A method of mining a coal gas overlap zone

By dividing coal seams, selecting drilling locations, and reinforcing goaf areas in overlapping coal and gas zones, the problems of resource waste and oil and gas well stability in overlapping coal and gas zones have been solved, achieving efficient mining and stability assurance in these zones.

CN117211786BActive Publication Date: 2026-11-24SHENHUA XINJIE ENERGY
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202311420866.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-10-30
Publication Date
2026-11-24
Estimated Expiration
2043-10-30

AI Technical Summary

Technical Problem

In areas where coal and gas resources overlap, mining coal first or gas first will lead to resource waste and oil and gas well instability issues, making it difficult to achieve effective exploitation.

Method used

The coal seam is divided into multiple coal bodies to be mined, the expected drilling location is selected, the goaf is mined and backfilled to form oil and gas wells, the remaining coal body is mined gradually, and the goaf is reinforced by backfilling and grouting to reduce the amount of coal pillars left, thereby improving resource utilization and formation stability.

Benefits of technology

It enables the coordinated mining of coal seams and oil and gas reservoirs, reduces resource waste, ensures the stability of oil and gas wells, improves the strength of goaf areas and formation stability, and avoids gas and liquid leakage problems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117211786B_ABST
    Figure CN117211786B_ABST
Patent Text Reader

Abstract

This invention provides a method for mining overlapping coal and gas zones. The overlapping zones include multiple mining areas, each containing a coal seam and an oil and gas layer vertically overlapping the coal seam. The mining method includes: dividing the coal seam into multiple mined coal bodies and selecting a planned drilling location; mining the mined coal body vertically corresponding to the planned drilling location; filling and reinforcing the goaf formed by the mined coal body; drilling based on the planned drilling location to form an oil and gas well penetrating the goaf; mining the remaining mined coal bodies in the mining areas, and filling and reinforcing the goaf formed by the mined coal bodies. In this mining method, coal seam mining and oil and gas mining are spatially and temporally separated. Furthermore, by filling and reinforcing the goaf, support performance is provided, reducing the need for coal pillars, improving coal resource utilization, increasing the strength of the goaf, ensuring the stability of the formation within the mining area, and preventing gas and liquid leakage during oil and gas extraction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This disclosure relates to the field of mining technology, and more specifically, to a method for mining overlapping gas zones. Background Technology

[0002] my country has many coal-oil-gas associated basins, and in actual mining operations, numerous engineering cases have emerged where coal and oil / gas extraction interfere with each other. In areas where coal and gas resources overlap, mining coal first will create goafs, which will affect the stability of oil and gas wells, making gas extraction difficult and resulting in a waste of natural gas resources. Conversely, if gas is extracted first, a large number of coal pillars need to be left in the coal seam to protect the stability of the oil and gas wells, which will result in a waste of coal resources. Summary of the Invention

[0003] The purpose of this disclosure is to provide a method for the co-extraction of coal and gas, so as to solve at least one of the problems in the prior art, such as the difficulty in ensuring the stability of oil and gas wells and the waste of extraction resources during the extraction process in the coal-gas resource overlap area.

[0004] To address the aforementioned technical problems, embodiments of this disclosure provide a method for mining overlapping gas zones. The overlapping gas zones include multiple mining areas, each containing a coal seam and an oil and gas layer vertically overlapping the coal seam. The mining method includes: dividing the coal seam into multiple coal bodies to be mined and selecting a predetermined drilling location; mining the coal bodies to be mined vertically corresponding to the predetermined drilling location; filling and reinforcing the goaf formed by mining the coal bodies to be mined; drilling based on the predetermined drilling location to form an oil and gas well penetrating the goaf; mining the remaining coal bodies to be mined within the mining areas, and filling and reinforcing the goaf formed by mining the coal bodies to be mined.

[0005] Furthermore, dividing the coal seam into multiple coal bodies to be mined includes: dividing the coal seam into multiple spaced-apart coal bodies to be mined.

[0006] Furthermore, the filling and reinforcement of the goaf formed by mining the coal body to be mined includes: installing a filling pipeline in the return airway for mining the coal body to be mined, so as to simultaneously fill the goaf through the filling pipeline while mining the coal body to be mined.

[0007] Furthermore, the filling and reinforcement of the goaf formed by mining the coal body to be mined includes: grouting and reinforcing the fractured body formed by mining the coal body to be mined through grouting pipelines.

[0008] Furthermore, after grouting and reinforcing the fractured body formed by mining the coal body through the grouting pipeline, the method includes: installing strain detection devices and displacement detection devices in the surrounding rock mass around the grouting pipeline.

[0009] Furthermore, the mining of the remaining coal bodies to be mined in the mining area, and the filling and reinforcement of the goaf formed by mining the coal bodies to be mined, includes: gradually moving away from the expected drilling location, mining the remaining coal bodies to be mined in the mining area in sequence, while filling and reinforcing the goaf.

[0010] Furthermore, selecting the expected drilling location includes: selecting the expected drilling location on the surface based on the distribution of the oil and gas reservoir.

[0011] Furthermore, the filling and reinforcement of the goaf formed by mining the coal body to be mined includes: filling and reinforcing the goaf formed by mining the coal body to be mined with a filling body, wherein the filling body includes aggregate and paste, the aggregate includes at least coal gangue and fly ash, and the paste includes at least cementing material and water.

[0012] Furthermore, after drilling based on the expected drilling location to form an oil and gas well that passes through the goaf, the process includes: conducting a pre-production experiment on the oil and gas well.

[0013] Furthermore, after mining the remaining coal bodies in the mining area, filling and reinforcing the goaf formed by mining the coal bodies, the process includes: mining the oil and gas reservoir through the oil and gas well.

[0014] The method for mining overlapping coal and gas zones employed in this invention involves mining the coal body corresponding to the expected drilling location, filling and reinforcing the resulting goaf, and then drilling through the filled goaf to form an oil and gas well. The remaining coal bodies within the mining area are then mined. This method allows coal seam mining and oil and gas extraction to avoid spatial and temporal conflicts. Furthermore, by filling and reinforcing the goaf to provide support, the need for coal pillars can be reduced, improving coal resource utilization. Simultaneously, the strength of the goaf can be increased, ensuring the stability of the formation within the mining area and preventing gas and liquid leakage during oil and gas extraction. Attached Figure Description

[0015] To more clearly illustrate the technical solutions in the embodiments of this disclosure or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in this disclosure. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0016] Figure 1 A schematic diagram illustrating the steps of the method for mining overlapping gas zones provided by the present invention;

[0017] Figure 2A stratigraphic relationship map of the formation in the area before it was disturbed by mining, provided for the present invention;

[0018] Figure 3 A schematic diagram illustrating how a coal seam, after being disturbed by mining, fills the goaf with a backfilling body, as provided by the present invention.

[0019] Figure 4 This is a schematic diagram showing the completed filling of the goaf area provided by the present invention.

[0020] Figure 5 This is a schematic diagram of oil and gas well construction provided by the present invention;

[0021] Figure 6 A partial schematic diagram of the process by which the drill bit passes through the filling material of the goaf provided by the present invention;

[0022] Figure 7 This is a schematic diagram illustrating the extraction of oil and gas reservoirs after the coal seam within the extraction area has been mined, as provided by the present invention. Detailed Implementation

[0023] Various embodiments and features of this disclosure are described herein with reference to the accompanying drawings.

[0024] It should be understood that various modifications can be made to the embodiments described herein. Therefore, the above description should not be considered as limiting, but merely as an example of embodiments. Other modifications within the scope and spirit of this disclosure will be apparent to those skilled in the art.

[0025] The accompanying drawings, which are included in and form part of this specification, illustrate embodiments of the present disclosure and, together with the general description of the disclosure given above and the detailed description of the embodiments given below, serve to explain the principles of the disclosure.

[0026] These and other features of this disclosure will become apparent from the following description of preferred forms of embodiments given as non-limiting examples, with reference to the accompanying drawings.

[0027] It should also be understood that although this disclosure has been described with reference to some specific examples, those skilled in the art can certainly implement many other equivalent forms of this disclosure, which have the features described in the claims and are therefore all within the scope of protection defined herein.

[0028] The above and other aspects, features and advantages of this disclosure will become more apparent when taken in conjunction with the accompanying drawings and in view of the following detailed description.

[0029] Specific embodiments of this disclosure are described thereafter with reference to the accompanying drawings; however, it should be understood that the claimed embodiments are merely examples of this disclosure, which may be implemented in various ways. Well-known and / or repeated functions and structures are not described in detail to avoid unnecessary or redundant details that could obscure this disclosure. Therefore, the specific structural and functional details claimed herein are not intended to be limiting, but merely to serve as the basis and representative basis for the claims to teach those skilled in the art to use this disclosure in a variety of substantially any suitable detailed structures.

[0030] This specification may use the phrases “in one embodiment,” “in another embodiment,” “in yet another embodiment,” or “in still another embodiment,” all of which may refer to one or more of the same or different embodiments according to this disclosure.

[0031] The first aspect of this invention provides a method for mining overlapping gas zones, wherein the overlapping gas zones include multiple mining areas, combined with... Figure 2 The diagram shows the stratigraphic relationship of the collection area. The strata in the collection area include the surface 1, coal seam roof 2, coal seam 3, coal seam floor 4, and an oil and gas layer 5 that overlaps with coal seam 3 vertically. Figure 1 As shown, the mining method includes:

[0032] S100. Divide the coal seam 3 into multiple coal bodies to be mined and select the expected drilling location.

[0033] In step S100, Figure 2 The coal seam 3 in the mining area shown is divided into multiple coal bodies to be mined. Depending on the specific size of the area, a certain interval can be set between adjacent coal bodies. This way, the coal body at the interval can be used as a coal pillar 11 after the surrounding coal bodies are mined (e.g., ...). Figure 7 As shown), it is supported between the coal seam roof 2 and the coal seam floor 4 (if the goaf 6 formed after the coal body to be mined has sufficient stability, or has sufficient stability through other support or reinforcement methods, then coal pillars 11 may not be required or a small number of coal pillars 11 may be required); when selecting the expected drilling location, it can be determined based on the specific distribution of the oil and gas layer 5, for example, the expected drilling location can be set at the center of the oil and gas layer 5 in the collection area (such as...). Figure 6 and Figure 7 (The locations corresponding to drilling platform 8 and oil and gas well 9).

[0034] S200, Mining the coal body to be mined in the vertical direction corresponding to the expected drilling location.

[0035] In step S200, combined Figure 3As shown in the figure, the expected drilling location is located at the center of the figure. The coal body to be mined corresponding to the expected drilling location in the vertical direction has been mined and formed the goaf 6 shown in the figure.

[0036] S300, Fill and reinforce the goaf formed by mining the coal body to be mined 6.

[0037] In step S300, exemplarily combined Figure 3 and Figure 4 As shown, the goaf 6 formed after the coal seam is mined can be filled with a filling body 7 through the goaf filling technology, which plays a role in reinforcement. The filling body 7 includes aggregate and paste. The aggregate includes at least coal gangue and fly ash, and the paste includes at least cementing material and water. The goaf filling technology refers to filling the goaf 6 with aggregate and transporting a paste-like liquid (paste) with no critical flow velocity and no need for dehydration to the goaf 6 under the action of external force and the paste's own gravity, which finally solidifies to form the filling body 7.

[0038] Preferably, in step S300, filling and reinforcing the goaf formed by mining the coal body to be mined includes:

[0039] S301. The filling pipeline is installed in the return airway for mining the coal body to be mined, so that the filling can be carried out synchronously through the filling pipeline while mining the coal body.

[0040] For example, for every 1 meter of coal body to be mined, the goaf formed within that 1 meter of mining is filled, thereby improving construction efficiency.

[0041] Preferably, in step S300, filling and reinforcing the goaf formed by mining the coal body to be mined includes:

[0042] S302. Grouting is performed to reinforce the fractures formed during the mining of the coal body through grouting pipelines.

[0043] Typically, during the mining process, fissures inevitably form near the goaf. If not properly treated, they may lead to problems such as collapse during subsequent construction. Multiple grouting pipelines can be used to grout the fissures, and once the injected grout has completely solidified, a certain degree of reinforcement can be achieved.

[0044] Further, after step S302, in which the fractured body formed by mining the coal body is reinforced by grouting through the grouting pipeline, the process includes:

[0045] S303. Strain detection devices and displacement detection devices are installed in the surrounding rock mass around the grouting pipeline.

[0046] By installing strain gauges (such as strain gauges) and displacement sensors (such as displacement sensors) in the surrounding rock mass around the grouting pipeline, it is possible to determine whether the strength of the surrounding rock mass around the grouting pipeline meets the requirements. During subsequent construction, changes in parameters such as strain and displacement can be closely monitored. If problems such as low strength occur, the fractured body can be immediately re-grouted or other remedial measures can be taken.

[0047] S400. Drilling is carried out based on the expected drilling location to form an oil and gas well 9 that passes through the goaf 6.

[0048] Combination Figure 5 As shown, drilling platform 8 is set on the surface 1 corresponding to the expected drilling location, combined with... Figure 6 As shown, drill bit 10 passes through the goaf 6 after it has been filled by filling body 7, and finally forms oil and gas well 9 that passes through surface 1, coal seam roof 2, goaf 6, coal seam floor 4 and reaches oil and gas layer 5.

[0049] After step S400, where drilling is performed based on the expected drilling location to form an oil and gas well 9 penetrating the goaf 6, the process includes:

[0050] A pre-production gas experiment was conducted on the oil and gas well 9.

[0051] For example, a certain amount of oil and gas is extracted through oil and gas well 9, and during the extraction process, the stability of oil and gas well 9 is determined by checking whether the pipe wall of oil and gas well 9 leaks gas, and whether the displacement and strain of the surrounding rock mass are stable. The gas production pre-experiment steps mentioned above ensure the smooth progress of subsequent gas production.

[0052] S500, Mining the remaining coal bodies to be mined in the mining area, and filling and reinforcing the goaf 6 formed by mining the coal bodies to be mined.

[0053] Combination Figure 7 As shown, all the remaining coal bodies to be mined within the mining area shown in the figure have been mined. The coal pillars 11 left between the adjacent coal bodies to be mined and the filling body 7 in the goaf 6 support the roof of the coal seam 2. Correspondingly, the oil and gas resources in the oil and gas layer 5 can be directly extracted through the oil and gas well 9.

[0054] When the coverage area of ​​the gas overlap zone is large, multiple collection areas can be set up. Each collection area is equipped with the aforementioned oil and gas wells 9 that pass through the goaf 6. More efficient oil and gas extraction can be achieved through multiple oil and gas wells 9.

[0055] Step S500, mining the remaining coal seam in the mining area, and filling and reinforcing the goaf 6 formed by mining the coal seam, includes:

[0056] By gradually moving away from the expected drilling location, the remaining coal bodies to be mined in the mining area are mined in sequence, while the goaf is filled and reinforced. In this way, the stability of the mining area can be guaranteed to a large extent.

[0057] After step S500, mining the remaining coal seam in the mining area, and filling and reinforcing the goaf formed by mining the coal seam, the process includes:

[0058] The oil and gas reservoir is extracted through the oil and gas well.

[0059] In this way, after the coal body to be mined in the mining area is mined, the resulting goaf 6 is completely filled by the filling body 7, forming a relatively stable structure, which facilitates the mining work of oil and gas well 9.

[0060] The method for mining overlapping coal and gas zones in this invention involves mining the coal body corresponding to the expected drilling location, filling and reinforcing the resulting goaf 6, and then passing through the filled goaf 6 to form an oil and gas well 9. The remaining coal bodies within the mining area are then mined. This method allows for temporal and spatial avoidance between coal seam mining and oil and gas extraction. Furthermore, the filling and reinforcement of the goaf 6 provides support, reducing the need for coal pillars 11 and improving coal resource utilization. Simultaneously, it enhances the strength of the goaf 6, ensuring the stability of the formation within the mining area and preventing gas and liquid leakage during oil and gas extraction.

[0061] In the above embodiments, the descriptions of each embodiment have different focuses. For parts that are not described in detail or recorded in a certain embodiment, please refer to the relevant descriptions of other embodiments.

[0062] Furthermore, the features of the embodiments shown in the accompanying drawings or the various embodiments mentioned in this specification should not be construed as independent embodiments. Rather, each feature described in one example of an embodiment can be combined with one or more other desired features from other embodiments to produce other embodiments not described in words or with reference to the accompanying drawings.

[0063] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application, and should all be included within the protection scope of this application.

Claims

1. A method for mining overlapping gas zones, characterized in that, The gas overlap zone includes multiple extraction areas, and the strata in the extraction areas contain coal seams and oil and gas layers that overlap with the coal seams in a vertical direction. The extraction method includes: The coal seam is divided into multiple coal bodies to be mined, and the expected drilling locations are selected; Mining the coal body to be mined in the vertical direction corresponding to the expected drilling location; To fill and reinforce the goaf formed by mining the coal body to be mined; Drilling will be carried out based on the expected drilling location to form an oil and gas well that penetrates the goaf. Mining the remaining coal bodies to be mined in the mining area, and filling and reinforcing the goaf formed by mining the coal bodies to be mined; The filling and reinforcement of the goaf formed by mining the coal body includes: The filling pipeline is installed in the return airway for mining the coal body to be mined, so that the filling can be carried out synchronously through the filling pipeline while mining the coal body. Grouting is used to reinforce the fractured body formed by mining the coal body through grouting pipelines. After that, strain detection devices and displacement detection devices are installed in the surrounding rock mass around the grouting pipelines. The selection of the expected drilling location includes: selecting the expected drilling location on the surface based on the distribution of the oil and gas reservoir; After drilling based on the predicted drilling location to form an oil and gas well through the goaf, the process includes: A pre-production experiment was conducted on the oil and gas well.

2. The mining method according to claim 1, characterized in that, The process of dividing the coal seam into multiple coal bodies to be mined includes: The coal seam is divided into multiple spaced coal bodies to be mined.

3. The mining method according to claim 1, characterized in that, The mining of the remaining coal seam in the mining area, and filling and reinforcing the goaf formed by mining the coal seam, includes: Gradually move away from the expected drilling location and sequentially mine the remaining coal bodies to be mined in the mining area, while simultaneously filling and reinforcing the goaf.

4. The mining method according to claim 1, characterized in that, The filling and reinforcement of the goaf formed by mining the coal body includes: The goaf formed by mining the coal body is filled and reinforced by a backfill body, wherein the backfill body includes aggregate and paste, the aggregate includes at least coal gangue and fly ash, and the paste includes at least cementing material and water.

5. The mining method according to claim 1, characterized in that, After mining the remaining coal seams in the mining area, and filling and reinforcing the goaf formed by mining the coal seams, the process includes: The oil and gas reservoir is extracted through the oil and gas well.

Citation Information

Patent Citations

  • Coal mine goaf stratum reconstruction and horizontal well drilling and completion method

    CN112855021A