A tunnel working condition multi-dimensional detection method for a patrol robot
By dividing the tunnel into multiple scene areas, designing targeted multi-dimensional data acquisition methods, and utilizing RFID and cloud platforms for data transmission and analysis, the problem of data waste in tunnel inspection was solved, achieving efficient and accurate tunnel condition monitoring.
Patent Information
- Application Number
- CN202310843042.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-11
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-07-11
AI Technical Summary
Existing technologies cannot adapt multi-dimensional data acquisition methods to the actual tunnel scenario, resulting in the waste of some data.
The tunnel is divided into several tunnel scene areas, different multi-dimensional data acquisition methods are designed, and weighted calculations are performed based on geographical environmental factors. The multi-dimensional data acquisition frequency is set, and data transmission and analysis are carried out using RFID tags and cloud platforms.
It achieves targeted and efficient tunnel condition detection, avoids resource waste, and ensures data integrity and accuracy.
Smart Images

Figure QLYQS_1 
Figure QLYQS_3 
Figure QLYQS_4
Abstract
Description
Technical Field
[0001] This invention relates to the field of tunnel inspection technology, and in particular to a multi-dimensional detection method for tunnel working conditions using an inspection robot. Background Technology
[0002] Due to changes in natural conditions (groundwater, materials, strata, freeze-thaw cycles, etc.), tunnel structures undergo various alterations (such as cracking and misalignment), causing groundwater or surface water to seep into the tunnel directly or indirectly, forming tunnel leakage defects. This erodes the tunnel structure and affects normal tunnel operation and the use of equipment inside. In tunnels, defects are typically identified visually, and re-inspections often involve comparing previous defect information. This method is not intuitive and information is easily overlooked.
[0003] Currently, inspection robots are used to identify tunnel defects. For example, a "track robot detection method based on binocular vision sensors" disclosed in Chinese patent literature, publication number CN108279677A, describes the following steps: Step 1, using two infrared binocular vision sensors as the infrared binocular stereo vision system for the track robot; Step 2, establishing an ideal imaging model of the binocular vision system based on the infrared binocular stereo vision system, and obtaining the three-dimensional spatial coordinates of the digital image based on the parallax and the ideal imaging model. Besides using binocular sensors for tunnel defect identification, other sensors are also used for tunnel condition detection. For example, gas detection sensors are used to detect air quality inside the tunnel, and ultraviolet cameras are used to detect discharge faults in electrical equipment and contaminants such as oil stains, dirt, and limescale on tunnel walls and pipe surfaces.
[0004] Tunnel sidewall rail-mounted inspection robots can improve inspection efficiency and accuracy, reduce the risks of manual inspection, and also reduce the workload of staff. However, many sensors do not need to collect data in all tunnel scenarios. The tunnel length, equipment installation, and geographical conditions vary at different locations, and the key data to be collected also differ. If the same data collection method is used in different situations to collect all multidimensional data, it will inevitably lead to data waste. Summary of the Invention
[0005] This invention primarily addresses the problem that existing technologies cannot design and change multi-dimensional data acquisition methods according to actual tunnel scenarios, resulting in some data waste. It provides a multi-dimensional detection method for tunnel working conditions using an inspection robot, which divides the tunnel into several tunnel scene areas, designs different multi-dimensional data acquisition methods, and conducts inspection and maintenance of tunnel working conditions, making monitoring more targeted and avoiding resource waste.
[0006] The above-mentioned technical problems of the present invention are mainly solved by the following technical solutions:
[0007] A method for multi-dimensional detection of tunnel working conditions using an inspection robot includes the following steps:
[0008] S1: Set up an inspection robot to scan and model the tunnel;
[0009] S2: Based on the geographical environment of the tunnel's location, the tunnel is divided into several tunnel scene areas, and corresponding combinations of multi-dimensional data acquisition methods are set.
[0010] S3: Collect working condition data of each tunnel scene area according to the set multi-dimensional data acquisition method, and adjust the acquisition frequency of each sensor in real time according to the acquired working condition data;
[0011] S4: The collected working condition data is transmitted to the cloud platform. The cloud platform performs comprehensive analysis, determines the working condition and health status of the tunnel, and sends the results to the relevant personnel.
[0012] By dividing the tunnel into several tunnel scene areas and designing different multi-dimensional data acquisition methods, the tunnel's working conditions can be inspected and maintained, making monitoring more targeted and avoiding resource waste.
[0013] As a preferred option, the tunnel scene area division process is as follows:
[0014] Obtain data on geographical environmental factors that may affect the tunnel structure, including factors such as soft geology, historical precipitation, historical freeze-thaw cycles, tunnel depth, and groundwater conditions, which may have an impact on the tunnel structure.
[0015] Quantitatively describe the geographical environmental factors at each tunnel location and normalize them;
[0016] The geographical impact scores at each location of the tunnel are obtained by weighting and calculating the data of various geographical environmental factors.
[0017] Based on the changes in geographical impact scores along the tunnel direction, the tunnel scene area is divided.
[0018] Divide the tunnel scene into regions, grouping tunnels with similar conditions into the same region to facilitate adjusting the corresponding multi-dimensional acquisition mode.
[0019] As a preferred method, the calculation process for the geographic impact score is expressed as follows:
[0020]
[0021] Where, P k Score the geographical impact of the tunnel at location k;
[0022] E nkThis is the normalized value of the nth geographical environmental factor data at location k of the tunnel;
[0023] α nk The weighting coefficient for the nth geographical environmental factor data at location k of the tunnel;
[0024] N represents the total number of geographical environmental factor data;
[0025]
[0026] Among them, e mn This represents the degree of influence of the m-th geographical environmental factor data on the n-th geographical environmental factor data.
[0027] α0 is the initial value of the weighting coefficient.
[0028] For different geographical environmental factor data, changes in other geographical environmental factor data may also affect the degree of influence of that geographical environmental factor data on the tunnel structure. For example, the degree of influence of groundwater on the tunnel structure may change with the freeze-thaw conditions (temperature), therefore, the weighting coefficient should also change according to the changes in other factor data.
[0029] As a preferred approach, the process of dividing the tunnel scene area based on the change in geographical impact score along the tunnel direction is as follows:
[0030] Plot the change curve of the geographical impact score with the location along the tunnel direction as the horizontal axis and the geographical impact score as the vertical axis;
[0031] The points with a rate of change of 0 on the geographic impact score curve are taken as the first boundary; and the distance between adjacent first boundaries is calculated.
[0032] If the distance between adjacent first boundaries is greater than or equal to the first distance threshold, then a second boundary is inserted in the middle of the adjacent first boundaries;
[0033] If the distance between adjacent first boundaries is less than or equal to the second distance threshold, and the corresponding difference in geographic impact score is less than or equal to the difference threshold, then retain any one of the first boundaries, remove the other first boundary, and recalculate the distance between adjacent first boundaries.
[0034] If the distance between adjacent first boundaries is less than or equal to the second distance threshold, and the corresponding difference in geographic impact score is greater than the difference threshold, then all first boundaries are retained.
[0035] The tunnels between adjacent boundaries are divided into a tunnel scene area.
[0036] The second distance threshold is less than half of the first distance threshold.
[0037] As a preferred option, boundary RFID tags are set at the boundaries of the tunnel scene area to delineate locations and exchange data with the inspection robot; within the tunnel scene area, an RFID tag is set at a fixed interval.
[0038] RFID is connected to a communication platform on the ground via cables. The communication platform communicates with a cloud platform. The cloud platform receives the collected information, performs calculations and analysis, and determines the working condition of the tunnel.
[0039] Because the robot in the tunnel is underground, communication with the cloud platform cannot be guaranteed. Continuously setting up RFID tags in the tunnel can serve as location identifiers to distinguish different tunnel areas, and can also be used for information exchange with the inspection robot. The data is transmitted to the surface communication platform via wired connection to ensure data integrity, avoid data loss, and eliminate interference from the underground tunnel on signal transmission.
[0040] As a preferred approach, a combination of multi-dimensional data acquisition methods is set for each tunnel segment, specifically including the following process:
[0041] For each tunnel scene area, the corresponding data acquisition type is set for the objects that need to be detected. The objects to be detected include various types of equipment and tunnel structure detection points.
[0042] The data collection frequency is set based on the maximum rate of change and the highest value of the geographical impact score in the tunnel scene area.
[0043] As a preferred option, for equipment in the tunnel, including lighting, ventilation, drainage, and fire protection facilities, there is no need to set a fixed acquisition frequency; data is only collected at the corresponding locations.
[0044] The sampling frequency for tunnel structure types, such as whether the tunnel walls are cracked, leaking, deformed, or settled, is set based on the rate of change and the highest value of the geographical impact score in the tunnel scene area.
[0045]
[0046] Among them, f si0 The initial frequency for acquiring the structure type of the i-th tunnel scene region;
[0047] k pimax The maximum rate of change in the geographical impact score of the i-th tunnel scene area;
[0048] k p0 The standard value for the rate of change of the geographical impact score;
[0049] p imax The highest value of the geographical impact score for the i-th tunnel scene area;
[0050] p0 is the standard value for the geographic impact score;
[0051] The calculation is performed by rounding down to the nearest integer.
[0052] f0 is a preset fixed frequency;
[0053] For the detection of special conditions in tunnels, a preset fixed frequency f0 is used for the acquisition frequency.
[0054] Special case detection includes emergency situations such as fires and electrical leaks, as well as the levels of harmful gases such as carbon dioxide, carbon monoxide, and methane.
[0055] As a preferred option, for the acquisition frequency of tunnel structure types, the acquisition frequency adjustment process is as follows:
[0056] Compare the currently acquired tunnel structure data with the tunnel structure data from the initial modeling. If the parameter changes exceed the set safety threshold, the structure type acquisition frequency is adjusted to the set maximum value; otherwise, it changes according to the following formula:
[0057]
[0058] Among them, f si The sampling frequency for the structure type of the i-th tunnel scene region;
[0059] Δd t Let t be the difference between the tunnel structure data collected in the t-th iteration and the previous tunnel structure data.
[0060] T represents the current data collection round;
[0061] Δd e The preset threshold for the difference in tunnel structure data;
[0062] f e This is the preset sampling frequency change value;
[0063] This is for rounding up.
[0064] Based on a comparison of the sum of the last five tunnel structure data changes and the resulting tunnel structure data difference threshold, the frequency of structural data acquisition is adaptively adjusted. Different tunnel structure data are obtained through different sensors, and the changes in tunnel structure data for each type are calculated separately. The maximum value of the acquisition frequency for each sensor is taken.
[0065] As a preferred option, the cloud platform stores multiple neural network models trained with historical data. Each tunnel condition corresponds to a neural network model. Based on the data type of the multidimensional tunnel data, the multidimensional tunnel data is input into the corresponding neural network model to determine the health status of various tunnel conditions.
[0066] The beneficial effects of this invention are:
[0067] 1. Divide the tunnel into several tunnel scene areas and design different multi-dimensional data acquisition methods to conduct tunnel condition inspections and maintenance, making monitoring more targeted and avoiding resource waste.
[0068] 2. Divide the tunnel area scene and group tunnels with similar conditions into the same area to facilitate the adjustment of the corresponding multi-dimensional acquisition mode.
[0069] 3. Consider the influence of different geographical environmental factors on the data, and adjust the weighting coefficients according to the data to make the calculation results more accurate and reliable.
[0070] 4. Continuously installing RFID tags in the tunnel can serve as location identifiers to distinguish different tunnel areas, and can also be used for information exchange with inspection robots. The data is transmitted to the surface communication platform via wired transmission, ensuring data integrity, preventing data loss, and eliminating interference from underground tunnels on signal transmission.
[0071] 5. The acquisition frequency is adaptively adjusted based on the collected data, which can avoid data waste and ensure that important data is not missed. Attached Figure Description
[0072] Figure 1 This is a flowchart of the multi-dimensional detection method for tunnel working conditions according to the present invention.
[0073] Figure 2 This is a flowchart of the process of dividing the tunnel scene area according to the present invention. Detailed Implementation
[0074] The technical solution of the present invention will be further described in detail below through embodiments and in conjunction with the accompanying drawings.
[0075] Example:
[0076] This embodiment presents a multi-dimensional detection method for tunnel working conditions using an inspection robot, such as... Figure 1 As shown, it includes the following steps:
[0077] S1: Set up an inspection robot to scan and model the tunnel.
[0078] An inspection system using a track-guided robot is installed in the tunnel. Before inspecting the tunnel's working conditions, the robot runs along the track and acquires images of the tunnel's interior using sensors such as binocular cameras.
[0079] The structure and equipment of the tunnel are modeled. The specific scanning and modeling process of the tunnel will not be described in detail here.
[0080] S2: Based on the geographical environment of the tunnel's location, the tunnel is divided into several tunnel scene areas, and corresponding combinations of multi-dimensional data acquisition methods are set.
[0081] The process of dividing the tunnel scene area is as follows:
[0082] 1) Obtain data on geographical environmental factors that affect the tunnel structure.
[0083] Geographic environmental factors data are relevant factors that may affect the tunnel structure, including soft geology, tunnel materials, historical precipitation, historical freeze-thaw cycles, tunnel depth, and groundwater conditions, etc.
[0084] Along the tunnel's direction, acquire data on geographical environmental factors at various locations within the tunnel. This type of data can be obtained through historical geological surveys, environmental change statistics, and design parameters used during tunnel construction.
[0085] 2) Quantitatively describe the geographical environmental factors at each tunnel location and normalize them.
[0086] Because the data have different dimensions, it is difficult to perform uniform data processing. Therefore, a corresponding maximum value is set for each geographical environmental factor data, and the quantitative data is normalized by dividing it by the corresponding maximum value for subsequent geographical impact score calculation.
[0087] 3) Weighted calculations are performed on the data of each geographical environmental factor to obtain the geographical impact score at each location of the tunnel.
[0088] The calculation process for the geographic impact score is expressed as follows:
[0089]
[0090] Where, P k Score the geographical impact of the tunnel at location k.
[0091] E nk This is the normalized value of the nth geographical environmental factor data at location k of the tunnel.
[0092] α nk , where is the weighting coefficient for the nth geographical environmental factor data at location k of the tunnel.
[0093] N represents the total number of geographical environmental factor data.
[0094] For different geographical environmental factor data, changes in other geographical environmental factor data may also affect the degree of influence of that geographical environmental factor data on the tunnel structure. For example, the degree of influence of groundwater on the tunnel structure may change with the freeze-thaw conditions (temperature), therefore, the weighting coefficient should also change according to the changes in other factor data.
[0095]
[0096] Among them, e mn This represents the degree of influence of the m-th geographical environmental factor data on the n-th geographical environmental factor data. It can be obtained by looking up historical data in a table or by training a neural network model using historical data; details will not be elaborated upon in this embodiment.
[0097] α0 is the initial value of the weighting coefficient, which is usually taken as 1.
[0098] 4) Divide the tunnel scene area according to the changes in the geographical impact score along the tunnel direction.
[0099] The process of dividing the tunnel scene area is as follows:
[0100] 4-1) Using the location along the tunnel direction as the horizontal axis and the geographical impact score as the vertical axis, plot the geographical impact scores of each location on the same curve. After smoothing the curve, obtain the final geographical impact score change curve.
[0101] 4-2) Calculate the rate of change of each point on the geographic impact score curve, and take the point with a rate of change of 0 as the first boundary.
[0102] 4-3) Calculate the distance between adjacent first boundaries.
[0103] 4-4) If the distance between adjacent first boundaries is greater than or equal to the first distance threshold, then insert a second boundary in the middle of the adjacent first boundaries;
[0104] If the distance between adjacent first boundaries is less than or equal to the second distance threshold, and the corresponding difference in geographic impact score is less than or equal to the difference threshold, then retain any one of the first boundaries, remove the other first boundary, and return to step 4-3) to calculate the distance between adjacent first boundaries.
[0105] If the distance between adjacent first boundaries is less than or equal to the second distance threshold, and the corresponding geographical impact score difference is greater than the difference threshold, then all first boundaries are retained.
[0106] The second distance threshold is less than half of the first distance threshold.
[0107] 4-5) Tunnels between adjacent boundaries are divided into a tunnel scene area.
[0108] At the boundary of the tunnel scene area, a boundary RFID tag is set up to delineate the location and exchange data with the inspection robot; within the tunnel scene area, an RFID tag is set at a fixed interval.
[0109] RFID is connected to a communication platform on the ground via cables. The communication platform communicates with a cloud platform. The cloud platform receives the collected information, performs calculations and analysis, and determines the working condition of the tunnel.
[0110] Because the robot in the tunnel is underground, communication with the cloud platform cannot be guaranteed. Continuously setting up RFID tags in the tunnel can serve as location identifiers to distinguish different tunnel areas, and can also be used for information exchange with the inspection robot. The data is transmitted to the surface communication platform via wired connection to ensure data integrity, avoid data loss, and eliminate interference from the underground tunnel on signal transmission.
[0111] For each tunnel segment, a corresponding combination of multi-dimensional data acquisition methods is set, including setting the data acquisition type and the frequency of each data acquisition type. The specific process includes the following:
[0112] 1> Statistically determine the objects that need to be detected in each tunnel scene area and set the corresponding data acquisition type. The objects to be detected include various equipment and tunnel structure detection points, etc.
[0113] 2> Set the data collection frequency based on the maximum rate of change and the highest value of the geographical impact score in the tunnel scene area.
[0114] This embodiment's data acquisition process includes using binocular vision technology to enable the construction robot to acquire stereoscopic images, thereby accurately measuring the dimensions and distances of tunnel facilities and detecting cracks and defects on the wall surfaces. An ultraviolet camera can detect discharge faults in electrical equipment and contaminants such as oil stains, dirt, and limescale on tunnel walls and pipe surfaces, promptly notifying maintenance personnel for cleaning and treatment. The robot is equipped with gas detection sensors to monitor the air quality inside the tunnel, including the levels of harmful gases such as carbon dioxide, carbon monoxide, and methane, providing timely alarms and emergency measures. The robot is also equipped with laser vision technology to acquire three-dimensional data of the tunnel interior, detecting deformation and settlement to assess the safety status of the tunnel structure.
[0115] For equipment in the tunnel, including lighting, ventilation, drainage, and fire protection facilities, there is no need to set a fixed data acquisition frequency; data is only collected at the corresponding locations.
[0116] The sampling frequency for different tunnel structure types, such as whether the tunnel walls are cracked, leaking, deformed, or settled, is determined based on the rate of change and the highest value of the geographical impact score in the tunnel scene area.
[0117]
[0118] Among them, f si0 The initial frequency for sampling the structure type of the i-th tunnel scene area.
[0119] k pimax The maximum rate of change in the geographical impact score of the i-th tunnel scene area.
[0120] k p0 This is the standard value for the rate of change of the geographical impact score.
[0121] p imax This represents the highest value of the geographical impact score for the i-th tunnel scene area.
[0122] p0 is the standard value for the geographic impact score.
[0123] This is for rounding down to the nearest integer.
[0124] f0 is a preset fixed frequency.
[0125] For the detection of special conditions in tunnels, a preset fixed frequency f0 is used for the acquisition frequency.
[0126] Special case detection includes emergency situations such as fires and electrical leaks, as well as the levels of harmful gases such as carbon dioxide, carbon monoxide, and methane.
[0127] S3: Collect working condition data of each tunnel scene area according to the set multi-dimensional data acquisition method, and adjust the acquisition frequency of each sensor in real time according to the acquired working condition data.
[0128] As time changes, the conditions inside the tunnel will continue to change. Using only a fixed data acquisition frequency may not be able to meet the monitoring needs of the tunnel's working conditions in the later stages, and may miss important data. Alternatively, based on the analysis of the acquired data, the initial frequency may be too high, resulting in data waste. Therefore, it is necessary to adaptively adjust the acquisition frequency according to the structure type in real time based on the acquired data.
[0129] For the acquisition frequency of tunnel structure types, the acquisition frequency adjustment process is as follows:
[0130] Compare the currently acquired tunnel structure data with the tunnel structure data from the initial modeling. If the parameter changes exceed the set safety threshold, the structure type acquisition frequency is adjusted to the set maximum value; otherwise, it changes according to the following formula:
[0131]
[0132] Among them, f si The frequency of data acquisition for the structure type of the i-th tunnel scene area.
[0133] Δd t Let t be the difference between the tunnel structure data collected in the t-th iteration and the previous tunnel structure data.
[0134] T represents the current data collection round.
[0135] Δd e This is a preset threshold for the difference in tunnel structure data.
[0136] f e This is the preset sampling frequency change value.
[0137] This is for rounding up.
[0138] In this embodiment, the structural data acquisition frequency is adaptively adjusted based on a comparison of the sum of the last five tunnel structural data changes and the resulting tunnel structural data difference threshold. Different tunnel structural data are obtained through different sensors, and the changes in tunnel structural data for each type are calculated separately. The acquisition frequency of each sensor is set to the maximum value.
[0139] S4: The collected working condition data is transmitted to the cloud platform. The cloud platform performs comprehensive analysis, determines the working condition and health status of the tunnel, and sends the results to the relevant personnel.
[0140] The inspection robot exchanges multidimensional tunnel data collected by its various sensors with the set RFID tags. The RFID tags record the time of the data exchange and carry their own identification number to transmit the multidimensional tunnel data collected by the inspection robot to the communication platform. The communication platform then collects the data and sends it to the cloud platform for processing.
[0141] The cloud platform stores multiple neural network models trained with historical data. Each tunnel condition corresponds to a neural network model. Based on the data type of the multidimensional tunnel data, the multidimensional tunnel data is input into the corresponding neural network model to determine the health status of various tunnel conditions.
[0142] The analysis results are sent to the relevant staff, who then respond and process the feedback.
[0143] The solution in this embodiment divides the tunnel into several tunnel scene areas and designs different multi-dimensional data acquisition methods to inspect and maintain the tunnel's working conditions, making the monitoring more targeted and avoiding resource waste.
[0144] It should be understood that the embodiments are for illustrative purposes only and are not intended to limit the scope of the invention. Furthermore, it should be understood that after reading the teachings of this invention, those skilled in the art can make various alterations or modifications to the invention, and these equivalent forms also fall within the scope defined by the appended claims.
Claims
1. A method for multi-dimensional detection of tunnel working conditions by a tunnel inspection robot, characterized in that, Includes the following steps: S1: Set up an inspection robot to scan and model the tunnel; S2: Based on the geographical environment of the tunnel's location, the tunnel is divided into several tunnel scene areas, and corresponding combinations of multi-dimensional data acquisition methods are set. S3: Collect working condition data of each tunnel scene area according to the set multi-dimensional data acquisition method, and adjust the acquisition frequency of each sensor in real time according to the acquired working condition data; S4: The collected working condition data is transmitted to the cloud platform. The cloud platform performs comprehensive analysis, determines the working condition and health status of the tunnel, and sends the results to the relevant personnel. The process of dividing the tunnel scene area is as follows: Obtain data on geographical environmental factors that affect the tunnel structure; Quantitatively describe the geographical environmental factors at each tunnel location and normalize them; The geographical impact scores at each location of the tunnel are obtained by weighting and calculating the data of various geographical environmental factors. Based on the changes in geographical impact scores along the tunnel direction, the tunnel scene area is divided; The calculation process for the geographic impact score is expressed as follows: wherein, is the geographical impact score of the tunnel at k position; is the normalized value of the nth geographical environmental factor data at the kth location of the tunnel; is a weighting coefficient for the nth geographical environmental factor data of the tunnel at the kth location; N represents the total number of geographical environmental factor data; wherein, is the degree of influence of the mthgeographical environmental factor data on the nthgeographical environmental factor data; is the initial value of the weighting coefficient; The process of dividing the tunnel scene area is as follows: Plot the change curve of the geographical impact score with the location along the tunnel direction as the horizontal axis and the geographical impact score as the vertical axis; The points with a change rate of 0 on the geographical impact score curve are taken as the first boundary; and the distance between adjacent first boundaries is calculated. If the distance between adjacent first boundaries is greater than or equal to the first distance threshold, then a second boundary is inserted in the middle of the adjacent first boundaries; If the distance between adjacent first boundaries is less than or equal to the second distance threshold, and the corresponding difference in geographic impact score is less than or equal to the difference threshold, then retain any one of the first boundaries, remove the other first boundary, and recalculate the distance between adjacent first boundaries. If the distance between adjacent first boundaries is less than or equal to the second distance threshold, and the corresponding difference in geographic impact score is greater than the difference threshold, then all first boundaries are retained. The tunnels between each adjacent boundary are divided into a tunnel scene area; For each tunnel segment, a corresponding combination of multi-dimensional data acquisition methods is set up, specifically including the following process: For each tunnel scene area, the corresponding data acquisition type is set for the objects that need to be detected. The objects to be detected include various types of equipment and tunnel structure detection points. The data collection frequency is set based on the maximum rate of change and the highest value of the geographical impact score in the tunnel scene area.
2. The multi-dimensional detection method for tunnel working conditions of a patrol robot according to claim 1, characterized in that, At the boundary of the tunnel scene area, boundary RFID tags are set up to delineate locations and exchange data with the inspection robot; within the tunnel scene area, an RFID tag is set at a fixed interval. RFID is connected to a communication platform on the ground via cables. The communication platform communicates with a cloud platform. The cloud platform receives the collected information, performs calculations and analysis, and determines the working condition of the tunnel.
3. The multi-dimensional detection method for tunnel working conditions of a patrol robot according to claim 1, characterized in that, For equipment inside the tunnel, data is collected only at the corresponding locations; For the sampling frequency of tunnel structure types, the initial frequency is set based on the rate of change and the highest value of the geographical influence score in the tunnel scene area: wherein, is the initial frequency of the structure type collection frequency for the i-th segment tunnel scenario area; maximum rate of change of the geographic influence score for the i-th segment tunnel scenario region; is a change rate criterion value for the geographical influence score; the highest value of the geographical impact score for the i-th segment tunnel scenario region; is a standard value for the geographical impact score; is rounded down; The preset fixed frequency is 2. The collection frequency of the tunnel special case detection is all preset fixed frequency .
4. The multi-dimensional detection method for tunnel working conditions of a patrol robot according to claim 3, characterized in that, For the acquisition frequency of tunnel structure types, the acquisition frequency adjustment process is as follows: Compare the current acquired tunnel structure data with the tunnel structure data when initially modeled, if the parameter change exceeds the set safety threshold, the structure type collection frequency is adjusted to the set maximum value; otherwise, change according to the following formula: wherein, is the structure type collection frequency for the i-th tunnel scene region. Dtunnel is the tunnel structure data collected at the tth time; T is the current collection round; a preset tunnel structure data difference threshold value; is a preset acquisition frequency change value; is rounded up.
5. The multi-dimensional detection method for tunnel working conditions of a patrol robot according to claim 1 or 2, characterized in that, The cloud platform stores a plurality of neural network models trained by historical data, each tunnel condition corresponds to a neural network model, according to the data type of the multi-dimensional tunnel data, respectively input the multi-dimensional tunnel data into the corresponding neural network model, judge the health condition of each type of working condition of the tunnel.
Citation Information
Patent Citations
Method for detecting track robots on basis of binocular vision sensors
CN108279677A
Tunnel data acquisition method and equipment based on inspection robot, and medium
CN114814877A
Tunnel risk analysis method based on influence of two factors of regional geology and construction
CN115829322A
