Thermal insulation head structure of super-large solid rocket engine shell and preparation method thereof

By employing a segmented curing molding process and integrated hot-pressing curing technology, the manufacturing challenges of the insulating head for ultra-large solid rocket motor casings have been solved, achieving high-quality head molding and reducing equipment requirements.

CN117189417BActive Publication Date: 2026-11-20JINGGONG(SHAOXING)COMPOSITE MATERIAL CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210612573.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-31
Publication Date
2026-11-20
Estimated Expiration
2042-05-31

AI Technical Summary

Technical Problem

Existing technologies for manufacturing thermal insulation heads for ultra-large solid rocket motor casings present challenges such as high requirements for molds and equipment, manufacturing difficulties, and difficulty in controlling the quality of head forming.

Method used

The process employs a segmented curing molding process and a hot-press integrated curing molding process. By connecting the metal joints, the bottom molding section, and the airbag hot-pressing section in segments, 824 insulation sheets of different thicknesses are prepared using a calender. The integrated structure is then formed through high-temperature vulcanization and hot-press curing.

Benefits of technology

This reduces the high requirements for molds and equipment, improves the quality of head forming, ensures manufacturing reliability and overall quality, and reduces manufacturing difficulty.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117189417B_ABST
    Figure CN117189417B_ABST
Patent Text Reader

Abstract

The adiabatic head structure of the super-large solid rocket engine shell and the preparation method thereof, the adiabatic material is sheeted into a material sheet with a specified size and thickness by using a calender, the metal joint is sandblasted and cleaned and then is placed into a bottom layer mold pressing section mold, then the adiabatic material sheet is laid and pasted, after the mold is closed, the mold is placed on a press for high-temperature vulcanization, after the mold is opened, the inclined section is polished, the air bag hot pressing section and the bottom layer mold pressing section are assembled through the inclined section, the artificial debonding layer is pasted, the cover layer and the air bag hot pressing section adiabatic material sheet are laid and pasted, the air bag hot pressing section is closed, and finally the whole is put into an oven for integral hot pressing and curing to integrally form the super-large adiabatic head with an opening diameter greater than 3 m. The present application is made by using a sectional curing and forming process, the bottom layer mold pressing section preform is first mold pressed and cured to form, and the adhesion performance of the metal joint and the adiabatic material is ensured, the bottom layer mold pressing section preform and the cover layer and the air bag hot pressing section structure are integrally cured by air bag hot pressing, and the overall quality of the super-large head is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of aerospace thermal insulation structure manufacturing, and in particular to a thermal insulation head structure for use in the casing of an ultra-large solid rocket motor and its preparation method. Background Technology

[0002] Currently, all types of solid rocket engines are propulsion devices that use solid propellants and belong to the category of chemical rocket engines, using solid materials (energy and working fluid) as propellants. Solid rocket engines are widely used not only in rockets but also in missiles and spacecraft. Because the solid rocket engine casing is the load-bearing and critical component for the entire engine's operating pressure, the combustion chamber must withstand temperatures of 2500–3500 degrees Celsius and pressures of 10²–2 × 10⁷ bar during propellant combustion. Therefore, it must be manufactured using high-strength alloy steel, titanium alloys, or composite materials, and requires the installation of heat insulation structures.

[0003] The thermal insulation structure is an important component of the solid rocket motor casing, and it mainly protects the motor casing through its excellent thermal insulation and ablation resistance.

[0004] Existing thermal insulation structures generally consist of front and rear thermal insulation heads and an insulation layer. The front and rear thermal insulation heads are typically manufactured using a molding process. This is not a problem for small thermal insulation head structures. However, thermal insulation head structures used in ultra-large solid rocket motor casings, with opening diameters exceeding 3 meters, present several challenges, as follows:

[0005] 1. When manufacturing ultra-large thermal insulation heads (thermal insulation heads with an opening diameter greater than 3m), the problem of the ultra-large head forming mold being too large and heavy will be encountered, which will make its manufacturing difficult.

[0006] 2. Extra-large insulating heads require high-performance molding machines, and ordinary equipment is difficult to meet the manufacturing requirements;

[0007] 3. Due to problems such as large structure or equipment defects, the forming quality of the insulating head is difficult to control, resulting in low yield and waste of raw materials.

[0008] In summary, the present invention provides a novel thermal insulation head structure for ultra-large solid rocket motor casings and its preparation method, which can reduce the high requirements for molds and equipment under existing technologies, while also ensuring good head forming quality and meeting usage requirements. Summary of the Invention

[0009] To address the aforementioned problems in the fabrication of ultra-large thermally insulating heads in the prior art, this invention provides a thermally insulating head structure for an ultra-large solid rocket motor casing and its fabrication method. By employing a segmented curing molding process and a hot-press integrated curing molding process, it solves the problems of manufacturing difficulties, high requirements for molding machines, and difficulty in controlling the quality of the head molding in the prior art. The specific structure and method steps of the thermally insulating head structure for an ultra-large solid rocket motor casing of this invention are as follows:

[0010] The thermally insulating head structure of a super-large solid rocket motor casing, including a metal joint, is characterized by:

[0011] The metal connector is a ring-shaped structure with a threaded hole in the center, and the outer edge of the ring of the metal connector is connected to the bottom molded section.

[0012] The bottom molding section is a circular structure with an arc, and its diameter is larger than that of the metal joint. The inner edge of the bottom molding section and the outer edge of the metal joint are pressed and connected by the bottom molding section mold and vulcanized at high temperature to form an integral structure. The inner side of the outer edge of the bottom molding section has a sloping section with a width of 100±15mm and an angle of 5 to 15°.

[0013] The airbag hot-pressed section is an arc-shaped ring structure with a diameter larger than that of the bottom molding section. The inner ring edge of the airbag hot-pressed section is closely attached to the sloping section of the bottom molding section. An artificial release layer is pasted on the inner surface of the bottom molding section. The inner surface of the airbag hot-pressed section mold is covered with a cover layer and an 824 heat insulation sheet for the airbag hot-pressed section. Through mold pressing and baking, the airbag hot-pressed section and the bottom molding section are connected together, ultimately forming a metal joint, the bottom molding section and the airbag hot-pressed section into an integrated structure.

[0014] The thermal insulation head structure of the ultra-large solid rocket motor casing according to the present invention is characterized in that the connection between the metal joint and the bottom molding section and the connection between the bottom molding section and the gasbag hot pressing section are provided with 824 sheet made of 824 thermal insulation material.

[0015] The thermal insulation head structure of the ultra-large solid rocket motor casing according to the present invention is characterized in that the 824 sheet is pressed by a calender to form 824 thermal insulation sheets of three different thicknesses: 1mm, 2mm and 3mm.

[0016] The method for fabricating the thermal insulation head of an ultra-large solid rocket motor casing, based on any of the aforementioned ultra-large solid rocket motor casing thermal insulation head structures, comprises the following specific steps:

[0017] 1) Use a calender to press 824 insulation material into sheets, forming 824 insulation sheets of three different thicknesses: 1mm, 2mm, and 3mm.

[0018] 2) Pretreatment of metal joints:

[0019] Before use, the metal joint is sandblasted. The end face of the threaded hole in the center is protected with a sandblasting tool to ensure that the bonding surface between the metal joint and the 824 insulation sheet is sandblasted evenly and without omission.

[0020] 3) Reprocessing of metal joints:

[0021] After sandblasting the metal joint, use medical cotton swabs, ethyl acetate, and an air gun to clean the particles and powder on the surface of the metal joint. Then, use ethyl acetate or acetone to clean the sandblasted surface. The cleaning should be done no less than 3 times. Finally, allow it to air dry naturally for no less than 5 minutes.

[0022] 4) After cleaning the sandblasted surface of the metal joint with ethyl acetate or acetone in step 3), the sandblasted surface can be dried with a hot air gun. The hot air gun should be used at a temperature below 100°C.

[0023] 5) Apply 730 adhesive to the outer edge of the ring of the sandblasted metal joint, then bond a 1mm thick layer of 824 insulation sheet. Place the metal joint into the mold of the bottom molding section preform, and confirm that the inner edge of the ring of the bottom molding section is in contact and connected with the outer edge of the ring of the metal joint. Lay 1mm, 2mm or 3mm thick 824 insulation sheets in the mold according to the predetermined thickness and layering sequence.

[0024] 6) In step 5), after all the 824 insulation sheets of various thicknesses have been laid, the mold of the bottom molding section prefabricated part is closed, and then it is placed on the press for high-temperature vulcanization. The specific high-temperature vulcanization process is as follows:

[0025] The bottom molding section preform is heated to 80±5℃ with the press, kept at that temperature for 3 hours, then pressurized to 4500T, then heated to 130±5℃ and kept at that temperature for another 12 hours. After the high-temperature vulcanization time is over, the press is cooled and the pressure is reduced.

[0026] 7) After the press is cooled and depressurized, the mold is removed. At this time, the metal joint and the bottom molding section have formed an integral structure. Then, the outer edge of the ring of the bottom molding section is ground inward to form a slope section with a width of 100±15mm and an angle of 4~10°. The slope section is then cleaned with ethyl acetate.

[0027] 8) The inner ring edge of the hot-pressed section of the airbag is tightly attached to the sloping section of the bottom molding section. The inner surface of the bottom molding section is covered with an artificial release layer. Then, the hot-pressed section of the airbag with the metal connector is assembled together with the bottom molding section into the mold of the hot-pressed section of the airbag.

[0028] 9) A cover layer and an 824 insulation sheet for the airbag hot-pressing section are integrally laid on the inner surface of the airbag hot-pressing section mold. Then, the airbag hot-pressing section mold is closed and placed in an oven for integral hot-pressing curing. The specific hot-pressing curing process is as follows:

[0029] The airbag pressure is 0.5-1 MPa. The oven temperature is raised to 80±5℃ and held for 3 hours. Then, the temperature is raised to 135±5℃ and held for another 8 hours. After the hot pressing time is over, the oven is cooled and depressurized. Finally, the hot-pressed airbag section and the bottom molding section, which are formed into an integral piece, are removed from the oven. At this point, since the metal joint has been integrated with the bottom molding section in the previous steps, the metal joint, the bottom molding section and the hot-pressed airbag section form an integral structure after this step, ultimately forming an ultra-large thermal insulation head with an opening diameter greater than 3m.

[0030] The method for preparing the thermal insulation head of the ultra-large solid rocket motor casing according to the present invention is characterized in that the artificial debonding layer in step 8) is polytetrafluoroethylene tape.

[0031] The method for preparing the thermal insulation head of the super-large solid rocket motor casing according to the present invention is characterized in that the cover layer (5) and the bottom molding section in step 9) are made of the same material, and the cover layer and the thermal insulation sheet of the airbag hot pressing section 824 are laid together.

[0032] The method for preparing the thermal insulation head of the super-large solid rocket motor casing according to the present invention is characterized in that the thickness of the 824 thermal insulation sheet in the hot-pressed section of the airbag in step 9) is 14-16 mm, and this thickness is formed by combining three different thicknesses of 824 thermal insulation sheet of 1 mm, 2 mm and 3 mm pressed out in step 1) as required.

[0033] The overall concept of the thermal insulation head structure and its fabrication method for the ultra-large solid rocket motor casing of the present invention is as follows:

[0034] The insulation material is calendered into sheets of specified size and thickness. After sandblasting and cleaning, the metal joints are placed in the mold of the bottom molding section. The insulation sheet is then laid on, and after the mold is closed, it is placed on a press for high-temperature vulcanization. After demolding, the beveled section of the bottom molding section is ground out. The airbag hot-pressed section is assembled with the bottom molding section through the beveled section. The manual release layer is then applied, and the cover layer and the insulation sheet of the airbag hot-pressed section are laid on. The bottom molding section and the airbag hot-pressed section are then closed. Finally, the entire structure is placed in an oven and hot-pressed to cure and form an ultra-large insulation head with an opening diameter greater than 3m.

[0035] The thermally insulating head structure and its preparation method for the ultra-large solid rocket motor casing of the present invention have achieved the following beneficial effects:

[0036] 1. The thermal insulation head structure of the ultra-large solid rocket engine shell of the present invention and its preparation method are made by adopting a segmented curing molding process for the structure of the ultra-large thermal insulation head. First, the prefabricated part of the bottom molding section is molded and cured to ensure the bonding performance between the metal joint and the thermal insulation material, so as to make its manufacturing quality reliable.

[0037] 2. The thermal insulation head structure and its preparation method for the ultra-large solid rocket engine shell of the present invention integrate the bottom molding section preform with the cover layer and the airbag hot-pressed section structure by airbag hot-pressing and solidifying, which further improves the overall quality of the ultra-large head.

[0038] 3. The thermal insulation head structure of the ultra-large solid rocket motor shell of the present invention and its preparation method adopt a segmented curing molding method, which reduces the manufacturing difficulty of the entire ultra-large thermal insulation head and reduces the high requirements on the molding mold and molding machine. Attached Figure Description

[0039] Figure 1 This is a schematic diagram of the thermal insulation head structure of the ultra-large solid rocket motor casing and its preparation method according to the present invention.

[0040] Figure 2 This is a partial cross-sectional view of the thermal insulation head structure of the ultra-large solid rocket motor casing of the present invention and its preparation method.

[0041] Figure 3 This is a partial cross-sectional enlarged view of the thermal insulation head structure of the ultra-large solid rocket motor casing and its preparation method according to the present invention.

[0042] In the diagram: 1-Metal connector, 2-Bottom molding section, 2a-Sloping section, 3-Airbag hot pressing section, 4-Artificial release layer, 5-Cover layer. Detailed Implementation

[0043] The following description, in conjunction with the accompanying drawings and embodiments, further illustrates the technical means, creative features, objectives, and effects achieved by the thermal insulation head structure of the ultra-large solid rocket motor casing and its preparation method of the present invention.

[0044] Example

[0045] like Figures 1-3 As shown, the thermal insulation head structure of the super-large solid rocket motor casing includes a metal joint 1, which is an annular structure with a threaded hole in the center, and the outer edge of the annular part of the metal joint is connected to the bottom molded section 2.

[0046] The bottom molding section 2 is a circular structure with an arc, and its diameter is larger than that of the metal joint. The inner edge of the bottom molding section and the outer edge of the metal joint are pressed and connected by the bottom molding section mold and vulcanized at high temperature to form an integral structure. The inner side of the outer edge of the bottom molding section has a slope section 2a with a width of 100±15mm and an angle of 5~15° (10° in this embodiment).

[0047] The airbag hot-pressing section 3 is a circular structure with an arc, and its diameter is larger than that of the bottom molding section. The inner ring edge of the airbag hot-pressing section is closely attached to the slope section 2a of the bottom molding section 2. An artificial release layer 4 is pasted on the inner surface of the bottom molding section. The cover layer 5 and the airbag hot-pressing section 824 insulation sheet are laid on the inner surface of the mold of the airbag hot-pressing section. The airbag hot-pressing section is connected to the bottom molding section by mold pressing and baking, and finally the metal joint, the bottom molding section and the airbag hot-pressing section are connected into an integrated structure.

[0048] The connection between the metal joint 1 and the bottom molding section 2, as well as the connection between the bottom molding section and the airbag hot pressing section 3, is provided with 824 sheet made of 824 heat insulation material.

[0049] 824 sheets are produced by pressing with a calender to form 824 insulation sheets of three different thicknesses: 1mm, 2mm, and 3mm.

[0050] The method for fabricating the thermal insulation head of an ultra-large solid rocket motor casing, based on any of the aforementioned ultra-large solid rocket motor casing thermal insulation head structures, comprises the following specific steps:

[0051] 1) Use a calender to press 824 insulation material into sheets, forming 824 insulation sheets of three different thicknesses: 1mm, 2mm, and 3mm.

[0052] 2) Pretreatment of metal joints:

[0053] Before use, the metal connector 1 is sandblasted. The end face of the threaded hole in the center is protected by a sandblasting tool to ensure that the bonding surface between the metal connector and the 824 insulation sheet is sandblasted evenly and without omission.

[0054] 3) Reprocessing of metal joints:

[0055] After sandblasting the metal joint, use medical cotton swabs, ethyl acetate, and an air gun to clean the particles and powder on the surface of the metal joint. Then, use ethyl acetate or acetone to clean the sandblasted surface. The cleaning should be done no less than 3 times. Finally, allow it to air dry for no less than 5 minutes.

[0056] 4) After cleaning the sandblasted surface of the metal joint with ethyl acetate or acetone in step 3), the sandblasted surface can be dried with a hot air gun. The hot air gun should be used at a temperature below 100°C.

[0057] 5) Apply 730 adhesive to the outer edge of the ring of the sandblasted metal joint, then bond a 1mm thick 824 insulation sheet. Place the metal joint into the mold of the bottom molding section 2 preform, and confirm that the inner edge of the ring of the bottom molding section is in contact with and connected to the outer edge of the ring of the metal joint. Lay 1mm, 2mm or 3mm thick 824 insulation sheets in the mold according to the predetermined thickness and layering sequence.

[0058] 6) In step 5), after all the 824 insulation sheets of various thicknesses have been laid, the mold of the bottom molding section prefabricated part is closed, and then it is placed on the press for high-temperature vulcanization. The specific high-temperature vulcanization process is as follows:

[0059] The bottom molding section preform is heated to 80±5℃ with the press, kept at that temperature for 3 hours, then pressurized to 4500T, then heated to 130±5℃ and kept at that temperature for another 12 hours. After the high-temperature vulcanization time is over, the press is cooled and the pressure is reduced.

[0060] 7) After the press is cooled and depressurized, the mold is removed. At this time, the metal joint and the bottom molding section have formed an integral structure. Then, the outer edge of the ring of the bottom molding section is ground inward to form a slope section 2a with a width of 100±15mm and an angle of 4~10°. The slope section is cleaned with ethyl acetate.

[0061] 8) The inner ring edge of the airbag hot pressing section 3 is tightly attached to the slope section of the bottom molding section. The inner surface of the bottom molding section is covered with an artificial release layer 4. Then, the airbag hot pressing section with metal joint and the bottom molding section are assembled together into the airbag hot pressing section mold.

[0062] 9) The cover layer 5 and the 824 insulation sheet of the airbag hot pressing section are integrally laid on the inner surface of the airbag hot pressing section mold. Then, after the airbag hot pressing section mold is closed, it is placed in an oven and integrally hot-pressed and cured. The specific hot-pressing curing process is as follows:

[0063] The airbag pressure is 0.5-1 MPa. The oven temperature is raised to 80±5℃ and held for 3 hours. Then, the temperature is raised to 135±5℃ and held for another 8 hours. After the hot pressing time is over, the oven is cooled and depressurized. Finally, the hot-pressed airbag section and the bottom molding section, which are formed into an integral piece, are removed from the oven. At this point, since the metal joint has been integrated with the bottom molding section in the previous steps, the metal joint, the bottom molding section and the hot-pressed airbag section form an integral structure after this step, ultimately forming an ultra-large thermal insulation head with an opening diameter greater than 3m.

[0064] The artificial release layer in step 8) is polytetrafluoroethylene tape.

[0065] The cover layer (5) and the bottom molding section in step 9) are made of the same material. The cover layer and the airbag hot-pressed section 824 insulation sheet are laid together.

[0066] The thickness of the 824 insulation sheet in the hot-pressed section of the airbag in step 9) is 14-16 mm (14 mm in this embodiment). This thickness is formed by combining the 824 insulation sheets of 1 mm, 2 mm and 3 mm thicknesses pressed out in step 1) as required.

[0067] This embodiment can be summarized as follows: using a calender to cut insulation material into sheets of specified size and thickness, sandblasting and cleaning the metal joints and placing them into the bottom molding section mold, then laying the insulation sheet, closing the mold and placing it on a press for high-temperature vulcanization, after demolding, grinding out the inclined section of the bottom molding section, assembling the airbag hot-pressed section with the bottom molding section through the inclined section, attaching the manual release layer, laying the cover layer and the insulation sheet of the airbag hot-pressed section, closing the bottom molding section and the airbag hot-pressed section mold, and finally placing it in an oven to hot-press and cure the whole to form an ultra-large insulation head with an opening diameter greater than 3m.

[0068] The present invention discloses an insulating head structure for a super-large solid rocket motor casing and its preparation method. The super-large insulating head structure is manufactured using a segmented curing molding process. First, the bottom molding section preform is molded and cured to ensure the adhesion between the metal joints and the insulating material, thus ensuring reliable manufacturing quality. The present invention further improves the overall quality of the super-large head by integrating the bottom molding section preform with the cover layer and the airbag hot-pressed section structure through airbag hot-pressing curing. The segmented curing molding method reduces the manufacturing difficulty of the entire super-large insulating head and lowers the high requirements for molding dies and molding machines.

[0069] However, those skilled in the art should recognize that the above embodiments are only used to illustrate this application and are not intended to limit this application. Any changes or modifications to the above embodiments within the spirit and essence of this application will fall within the scope of the claims of this application.

Claims

1. A method for preparing the thermally insulating head of a super-large solid rocket motor casing, characterized in that, The specific steps are as follows: 1) Use a calender to press 824 thermal insulation material into sheets, forming 824 thermal insulation sheets of three different thicknesses: 1mm, 2mm, and 3mm; 2) Pretreatment of metal joints: Before use, the metal joint with a circular structure (1) is sandblasted. The end face of the threaded hole in the center is protected by a sandblasting tool to ensure that the bonding surface between the metal joint and the 824 insulation sheet is sandblasted evenly and without omission. 3) Reprocessing of metal joints: After sandblasting the metal joint, use medical cotton swabs, ethyl acetate, and an air gun to clean the particles and powder on the surface of the metal joint. Then, use ethyl acetate or acetone to clean the sandblasted surface. The cleaning should be done no less than 3 times. Finally, allow it to air dry naturally for no less than 5 minutes. 4) After cleaning the sandblasted surface of the metal joint in step 3) with ethyl acetate or acetone, dry the sandblasted surface with a hot air gun. The temperature of the hot air gun should be below 100℃. 5) Apply 730 adhesive to the outer edge of the ring of the sandblasted metal joint, then bond a 1mm thick 824 insulation sheet. Place the metal joint into the mold of the bottom molding section preform, and confirm that the inner edge of the ring of the bottom molding section with the arc-shaped structure is in contact and connected with the outer edge of the ring of the metal joint. Lay 1mm, 2mm or 3mm thick 824 insulation sheets in the mold according to the predetermined thickness and layering sequence. 6) In step 5), after all the 824 insulation sheets of various thicknesses have been laid, the mold of the bottom molding section prefabricated part is closed, and then it is placed on the press for high-temperature vulcanization. The specific high-temperature vulcanization process is as follows: The bottom molding section preform is heated to 80±5℃ with the press, kept at that temperature for 3 hours, then pressurized to 4500T, then heated to 130±5℃ and kept at that temperature for another 12 hours. After the high-temperature vulcanization time is over, the press is cooled and the pressure is reduced. 7) After the press is cooled and depressurized, the mold is removed. At this time, the metal joint and the bottom molding section have formed an integral structure. Then, the outer edge of the ring of the bottom molding section is ground inward to form a slope section (2a) with a width of 100±15mm and an angle of 5~15°. The slope section is then cleaned with ethyl acetate. 8) The inner ring edge of the airbag hot-pressing section (3) with an arc-shaped structure is tightly attached to the slope section of the bottom molding section. The inner surface of the bottom molding section is covered with an artificial release layer (4). Then, the bottom molding section with metal joint and the airbag hot-pressing section are assembled together into the airbag hot-pressing section mold. 9) Lay the cover layer (5) and the 824 heat insulation sheet of the airbag hot pressing section on the inner surface of the mold. Then, put the airbag hot pressing section mold into the oven after closing the mold and heat press it into a whole to solidify it. , The hot-press curing process is specifically as follows: The airbag pressure is 0.5-1 MPa. The oven temperature is raised to 80±5℃ and held for 3 hours. Then the temperature is raised to 135±5℃ and held for another 8 hours. After the hot pressing time is over, the oven is cooled and depressurized. Finally, the hot-pressed section of the airbag and the bottom molding section, which are formed into an integral piece, are removed from the oven, thus forming the heat-insulating head of the ultra-large solid rocket motor shell with an opening diameter of more than 3m.

2. The method for preparing the thermally insulating head of the ultra-large solid rocket motor casing as described in claim 1, characterized in that, The artificial release layer (4) in step 8) is polytetrafluoroethylene tape.

3. The method for preparing the thermally insulating head of the ultra-large solid rocket motor casing as described in claim 1, characterized in that, In step 9), the cover layer (5) and the bottom molding section are made of the same material, and the cover layer and the airbag hot pressing section 824 insulation sheet are laid together.

4. The method for preparing the thermally insulating head of the ultra-large solid rocket motor casing as described in claim 1, characterized in that, The thickness of the 824 insulation sheet in the hot-pressed section of the airbag in step 9) is 14-16 mm. This thickness is formed by combining the 824 insulation sheets of three different thicknesses of 1 mm, 2 mm and 3 mm pressed out in step 1) as required.