一种拉延料流控制装置及控制方法

By setting scale lines and adjustment components on the lower die pressing ring, the problem of long mold debugging time in the prior art is solved, realizing fast, time-saving and labor-saving material flow adjustment, and improving mold debugging efficiency.

CN117259548BActive Publication Date: 2026-07-17ANHUI JIANGHUAI AUTOMOBILE GRP CORP LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
ANHUI JIANGHUAI AUTOMOBILE GRP CORP LTD
Filing Date
2023-09-28
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In existing technologies, measuring with a ruler is not a quick way to obtain the actual material flow rate of the drawing die, resulting in long die debugging time and low efficiency.

Method used

Multiple equally spaced scale lines are set on the pressing surface of the lower die pressing ring, and the vertical height of the balance block is adjusted by the material flow adjustment mechanism and adjustment components to quickly obtain the actual material flow rate, and the adjustment is made by comparing with the theoretical material flow rate.

Benefits of technology

It enables rapid, time-saving, and labor-saving adjustment of actual material flow rate, improving mold debugging efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117259548B_ABST
    Figure CN117259548B_ABST
Patent Text Reader

Abstract

本发明提供了一种拉延料流控制装置及控制方法,其中拉延料流控制装置包括料流量调节机构和设置在下模压边圈的压料面上的多个刻度线,各所述刻度线之间的间距相等;所述料流量调节机构包括用于设定上模与下模之间闭合间隙的平衡块和用于调节所述平衡块的竖直高度的调节组件,所述平衡块设置在下模上且位于所述下模压边圈外。本发明能够较为快速地获得实际料流量,还能够使得实际料流量的调节较为省时省力,有效地提高模具的调试效率。
Need to check novelty before this filing date? Find Prior Art