A hidden mobile target defense method, system and device for power grid error data injection attack
By acquiring the deployment route diagram of D-FACTS devices in the power grid, the system can determine the defense against concealed moving targets, calculate the maximum detection capability, and generate a multi-stage MTD scheme. This solves the problem of insufficient detection capability in the power grid and improves the security and flexibility of the power grid.
Patent Information
- Application Number
- CN202311235954.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-22
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2043-09-22
AI Technical Summary
Existing methods for defending against moving targets are insufficient in their detection capabilities within the power grid, making them easily detectable by attackers and resulting in inadequate power grid security.
By acquiring the deployment route diagram of D-FACTS devices in the power grid, it is determined whether there is covert mobile target defense, the maximum detection capability is calculated, and a multi-stage MTD scheme is generated for power grid erroneous data injection attack detection. By utilizing the calculation method of covert space and the dynamic adjustment of D-FACTS devices, the detection capability is improved.
It enables the system to quickly reach its maximum detection capability without being detected by attackers, solving the problem of insufficient detection capability and improving the security and flexibility of the power grid.
Smart Images

Figure CN117220970B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of power grid attack detection technology, and in particular relates to a method, system and device for defending against covert moving targets against power grid erroneous data injection attacks. Background Technology
[0002] Since the introduction of False Data Injection Attack (FDIA) against power systems, scholars have conducted extensive research in this field. In recent years, information attacks against industrial control systems, such as power grids, have occurred frequently. How to meet the requirements of the system to cope with information attacks while ensuring the normal operation of the industrial control system is one of the hot issues in the current research field of industrial control systems.
[0003] Addressing the common problem of current cybersecurity—being easy to attack but difficult to defend—the United States has proposed "game-changing" technologies to achieve proactive cyber defense. Among them, Moving Target Defense (MTD) provides a new approach. Its core idea is to continuously and dynamically change the attack surface of the protected target in an internally manageable manner to confuse attackers, thereby increasing the cost and complexity of successful attacks, reducing the probability of successful attacks, and improving system resilience and security.
[0004] MTD mainly includes four basic concepts: moving target, moving target defense, attack surface, and attack surface transformation. Among them: moving target refers to a system that can move in multiple dimensions to reduce the attacker's advantage and increase resilience; moving target defense is to continuously change the attack surface presented to the attacker, thereby effectively increasing the cost for the attacker to discover the target's vulnerability; the attack surface is the set of ways in which an attacker can enter the system and cause potential threats. If a system's resources are defined as methods, channels, and data, then the attack surface is a subset of the system's resources.
[0005] The mobile target defense technology in the power grid specifically involves using Flexible Alternative Current Transmission Systems (FACTS) to periodically adjust the parameters of transmission lines and dynamically update key system information. This reduces the system's attack surface, transforming the previously largely uncontrollable power grid into one that can be fully controlled. It also improves the flexibility and stability of the power system, significantly increasing the transmission capacity of existing transmission lines.
[0006] Existing research lacks studies on the fundamental problems faced in the practical application of MTD technology, which makes it easy for attackers to discover and results in insufficient detection capabilities. Summary of the Invention
[0007] The purpose of this invention is to provide a method, system, and device for defending against covert moving targets in the face of power grid erroneous data injection attacks, which solves the problem of insufficient detection capability in existing moving target defense methods.
[0008] To achieve the above objectives, the technical solution adopted by the present invention is as follows:
[0009] This invention provides a method for defending against covert mobile targets against power grid error data injection attacks. Step 1: Obtain the deployment diagram of the D-FACTS device in the power network under test.
[0010] Step 2: Determine whether there is any concealed mobile target defense in the power network under test based on the obtained deployment route map. If so, proceed to Step 3.
[0011] Step 3: Calculate the maximum detection capability of the power network under test based on the judgment results of Step 2;
[0012] Step 4: Generate a multi-stage MTD scheme for the power network under test based on the obtained maximum detection capability of the power network under test.
[0013] Step 5: Apply the obtained multi-stage MTD scheme to the power grid error data injection attack detection of the power system under test.
[0014] Preferably, in step 2, the determination of whether the power network under test has covert mobile target defense based on the obtained deployment route map is specifically done as follows:
[0015] If the measurement matrix corresponding to a line in the power network under test that is not equipped with D-FACTS equipment cannot reach full rank, then the power network under test has covert moving target defense.
[0016] Preferably, in step 3, the maximum detection capability of the power network under test is obtained based on the judgment result of step 2 as mm. s +t, where m is the number of lines in the power network under test; m s t represents the number of single-line cut sets in the power network under test; t represents the number of connected components.
[0017] Preferably, in step 4, a multi-stage MTD scheme corresponding to the power network under test is generated based on the obtained maximum detection capability of the power network under test. Specifically, the method is as follows:
[0018] S41, The multi-stage MTD scheme includes multiple single-stage MTD schemes. The multi-stage MTD schemes are set as a set, and the initial set is an empty set.
[0019] S42, Construct the single-stage MTD scheme in this multi-stage MTD scheme;
[0020] S43, Detect the security constraints of the constructed single MTD scheme;
[0021] S44, update the multi-stage MTD scheme to obtain the updated multi-stage MTD scheme;
[0022] S45, determine whether the detection capability of the updated multi-stage MTD scheme reaches the maximum detection capability of the power network under test obtained in step 3. If it does, output the final multi-stage MTD scheme; otherwise, return to S42.
[0023] Preferably, in step S42, a single-stage MTD scheme is constructed within this multi-stage MTD scheme. The specific method is as follows:
[0024] Based on the judgment result of step 2, the concealment space is defined as a set that includes all concealment schemes;
[0025] The hidden space can be solved using the following formula:
[0026]
[0027] Based on the solution of the hidden space, the single-stage hidden scheme of the power network under test is constructed by combining the following formula:
[0028] maxrank(L1)-rank(L0)
[0029]
[0030] |x 1,l -x 0,l |≤τx 0,l ,l∈K D
[0031] ||y|| ∞ =τ
[0032] Among them, K D For a collection of lines with D-FACTS equipment deployed; x 1,l and x 0,l L1 and L2 are the reactance values of line l before and after MTD, respectively; τ is the maximum change ratio of line reactance; y is the vector of all reactance change ratios; L0 and L1 are the joint matrices before and after one MTD, respectively. Measurements taken on lines where D-FACTS equipment has not been deployed; The phase angle difference between the nodes at both ends of a line where D-FACTS equipment has not been deployed.
[0033] Preferably, the security constraints of the constructed single-time MTD scheme are checked, specifically by:
[0034] Obtain the line parameters, voltage, and power in a single MTD scheme;
[0035] Determine whether the line parameters, voltage, and power meet the corresponding safety constraints. If any of the line parameters, voltage, and power in a single MTD scheme does not meet the safety constraints, return to S42; otherwise, proceed to S44.
[0036] Preferably, the multi-stage MTD scheme is updated, specifically by:
[0037] The single-stage MTD scheme that satisfies the power grid safety operation constraints is added to the multi-stage scheme set to obtain the updated multi-stage MTD scheme.
[0038] Preferably, the method for determining whether the detection capability of the updated multi-stage MTD scheme reaches the maximum detection capability of the power network under test obtained in step 3 is as follows:
[0039] Calculate the L corresponding to the updated multi-stage MTD scheme k The rank of a matrix;
[0040] If the rank equals the maximum detection capability of the power network under test obtained in step 3, then the detection capability of the updated multi-stage MTD scheme reaches the maximum detection capability of the power system under test based on the D-FACTS device for mobile target defense obtained in step 1.
[0041] A covert mobile target defense system against power grid erroneous data injection attacks includes:
[0042] The deployment route map acquisition unit is used to acquire the deployment route map of the D-FACTS equipment in the power network under test;
[0043] The judgment unit is used to determine whether there is a hidden mobile target defense in the power network under test based on the obtained deployment route map. If so, proceed to step 3.
[0044] The detection capability calculation unit is used to calculate the maximum detection capability of the power network under test based on the judgment result of the judgment unit.
[0045] A multi-stage MTD scheme generation unit is used to generate a multi-stage MTD scheme for the power network under test based on the maximum detection capability of the obtained power network under test.
[0046] The multi-stage MTD scheme application unit is used to apply the obtained multi-stage MTD scheme to the power grid error data injection attack detection of the power system under test.
[0047] A covert mobile target defense device against power grid error data injection attacks includes a processor and a computer program capable of running on the processor, wherein the processor executes the computer program to implement the steps of the method.
[0048] Compared with the prior art, the beneficial effects of the present invention are:
[0049] This invention provides a covert moving target defense method against power grid erroneous data injection attacks. It analyzes the feasibility of implementing covert MTD by examining the power grid topology and D-FACTS device deployment conditions, and proposes for the first time a method for calculating the covert space. By sliding along the covert space, the system's maximum detection capability is achieved. It also considers the power grid's security requirements in the face of information attacks, a point not previously considered in D-FACTS device configuration designs. This application ensures that the defense method's activation is undetectable by attackers while achieving the system's maximum detection capability at the fastest speed, solving the problems of previous MTD attacks being detectable by attackers and having insufficient detection capabilities. Attached Figure Description
[0050] Figure 1 This is a flowchart of the present invention;
[0051] Figure 2 Diagram of the IEEE-14BUS system;
[0052] Figure 3 This represents the results of the detection and concealment capabilities of this method. Detailed Implementation
[0053] In the following description, specific details such as particular system architectures and techniques are set forth for illustrative purposes and not for limitation, in order to provide a thorough understanding of the embodiments of this application. However, those skilled in the art will understand that this application may also be implemented in other embodiments without these specific details. In other instances, detailed descriptions of well-known systems, apparatuses, circuits, and methods have been omitted so as not to obscure the description of this application with unnecessary detail.
[0054] Example 1
[0055] Please see Figure 1 This embodiment provides a method for defending against covertly moving targets in the face of power grid error data injection attacks, comprising the following steps:
[0056] S01, Collect power grid system data:
[0057] The collected system data includes: node injection power, line power flow, node parameters, line parameters, and D-FACTS equipment installation data, among which:
[0058] Line power flow includes the direction and magnitude of active power and the direction and magnitude of reactive power.
[0059] Node parameters include voltage and phase angle.
[0060] The line parameters include the node admittance matrix.
[0061] D-FACTS equipment installation data includes installation location, equipment capacity, and the operating range of each device.
[0062] S02, Preprocessing of the collected power grid system data:
[0063] Formatting the data involves processing it according to its data type. Specifically:
[0064] Power, voltage, and other data are uniformly converted into per-unit values for easier calculation;
[0065] The deployment route diagram of D-FACTS equipment is drawn based on data such as the installation location and capacity of D-FACTS equipment, as well as node parameters and line parameters.
[0066] S03, Determine if a covert moving target defense plan exists:
[0067] Based on the D-FACTS device deployment diagram obtained in step S02, determine whether the current system has a solution for covert mobile target defense. Covert means that if the system power flow monitored by the attacker does not change after the implementation of a certain mobile target defense scheme, then the mobile target defense scheme is considered a covert scheme. Specifically:
[0068] A stealthy moving target defense scheme exists in a system only if there is no D-FACTS device deployed on the line and the line does not contain any spanning tree in the system. Specifically, in a power system with m lines and n+1 nodes, there are m line measurements and n node state variables. Generally, m ≥ n. Let the initial measurement matrix of the system be H0. In a DC simplified system, H0 can be obtained by right-multiplying the system adjacency matrix (excluding the reference node) by a diagonal matrix composed of the system line susceptances.
[0069] Let the measurement matrix for the lines in the system without D-FACTS equipment be: Therefore, the matrix must not have a full column rank, i.e.
[0070] S04, Termination Plan:
[0071] When the current equipment deployment of the system does not meet the basic conditions for defending against concealed mobile targets, the system outputs "no solution" and terminates the solution.
[0072] S05, Hidden Space Calculation:
[0073] Based on the results of S03, if a concealment scheme exists in the system, then the concealment space should be solved. The concealment space refers to the set containing all concealment schemes, which can be obtained by giving the general analytical expression of the concealment schemes.
[0074] Specifically, in a power system, the relationship between measured values and system state is z = H0θ + w, where z is the measured value, θ is the system state variable, and w is the measurement noise. In a noise-free system, z = H0θ. For the measurement matrix H, let f1, f2, ..., f m-n F is a basis for the null space of H, where F = [f1f2…f m-n ] T Then H T F T =0, that is, FH=0, and thus we can obtain Fz=FHθ=0. The F matrix is obtained by multiplying the system's loop matrix G by the diagonal matrix X composed of the system's line reactances, that is, GZx=0. The position of reactances and power flow in the switching equation gives GZx=0, where x is the vector composed of line reactances. Let GZ=J, we can get Jx=0. For lines without D-FACTS equipment, since their line parameters cannot be modified, they must satisfy These are the measured values on these lines and the phase angle difference between the nodes at both ends of the lines, respectively.
[0075] Combining the above conditions, the solution for the hidden space is that it satisfies... All solutions.
[0076] Here, J is the intermediate matrix, which has no specific meaning.
[0077] S06, Calculation of maximum detection capability:
[0078] The impact of concealment constraints must be considered when calculating maximum detection capability. It has been proven that a concealed mobile target defense scheme is always susceptible to undetectable erroneous data injection attacks, which means that its maximum detection capability will inevitably decrease when concealment is required.
[0079] Let F0 be the cyclomatrix basis matrix corresponding to the initial measurement matrix H0 of the system. After the k-th MTD, F k , To represent the simultaneous matrix obtained by row stacking after k MTDs, we can use L k The rank of a matrix is used to characterize the detection capability of a system.
[0080] When m exists in the system s When L is a single-line cut set k m always exists sThe column contains only zero elements, meaning the dimension of the feasible attack region is at least m. s If the topology after disconnecting all single-line cut sets of the system has t connected components, then each connected component will cause L... k If the maximum rank is reduced by 1, then the minimum dimension of the feasible attack region is m. s +t gives the system's maximum detection capability as mm. s +t.
[0081] S07, Construct a single MTD solution:
[0082] The multi-stage moving target defense strategy of this invention generates a multi-stage scheme consisting of multiple single-shot MTD schemes. These schemes have minimal overlap with each other, thus maximizing the system's detection capability with the fewest possible single-shot MTD schemes after stacking. Therefore, the construction of single-shot MTD schemes should maximize L. k The specific method for changing the rank is as follows:
[0083] The line reactance of each new scheme should be linearly independent of the existing scheme, and the selected scheme should be chosen from the hidden space calculated in S05.
[0084] Furthermore, since the rank determination criterion is too simplistic in AC scenarios—because even a small disturbance can cause the same change in the matrix rank—it is necessary to maximize the absolute value of the disturbance while ensuring rank increase. Because the amplitudes of reactances of different lines vary, but their maximum allowable offset ratios are the same, we can set the infinity norm of the offset ratios of all elements of x equal to the maximum offset ratio of the line, thus obtaining the most effective concealment scheme. Let the joint matrices before and after a single MTD be L0 and L1, respectively; then the solution method for a single MTD scheme is as follows:
[0085] maxrank(L1)-rank(L0)
[0086]
[0087] |x 1,l -x 0,l |≤τx 0,l ,l∈K D
[0088] ||y‖ ∞ =τ
[0089] Among them, K D For a collection of lines with D-FACTS equipment deployed; x 1, l and x 0, l represents the reactance value of line l before and after MTD, τ represents the maximum change ratio of line reactance, and y represents the vector of all reactance change ratios.
[0090] S08, Power Grid Security Constraint Judgment:
[0091] The line parameter adjustment scheme obtained from S07 needs to be verified to determine whether the implementation of the action strategy will cause the power grid operating state and key parameters to exceed safe operating limits. Power grid constraints mainly include:
[0092] 1) Line parameters have range limitations; that is, the regulation capability of D-FACTS on the line should be within the allowable range of normal grid operation. For lines equipped with D-FACTS devices, their line parameters should meet the following requirements:
[0093]
[0094] in, x ij , Line l ij The lower and upper bounds of the parameter;
[0095] 2) System voltage constraints and power balance. Voltage constraint means that for any vertex, U∈(U N -ΔU,U N +ΔU), meaning that adjusting line parameters should not cause system voltage collapse, where U N The rated voltage is given, and ΔU is the maximum voltage variation. Power balance refers to the consistency between the output power of the generator and the sum of the power consumed by the load and network losses. For example, for a DC system, P... G -P L = -Bθ, where P G P L Let B and θ be the system's power generation and load power, respectively; and let B and θ be the admittance matrix and phase angle matrix, respectively.
[0096] If so, proceed to S07 for processing, and adjust the detection requirement action quantity so that the integrated initial action strategy meets the line parameter constraints during power grid operation; otherwise, proceed to S09 for processing.
[0097] S09, Detection capability verification:
[0098] Add the single-step MTD scheme obtained in S08 to the existing multi-stage scheme, and compare the current detection capability with the maximum detection capability obtained in S06. If the current detection capability has reached the maximum, proceed to S10 and output the final scheme; otherwise, proceed to S07 to construct the next scheme.
[0099] Specifically, this means determining L k Is the rank of the matrix mm? s-t, if yes, it means that the current system's detection capability has reached its maximum, and it will switch to S10 to output a multi-stage covert moving target defense scheme; if no, it means that the system's detection capability still has room for improvement, and it will switch to S07 to continue generating a new single MTD scheme until the detection capability reaches its maximum.
[0100] S10, Output Scheme:
[0101] The output configuration strategy includes: the number of devices to be configured, the location of the devices to be configured, and the adjustment scheme for the devices.
[0102] Example 2
[0103] Figure 2 This is a system architecture diagram for a test case of an IEEE-14 node standard power system. The system contains 14 nodes, of which nodes 1, 2, 3, 6, and 8 are generating nodes, and the other nodes are load nodes. There are 20 branches between the nodes.
[0104] The control center can control the on / off state of each branch in the system and the working status of each generator. Under normal operation, all generators in the system are in the on state. When an attacker intrudes into the control center, he can issue false control commands to the generators. For example, the attacker can send a control command to shut down the generator on node 2. When the generator receives the command, it will respond to it, which may cause damage to the system's operating status.
[0105] In the MATPOWER environment, a physical response model of the power system is constructed based on the power system's connection structure, electrical parameters, and the switching states of each generator. This model allows for power flow analysis of the power system. Figure 2 Specifically, it includes the following steps:
[0106] Step S01: Set the baseMVA value of the entire system to 100MVA, and initially generate the following bus matrix based on the node power and voltage parameters:
[0107]
[0108] In the Bus matrix, the first column is the No parameter, the second column is the Type parameter, the third column is the Pd parameter, the fourth column is the Od parameter, the fifth column is the Gs parameter, the sixth column is the Bs parameter, the seventh column is the area parameter, the eighth column is the Vm parameter, the ninth column is the Va parameter, the tenth column is the baseKV parameter, the eleventh column is the zone parameter, the twelfth column is the Vmax parameter, and the thirteenth column is the Vmin parameter.
[0109] In the Bus matrix, Type indicates the node type, where 1 is a PQ node, 2 is a PV node, and 3 is a slack node; Pd and Qd represent the active and reactive power injected by the node into the load; Gs and Bs represent the conductance and susceptance values of the node in parallel, which are all set to 0 in this system; Vm, Va, Vmax, and Vmin represent the initial amplitude, initial phase, maximum amplitude, and minimum amplitude of the node voltage, respectively, where the voltage amplitudes are per-unit values under the base capacity. For the simplification of the system model, the initial phase value of each node is uniformly set to 0, and the maximum and minimum amplitudes are uniformly set to 1.1 and 0.9, respectively; baseKV represents the node base voltage, which is consistent with the system base capacity; area and zone are used to set the grid section number and zone number, which are generally set to 1;
[0110] Step S02: Based on the line connection relationships between nodes and the impedance and admittance parameters of each branch, determine the following branch matrix:
[0111]
[0112] In the branch matrix, the first column is the fb parameter, the second column is the tb parameter, the third column is the R parameter, the fourth column is the X parameter, the fifth column is the B parameter, the sixth column is the rA parameter, the seventh column is the rB parameter, the eighth column is the rC parameter, the ninth column is the ratio parameter, the tenth column is the ang parameter, the eleventh column is the S parameter, the twelfth column is the angmin parameter, and the thirteenth column is the angmax parameter.
[0113] In the branch matrix, fb and tb represent the node numbers connected to the branch; columns R, X, and B represent the resistance, reactance, and susceptance of the branch, respectively; rA, rB, and rC represent the allowable power of the branch in the long term, short term, and emergency, respectively. To simplify the system model, the values of these three columns are uniformly set to 250; ratio represents the branch voltage ratio. If the branch is a conductor, its value is 0. If the branch has a transformer, its value is the ratio of the reference voltages on both sides of the transformer; S represents the closed state of the branch, where 1 indicates the branch is closed and 0 indicates the branch is open; ang, angmin, and angmax represent the branch phase angle and the maximum and minimum angle difference, respectively.
[0114] Step S03: Based on the generator's power parameters and electrical parameters, determine the following generator matrix (gen matrix):
[0115]
[0116] In the gen matrix, the first column is the bus parameter, the second column is the Pg parameter, the third column is the Qg parameter, the fourth column is the Qmax parameter, the fifth column is the Qmin parameter, the sixth column is the Vg parameter, the seventh column is the mBase parameter, the eighth column is the S parameter, the ninth column is the Pmax parameter, and the tenth column is the Pmin parameter.
[0117] In the gen matrix, Pg, Pmax, and Pmin represent the generator's active power and maximum and minimum allowable values, respectively; Qg, Qmax, and Qmin represent the generator's reactive power and maximum and minimum allowable values, respectively; Vg represents the generator's operating voltage, which is a per-unit value under the base capacity; mBase represents the generator's power base, which is consistent with the base capacity; S represents the generator's operating state, where 1 indicates the generator is running and 0 indicates the generator is off.
[0118] Step S02: Calculate the system power flow to determine the system state matrix s and the line power flow matrix l.
[0119]
[0120] The first column of the s matrix is the node number data, the second column is the voltage amplitude, the third column is the voltage phase angle, the fourth column is the active power injected by the node, the fifth column is the reactive power injected by the node, and the node without these two values is the load node. The sixth column is the active power absorbed by the node, and the seventh column is the reactive power absorbed by the node, and the node without these two values is the generator node.
[0121]
[0122] The first column of the l matrix contains the line number data, the second column contains the starting node of the line power, the third column contains the ending node of the line power, the fourth column contains the active power injected by the starting node, the fifth column contains the reactive power injected by the starting node, the sixth column contains the active power injected by the ending node (negative values indicate that the node absorbs active power from the line), the seventh column contains the reactive power injected by the ending node (negative values indicate that the node absorbs reactive power from the line), and the eighth and ninth columns contain the active and reactive power losses of the line, respectively.
[0123] Step S03: Determine if the system has a concealment scheme, such as... Figure 2 As shown, we assume that D-FACTS devices are deployed on all lines, and let the measurement matrix for the lines in the system without D-FACTS devices be... at this time This means that there is a feasibility for a covert solution in the system. Based on methods S05 and S07, we obtained the solution that maximizes the detection capability, as shown in columns 3-5 of Table 1. A total of three solutions need to be superimposed to maximize the detection capability.
[0124] Table 1
[0125]
[0126]
[0127] Before and after adopting this configuration scheme, the detection efficiency for attack volumes of different magnitudes is as follows: Figure 3 As shown, after implementing this method, the system can detect most attacks with a high degree of stealth.
[0128] Example 3
[0129] This embodiment provides a covert moving target defense system against power grid error data injection attacks, comprising:
[0130] The deployment route map acquisition unit is used to acquire the deployment route map of the D-FACTS equipment in the power network under test;
[0131] The judgment unit is used to determine whether there is a hidden mobile target defense in the power network under test based on the obtained deployment route map. If so, proceed to step 3.
[0132] The detection capability calculation unit is used to calculate the maximum detection capability of the power network under test based on the judgment result of the judgment unit.
[0133] A multi-stage MTD scheme generation unit is used to generate a multi-stage MTD scheme for the power network under test based on the maximum detection capability of the obtained power network under test.
[0134] The multi-stage MTD scheme application unit is used to apply the obtained multi-stage MTD scheme to the power grid error data injection attack detection of the power system under test.
[0135] Example 4
[0136] The aforementioned covert mobile target defense device against power grid error data injection attacks can be a computing device such as a desktop computer, laptop, handheld computer, or cloud server. This covert mobile target defense device against power grid error data injection attacks may include, but is not limited to, processors and memory. ...
[0137] The processor can be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. …
[0138] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application, and should all be included within the protection scope of this application.
Claims
1. A method for defending against covertly moving targets in the face of power grid erroneous data injection attacks, characterized in that, Includes the following steps: Step 1: Obtain the deployment route diagram of the D-FACTS equipment for the power network under test; Step 2: Determine whether there is any concealed mobile target defense in the power network under test based on the obtained deployment route map. If so, proceed to Step 3. Step 3: Calculate the maximum detection capability of the power network under test based on the judgment results of Step 2; Step 4: Generate a multi-stage MTD scheme for the power network under test based on the obtained maximum detection capability of the power network under test. Step 5: Apply the obtained multi-stage MTD scheme to the power grid error data injection attack detection of the power system under test; In step 4, a multi-stage MTD scheme is generated based on the obtained maximum detection capability of the power network under test. The specific method is as follows: S41, The multi-stage MTD scheme includes multiple single-stage MTD schemes. The multi-stage MTD schemes are set as a set, and the initial set is an empty set. S42, Construct the single-stage MTD scheme in this multi-stage MTD scheme; S43, Detect the security constraints of the constructed single MTD scheme; S44, update the multi-stage MTD scheme to obtain the updated multi-stage MTD scheme; S45, determine whether the detection capability of the updated multi-stage MTD scheme reaches the maximum detection capability of the power network under test obtained in step 3. If it does, output the final multi-stage MTD scheme. Otherwise, return to S42; S42, Construct the single-stage MTD scheme in this multi-stage MTD scheme, specifically as follows: Based on the judgment result of step 2, the concealment space is defined as a set that includes all concealment schemes; The hidden space can be solved using the following formula: Based on the solution of the hidden space, the single-stage hidden scheme of the power network under test is constructed by combining the following formula: in, For a collection of lines with D-FACTS equipment deployed; and These are the front and rear lines of MTD respectively. The reactance value; This represents the maximum percentage change in the line reactance. This is a vector representing the proportions of all reactance changes; and These are the joint matrices before and after a single MTD; Measurements taken on lines where D-FACTS equipment has not been deployed; The phase angle difference between the nodes at both ends of a line where D-FACTS equipment has not been deployed; This is the intermediate matrix.
2. The method for defending against covertly moving targets against power grid erroneous data injection attacks according to claim 1, characterized in that, In step 2, the system determines whether the power network under test has covert mobile target defense based on the obtained deployment route map. The specific method is as follows: If the measurement matrix corresponding to a line in the power network under test that is not equipped with D-FACTS equipment cannot reach full rank, then the power network under test has covert moving target defense.
3. A method for defending against covertly moving targets against power grid erroneous data injection attacks according to claim 1, characterized in that, In step 3, based on the judgment result of step 2, the maximum detection capability of the power network under test is obtained as follows: ,in, The number of lines in the power network to be tested; The number of single-line cut sets in the power network under test; The number of connected components.
4. A method for defending against covertly moving targets against power grid erroneous data injection attacks according to claim 1, characterized in that, The security constraints of the constructed single-time MTD scheme are checked, specifically by: Obtain the line parameters, voltage, and power in a single MTD scheme; Determine whether the line parameters, voltage, and power meet the corresponding safety constraints. If any of the line parameters, voltage, and power in a single MTD scheme does not meet the safety constraints, return to S42; otherwise, proceed to S44.
5. A method for defending against covert moving targets against power grid erroneous data injection attacks according to claim 1, characterized in that, The multi-stage MTD scheme is updated using the following method: The single-stage MTD scheme that satisfies the power grid safety operation constraints is added to the multi-stage scheme set to obtain the updated multi-stage MTD scheme.
6. A method for defending against covert moving targets against power grid erroneous data injection attacks according to claim 1, characterized in that, To determine whether the detection capability of the updated multi-stage MTD scheme reaches the maximum detection capability of the power network under test obtained in step 3, the specific method is as follows: Calculate the updated multi-stage MTD scheme. The rank of a matrix; If the rank equals the maximum detection capability of the power network under test obtained in step 3, then the detection capability of the updated multi-stage MTD scheme reaches the maximum detection capability of the power system under test based on the D-FACTS device for mobile target defense obtained in step 1.
7. A covert mobile target defense system against power grid erroneous data injection attacks, characterized in that, The defense method based on claim 1 includes: The deployment route map acquisition unit is used to acquire the deployment route map of the D-FACTS equipment in the power network under test; The judgment unit is used to determine whether there is a hidden mobile target defense in the power network under test based on the obtained deployment route map. If so, proceed to step 3. The detection capability calculation unit is used to calculate the maximum detection capability of the power network under test based on the judgment result of the judgment unit. A multi-stage MTD scheme generation unit is used to generate a multi-stage MTD scheme for the power network under test based on the maximum detection capability of the obtained power network under test. The multi-stage MTD scheme application unit is used to apply the obtained multi-stage MTD scheme to the power grid error data injection attack detection of the power system under test.
8. A covert mobile target defense device against power grid error data injection attacks, comprising a processor and a computer program capable of running on the processor, characterized in that, When the processor executes the computer program, it implements the steps of the method as described in any one of claims 1-6.
