Liquid flow test system for switchable flow of rocket engine and test method thereof

By designing a switchable flow liquid flow test system for rocket engines and using a combination of simulated throttling elements, the problem of numerous test steps and large deviations in the selection of throttling elements under variable operating conditions was solved, and precise flow switching and system parameter adjustment of rocket engines under different operating conditions were realized.

CN117213813BActive Publication Date: 2026-11-20XIAN AEROSPACE PROPULSION INST
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311106743.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-08-30
Publication Date
2026-11-20
Estimated Expiration
2043-08-30

AI Technical Summary

Technical Problem

Existing liquid flow testing methods involve numerous testing steps and significant deviations in the selection of throttling elements for variable-condition liquid rocket engine systems, making it impossible to precisely adjust system parameters to achieve high-precision engine performance.

Method used

Design a fluid flow test system for switchable flow rates in rocket engines. Through the flow channel of the simulated operating condition switching module MT0, use a combination of multiple simulated throttling elements to determine the flow resistance characteristics and dimensions of each throttling element step by step to ensure precise adjustment of system parameters.

Benefits of technology

It enables rapid and precise flow switching of rocket engines under different operating conditions, reduces test deviations, improves system test accuracy, and ensures the balance of system pressure, flow, and power of the engine under different operating conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117213813B_ABST
    Figure CN117213813B_ABST
Patent Text Reader

Abstract

The present application relates to a liquid flow test system for a rocket engine switchable flow and a test method thereof; solve the problems of more test steps and larger deviation in selecting system throttling elements in the existing liquid flow test method; the system comprises an inlet unit, a first outlet unit, a second outlet unit, a working condition conversion valve, a first adjusting element group, a second adjusting element group and a third adjusting element group; one of the outlets of the inlet unit is communicated with the inlet of the working condition conversion valve, the outlet of the working condition conversion valve is communicated with one of the inlets of the second outlet unit through the third simulated throttling element group; the other outlet of the inlet unit is communicated with the inlet of the first outlet unit through the first simulated throttling element group, the first outlet of the first outlet unit is defined as the first outlet, the second outlet is communicated with the other inlet of the second outlet unit through the second simulated throttling element group, and the outlet of the second outlet unit is defined as the second outlet; the present application also provides a test method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a liquid flow test system and method for rocket engines, specifically to a liquid flow test system and method for rocket engines with switchable flow rates. Background Technology

[0002] During the development of liquid rocket engines, relevant data parameters need to be calculated according to design requirements. Adjustment elements such as throttling rings with appropriate flow resistance or cavitation tubes with appropriate cavitation coefficients are then installed at specific locations to ensure the pressure, flow rate, and power balance of the engine system. Based on the current precision requirements of engine performance, existing general-purpose adjustment element design theories and current manufacturing capabilities cannot directly provide sufficiently precise adjustment element dimensions. By conducting liquid flow tests using water or other non-toxic and inexpensive media, adjustment elements can be tested and selected to ensure that their pressure drop parameters, cavitation coefficient, etc., at rated flow rates meet the requirements.

[0003] For pump-fed upper-stage liquid rocket engines with variable operating conditions, the main system and auxiliary system are important components of the engine system. Both the main system and auxiliary system switch operating conditions via an operating condition switching module (MTo). Figure 1 As shown, the operating condition switching module MT0 includes an operating condition switching valve 07, a first throttling element 04, a second throttling element 05, a third throttling element 06, and connecting conduits connecting the various elements. The module inlet 01 is connected to the outlet of the engine oxidizer turbopump, the first outlet 02 is connected to the oxidizer auxiliary system and the gas generator, and the second outlet 03 is connected to the oxidizer main conduit and the thrust chamber. After the oxidizer flows through the first throttling element 04 and the connecting conduit, after the A-branch point, one path flows through the second throttling element 05, and the other path enters the oxidizer auxiliary system, the mixture ratio regulating valve, and the gas generator through the first outlet 02.

[0004] 1.1) Under throttling conditions, the operating condition switching valve 07 is closed. The oxidant flowing out of the turbine pump outlet passes through inlet 01. The first part flows only through the first throttling element 04 and enters the auxiliary system and gas generator through the first outlet 02. The second part flows through the first throttling element 04, the second throttling element 05 and the connecting conduit, and enters the main connecting pipeline and thrust chamber through the second outlet 03.

[0005] 1.2) Under the main operating condition, the operating condition switching valve 07 is opened. The oxidant flowing out of the turbine pump outlet passes through the inlet 01. The first part flows only through the first throttling element 04 and enters the auxiliary system and gas generator through the first outlet 02. The second part flows through the first throttling element 04, the second throttling element 05 and the connecting conduit. The third part flows through the operating condition switching valve 07 and the third throttling element 06 and the connecting conduit. The flow of the second part and the third part merges before the second outlet 03 and enters the main connecting conduit and thrust chamber after passing through the second outlet 03.

[0006] 1.3) When switching operating conditions, the propellant flows through different flow channels and throttling elements to achieve a wide range of rapid response switching between set operating conditions of the rocket engine.

[0007] Under two operating conditions, the main system employs different flow channels, resulting in varying propellant flow rates into the thrust device and thus generating different thrust. Similarly, the auxiliary system also uses different flow channels, ensuring varying propellant flow rates into the gas generator under different operating conditions. This generates gas at varying pressures and flow rates to drive the turbine, which provides power to both the main and auxiliary systems. The main and auxiliary systems simultaneously switch flow channels to achieve the transition between the main and throttling operating conditions. When adjusting the calculations for this type of engine, it is necessary to ensure that the system pressure, flow rate, and power are balanced under both the main and throttling operating conditions. Both the main and auxiliary systems are equipped with main and throttling propellant channels, employing different combinations of throttling elements. Rapid switching between operating conditions is achieved by switching the flow channels. In this type of engine system design, there are many locations where throttling elements are set, and the flow resistance between the throttling elements is interconnected and affects each other. Existing fluid flow test methods generally measure the pressure drop across the selected throttling element at the rated flow rate. Using this existing method to select the system throttling element for this type of engine system design has technical problems such as many test steps and large test system deviations. Summary of the Invention

[0008] To address the problems of numerous experimental steps and significant deviations in the selection of throttling elements for systems using existing liquid flow testing methods, this invention proposes a liquid flow testing system and method for switchable flow rates in rocket engines. This solves the problem of selecting throttling elements for variable-condition liquid rocket engine systems. Through the method designed in this invention, throttling elements that meet the required flow resistance characteristics at rated flow rates are selected and adjusted for different flow channels in the system modules during the development process. This solution primarily addresses how to select throttling elements, i.e., the methods and steps for selecting throttling elements, and how to ensure the accuracy of selection. This allows the engine system to precisely adjust system parameters to achieve high-precision engine performance.

[0009] The technical solution of the present invention is as follows:

[0010] A fluid flow test system for a rocket engine with switchable flow rate includes: an inlet unit, a first outlet unit, a second outlet unit, a condition switching valve, a first regulating element group, a second regulating element group, and a third regulating element group; its special feature is that:

[0011] The first regulating element group includes one or more first analog throttling elements of different sizes; the second regulating element group includes one or more second analog throttling elements of different sizes; and the third regulating element group includes one or more third analog throttling elements of different sizes.

[0012] The inlet of the inlet unit is used to connect to external devices; one of the outlets of the inlet unit is connected to the inlet of the operating condition switching valve, and the outlet of the operating condition switching valve is connected to one of the inlets of the second outlet unit through any third simulated throttling element; the other outlet of the inlet unit is connected to the inlet of the first outlet unit through any first simulated throttling element, the first outlet of the first outlet unit is defined as the first outlet, and the first outlet is used to connect to external devices; the second outlet is connected to the other inlet of the second outlet unit through any second simulated throttling element, and the outlet of the second outlet unit is defined as the second outlet, and the second outlet is used to connect to external devices.

[0013] Furthermore, a main pipe is provided between the second simulated throttling element and another outlet of the first outlet unit.

[0014] Furthermore, regulating valves are provided at the inlet, first outlet, and second outlet of the inlet unit.

[0015] Furthermore, the inlet unit is an inlet tee, the first outlet unit is an outlet four-way, and the second outlet unit is an outlet tee.

[0016] Furthermore, a pressure gauge and a flow meter are installed at both the inlet and the second outlet of the inlet unit; a pressure gauge is installed at the third outlet of the outlet four-way valve, and a flow meter is installed at the first outlet.

[0017] This invention also proposes a test method for a switchable flow liquid test system for rocket engines, used to simulate the operating condition of the MTo (Motion To-Off) module in a rocket engine. Its unique feature is that it includes the following steps:

[0018] Step 1: Construct the above-mentioned fluid flow test system for switchable flow rates in rocket engines;

[0019] Step 2: Open the first outlet, keep the second outlet and the operating condition switching valve closed, adjust the inlet pressure of the inlet unit to be equal to the inlet pressure of the operating condition switching module MTo under the main operating condition, and the flow rate through the inlet is the flow rate through the first throttling element under the main operating condition;

[0020] Step 3: If the current flow resistance of the first simulated throttling element is equal to the flow resistance of the first throttling element in the operating condition switching module MTo, then define the first simulated throttling element as the selected first throttling element and execute step 5; otherwise, execute step 4.

[0021] Step 4: Replace the first simulated throttling element with a different size and return to step 3 until the flow resistance of the selected first simulated throttling element is equal to the flow resistance of the first throttling element in the operating condition switching module MTo;

[0022] Step 5: Select the second simulated throttling element;

[0023] Step 6: Select the third simulated throttling element and complete the test.

[0024] Furthermore, step 5 specifically includes:

[0025] 5.1 Based on the determination of the first simulated throttling element, open the second outlet, adjust the flow rate through the inlet to be equal to the flow rate at the inlet under the throttling condition of the operating condition switching module MTo, adjust the pressure at the inlet to be equal to the pressure at the inlet under the throttling condition of the operating condition switching module MTo, and adjust the pressure at the first outlet to be equal to the pressure at the first outlet under the throttling condition of the operating condition switching module MTo.

[0026] 5.2 If the flow resistance from the inlet to the second outlet is equal to the flow resistance from the inlet to the second outlet under the throttling condition of the operating condition switching module MTo, then define the second simulated throttling element as the selected second throttling element and execute step 6; otherwise, execute step 5.3.

[0027] 5.3 Replace the second analog throttling element with one of different sizes and return to step 5.2 until the flow resistance from the inlet to the second outlet is equal to the flow resistance from the inlet to the second outlet under the throttling condition of the operating condition switching module MTo.

[0028] Furthermore, step 6 specifically includes:

[0029] 6.1 Based on the determination of the first and second simulated throttling elements, open the operating condition switching valve, control the inlet pressure to be equal to the inlet pressure of the operating condition switching module MTo under the main operating condition, and the first outlet pressure to be equal to the first outlet pressure of the operating condition switching module MTo under the main operating condition;

[0030] 6.2 If the flow resistance from the inlet to the second outlet is equal to the flow resistance from the inlet to the second outlet under the main operating condition of the operating condition switching module MTo, then the third simulated throttling element is defined as the selected third throttling element, and the test is completed; otherwise, proceed to step 6.3.

[0031] 6.3 Replace the third simulated throttling element with one of different sizes and return to step 6.2 until the flow resistance from the inlet to the second outlet is equal to the flow resistance from the inlet to the second outlet under the main operating condition of the operating condition switching module MTo, and the test is completed.

[0032] The beneficial effects of this invention are:

[0033] 1. In this invention, a liquid flow test system for switchable flow rates of rocket engines is designed to simulate the operating condition switching module MTo, which can be set in the engine oxidizer, fuel main system and auxiliary system and can perform a wide range of flow rate switching operations. After the operating condition is switched, the propellant flows through different combinations of throttling elements, thereby realizing the rocket engine to switch between set operating conditions in a wide range and with fast response.

[0034] 2. In this invention, by adjusting and calculating the flow rate and flow resistance of the known operating condition switching module MTo under various operating conditions, the working principle of the operating condition switching module MTo is simulated, and the flow resistance characteristics of the first simulated throttling element, the second simulated throttling element, and the third simulated throttling element are determined step by step, and the throttling size is selected, thus solving the problem of selecting the throttling elements required for different flow channels of the system.

[0035] 3. The system test proposed in this invention has high accuracy. The test system deviation is controlled according to the parameters of the entire operating condition switching module MTo, which is definitely less than the cumulative system deviation caused by testing a single throttling element. In the development of subsequent models, the adjustment calculation only needs to calculate the pressure drop characteristics of the operating condition switching module MTo, without having to calculate the pressure drop and flow rate of each throttling element. All systems have participated in the liquid flow test, which further reduces the deviation between the test results and the actual requirements. Attached Figure Description

[0036] Figure 1 It is the operating condition switching module MT in existing rocket engines;

[0037] Figure 1 In the diagram, 01 is the inlet; 02 is the first outlet; 03 is the second outlet; 04 is the first throttling element; 05 is the second throttling element; 06 is the third throttling element; and 07 is the operating condition switching valve.

[0038] Figure 2 This is a schematic diagram of the structural principle of an embodiment of the fluid flow test system for switchable flow rates in rocket engines according to the present invention;

[0039] Figure 2 In the middle, 1. Inlet; 2. First outlet; 3. Second outlet; 4. First simulated throttling element; 5. Second simulated throttling element; 6. Third simulated throttling element; 7. Operating condition switching valve; 8. Control valve; 9. Flow meter; 10. Pressure gauge; 11. Main pipe; 12. Inlet tee; 13. Outlet four-way; 14. Outlet tee. Detailed Implementation

[0040] To address the challenge of accurately and rapidly selecting throttling elements for variable-condition liquid rocket engine systems, this invention proposes a liquid flow test system and its test method for switchable flow rates in rocket engines.

[0041] Based on the operating condition switching module MT0 in the rocket engine simulated by this invention, this invention proposes an adjustment calculation method that requires the operating condition switching module MT0 to operate simultaneously in both the main operating condition and the throttling operating condition. First, the flow resistance characteristics of the operating condition switching module MT0 are calculated under the two different operating conditions. Second, the balance calculation of each throttling element in the operating condition switching module MT0 is performed: First, the flow resistance characteristics of the first throttling element 04, the second throttling element 05 and the connecting conduit under the throttling operating condition are calculated at the required oxidant flow rate. Then, the flow resistance characteristics of the third throttling element 06 and the connecting conduit are calculated when both paths are opened simultaneously under the main operating condition.

[0042] Definition: The inlet flow rate 01 (i.e., the turbine pump outlet flow rate) under the main operating condition is q. 0z Under throttling conditions, q 0j The flow rate at the first outlet 02 (i.e., the flow rate into the secondary system) under the primary operating condition is q. 1z Under throttling conditions, q 1j The flow rate at the second outlet 03 (i.e., the flow rate required by the thrust chamber) under the main operating condition is q. 2z Under throttling conditions, q 2j The unit is kg / s;

[0043] The pressure at inlet 01 (i.e., pump outlet pressure minus a certain duct flow resistance) under the main operating condition is P. 0z Under throttling conditions, P is 0j The pressure at the first outlet 02 (i.e., the pressure required by the mixing ratio regulating valve to supply inlet 01, plus a certain increase in conduit flow resistance) under the main operating condition is P. 1z Under throttling conditions, P is 1j The pressure at the second outlet 03 (i.e., the pressure required by the thrust chamber at inlet 01 plus a certain amount of duct flow resistance) is P under the main operating condition. 2z Under throttling conditions, P is 2j The unit is MPa.

[0044] The flow resistance ΔP of the operating condition switching module MTo under the main operating condition is calculated using the following formulas. Toz (MPa) and flow resistance ΔP under throttling conditions Toj (MPa):

[0045] ΔP Toz =P 0z -P 2z …………………………………………(1)

[0046] ΔP Toj =P 0j -P 2j ………………………………………(2)

[0047] The flow rate through the first throttling element 04 and the flow resistance across the first throttling element 04 are calculated using the following formulas: Flow rate q through the first throttling element 04 under throttling conditions ph1j This refers to the inlet flow rate q under throttling conditions. 0j , i.e. q ph1j =q 0j ;

[0048] The flow resistance Δph1 of the first throttling element 04 under the main operating condition z Flow resistance Δph1 under throttling conditions j The calculation formula is as follows:

[0049] Δph1 z =P 0z -P 1z …………………………………………(3)

[0050] Δph1 j =P 0j -P 1j …………………………………………(4)

[0051] The flow rate q through the first throttling element 04 under the main operating condition is... ph1z kg / s, the calculation formula is as follows:

[0052]

[0053] Calculate the flow rate through the second throttling element 05 under throttling conditions, and the flow resistance across the second throttling element 05:

[0054] Flow rate q through the second throttling under throttling conditions ph2j kg / s, the calculation formula is as follows:

[0055] q ph2j =q ph1j -q 1j …………………………….……….(6)

[0056] Pressure drop (flow resistance) Δph2 under throttling conditions in the second throttling operation j MPa, the calculation formula is as follows:

[0057] Δph2 j =ΔP Toj -Δph1 j ……………………………….……….(7)

[0058] Calculate the flow rate through the third throttling element 06 under the main operating condition, and the flow resistance across the third throttling element 06:

[0059] Calculate the flow rate q through the third throttle under the main operating condition. ph3z kg / s, the calculation formula is as follows:

[0060] q ph3z =q 1z -q ph1z ……………………………….……….(8)

[0061] The pressure drop (flow resistance) Δph3 at both ends of the third throttling point under the main operating condition z This refers to the voltage drop (current resistance) ΔP of the switching module under the main operating condition. Toz ,Right now

[0062] Δph3 z =ΔP Toz ……………………………….……….(9)

[0063] For the above, throttling elements are only required when the engine is initially designed or when the system state changes. Once the engine state is fixed, the throttling ring sizes φ1, φ2, and φ3 of the first throttling element 04, the second throttling element 05, and the third throttling element 06 will not fluctuate significantly. Fluid flow tests can be carried out directly to select the three throttling elements from φ1′, φ1″, φ1″′, ..., φ2′, φ2″, φ2″′, ..., φ3′, φ3″, φ3″′, etc.

[0064] By measuring the flow rates of the first throttling element 04, the second throttling element 05, and the third throttling element 06, as well as the flow resistance at both ends of the first throttling element 04, the second throttling element 05, and the third throttling element 06, the throttling ring sizes φ1, φ2, and φ3 can be calculated. However, since precise throttling sizes cannot be obtained from theoretical calculations, a series of throttling sizes φ1′, φ1″, φ1″′…, φ2′, φ2″, φ2″′…, φ3′, φ3″, φ3″′… are generally manufactured to approximate the required throttling size. The next step is to conduct a flow test to select throttling element sizes that match the adjusted calculation parameters.

[0065] First, based on the flow resistance and flow rate parameters of the first throttling element 04 in the adjustment calculation, the size of the first simulated throttling element 4 is selected; then, based on the flow rate and flow resistance parameters of the oxidant main system's operating condition switching module MTo leading to the thrust chamber (main path) under throttling conditions, the size of the second simulated throttling element 5 is selected; finally, based on the flow rate and flow resistance parameters of the oxidant main system's operating condition switching module MTo leading to the thrust chamber (main path) under main operating conditions, the size of the third simulated throttling element 6 is selected.

[0066] To realize the above concept, this invention proposes a fluid flow test system for switchable flow rates in rocket engines, such as... Figure 2 As shown, it includes an inlet unit, a first outlet unit, a second outlet unit, a working condition switching valve 7, a first regulating element group, a second regulating element group, and a third regulating element group.

[0067] The first regulating element group includes multiple first analog throttling elements 4 of different sizes; the second regulating element group includes multiple second analog throttling elements 5 of different sizes; and the third regulating element group includes multiple third analog throttling elements 6 of different sizes.

[0068] In this embodiment, the inlet unit is an inlet tee 12, the first outlet unit is an outlet four-way 13, and the second outlet unit is an outlet tee 14.

[0069] Inlet 1 of inlet tee 12 is connected to an external water tank to provide the test medium and flow rate. A regulating valve 8 is installed between inlet 1 of inlet tee 12 and the water tank to regulate the pressure at inlet 1, simulating the outlet pressure of the turbine pump. A pressure gauge 10 and a flow meter 9 are installed between inlet 1 of inlet tee 12 and the water tank. One outlet of inlet tee 12 is connected to one inlet of operating condition switching valve 7. The other inlet of operating condition switching valve 7 is connected to an external air intake device. The outlet of operating condition switching valve 7 is connected to one inlet of outlet tee 14 through one of the third simulated throttling elements 6. The other outlet of inlet tee 12 is connected through one of the first simulated throttling elements 4. The outlet is connected to one inlet of the outlet four-way 13. A pressure gauge 10 is installed at the other inlet of the outlet four-way 13. One outlet of the outlet four-way 13 is connected to the other inlet of the outlet three-way 14 via the main pipe 11 and one of the second simulated throttling elements 5. The outlet of the outlet three-way 14 is connected to an external device as the second outlet 3. The other outlet of the outlet four-way 13 is connected to an external device as the first outlet 2. A regulating valve 8 is installed at the first outlet 2 to simulate the pressure at the first outlet 2. A regulating valve 8 is installed at the second outlet 3 to simulate the pressure at the second outlet 3. Flow meters 9 are installed at both the first outlet 2 and the second outlet 3.

[0070] The above components are connected by sealing with rubber rings and threaded fastening.

[0071] The experimental method proposed in this invention consists of three steps, involving the selection of the first simulated throttling element 4, the second simulated throttling element 5, and the third simulated throttling element 6:

[0072] First, adjust the flow resistance and flow rate parameters of the first throttling element 04 in the calculation according to the problem, and select the size of the first simulated throttling element 4; then, select the size of the second simulated throttling element 5 according to the flow rate and flow resistance parameters of the working condition switching module MTo to the thrust chamber (main road) under the throttling working condition; finally, select the size of the third simulated throttling element 6 according to the flow rate and flow resistance parameters of the working condition switching module MTo to the thrust chamber (main road) under the main working condition.

[0073] Step 1: Select the first simulated throttling element 4PH1

[0074] a) Preparation for the test:

[0075] Close the second outlet 3 of the test system, keep the operating condition switching valve 7 in the closed state, and measure the pressure P0 at the test inlet tee 12, the pressure P1 at the outlet quay 13, and the flow rate G through the test system.

[0076] b) Experimental procedure:

[0077] Given the pressure at test inlet 1, let P0 = P 0z The flow rate through the test system is G = q ph1z Select a suitable first simulated throttling element 4PH1 from a series of sizes φ1′, φ1″, φ1″′... to ensure that its flow resistance meets the parameter requirement Δph1. z That is, P0 - P1 = Δph1 z Generally, a very small measurement deviation in pressure drop (flow resistance) is allowed, such as 0.03MPa. Therefore, the first analog throttling element 4 is defined as the first throttling element 04.

[0078] Step 2: Select the second simulated throttling element 5PH2

[0079] a) Preparation for the test:

[0080] Keep the first outlet 2 of the test system open, open the second outlet 3, and keep the operating condition switching valve 7 closed; the first simulated throttling element 4PH1 is in the selected state; measure the pressure P0 at the test inlet tee 12, the pressure P1 at the outlet four-way 13, and the pressure P2 at the second outlet 3; measure the flow rate G through inlet 1 and the flow rate G' through the second outlet 3.

[0081] b) Experimental process

[0082] Given the inlet pressure of the test system, P0 = P 0j , Inlet 1 flow G = q 0j Adjust the regulating valve 8 at the first outlet 2 of the test so that the pressure at the four-way valve is P1 = P 1j A suitable second simulated throttling element 5PH2 is selected from a series of sizes φ2′, φ2″, φ2″′... when the flow rate G' = q at the second outlet 3. 2j This ensures that the pressure drop (flow resistance) from inlet 1 to the second outlet 3 satisfies φP. Toj That is, P0 - P2 = ΔP Toj Generally, a very small measurement deviation in pressure drop (flow resistance) is allowed, such as 0.03MPa. Therefore, the second analog throttling element 5 is defined as the second throttling element 05.

[0083] Step 3: Select the third analog throttling element 6PH3

[0084] a) Preparation for the test:

[0085] Keep the first outlet 2 of the test system open, open the second outlet 3, and keep the operating condition switching valve 7 open; the first simulated throttling element 4PH1 and the second simulated throttling element 5PH2 are in the selected state;

[0086] Measure the pressure P0 at test inlet 1, the flow rate G at inlet 1, the pressure P1 at outlet four-way 13, the pressure P2 at the second outlet 3, and the flow rate G through inlet 1 and the flow rate G' through the second outlet 3.

[0087] b) Experimental process

[0088] Given the test inlet pressure P0 = P 0z , Inlet 1 flow G = q 0z Adjust the regulating valve 8 at the first outlet 2 of the test so that the pressure at the outlet four-way valve 13 is P1 = P 1z Select a suitable third simulated throttling element 6 from a series of sizes φ3′, φ3″, φ3″′... when the flow rate G' = q at the second outlet 3. 2z This ensures that the pressure drop (flow resistance) from inlet 1 to the second outlet 3 satisfies ΔP. Toz That is, P0 - P2 = ΔP Toj Generally, a very small measurement deviation in pressure drop (flow resistance) is allowed, such as 0.03MPa. Therefore, the third analog throttling element 6 is defined as the third throttling element 06.

[0089] Thus, the selection of the first throttling element 04PH1, the second throttling element 05PH2, and the third throttling element 06PH3 was completed, and the experiment was finished.

Claims

1. A fluid flow test system for switchable flow rates in rocket engines, comprising: The system comprises an inlet unit, a first outlet unit, a second outlet unit, a working condition switching valve (7), a first regulating element group, a second regulating element group, and a third regulating element group; characterized in that: The first regulating element group includes one or more first analog throttling elements (4) of different sizes; the second regulating element group includes one or more second analog throttling elements (5) of different sizes; and the third regulating element group includes one or more third analog throttling elements (6) of different sizes. The inlet (1) of the inlet unit is used to connect to external equipment; one of the outlets of the inlet unit is connected to the inlet of the operating condition switching valve (7), and the outlet of the operating condition switching valve (7) is connected to one of the inlets of the second outlet unit through any third analog throttling element (6); the other outlet of the inlet unit is connected to the inlet of the first outlet unit through any first analog throttling element (4), the first outlet of the first outlet unit is defined as the first outlet (2), the first outlet (2) is used to connect to external equipment, the second outlet is connected to the other inlet of the second outlet unit through any second analog throttling element (5), the outlet of the second outlet unit is defined as the second outlet (3), the second outlet (3) is used to connect to external equipment; A main pipe (11) is provided between the second simulated throttling element (5) and another outlet of the first outlet unit; The inlet unit is equipped with regulating valves (8) at its inlet (1), first outlet (2) and second outlet (3); The inlet unit is an inlet tee (12), the first outlet unit is an outlet four-way (13), and the second outlet unit is an outlet tee (14).

2. The fluid flow test system for switchable flow rates in rocket engines according to claim 1, characterized in that: A pressure gauge (10) and a flow meter (9) are provided at the inlet (1) and the second outlet (3) of the inlet unit; a pressure gauge (10) is provided at the third outlet of the outlet four-way (13), and a flow meter (9) is provided at the first outlet (2).

3. A test method for a switchable flow rate liquid flow test system for rocket engines, used to simulate the operating condition of the operating condition switching module MT0 in a rocket engine, characterized in that, Includes the following steps: Step 1: Construct the fluid flow test system for switchable flow rates of rocket engines as described in claim 1 or 2; Step 2: Open the first outlet (2), keep the second outlet (3) and the working condition switching valve (7) closed, adjust the pressure of the inlet (1) of the inlet unit to be equal to the pressure of the inlet (01) of the working condition switching module MTo under the main working condition, and the flow rate through the inlet (1) is the flow rate through the first throttling element (04) under the main working condition; Step 3: If the current flow resistance of the first simulated throttling element (4) is equal to the flow resistance of the first throttling element (04) in the operating condition switching module MTo, then define the first simulated throttling element (4) as the selected first throttling element (04) and execute step 5; otherwise, execute step 4. Step 4: Replace the first analog throttling element (4) of different sizes and return to step 3 until the flow resistance of the selected first analog throttling element (4) is equal to the flow resistance of the first throttling element (04) in the operating condition switching module MTo; Step 5: Select the second simulated throttling element (5); Step 6: Select the third simulated throttling element (6) to complete the test.

4. The test method for a switchable flow rate liquid flow test system for rocket engines according to claim 3, characterized in that: Step 5 specifically involves: 5.1 Based on the determination of the first analog throttling element (4), open the second outlet (3), adjust the flow rate through the inlet (1) to be equal to the flow rate of the inlet (01) under the throttling condition of the working condition switching module MTo, adjust the pressure of the inlet (1) to be equal to the pressure of the inlet (01) under the throttling condition of the working condition switching module MTo, and adjust the pressure of the first outlet (2) to be equal to the pressure of the first outlet (02) under the throttling condition of the working condition switching module MTo; 5.2 If the flow resistance from the inlet (1) to the second outlet (3) is equal to the flow resistance from the inlet (01) to the second outlet (03) under the throttling condition of the operating condition switching module MTo, then the second simulated throttling element (5) is defined as the selected second throttling element (05), and step 6 is executed; otherwise, step 5.3 is executed. 5.3 Replace the second analog throttling element (5) of different sizes and return to step 5.2 until the flow resistance from the inlet (1) to the second outlet (3) is equal to the flow resistance from the inlet (01) to the second outlet (03) under the throttling condition of the operating condition switching module MTo.

5. The test method for a switchable flow rate liquid flow test system for rocket engines according to claim 4, characterized in that: Step 6 specifically involves: 6.1 Based on the determination of the first simulated throttling element (4) and the second simulated throttling element (5), the operating condition switching valve (7) is opened, and the pressure of the inlet (1) is equal to the pressure of the inlet (01) under the main operating condition of the operating condition switching module MTo, and the pressure of the first outlet (2) is equal to the pressure of the first outlet (02) under the main operating condition of the operating condition switching module MTo. 6.2 If the flow resistance from the inlet (1) to the second outlet (3) is equal to the flow resistance from the inlet (01) to the second outlet (03) under the main working condition of the working condition switching module MTo, then the third simulated throttling element (6) is defined as the selected third throttling element (06), and the test is completed; otherwise, step 6.3 is executed. 6.3 Replace the third analog throttling element (6) of different sizes and return to step 6.2 until the flow resistance from the inlet (1) to the second outlet (3) is equal to the flow resistance from the inlet (01) to the second outlet (03) under the main operating condition of the operating condition switching module MTo, and the test is completed.

Citation Information

Patent Citations

  • Comprehensive liquid flow test system for liquid rocket engine

    CN112729848A

  • Calibration test system for ultralow-temperature flow regulating valve of liquid rocket engine

    CN215952971U