality and the stability and safety of the tunnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117189243B_ABST
    Figure CN117189243B_ABST
Patent Text Reader

Abstract

The application discloses a prefabricated bracket bolt type connecting structure of a shield tunnel flue plate, relates to the technical field of shield tunneling, and comprises a tunnel, a segment lining, a tunnel main body as a supporting mechanism, a cantilever mechanism arranged on the tunnel and connected with the segment, and a smoke exhaust mechanism connected with the cantilever mechanism and used for discharging smoke generated when an unexpected fire occurs in the tunnel, and a buffer component arranged at the connecting position of the segment and the cantilever mechanism. The application can reduce the damage of the bolt to the segment, guarantee the connecting quality, greatly improve the construction efficiency, and save the labor cost and equipment cost by pre-burying a convex socket on one side of the segment, pre-burying a concave interface on one side of the bracket and reserving a concrete groove, and finally filling the gap with slurry.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of shield tunneling technology, and in particular to a prefabricated corbel pin-type connection structure for shield tunnel flue slabs. Background Technology

[0002] Currently, with the development of urbanization in the country, more and more cities are using the shield tunneling method to build tunnels. In order to meet the smoke exhaust function in the event of a fire in the tunnel, a smoke exhaust channel needs to be set up at the top. The smoke exhaust channel consists of a smoke duct slab structure and a corbel structure.

[0003] In related technologies, the prefabricated structure of flue slabs is already mature, and the connection method of the corbels on both sides adopts the cast-in-place form.

[0004] Cast-in-place corbels require the erection of supports, formwork, pouring, and structural curing. The flue slab can only be installed after the concrete reaches the design strength. This not only causes structural damage to the pipe segments and is complex and inefficient, but also affects the reliability of the connection due to the effectiveness of the rebar installation. Summary of the Invention

[0005] In order to overcome the above-mentioned technical defects in the existing technology, this application provides a prefabricated corbel pin-type connection structure for shield tunnel flue slabs.

[0006] The technical solution provided in this application for a prefabricated corbel pin-type connection structure for shield tunnel flue slabs is as follows:

[0007] A prefabricated corbel pin-type connection structure for flue slabs in a shield tunnel includes: a tunnel, segment lining, and a tunnel body serving as a support mechanism.

[0008] A cantilever mechanism is installed on the tunnel and connected to the tunnel segments;

[0009] A smoke exhaust mechanism, connected to the cantilever mechanism, is used to exhaust the smoke generated in the event of an accidental fire inside the tunnel.

[0010] A buffer component is provided at the connection between the tube segment and the cantilever mechanism.

[0011] In any of the above embodiments, it is preferred that the tunnel segments are arranged in multiple groups, and the multiple groups of tunnel segments are distributed along the longitudinal length of the tunnel, and the connection between each group of tunnel segments is by concrete pouring.

[0012] In any of the above embodiments, it is preferred that the cantilever mechanism includes brackets, and multiple sets of brackets are provided, with two brackets in each set, and the two brackets are symmetrically arranged on the inner wall of a set of segments, and the number of multiple sets of brackets and multiple sets of segments are equal.

[0013] In any of the above embodiments, it is preferred that the smoke exhaust mechanism includes a flue plate, and the two longitudinally continuous sides of the flue plate are fixedly connected to a plurality of sets of brackets.

[0014] In any of the above embodiments, it is preferred that each group of the segments includes two symmetrically arranged cast steel convex inserts, the cast steel convex inserts being fixedly connected to the inner wall of the segment by reinforcing bars, and the cast steel convex inserts being snapped onto the bracket.

[0015] In any of the above embodiments, it is preferred that the buffer component includes a rubber pad disposed at the connection between the corbel and the tube segment.

[0016] In any of the above embodiments, it is preferred that the cow leg has a groove on the side near the rubber pad.

[0017] In any of the above schemes, it is preferred that the width of each group of segments is equal to the length of each group of corbels.

[0018] In any of the above embodiments, it is preferred that a cast steel concave insert is provided in the groove.

[0019] In any of the above embodiments, it is preferred that each set of the cow legs has a grouting hole that extends from the outer surface of the cow leg into the groove.

[0020] In summary, this application includes at least one of the following beneficial technical effects: by pre-embedding a convex spigot on one side of the pipe segment, pre-embedding a concave interface on the other side of the corbel and reserving a concrete groove, connecting the corbel and the pipe segment with a pin, and finally filling the gap with grout, the damage to the pipe segment caused by rebar installation can be reduced, the connection quality can be guaranteed, and in terms of construction, the construction efficiency can be greatly improved, and labor and equipment costs can be saved. Attached Figure Description

[0021] Figure 1 This is a perspective view of the prefabricated corbel pin-type connection structure of the shield tunnel flue slab in this application.

[0022] Figure 2 This is an enlarged view of section A of the prefabricated corbel pin-type connection structure of the shield tunnel flue slab in this application.

[0023] Figure 3 This is a partial cross-sectional view of the prefabricated corbel pin-type connection structure of the shield tunnel flue slab in this application.

[0024] Figure 4 This is a cross-sectional view of section A of the prefabricated corbel pin-type connection structure of the shield tunnel flue slab in this application.

[0025] Reference numerals: 1. Segment; 11. Cast steel convex insert; 2. Bracket; 21. Rubber gasket; 22. Cast steel concave insert; 3. Flue plate. Detailed Implementation

[0026] To make the technical solutions and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.

[0027] To better understand the above technical solutions, the following is in conjunction with the appendix. Figure 1-4 This application will be described in further detail.

[0028] like Figures 1 to 4 As shown, a prefabricated corbel pin-type connection structure for smoke duct slabs in a shield tunnel includes: a tunnel, a lining segment 1, a tunnel body serving as a support mechanism; a cantilever mechanism installed on the tunnel and connected to the segment 1; a smoke exhaust mechanism connected to the cantilever mechanism for discharging smoke generated in the event of an accidental fire in the tunnel; and a buffer component installed at the connection between the segment 1 and the cantilever mechanism.

[0029] In this application, the cantilever mechanism, in cooperation with the tunnel segment 1, improves the overall load-bearing capacity of the tunnel segment 1, prevents local damage and instability of the tunnel, and can also absorb the vibration generated during the shield tunnel construction process, ensuring the stability and safety of the tunnel construction. The cantilever mechanism can also support the smoke exhaust mechanism and keep it flat and stable, preventing it from sinking or deforming. At the same time, the cantilever mechanism and the smoke exhaust mechanism have a large contact area, so the cantilever mechanism can also distribute the load on the smoke exhaust mechanism, reducing the concentrated pressure on the smoke exhaust mechanism and improving its load-bearing capacity and service life. By setting up the smoke exhaust mechanism, the smoke generated can be discharged in the event of an accidental fire in the tunnel, ensuring that a large amount of toxic gas does not accumulate in the tunnel.

[0030] like Figures 1 to 4 As shown, there are multiple sets of the tunnel segments 1, and the multiple sets of tunnel segments 1 are distributed along the longitudinal length of the tunnel. The connection method between each set of tunnel segments 1 is concrete pouring.

[0031] In this application, multiple sets of tunnel segments 1 are installed inside the tunnel to support the tunnel structure. The inner wall of the tunnel is treated by coating the outside of the tunnel segments 1 with anti-corrosion material and wrapping them with cement mortar to enhance the adhesion between the tunnel segments 1 and the tunnel. The tunnel segments 1 are installed on the inner wall of the tunnel using other equipment. After the installation of the tunnel segments 1 is completed, the tunnel segments are connected by pouring concrete. The tunnel segments 1 play a guiding role in the tunnel construction, guiding the tunnel boring machine to the designated position and ensuring the smooth progress of the tunnel project.

[0032] like Figures 1 to 4As shown, the cantilever mechanism includes brackets 2, and multiple sets of brackets 2 are provided. Each set of brackets 2 has two brackets 2, and the two brackets 2 are symmetrically arranged on the inner wall of a set of tube segments 1. The number of multiple sets of brackets 1 and multiple sets of tube segments 1 are equal.

[0033] In this application, the cantilever mechanism is an important component of the prefabricated corbel pin-type connection structure of the smoke duct slab in the shield tunnel. The installation position of the corbel 2 is determined according to the position of the segment 1 to ensure that the segment 1 and the corbel 2 correspond one-to-one. By setting the corbel 2, the weight of the smoke exhaust mechanism itself can be distributed to ensure the stability and safety of the smoke exhaust mechanism and ensure that the smoke exhaust mechanism can operate normally.

[0034] like Figures 1 to 4 As shown, the smoke exhaust mechanism includes a flue plate 3, and the two longitudinal sides of the flue plate 3 are fixedly connected to multiple sets of brackets 2.

[0035] In this application, the smoke exhaust mechanism is the core component of the prefabricated corbel pin-type connection structure of the shield tunnel flue plate. The flue plate 3 can also prevent fire and smoke in the tunnel, which can limit the fire to a certain range, slow down the spread of the fire, and buy valuable time for personnel evacuation. At the same time, the flue plate 3 can also prevent smoke from entering the tunnel and keep the escape route unobstructed, providing important structural support and safety guarantee for the shield tunnel. It not only ensures the stability and reliability of the tunnel, but also protects the safety of personnel and the normal operation of the tunnel. The flue plate 3 is placed horizontally and stably on the top of the corbel 2 using a level, and adjusted and positioned according to the design requirements. The flue plate 3 is then tightly fixed to the upper surface of the corbel 2 by bolt connection, thereby completing the installation and fixing of the flue plate 3.

[0036] like Figures 1 to 4 As shown, each group of the pipe segments 1 includes two symmetrically arranged cast steel convex inserts 11. The cast steel convex inserts 11 are fixedly connected to the inner wall of the pipe segment 1 by steel bars, and the cast steel convex inserts 11 are snapped onto the bracket 2.

[0037] In this application, by setting symmetrical cast steel convex inserts 11 on the inner wall of each group of pipe segments 1, the pipe segments 1 have the function of connecting with other components. The installation position of the cast steel convex inserts 11 is determined according to the position of multiple groups of pipe segments 1. Then, the cast steel convex inserts 11 are installed one by one at the connection between the pipe segment 1 and the bracket 2. After installation, the cast steel convex inserts 11 are fixed at the connection between the pipe segment 1 and the bracket 2 with steel bars, and the connection is sealed to ensure a firm connection and good sealing performance. By connecting with other components, the cast steel convex inserts 11 can ensure accurate assembly and stable connection of the structure, improve the rigidity and stability of the pipe segments 1, and the symmetrical cast steel convex inserts 11 on the inner wall of the pipe segments 1 can also distribute the stress of the pipe segments 1, reduce the problem of strain concentration, and improve the durability and safety of multiple groups of pipe segments 1 by absorbing and buffering stress.

[0038] like Figures 1 to 4 As shown, the buffer component includes a rubber pad 21, which is disposed at the connection between the cow leg 2 and the tube segment 1.

[0039] In this application, by setting a rubber gasket 21 at the connection between the corbel 2 and the segment 1, the gap at the connection can be filled. The rubber gasket 21 has a certain deformation capacity and can play the role of elastic deformation when the structure deforms, compensate for the deformation difference of the structure, reduce the possibility of stress concentration and structural damage, share the load between the corbel 2 and the segment 1, protect the connection from excessive force, improve the durability and reliability of the structure, and extend the service life of the tunnel, thereby improving the stability and safety of the structure.

[0040] like Figures 1 to 4 As shown, the cow leg 2 has a groove on the side near the rubber pad 21.

[0041] In this application, a groove is provided on the side of the bracket 2 near the rubber gasket 21, which can facilitate the connection and fixation of the cast steel convex insert 11, making the connection between the bracket 2 and the segment 1 more stable and reliable. Moreover, by opening the groove, the construction process of the shield tunnel can be simplified and the efficiency of shield tunnel construction can be improved. First, the position of the groove of the bracket 2 is determined according to the position of the cast steel convex insert 11. The bracket 2 is cut with a cutting machine to obtain a groove with the same size as the cast steel convex insert 11. Then, the groove is aligned with the cast steel convex insert 11 and inserted for connection.

[0042] like Figures 1 to 4 As shown, the ring width of each group of segments 1 is equal to the length of each group of brackets 2.

[0043] In this application, the ring width of each group of segments 1 is equal to the length of each group of brackets 2, which can improve the rigidity of the entire device after the connection of segments 1 and brackets 2, forming continuous support and rigid connection, effectively resisting external loads, and increasing the stability and load-bearing capacity of the tunnel structure. Furthermore, the fact that the ring width of segment 1 is equal to the length of bracket 2 simplifies the construction process. During the connection and installation process, it is only necessary to align the groove of bracket 2 with the cast steel protruding insert 11 on segment 1 and insert it for connection, which can improve construction efficiency and reduce errors and process complexity. At the same time, the fact that the ring width of each group of segments 1 is equal to the length of each group of brackets 2 can reduce the deformation and displacement of the device after the connection of segments 1 and brackets 2 during use, and improve the stability and durability of the structure.

[0044] like Figures 1 to 4 As shown, a cast steel concave insert 22 is provided in the groove.

[0045] In this application, a cast steel concave insert 22 is provided in the groove, which can fit with the cast steel convex insert 11, increasing the connection strength between the bracket 2 and the segment 1, effectively increasing the stability and reliability of the connection, and providing stronger connection performance. The cast steel concave insert 22 can be easily removed or installed from the groove, greatly reducing the time and cost of maintenance and replacement, and also enhancing the stability and reliability of the connection structure between the bracket 2 and the segment 1, improving the safety and efficiency of the project. First, the size of the cast steel convex insert 11 is measured to determine the opening size of the cast steel concave insert 22. By applying lubricant to the surface of the groove, the cast steel concave insert 22 is installed into the groove one by one, ensuring that the cast steel concave insert 22 is in complete contact with the groove. Then, the cast steel concave insert 22 is fixed in the groove with steel bars, completing the installation of the cast steel concave insert 22.

[0046] like Figures 1 to 4 As shown, each set of the cow leg 2 has a grouting hole 4, which extends from the outer surface of the cow leg 2 into the groove.

[0047] In this application, the corbel 2 is provided with a grouting hole 4. When the cast steel convex insert 11 and the cast steel concave insert 22 are connected, grout is injected through the grouting hole 4 for reinforcement, which can improve the stability and load-bearing capacity of the connection between the corbel 2 and the segment 1, thereby protecting the stability of the tunnel structure and improving the safety, stability and reliability of the tunnel project.

[0048] In one specific implementation, multiple sets of tunnel segments 1 are installed on the inner wall of the shield tunnel. After aligning the cast steel concave insert 22 of each set of corbels 2 with the cast steel convex insert 11 on the tunnel segment 1, the cast steel convex insert 11 and the cast steel concave insert 22 are fitted together by sliding insertion. Grouting is then performed through the grouting hole 4 to improve the stability and load-bearing capacity of the connection between the corbel 2 and the tunnel segment 1. Finally, the flue plate 3 is placed on the corbel 2 to complete the installation and connection of the flue plate 3.

[0049] The beneficial effects provided by this application are as follows: by pre-embedding a convex spigot on one side of the pipe segment and a concave interface on the other side of the corbel and reserving a concrete groove, the corbel and the pipe segment are connected by a pin-type connection, and finally the gap is filled with grout. This can reduce the damage to the pipe segment caused by rebar installation, ensure the connection quality, greatly improve construction efficiency, and save labor and equipment costs.

[0050] The above are merely preferred embodiments of this application and are not intended to limit this application. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the protection scope of this application.

Claims

1. A prefabricated corbel pin-type connection structure for shield tunnel flue slabs, characterized in that: include: The tunnel, segment (1) lining, tunnel body, serves as a support structure; A cantilever mechanism is installed on the tunnel and connected to the tunnel segment (1). The cantilever mechanism includes a corbel (2). A smoke exhaust mechanism is connected to the cantilever mechanism and is used to exhaust the smoke generated in the event of an accidental fire in the tunnel. A buffer component is provided at the connection between the tube segment (1) and the cantilever mechanism; Each set of the pipe segments (1) includes two symmetrically arranged cast steel convex inserts (11), the cast steel convex inserts (11) are fixedly connected to the inner wall of the pipe segment (1) by steel bars, and the cast steel convex inserts (11) are stuck on the corbel (2); The buffer component includes a rubber pad (21), and the cow leg (2) has a groove on the side near the rubber pad (21), with a cast steel concave insert (22) inside the groove.

2. The prefabricated corbel pin-type connection structure for shield tunnel flue slabs according to claim 1, characterized in that: The tunnel segment (1) is provided in multiple sets, and the multiple sets of tunnel segments (1) are distributed along the longitudinal length of the tunnel. The connection between each set of tunnel segments (1) is a bolt connection.

3. The prefabricated corbel pin-type connection structure for shield tunnel flue slabs according to claim 2, characterized in that: The cow leg (2) is provided in multiple sets, and each set of the cow leg (2) has two cow legs (2), and the two cow legs (2) are symmetrically arranged on the inner wall of a set of tube segments (1). The number of sets of cow legs (2) and sets of tube segments (1) is equal.

4. The prefabricated corbel pin-type connection structure for shield tunnel flue slabs according to claim 3, characterized in that: The smoke exhaust mechanism includes a flue plate (3), and the longitudinal side of the flue plate (3) is fixedly connected to multiple sets of brackets (2).

5. The prefabricated corbel pin-type connection structure for shield tunnel flue slabs according to claim 4, characterized in that: The rubber gasket (21) is disposed at the connection between the cow leg (2) and the tube segment (1).

6. The prefabricated corbel pin-type connection structure for shield tunnel flue slabs according to claim 5, characterized in that: The circumference of each segment (1) is equal in width to the length of each leg (2).

7. The prefabricated corbel pin-type connection structure for shield tunnel flue slabs according to claim 6, characterized in that: Each set of the cow leg (2) is provided with a grouting hole (4), which extends from the outer surface of the cow leg (2) into the groove.

Citation Information

Patent Citations

  • Overlapped type shield-driven tunnel structure and construction method thereof

    CN107859522A

  • Socket-and-spigot fabricated flue plate for smoke exhaust at top of shield tunnel and construction method thereof

    CN112922658A

  • Fabricated flue structure and shield tunnel

    CN219570149U