Method for installation and recovery of a mud floating offshore wind turbine system

By using adjustable-length anchor chains and anchor cylinders, combined with gravity and vacuum suction, the installation process of offshore wind turbine systems has been simplified, achieving efficient, low-cost installation and stability.

CN117208165BActive Publication Date: 2026-11-20SHANGHAI EST OCEAN ENGINEERING TECHNOLOGY CO LTD +3
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202311306060.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-10-09
Publication Date
2026-11-20
Estimated Expiration
2043-10-09

AI Technical Summary

Technical Problem

The installation process of existing offshore wind turbine systems is complex and consumes a lot of manpower and resources.

Method used

Adjustable length anchor chains and anchor tubes are used. The anchor tubes are lowered to the designated position on the seabed by gravity and vacuum suction. Combined with the adjustment of the anchor chains, the wind turbine foundation and the whole machine are installed in a balanced manner, simplifying the installation process.

Benefits of technology

This has enabled simple and low-cost installation of offshore wind turbine systems, improving installation efficiency and stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117208165B_ABST
    Figure CN117208165B_ABST
Patent Text Reader

Abstract

The present application relates to a kind of installation method and recovery method of mud floating type offshore wind turbine system.The system includes wind turbine, wind turbine foundation and anchoring assembly arranged in vertical direction in sequence;Anchoring assembly includes multiple adjustable length anchor chains and anchor barrels, each anchor barrel is the structure of top sealing and bottom opening, each anchor barrel has valve on side wall, one end of each anchor chain is connected with one anchor barrel respectively, and the other end is connected with wind turbine foundation respectively;Installation method includes: in response to anchor barrel being shipped to the preset position on sea surface, each anchor chain is placed in slack state, each anchor barrel is loosened, and each anchor barrel is respectively sunk to the mud surface of seabed along vertical direction based on gravity;Anchor barrel is vacuumized, and each anchor barrel is sunk to the specified position under mud surface based on the pressure difference formed inside and outside anchor barrel;Wind turbine foundation is kept in balanced state, each anchor chain is tightened until wind turbine reaches specified working height.The present application is simple and low in cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of offshore wind power technology, and in particular to an installation method and a recovery method for a mud-floating offshore wind turbine system. Background Technology

[0002] With the growing prominence of the energy crisis, offshore wind power, as a renewable energy source, has become an important component of the current energy structure and a crucial energy source for addressing the energy crisis. Among related technologies, after the offshore wind turbine system is transported to the designated sea area, its installation requires significant manpower and resources, and the installation process is quite complex.

[0003] Therefore, there is an urgent need to provide an installation method and a recovery method for a mud-floating offshore wind turbine system to solve the above problems. Summary of the Invention

[0004] One or more embodiments of the present invention describe an installation and recovery method for a mud-floating offshore wind turbine system, which is simple to install and low in cost.

[0005] In a first aspect, one embodiment of the present invention provides an installation method for a mud-floating offshore wind turbine system. The offshore wind turbine system includes a wind turbine unit, a wind turbine foundation, and an anchoring assembly arranged sequentially in a vertical direction. The anchoring assembly includes multiple adjustable-length anchor chains and anchor cylinders. Each anchor cylinder has a top-sealed, bottom-open structure, and each anchor cylinder has a valve on its side wall. One end of each anchor chain is connected to an anchor cylinder, and the other end is connected to the wind turbine foundation. The installation method includes:

[0006] In response to each of the anchor tubes being transported to a predetermined position on the sea surface, each of the anchor chains is placed in a slack state, and each anchor tube is released so that each anchor tube is vertically lowered onto the mud surface of the seabed based on gravity.

[0007] Vacuuming is performed on the corresponding anchor cylinder by valves on the side wall of each anchor cylinder, so that each anchor cylinder is sunk to a designated position below the mud surface based on the pressure difference formed inside and outside the anchor cylinder. The internal pressure of each anchor cylinder is less than its external pressure. The designated position includes a designated depth and a designated latitude and longitude. The preset position and the designated position have a one-to-one correspondence in the vertical direction.

[0008] In response to each of the anchor cylinders sinking to the designated position, keeping the wind turbine foundation in a balanced state, each anchor chain is tightened until the entire wind turbine reaches the designated working height.

[0009] Secondly, one embodiment of the present invention provides a method for recovering a mud-floating offshore wind turbine system. The offshore wind turbine system includes a wind turbine unit, a wind turbine foundation, and an anchoring assembly arranged sequentially in a vertical direction. The anchoring assembly includes multiple adjustable-length anchor chains and anchor tubes. One end of each anchor chain is connected to an anchor tube, and the other end is connected to the wind turbine foundation. Each anchor tube has a top-sealed, bottom-open structure, and each anchor tube has a valve on its side wall. Each anchor tube is fixed within the mud surface of the seabed. The method includes:

[0010] For each anchor tube, water is filled through a valve on its side wall to lift the anchor tube out of the mud surface based on the pressure difference between the inside and outside of the anchor tube. The internal pressure of each anchor tube is greater than the external pressure.

[0011] Keep the wind turbine foundation in a balanced state, and adjust the tightening rate of each anchor chain to pull each anchor cylinder away from the seabed until each anchor cylinder abuts against the wind turbine foundation;

[0012] Each anchor cylinder, the wind turbine foundation, and the complete wind turbine will be transported to a designated port for recycling.

[0013] According to the installation and recovery method of the mud-floating offshore wind turbine system provided by embodiments of the present invention, after the anchor cylinder is transported to a preset position on the sea surface, the anchor chains are loosened, allowing each anchor chain to sink to the mud surface of the seabed under the action of gravity. Then, a vacuum is applied to the anchor cylinder, causing it to sink further based on suction until it reaches a specified depth, thus ensuring its strong load-bearing capacity and stability. Finally, while maintaining the wind turbine foundation in a balanced state, each anchor chain is tightened until the entire wind turbine reaches the specified working height, completing the installation. This invention allows for anchor cylinder installation under the action of gravity and suction, and the height of the wind turbine foundation and the entire wind turbine can be adjusted by adjusting the anchor chains, making installation simple and cost-effective. Attached Figure Description

[0014] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0015] Figure 1 This is a flowchart illustrating an installation method for a mud-floating offshore wind turbine system according to an embodiment of the present invention.

[0016] Figure 2 This is a structural schematic diagram of a mud-floating offshore wind turbine system provided in an embodiment of the present invention;

[0017] Figure 3 This is a structural schematic diagram of a mud-floating offshore wind turbine foundation provided in an embodiment of the present invention;

[0018] Figure 4 This is a schematic diagram of the structure of an anchoring component provided in an embodiment of the present invention;

[0019] Figure 5 This is a flowchart of a method for recovering a mud-floating offshore wind turbine system according to an embodiment of the present invention;

[0020] Figure 6 This is a schematic diagram of the structure of the partition chamber inside the sphere provided in an embodiment of the present invention.

[0021] Figure label:

[0022] 1-The complete fan unit;

[0023] 11-Upper fan; 12-Tower;

[0024] 2-Wind turbine foundation;

[0025] 21-Cylinder; 22-Sphere; 23-First Linkage; 24-Divider Compartment;

[0026] 3-Anchoring components;

[0027] 31-Anchor chain; 32-Anchor cylinder; 33-Second connecting rod; 34-Base. Detailed Implementation

[0028] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are some embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0029] To better understand the solution, the mud-floating offshore wind turbine system will be explained first:

[0030] A mud-floating offshore wind turbine system refers to a wind turbine foundation that can switch between a floating state and a mud-floating state. In the floating state, the wind turbine foundation floats on the sea surface or in the seawater. In this state, the upper wind turbine operates at a higher height, which is beneficial to improving power generation efficiency and is suitable for marine environments with good conditions. In the mud-floating state, the wind turbine foundation is fixed in the mud layer on the seabed. In this state, the upper wind turbine operates at a lower height, which is beneficial to improving safety and is suitable for marine environments with harsher conditions.

[0031] Please refer to Figure 1This invention provides an installation method for a mud-floating offshore wind turbine system, such as... Figure 2 and Figure 3 As shown, the offshore wind turbine system includes a wind turbine unit 1, a wind turbine foundation 2, and an anchoring assembly 3 arranged vertically in sequence. The anchoring assembly 3 includes multiple adjustable-length anchor chains 31 and anchor tubes 32. Each anchor tube 32 has a sealed top and an open bottom structure, and each anchor tube 32 has a valve on its side wall. One end of each anchor chain 31 is connected to an anchor tube 32, and the other end is connected to the wind turbine foundation 2. The installation method includes:

[0032] Step 100: In response to each of the anchor tubes 32 being transported to a preset position on the sea surface, each of the anchor chains 31 is placed in a slack state, and each anchor tube 32 is released so that each anchor tube 32 is vertically lowered onto the mud surface of the seabed based on gravity.

[0033] Step 102: Vacuuming is performed on the corresponding anchor cylinder 32 through the valve on the side wall of each anchor cylinder 32, so that each anchor cylinder 32 is sunk to a designated position below the mud surface based on the pressure difference formed inside and outside the anchor cylinder 32. The internal pressure of each anchor cylinder 32 is less than its external pressure. The designated position includes a designated depth and a designated latitude and longitude. The preset position and the designated position have a one-to-one correspondence in the vertical direction.

[0034] Step 104: In response to each of the anchor cylinders 32 sinking to the designated position, keeping the wind turbine foundation 2 in a balanced state, tighten each anchor chain 31 until the wind turbine 1 reaches the designated working height.

[0035] In this embodiment, after the anchor cylinder 32 is transported to a predetermined position on the sea surface, the anchor chains 31 are loosened, allowing each anchor chain 31 to sink to the muddy surface of the seabed under gravity. Then, a vacuum is applied to the anchor cylinder 32, causing it to sink further due to suction until it reaches a designated depth, thus ensuring strong load-bearing capacity and stability. Finally, while maintaining the wind turbine foundation 2 in a balanced state, each anchor chain 31 is tightened until the entire wind turbine 1 reaches the designated working height, completing the installation. This invention allows for the installation of the anchor cylinder 32 under the influence of gravity and suction, and the height of the wind turbine foundation 2 and the entire wind turbine 1 can be adjusted by regulating the anchor chains 31, resulting in simple installation and low cost.

[0036] It should be noted that, as Figure 2 As shown, the wind turbine 1 includes an upper wind turbine 11 and a tower 12 connected in sequence. When the wind turbine 1 reaches the specified working height, that is, when the upper wind turbine 11 reaches the specified working height.

[0037] In some implementations, such as Figure 4As shown, the anchoring assembly 3 may further include multiple second connecting rods 33 and a cylindrical base 34. One end of each of the multiple second connecting rods 33 is uniformly connected to the circumferential sidewall of the base 34, and the other end is connected to an anchor cylinder 32. During transportation, the wind turbine 1, the wind turbine foundation 2, and the anchoring assembly 3 can be bundled together and transported as a whole to the designated location.

[0038] In some implementations, step 104 includes:

[0039] At each first time interval, the target tilt angle of the wind turbine foundation 2 is obtained;

[0040] Determine whether the target's tilt angle is greater than the preset angle;

[0041] If so, reduce the tightening rate of the anchor chain 31 on the downward tilting side and increase the tightening rate of the anchor chain 31 on the upward tilting side to ensure that the wind turbine foundation 2 and the wind turbine 1 reach the designated working height smoothly.

[0042] In this embodiment, the first time interval can be determined based on the marine environment. When the marine environment is harsh, a smaller time interval is used, and vice versa. For example, the first time interval can be 5 seconds. Since the wind turbine 1 and the wind turbine foundation 2 are a single, rigid unit, the tilt angle of the wind turbine foundation 2 is measured, which is the overall tilt angle. Furthermore, the preset angle can be 5°. When the target tilt angle is greater than 5°, the tightening rate of the anchor chain 31 needs to be adjusted to straighten the wind turbine foundation 2 and ensure the balance of the wind turbine system.

[0043] In some implementations, such as Figure 3 As shown, the wind turbine foundation 2 includes a hollow cylinder 21, multiple hollow spheres 22, and multiple first connecting rods 23;

[0044] One end of each first connecting rod 23 is connected to the circumferential side wall of the cylinder 21, and the other end is connected to a ball 22, so that multiple balls 22 are evenly surrounding the circumference of the cylinder 21. The vertical distance from the center of each ball 22 to the axis of the cylinder 21 is equal. Each ball 22 is provided with an air-water replacement valve.

[0045] The installation method further includes:

[0046] Every second time interval, the tension of each anchor chain 31 is obtained;

[0047] If it is determined whether the tension of at least one anchor chain 31 is greater than the tension threshold, then each ball 22 on the downward tilting side is unloaded and each ball 22 on the upward tilting side is ballasted. The unloading and ballasting of each ball 22 is achieved by controlling the opening degree of the air-water replacement valve on the corresponding ball 22 to adjust the water filling and discharging rate.

[0048] In this embodiment, if the tension of any anchor chain 31 exceeds the tension threshold, there is a risk of excessive stress on the anchor chain 31. In this case, leveling is required by adjusting the ballast auxiliary anchor chain 31 of each sphere 22. By adjusting the opening degree of the air-water replacement valve on each sphere 22, the water filling and discharging rate and ballast of the corresponding sphere 22 can be adjusted, thereby restoring the fan system to its normal position. Furthermore, the second time interval can be equal to the first time interval; this application does not specifically limit it.

[0049] In some embodiments, unloading the spheres 22 on the downward-sloping side and ballasting the spheres 22 on the upward-sloping side includes:

[0050] Water is released from each of the spheres 22 on the downward-sloping side; among them, the sphere 22 at the bottom has the largest water release rate, and the water release rate of each sphere 22 is gradually reduced along the direction away from the bottom sphere 22.

[0051] Water is filled into each of the spheres 22 on the upward tilted side; among them, the uppermost sphere 22 has the largest water filling rate, and the water filling rate of each sphere 22 is gradually reduced along the direction away from the uppermost sphere 22.

[0052] In this embodiment, adjusting the water filling and discharging rate on different spheres 22 according to the tilt angle, i.e. the opening degree of the air-water replacement valve, can accelerate the return speed of the fan foundation 2 and improve the adjustment efficiency.

[0053] It should also be noted that when the wind turbine foundation 2 is in a balanced state, the axis of each of the first connecting rods 23 and the center of each of the spheres 22 are on the same horizontal plane. For any given moment, the present invention uses the horizontal plane containing the center of each sphere 22 in its balanced state as a reference plane. Spheres 22 whose centers are above this reference plane are defined as upwardly tilted spheres 22, and spheres 22 whose centers are below this reference plane are defined as downwardly tilted spheres 22.

[0054] In some implementations, such as Figure 6As shown, each of the spheres 22 is provided with multiple independent partitions 24. The multiple partitions 24 are symmetrically distributed along the target axis of the sphere 22. Each partition 24 is provided with an air-water replacement valve. The target axis is the vertical axis when the fan foundation is in a balanced state.

[0055] In this embodiment, by dividing each sphere 22 into compartments, the balance of the wind turbine foundation can be further adjusted and its stability increased by controlling the ballast of each compartment 24. Specifically, when the tilt angle of the wind turbine foundation exceeds a preset value, the foundation can be corrected as follows: For the sphere located at the midline of the horizontal plane, the opening degree of the air-water replacement valve of the first compartment 24 is increased. By increasing the opening degree of the air-water replacement valve, the water filling rate of the corresponding compartment 24 is increased, thereby increasing the ballast. For the second compartment 24, its air-water replacement valve is closed to stop water filling, or water is released through its air-water replacement valve to reduce its ballast, thereby correcting the wind turbine foundation and maintaining balance. The first side is the side closer to the upwardly tilted sphere, and the second side is the side closer to the downwardly tilted sphere.

[0056] In some embodiments, a plurality of tilt sensors are provided on the top of the cylinder 21, and the target tilt angle is determined in the following manner:

[0057] The tilt angle of the cylinder 21 is obtained based on each tilt sensor;

[0058] For each tilt angle, determine whether the absolute value of the difference between that tilt angle and other tilt angles is greater than a set value; if so, remove that tilt angle.

[0059] The average of the remaining tilt angles is taken as the target tilt angle.

[0060] In this step, multiple tilt sensors are used to determine the target tilt angle of the wind turbine foundation 2. Tilting angles with large deviations are removed, and balanced tilt angles are retained, which can improve the accuracy of the measurement results. Adjusting the tightening rate of each anchor chain 31 based on the target tilt angle can ensure the accuracy of the adjustment results, thereby ensuring that the offshore wind turbine system is always within the required verticality range.

[0061] In some embodiments, the installation method further includes:

[0062] In response to each anchor tube 32 sinking to the designated position, grouting is performed on each anchor tube 32 through the valves on the side wall of each anchor tube 32 to improve the stability of the anchoring assembly 3.

[0063] In this embodiment, by grouting the cylinder 21, the adverse effects of soil plugs and water films on the bearing capacity of the anchor cylinder 32 after installation can be prevented.

[0064] In addition, before gravity settling of the anchor cylinder 32, the sphere 22 can be preliminarily filled with water for ballast to lower the center of gravity of the wind turbine system and maintain structural stability.

[0065] It should also be noted that this invention does not impose specific limitations on the number of spheres, anchor chains, and compartments; users can choose 4, 6, 8, or other quantities as needed. Furthermore, the air-water replacement valve is preferably a regulating valve; by changing the opening degree of the regulating valve, the filling and discharging rate of the sphere or compartment can be adjusted, thereby regulating the ballast of the sphere or compartment.

[0066] Secondly, such as Figure 5 As shown, this embodiment of the invention also provides a method for recovering a mud-floating offshore wind turbine system. The offshore wind turbine system includes a wind turbine unit 1, a wind turbine foundation 2, and an anchoring assembly 3 arranged vertically in sequence. The anchoring assembly 3 includes multiple adjustable-length anchor chains 31 and anchor tubes 32. One end of each anchor chain 31 is connected to an anchor tube 32, and the other end is connected to the wind turbine foundation 2. Each anchor tube 32 has a sealed top and an open bottom structure, and each anchor tube 32 has a valve on its side wall. Each anchor tube 32 is fixed within the mud surface of the seabed. The method includes:

[0067] Step 500: For each anchor tube 32, water is filled into it based on the valve on the side wall of the anchor tube 32, so as to lift the anchor tube 32 out of the mud surface based on the pressure difference formed inside and outside the anchor tube 32. The internal pressure of each anchor tube 32 is greater than the external pressure.

[0068] Step 502: Keep the wind turbine foundation 2 in a balanced state, adjust the tightening rate of each anchor chain 31 to pull each anchor cylinder 32 away from the seabed until each anchor cylinder 32 abuts against the wind turbine foundation 2.

[0069] Step 504: Transport each anchor cylinder 32, the wind turbine foundation 2, and the complete wind turbine 1 to a predetermined port for recycling.

[0070] In this embodiment, water is first pumped into the anchor cylinder 32, creating a pressure greater inside than outside, causing the anchor cylinder 32 to rise above the seabed. The pressure difference then allows the anchor cylinder 32 to detach from the mud surface, making the operation simple and efficient. Next, the anchor chain 31 is tightened, causing the anchor cylinders 32 to rise slowly until each anchor cylinder 32 is in contact with the wind turbine foundation 2. Finally, the entire wind turbine system is transported to a designated port for recovery, conserving resources.

[0071] In some implementations, step 502 includes:

[0072] The tilt angle of the wind turbine foundation 2 is obtained every third time interval;

[0073] Determine whether the tilt angle is greater than the preset angle; if so, reduce the tightening rate of the anchor chain 31 on the downward tilting side and increase the tightening rate of the anchor chain 31 on the upward tilting side to ensure that each anchor cylinder 32 rises smoothly until it abuts against the wind turbine foundation 2.

[0074] In this step, the preset angle is the same as the preset angle in the installation method, and the third time interval can be the same as the first time interval; this application does not impose any specific limitations.

[0075] In some embodiments, the wind turbine foundation 2 includes a hollow cylinder 21, a plurality of hollow spheres 22 and a plurality of first connecting rods 23;

[0076] One end of each first connecting rod 23 is connected to the circumferential side wall of the cylinder 21, and the other end is connected to a ball 22, so that multiple balls 22 are evenly surrounding the circumference of the cylinder 21. The vertical distance from the center of each ball 22 to the axis of the cylinder 21 is equal. Each ball 22 is provided with an air-water replacement valve.

[0077] The recycling method further includes:

[0078] Every third time interval, the tension of each anchor chain 31 is obtained;

[0079] Determine whether there is at least one anchor chain 31 whose tension is greater than the tension threshold; if so, unload each ball 22 on the downward tilting side; ballast each ball 22 on the upward tilting side; wherein, unloading and ballasting each ball 22 is achieved by controlling the opening degree of the air-water replacement valve on the corresponding ball 22 to adjust the water filling and discharging rate.

[0080] In some embodiments, unloading the spheres 22 on the downward-sloping side and ballasting the spheres 22 on the upward-sloping side includes:

[0081] Water is released from each of the spheres 22 on the downward-sloping side; among them, the sphere 22 at the bottom has the largest water release rate, and the water release rate of each sphere 22 is gradually reduced along the direction away from the bottom sphere 22.

[0082] Water is filled into each of the spheres 22 on the upward tilted side; among them, the uppermost sphere 22 has the largest water filling rate, and the water filling rate of each sphere 22 is gradually reduced along the direction away from the uppermost sphere 22.

[0083] It is understood that the recovery method of the mud-floating offshore wind turbine system provided in the embodiments of the present invention and the installation method of the mud-floating offshore wind turbine system provided in the above embodiments are based on the same inventive concept, and therefore have the same beneficial effects. The beneficial effects of the recovery method of the mud-floating offshore wind turbine system will not be elaborated here.

[0084] It is understood that the method for adjusting the working height of the offshore wind turbine system provided in this embodiment of the invention and the offshore wind turbine system provided in the above embodiment are based on the same inventive concept, and therefore have the same beneficial effects. The beneficial effects of the method for adjusting the working height of the offshore wind turbine system will not be elaborated here.

[0085] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0086] Finally, it should be noted that the above description is merely a preferred embodiment of the present invention and is only used to illustrate the technical solution of the present invention, and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention are included within the scope of protection of the present invention.

Claims

1. An installation method for a mud-floating offshore wind turbine system, characterized in that, The floating offshore wind turbine system includes a wind turbine unit (1), a wind turbine foundation (2), and an anchoring assembly (3) arranged vertically in sequence. The anchoring assembly (3) includes multiple adjustable-length anchor chains (31) and multiple anchor tubes (32). Each anchor tube (32) has a sealed top and an open bottom structure. Each anchor tube (32) has a valve on its side wall. One end of each anchor chain (31) is connected to one anchor tube (32), and the other end is connected to the wind turbine foundation (2). The installation method includes: In response to each of the anchor tubes (32) being transported to a preset position on the sea surface, each of the anchor chains (31) is placed in a slack state, and each anchor tube (32) is released so that each anchor tube (32) is lowered vertically onto the mud surface of the seabed based on gravity. Vacuuming is performed on the corresponding anchor cylinder (32) through the valve on the side wall of each anchor cylinder (32) so that each anchor cylinder (32) is sunk to a designated position below the mud surface based on the pressure difference formed inside and outside the anchor cylinder (32). The internal pressure of each anchor cylinder (32) is less than its external pressure. The designated position includes a designated depth and a designated latitude and longitude. The preset position and the designated position have a one-to-one correspondence in the vertical direction. In response to each of the anchor cylinders (32) sinking to the designated position, keeping the wind turbine foundation (2) in a balanced state, tighten each anchor chain (31) until the entire wind turbine (1) reaches the designated working height; Maintaining the wind turbine foundation (2) in a balanced state and tightening each anchor chain (31) until the entire wind turbine (1) reaches the specified working height includes: At each first time interval, the target tilt angle of the wind turbine foundation (2) is obtained; Determine if the target's tilt angle is greater than a preset angle; the preset angle is 5°. If so, reduce the tightening rate of the anchor chain (31) on the downward tilting side and increase the tightening rate of the anchor chain (31) on the upward tilting side to ensure that the wind turbine foundation (2) and the wind turbine (1) reach the specified working height smoothly. The wind turbine foundation (2) includes a hollow cylinder (21), multiple hollow spheres (22) and multiple first connecting rods (23). One end of each first connecting rod (23) is connected to the circumferential side wall of the cylinder (21), and the other end is connected to a ball (22) so that multiple balls (22) are evenly surrounding the circumference of the cylinder (21). The vertical distance from the center of each ball (22) to the axis of the cylinder (21) is equal. Each ball (22) is provided with an air-water replacement valve. The installation method further includes: Every second time interval, the tension of each anchor chain (31) is obtained; Determine whether there is at least one anchor chain (31) whose tension is greater than the tension threshold. If so, unload each ball (22) on the downward tilting side and ballast each ball (22) on the upward tilting side. The unloading and ballasting of each ball (22) is achieved by controlling the opening degree of the air-water replacement valve on the corresponding ball (22) to adjust the water filling and discharging rate. A mud-floating offshore wind turbine system refers to a wind turbine foundation that can switch between a floating state and a mud-floating state. The floating state means that the wind turbine foundation floats on the sea surface or in the seawater; the mud-floating state means that the wind turbine foundation is fixed in the mud layer on the seabed. Each of the spheres is provided with multiple independent compartments, which are symmetrically distributed along the target axis of the sphere. Each compartment is provided with an air-water replacement valve. When the tilt angle of the wind turbine foundation exceeds the preset value, the wind turbine foundation is adjusted to be upright in the following way: For the sphere located at the midline of the horizontal plane, the opening degree of the air-water replacement valve of the first side compartment is increased. By increasing the opening degree of the air-water replacement valve, the water filling rate of the corresponding compartment is increased, thereby increasing the ballast. For the second side compartment, water is released outward through its air-water replacement valve to reduce its ballast, so that the wind turbine foundation is upright and balanced. The first side is the side closer to the upward tilting sphere, and the second side is the side closer to the downward tilting sphere.

2. The installation method according to claim 1, characterized in that, The unloading of each sphere (22) on the downward-sloping side and the ballasting of each sphere (22) on the upward-sloping side includes: Water is released from each of the spheres (22) on the downward tilting side; among them, the sphere (22) at the bottom has the largest water release rate, and the water release rate of each sphere (22) is gradually reduced along the direction away from the bottom sphere (22); Water is filled into each of the spheres (22) on the upward tilted side; among them, the uppermost sphere (22) has the largest water filling rate, and the water filling rate of each sphere (22) is gradually reduced along the direction away from the uppermost sphere (22).

3. The installation method according to claim 1, characterized in that, The top of the cylinder (21) is equipped with multiple tilt sensors, and the target tilt angle is determined in the following manner: The tilt angle of the cylinder (21) is obtained based on each tilt sensor; For each tilt angle, determine whether the absolute value of the difference between that tilt angle and other tilt angles is greater than a set value; if so, remove that tilt angle. The average of the remaining tilt angles is taken as the target tilt angle.

4. The installation method according to claim 1, characterized in that, Also includes: In response to each anchor tube (32) sinking to the designated position, grouting is performed on each anchor tube (32) through the valve on the side wall of each anchor tube (32) to improve the stability of the anchoring assembly (3).

5. A method for recovering a mud-floating offshore wind turbine system, characterized in that, The offshore wind turbine system includes a wind turbine (1), a wind turbine foundation (2), and an anchoring assembly (3) arranged in sequence along the vertical direction; wherein, the anchoring assembly (3) includes multiple adjustable length anchor chains (31) and anchor tubes (32), one end of each anchor chain (31) is connected to an anchor tube (32), and the other end is connected to the wind turbine foundation (2), each anchor tube (32) has a structure with a sealed top and an open bottom, each anchor tube (32) has a valve on its side wall, and each anchor tube (32) is fixed in the mud surface of the seabed; The recycling method includes: For each anchor tube (32), water is filled through the valve on the side wall of the anchor tube (32) to lift the anchor tube (32) out of the mud surface based on the pressure difference formed inside and outside the anchor tube (32). The internal pressure of each anchor tube (32) is greater than the external pressure. Keep the wind turbine foundation (2) in a balanced state, adjust the tightening rate of each anchor chain (31) to pull each anchor cylinder (32) away from the seabed until each anchor cylinder (32) abuts against the wind turbine foundation (2); Each anchor cylinder (32), the wind turbine foundation (2) and the complete wind turbine (1) will be transported to a predetermined port for recycling; Maintaining the wind turbine foundation (2) in a balanced state and adjusting the tightening rate of each anchor chain (31) to pull each anchor cylinder (32) away from the seabed until each anchor cylinder (32) abuts against the wind turbine foundation (2) includes: The tilt angle of the wind turbine foundation (2) is obtained every third time interval; Determine whether the tilt angle is greater than the preset angle; if so, reduce the tightening rate of the anchor chain (31) on the downward tilting side and increase the tightening rate of the anchor chain (31) on the upward tilting side to ensure that each anchor cylinder (32) rises smoothly until it abuts against the wind turbine foundation (2); the preset angle is 5°. The wind turbine foundation (2) includes a hollow cylinder (21), multiple hollow spheres (22) and multiple first connecting rods (23). One end of each first connecting rod (23) is connected to the circumferential side wall of the cylinder (21), and the other end is connected to a ball (22) so that multiple balls (22) are evenly surrounding the circumference of the cylinder (21). The vertical distance from the center of each ball (22) to the axis of the cylinder (21) is equal. Each ball (22) is provided with an air-water replacement valve. The recycling method further includes: Every third time interval, the tension of each anchor chain (31) is obtained; Determine whether there is at least one anchor chain (31) whose tension is greater than the tension threshold; if so, unload each ball (22) on the downward tilting side; ballast each ball (22) on the upward tilting side; wherein, unloading and ballasting each ball (22) is achieved by controlling the opening degree of the air-water replacement valve on the corresponding ball (22) to adjust the water filling and discharging rate; A mud-floating offshore wind turbine system refers to a wind turbine foundation that can switch between a floating state and a mud-floating state. The floating state means that the wind turbine foundation floats on the sea surface or in the seawater; the mud-floating state means that the wind turbine foundation is fixed in the mud layer on the seabed. Each of the spheres is provided with multiple independent compartments, which are symmetrically distributed along the target axis of the sphere. Each compartment is provided with an air-water replacement valve. When the tilt angle of the wind turbine foundation exceeds the preset value, the wind turbine foundation is adjusted to be upright in the following way: For the sphere located at the midline of the horizontal plane, the opening degree of the air-water replacement valve of the first side compartment is increased. By increasing the opening degree of the air-water replacement valve, the water filling rate of the corresponding compartment is increased, thereby increasing the ballast. For the second side compartment, water is released outward through its air-water replacement valve to reduce its ballast, so that the wind turbine foundation is upright and balanced. The first side is the side closer to the upward tilting sphere, and the second side is the side closer to the downward tilting sphere.

6. The recycling method according to claim 5, characterized in that, The unloading of each sphere (22) on the downward-sloping side and the ballasting of each sphere (22) on the upward-sloping side includes: Water is released from each of the spheres (22) on the downward tilting side; among them, the sphere (22) at the bottom has the largest water release rate, and the water release rate of each sphere (22) is gradually reduced along the direction away from the bottom sphere (22); Water is filled into each of the spheres (22) on the upward tilted side; among them, the uppermost sphere (22) has the largest water filling rate, and the water filling rate of each sphere (22) is gradually reduced along the direction away from the uppermost sphere (22).

Citation Information

Patent Citations

  • Submersible structure for actively supporting towers of generators and sub-stations or similar elements in maritime facilities

    CN105408550A

  • Floating foundation adjusting method and related equipment

    CN114604382A

  • Attitude control device for floating structure

    JP2005313665A

  • Suction Anchors and Their Methods of Manufacture

    US20220002961A1