A method for unit commitment optimization of photovoltaic power station with energy storage based on multi-scenario analysis
By optimizing the photovoltaic power plant unit combination through multi-scenario analysis and Benders decomposition theory, the impact of photovoltaic power generation volatility on the power grid was resolved, the efficient configuration of energy storage systems was achieved, and the security and economy of the power grid were improved.
Patent Information
- Application Number
- CN202311469196.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-07
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-11-07
AI Technical Summary
Existing technologies have failed to effectively address the impact of the volatility and intermittency of large-scale photovoltaic power generation on the power grid, resulting in high backup costs, severe curtailment of solar power, and the failure of energy storage system configuration to dynamically respond to power deviations, thus affecting the safe and economical operation of the power grid.
A photovoltaic power plant unit combination optimization method based on multi-scenario analysis is adopted. By acquiring photovoltaic power plant power prediction data, a photovoltaic power plant unit combination model is constructed, and a unified model of energy storage system is introduced. The Benders decomposition theory is used to solve the problem, optimize the energy storage configuration, smooth the fluctuation of photovoltaic output, and reduce the adjustment burden of traditional units.
It effectively reduces the adverse impact of photovoltaic power generation on the power grid, improves the safety and economy of system operation, optimizes the configuration of energy storage systems, and enhances the power grid's ability to absorb new energy sources.
Smart Images

Figure CN117277419B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of photovoltaic power plant unit combination optimization, and in particular relates to a method for optimizing the combination of photovoltaic power plant units including energy storage based on multi-scenario analysis. Background Technology
[0002] Among numerous new energy technologies, large-scale photovoltaic (PV) power generation technology has shown increasing advantages as power generation costs continue to decline. More and more PV power plants are being connected to the grid to participate in power supply and demand balance, greatly promoting the development and utilization of new energy sources in the power industry. PV output is closely related to sunlight intensity and exhibits strong fluctuations and intermittency, leading to numerous problems when PV power plants participate in system dispatching plans. This is currently a bottleneck for PV grid connection and effective utilization. The increase in the scale of PV grid connection presents new problems and challenges to the power grid. Faced with the integration of large-scale renewable energy, power dispatching departments generally adopt a relatively extensive and conservative method for power generation planning: 1) To cope with the uncertainty of PV power output, a large number of units are reserved for standby, resulting in expensive standby costs; 2) To cope with the peak-shaving problems brought about by PV power generation, PV power output is reduced, or even curtailed.
[0003] Therefore, to fully absorb the output of solar power, relying solely on the reserve capacity provided by other units in the system is insufficient to mitigate the load fluctuations and prediction errors after intermittent power sources are connected to the grid. To reduce the pressure on system regulation, advanced energy storage technology is needed to smooth renewable energy output and increase the system's flexibility and resilience. Currently, energy storage systems remain expensive. The key to solving the solar power absorption problem lies in selecting suitable energy storage systems while meeting output requirements, and rationally coordinating the allocation of energy storage capacity and unit reserve capacity to achieve system supply and demand balance.
[0004] Rational allocation of energy storage resources can reduce the cost of photovoltaic power generation and backup costs. Simultaneously, utilizing energy storage systems can smooth out fluctuations in photovoltaic power generation and improve the grid's capacity to accept new energy generation, making it an ideal means to achieve the safe and effective utilization of large-scale new energy power generation systems. With the improvement of demand-side management, the grid has begun to emphasize the integration and management of demand-side distributed generation and energy storage systems. Without orderly management, demand-side uncertainty will further increase. How to optimize energy storage resources within the system while ensuring the safety and economy of large-scale photovoltaic integration, and achieve effective interaction between demand-side distributed energy storage systems and the grid, presents new challenges to the safe and economical operation of the power system.
[0005] Domestic and foreign scholars have achieved many valuable phased results in the capacity configuration of renewable energy storage systems: (1) The system's economic indicators are used as the objective function, and the energy storage capacity configuration is incorporated into the active power balance constraint of the system for modeling. However, this method ignores the real-time balance requirements of the system, and the configured energy storage capacity cannot dynamically respond to power deviations. (2) From the perspective of the whole network peak regulation, a method for optimizing the capacity configuration of large-scale energy storage systems to relax the peak regulation bottleneck is proposed, as well as a method for determining the minimum capacity of energy storage systems from the perspective of spectrum analysis. However, neither of these methods considers how to handle situations where the power deviation exceeds the energy storage capacity compensation limit. In the existing technologies, no time-based fine division, control and management mechanism of energy storage systems or system backup is mentioned, nor is the issue considered from the perspective of improving the grid's ability to absorb renewable energy generation, nor is the impact on the grid unit combination problem considered. Summary of the Invention
[0006] The purpose of this invention is to provide a method for optimizing the combination of photovoltaic power plant units with energy storage based on multi-scenario analysis, so as to solve the problems existing in the prior art.
[0007] To achieve the above objectives, this invention provides a method for optimizing the combination of photovoltaic power plant units with energy storage based on multi-scenario analysis, comprising: Obtain short-term forecast curve data of photovoltaic power plant power, and construct a photovoltaic power plant unit combination model based on the short-term forecast curve data; A unified model of the energy storage system is constructed, and the unified model of the energy storage system is introduced into the photovoltaic power station unit combination model with the coordinated operation of photovoltaic power generation and energy storage system as the control objective, so as to obtain a multi-scenario correction type unit combination model. The multi-scenario correction unit combination model is solved using Benders decomposition theory to obtain an optimal energy storage configuration scheme. Optionally, the feature is that constructing a photovoltaic power plant unit combination model based on the short-term forecast curve data specifically includes: Based on the short-term prediction curve data of the photovoltaic power plant power, several typical photovoltaic output scenarios are generated. Based on the several typical photovoltaic output scenarios and combined with the distribution characteristics of regional photovoltaic prediction errors, the occurrence probability data of each typical photovoltaic output scenario is obtained. The photovoltaic power plant unit combination model is constructed based on the first objective function and the first constraint condition, which is to achieve a balance between economic utilization and maximum utilization of photovoltaic power.
[0008] Optionally, the first objective function is: In the formula, For the context The probability of occurrence; The number of scenarios simulating photovoltaic power output; This is the optimization cycle for unit combination problems; This refers to the number of grid-connected photovoltaic power plants in the system; and respectively scenarios Below, photovoltaic power station exist Available output power and actual output power for a given time period.
[0009] Optionally, the first constraint includes: power balance constraint, reserve capacity demand constraint, and line active power constraint for photovoltaic injected power. The power balance constraint condition is as follows: In the formula, The total load demand of the system during time period t. Let t be the output of a conventional unit under scenario s. The utilization value of photovoltaic power output under scenario s at time t; The constraints on the reserve capacity requirement are as follows: In the formula, This refers to the start-up and shutdown status of a conventional generating unit. For system reserve rate, To predict photovoltaic power output; Predicted photovoltaic output of photovoltaic power plant j under scenario s The constraints are: The active power constraint condition for the photovoltaic injection power is as follows: In the formula, B is the system coefficient matrix. For matrix The row vector corresponding to the generator, For matrix The row vector corresponding to the grid-connected photovoltaic power station access point, Let be the vector representing the amount of line transmission power exceeding the limit at different time periods under scenario s. For matrix The row vector corresponding to the load, , For the reactance of the branch circuit, l Let L be the number of system branches, and L be the connection matrix of the system branch nodes. P L This is the branch power constraint vector; P dThis represents the total load requirement of the system.
[0010] Optionally, the process of constructing the unified model of the energy storage system specifically includes: Several energy storage device models are obtained, and energy storage unification processing is performed on the several energy storage device models according to the internal and external characteristics of the energy storage system model to obtain the unified model of the energy storage system.
[0011] Based on the internal and external characteristics of energy storage systems, various energy storage device models are analyzed and compared to identify their commonalities and establish a unified model for energy storage systems. From the grid side, energy storage systems exhibit three states: charging, discharging, and idle. The external characteristics of energy storage systems under different operating states are described as follows: Energy storage systems cannot be in a charging and discharging state simultaneously; The system is charging; The system discharged; The system is idle.
[0012] Introducing energy storage function and The following table describes the changes in the charge / discharge rate and energy storage state of an energy storage system: This is the initial energy storage state. , For minimum and maximum energy storage capacity, , This represents the charge / discharge rate.
[0013] State of energy storage and charge / discharge rate are two key parameters, and their constraints are as follows: (9) in, This is a function for the number of charge / discharge conversions.
[0014] Optionally, the objective function of the unified model is: In the formula, , is the energy storage start-up and shutdown cost function, and represents the start-up and shutdown status of the conventional unit.
[0015] Optionally, the constraints of the unified model include: system constraints, energy storage system constraints, and network constraints; Wherein, the system constraints are In the formula, For total load, , For charge / discharge rate, Reserve capacity; The constraints of the energy storage system are: The network constraints are: .
[0016] The multi-scenario correction type unit combination model is as follows: In the formula, and Let t be the conventional and combined photovoltaic power output vectors under scenario s, where t is the time period; and Efforts to optimize the main problem in the previous round, Let be the vector representing the amount of line transmission power exceeding the limit at different time periods under scenario s. To be the minimum value, P pv cs Contribute to photovoltaic correction; Let be the charge / discharge cycle number function, u be the battery's state of charge / discharge, and b be the battery's rated charge / discharge cycles. To obtain the partial derivative.
[0017] To achieve the control objective, the objective function and constraints of the multi-scenario correction unit combination model are as follows: The objective function of the multi-scenario correction unit combination model is: The constraints of the multi-scenario correction type unit combination model are: .
[0018] Optionally, the feature is that the multi-scenario correction unit combination model is solved using Benders decomposition theory to obtain an optimal energy storage configuration scheme, specifically including: Step 1: Decompose the network security constraints of the multi-scenario correction type unit combination model into security sub-problems under normal operation and security sub-problems under fault conditions; Step 2: Verify each security sub-issue using a unified verification method covering all time periods and scenarios; Step 3: Under normal operating conditions, if the line transmission power exceeds the allowable transmission power limit under normal conditions, a Benders cut set containing unit output information is generated and fed back to the main unit combination problem as safety sub-problem correction information. In a fault state, if short-term adjustment of the unit output cannot eliminate the line transmission power exceeding the limit, a Benders cut set containing the corrected unit output information is generated, and the relevant constraints are identified to obtain a constraint set that constrains the main problem. Furthermore, the Benders cut set containing the corrected unit output information and the constraint set are fed back to the main problem as fault subproblem correction information. Step 4: Resolve the safety sub-problem correction information and the fault sub-problem correction information, and repeat steps 1 to 4 to obtain an energy storage optimization configuration scheme that satisfies the safety sub-problem verification.
[0019] The technical effects of this invention are as follows: The present invention provides a method for optimizing the unit combination of photovoltaic power plants with energy storage based on multi-scenario analysis, comprising: acquiring short-term forecast curve data of photovoltaic power plant power; constructing a photovoltaic power plant unit combination model based on the short-term forecast curve data; constructing a unified model of energy storage system, and introducing the unified model of energy storage system into the photovoltaic power plant unit combination model with the coordinated operation of photovoltaic power generation and energy storage system as the control objective, thereby obtaining a multi-scenario corrected unit combination model; and solving the multi-scenario corrected unit combination model using Benders decomposition theory to obtain an energy storage optimization configuration scheme.
[0020] This invention introduces a scenario analysis method to simulate the volatility and randomness of actual photovoltaic power output, and establishes a multi-scenario unit combination model considering safety constraints. The desired curtailment penalty function is incorporated into the optimization objective, taking into account the spinning reserve demand due to photovoltaic power fluctuations in the same and adjacent time periods. By analyzing the unit combination model, the configuration of the grid-connected photovoltaic power station's energy storage system is optimized.
[0021] This invention proposes a method for a unified model of various energy storage devices, constructing a safety-constrained unit combination model that considers the coordination between photovoltaic power generation and energy storage systems. Through optimization of the charging and discharging of the energy storage system, the volatility of photovoltaic output is smoothed, reducing the output adjustment burden of traditional units. Employing a multi-scenario safety-constrained unit combination method for the joint operation of photovoltaic and energy storage, the coordinated operation of photovoltaic and energy storage systems is optimized, effectively reducing the adverse effects of large-scale photovoltaic power generation on power system operation and improving the safety and economy of system operation.
[0022] This invention applies Benders decomposition theory and proposes a strategy for unified verification of power transmission security sub-problems and generation of Benders cut sets in different time periods and scenarios. Under the premise of ensuring the optimality of model solution, the verification of security constraint sub-problems can be completed quickly, effectively reducing the number of iterations of the decomposition algorithm. This provides a safe, efficient and flexible method for optimizing the configuration of energy storage systems for unit combination problems that consider the uncertainty of photovoltaic power generation. Attached Figure Description
[0023] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0024] The accompanying drawings, which form part of this application, are used to provide a further understanding of this application. The illustrative embodiments and descriptions of this application are used to explain this application and do not constitute an undue limitation of this application. In the drawings: Figure 1 This is a flowchart from an embodiment of the present invention; Figure 2 This is a schematic diagram of the interannual variation curves of total solar radiation and sunshine duration in an embodiment of the present invention. Figure 3 This is a schematic diagram of the spatiotemporal scale of photovoltaic power generation prediction in an embodiment of the present invention; Figure 4 This is a flowchart illustrating the photovoltaic power generation prediction process in an embodiment of the present invention. Figure 5 This is a schematic diagram of the scenario analysis process in an embodiment of the present invention; Figure 6 This is a block diagram of a photovoltaic power generation structure considering an energy storage system in an embodiment of the present invention; Figure 7 This is a flowchart illustrating the combination of the optimization model and optimization algorithm in this embodiment of the invention. Figure 8 This is a flowchart of the model solving algorithm in an embodiment of the present invention. Detailed Implementation
[0025] Various exemplary embodiments of the present invention will now be described in detail. This detailed description should not be considered as a limitation of the present invention, but rather as a more detailed description of certain aspects, features, and embodiments of the present invention.
[0026] It should be understood that the terminology used in this invention is merely for describing particular embodiments and is not intended to limit the invention. Furthermore, with respect to numerical ranges in this invention, it should be understood that each intermediate value between the upper and lower limits of the range is also specifically disclosed. Every smaller range between any stated value or intermediate value within a stated range, and any other stated value or intermediate value within said range, is also included in this invention. The upper and lower limits of these smaller ranges may be independently included or excluded from the range.
[0027] Unless otherwise stated, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art. While only preferred methods have been described herein, any methods similar or equivalent to those described herein may be used in the implementation or testing of this invention. All references to this specification are incorporated by way of citation to disclose and describe the methods associated with those references. In the event of any conflict with any incorporated reference, the content of this specification shall prevail.
[0028] Various modifications and variations can be made to the specific embodiments described in this specification without departing from the scope or spirit of the invention, as will be apparent to those skilled in the art. Other embodiments derived from this specification will also be obvious to those skilled in the art. This application specification and embodiments are merely exemplary.
[0029] The terms “include,” “including,” “have,” “contain,” etc., used in this article are all open-ended terms, meaning that they include but are not limited to.
[0030] It should be noted that, unless otherwise specified, the embodiments and features described in this application can be combined with each other. This application will now be described in detail with reference to the accompanying drawings and embodiments.
[0031] Example 1 like Figures 1-8 As shown, this embodiment provides a method for optimizing the combination of photovoltaic power station units with energy storage based on multi-scenario analysis, including: Obtain short-term forecast curve data of photovoltaic power plant power, and construct a photovoltaic power plant unit combination model based on the short-term forecast curve data; A unified model of the energy storage system is constructed, and the unified model of the energy storage system is introduced into the photovoltaic power station unit combination model with the coordinated operation of photovoltaic power generation and energy storage system as the control objective, so as to obtain a multi-scenario correction type unit combination model. The multi-scenario correction unit combination model is solved using Benders decomposition theory to obtain an optimal energy storage configuration scheme. The reliability of the multi-scenario correction unit combination model and the energy storage optimization configuration scheme is objectively evaluated by using the expected power shortage time data as a reliability index. This makes the photovoltaic power generation balancing process closer to a typical non-stationary strong stochastic process. By calling the unit combination model of different scenarios, the power is stabilized back to a given value. The deviation between the output power of the photovoltaic power station and the planned power is analyzed using the unit combination model, which intuitively reflects the operating characteristics of the photovoltaic power station energy storage system, determines the configuration of the energy storage system to compensate for the random fluctuations of photovoltaic power generation, and has the ability to provide control capacity for the system units.
[0032] This embodiment focuses on photovoltaic power generation and energy storage systems. It constructs a unit combination optimization model for the coordinated operation of photovoltaic power generation and energy storage systems. The optimal configuration of the energy storage system is studied using this model. The main process is as follows: Figure 1 As shown.
[0033] Photovoltaic power plant output scenario analysis: Taking Hami region of Xinjiang as an example, the interannual variation curves of total solar radiation and sunshine hours are as follows: Figure 2 As shown, the annual average total solar radiation is 6178.8 MJ / m2, and the annual average sunshine duration is 3420.7 h.
[0034] The output of photovoltaic (PV) power plants is significantly affected by weather, exhibiting strong volatility and randomness. Based on short-term power forecast curves for PV power plants, optimization of unit combination and economic dispatch in power systems incorporating PV power can be achieved. The spatiotemporal scale of regional PV power generation forecasting using numerical weather prediction is as follows: Figure 3 As shown.
[0035] To address the issue of power output fluctuations in photovoltaic (PV) power plants, it is necessary to consider the probability distribution characteristics of PV power output. Multiple typical scenarios describing the potential future power output of grid-connected PV power plants should be generated in advance. The probability of each scenario occurring should be calculated based on stochastic mathematical theory, and then incorporated into the unit combination model for unified optimization. This approach allows for simultaneous consideration of the impact of uncertainties on system operational safety and economic efficiency. The PV power output prediction process is as follows: Figure 4 As shown.
[0036] Considering the uncertainty of photovoltaic (PV) power generation forecasts, a set of uncertain scenarios for PV power generation is introduced to establish a multi-scenario unit combination model that takes into account the uncertainty of PV power generation. This multi-scenario unit combination model based on PV power output scenario simulation exhibits strong robustness. Based on this unit combination scheme, a relatively stable PV power generation plan can be found under any PV power output scenario. The scenario analysis process is as follows: Figure 5 As shown.
[0037] Compared to conventional photovoltaic (PV) power plants, PV power plants with energy storage can not only output power to the grid but also absorb power from it. Energy storage systems have a faster response speed, can improve the economic efficiency of system operation through peak shaving and valley filling, and can quickly replenish the grid's power shortages, providing a certain amount of spinning reserve capacity to the grid, reducing the output adjustment pressure on conventional units, and improving the safety of system operation. To optimize the simultaneous participation of energy storage systems in peak shaving and valley filling and the provision of backup services, it is necessary to construct systems such as… Figure 6 The model shown.
[0038] Based on scenario analysis of photovoltaic (PV) power output, this paper optimizes the configuration of energy storage systems in PV power plants and establishes a unit combination model incorporating energy storage systems. Building upon previous research, and aiming at the coordinated operation of PV power generation and energy storage systems, this paper considers the uncertainties of PV power generation and the impact of grid N-1 faults on unit combination optimization. It employs a unit combination model and method for the coordinated operation of PV and energy storage systems to improve the absorption capacity of large-scale photovoltaic resources, optimize the role of energy storage resources in system operation, and address the impact of grid N-1 faults on system safety and economic operation.
[0039] System Reliability Assessment: To accurately measure the impact of energy storage systems on the stability and economy of photovoltaic (PV) power generation systems, and considering the benefits of PV power generation to the grid, an appropriate assessment model is established. Expected Time Out of Power (LOLE) is used as a reliability index to objectively assess the reliability of PV-integrated systems. This project employs a sequential Monte Carlo simulation method, comprehensively considering factors such as irradiance, ambient temperature, and PV cell power conversion characteristics to model the reliability of the PV power generation system. Then, the power generation adequacy of the PV-integrated system is assessed, and based on these results, the variation of the PV power generation system's peak load capacity (PLCC) is further studied and introduced.
[0040] In general, the research approach combines theory with practice, and integrates optimization models with optimization algorithms. Figure 7 As shown.
[0041] Constructing a photovoltaic power plant unit combination model: Performing photovoltaic power generation probability analysis, based on the Beta distribution of solar irradiance, solving for its probability density function and the probability of photovoltaic power fluctuation, the photovoltaic prediction values under k scenarios are x1, x2, ..., xk, with probabilities ω1, ω2, ..., ωk. The criterion for the discrete distribution to be equivalent to a continuous distribution can be written as: (1) By solving equation set (1), the probability of occurrence of the corresponding photovoltaic (PV) power generation prediction scenario can be obtained. Based on the probability distribution characteristics of PV power generation prediction errors, a set of typical PV power generation scenarios under different prediction error levels is constructed to describe its long-term randomness. Given a typical PV power generation scenario, the probability of occurrence of the corresponding predicted PV power generation scenario can be obtained.
[0042] The objective function of the combined model: The objective function of the multi-scenario optimization model mainly considers the curtailment penalty function λ, using the expected value of the curtailment amount under different photovoltaic power output scenarios to measure the cost of curtailment. By controlling the magnitude of λ, a balance is achieved between economical and maximum utilization of photovoltaic power. As shown in the following equation.
[0043] (2) in, For the context The probability of occurrence; The number of scenarios simulating photovoltaic power output; This is the optimization cycle for unit combination problems; This refers to the number of grid-connected photovoltaic power plants in the system; and respectively scenarios Below, photovoltaic power station exist Available output power and actual output power for a given time period.
[0044] Constraints of the combined model: Under different photovoltaic output scenarios, the system must satisfy the balance between power generation and load demand. Power balance constraints are satisfied as follows: (3) in, The total load demand of the system during time period t. Let t be the output of a conventional unit under scenario s. Let t be the utilization value of photovoltaic power output under scenario s at time t.
[0045] The system's backup capacity requirements are met under different photovoltaic output scenarios: (4) in, This refers to the start-up and shutdown status of a conventional generating unit. This refers to the system's reserve rate.
[0046] Predicted photovoltaic output of photovoltaic power plant j under scenario s satisfy (5) For large-scale photovoltaic (PV) power generation connected to the grid, using DC power flow analysis, the active power constraint of the lines considering the injected PV power is as follows: (6) In the formula, B is the system coefficient matrix. For matrix The row vector corresponding to the generator, For matrix The row vector corresponding to the grid-connected photovoltaic power station access point, Let be the vector representing the amount of line transmission power exceeding the limit at different time periods under scenario s. For matrix The row vector corresponding to the load, , For the reactance of the branch circuit, l Let L be the number of system branches, and L be the connection matrix of the system branch nodes. P L This is the branch power constraint vector;P d This represents the total load requirement of the system.
[0047] Constructing a unified model for energy storage systems: Energy storage is standardized by analyzing and comparing various energy storage device models based on their internal and external characteristics, identifying commonalities, and establishing a unified model for energy storage systems. From the grid side, energy storage systems exhibit three states: charging, discharging, and idle. The external characteristics of energy storage systems under different operating states are described as follows: (7) Energy storage systems cannot be in a charging and discharging state simultaneously; The system is charging; The system discharged; The system is idle.
[0048] Introducing energy storage function and The following table describes the changes in the charge / discharge rate and energy storage state of an energy storage system: (8) This is the initial energy storage state. , For minimum and maximum energy storage capacity, , This represents the charge / discharge rate.
[0049] State of energy storage and charge / discharge rate are two key parameters, and their constraints are as follows: (9) in, This is a function for the number of charge / discharge conversions.
[0050] Objective function of the unified energy storage model: The objective function of a photovoltaic power generation system with energy storage includes the investment cost of energy storage and the system operating cost, and can be expressed as: (10) in, , This is the start-up and shutdown cost function for energy storage.
[0051] Constraints of the unified energy storage model: The main constraints include system constraints, energy storage system constraints, and network constraints. System constraints consist of power balance and load reserve requirements, as shown below: (11) in, For total load, , For charge / discharge rate, This is for backup capacity.
[0052] Energy storage constraints include: energy storage charge / discharge state constraints, state transition number constraints, energy storage capacity constraints, energy storage reserve capacity constraints, and initial energy storage capacity constraints, which can be expressed as: (12) Network constraints are mainly branch transmission power constraints, expressed as: (13) Constructing a unit combination model for coordinated operation of photovoltaic power generation and energy storage systems: Energy storage systems have the advantage of fast response speed, and their combined operation with photovoltaic power generation can suppress photovoltaic power fluctuations. While ensuring stable system operation, energy storage systems can also provide sufficient reserve capacity for grid-connected photovoltaic power plants. Therefore, while considering the optimization of system operating costs through energy storage system charging and discharging, it is also necessary to consider the reserve capacity required to suppress power fluctuations in grid-connected photovoltaic power plants.
[0053] Objective function for coordinated operation of generating units: The unit combination model for coordinated operation of photovoltaic (PV) and energy storage consists of two parts: the power generation cost of PV and the start-up and shutdown cost of the energy storage system. Considering the coordinated operation of the energy storage system and PV, the objective function can be expressed as: (14) Unit Coordination Operation Constraints: The constraints of the unit combination model for coordinated operation of photovoltaic and energy storage mainly consist of two parts: system constraints and energy storage system constraints. The system constraints are composed of power balance constraints and load reserve constraints, expressed as follows: (15) Under the coordinated operation of photovoltaics and energy storage, the constraints of the energy storage system consist of energy balance constraints, charge / discharge power constraints, charge / discharge state constraints, and energy storage constraints, which can be expressed as: (16) The multi-scenario correction type unit combination model is as follows: (17) In the formula, and Let t be the conventional and combined photovoltaic power output vectors under scenario s, where t is the time period; and Efforts to optimize the main problem in the previous round, Let be the vector representing the amount of line transmission power exceeding the limit at different time periods under scenario s. To be the minimum value, P pv cs Contribute to photovoltaic correction; Let be the charge / discharge cycle number function, u be the battery's state of charge / discharge, and b be the battery's rated charge / discharge cycles. To obtain the partial derivative.
[0054] For the N-1 fault-safe optimization subproblem, a method combining Benders decomposition and active constraint identification is proposed, which realizes error-free correction of the main problem for the N-1 fault subproblem and ensures the rigor of the decomposition algorithm solution process.
[0055] Under normal conditions, the safety subproblem's optimal solution space guarantees a linear correspondence between the optimal solution and the unit output. This ensures that the main problem's correction of the subproblem will not deviate during the Benders decomposition iteration process. After large-scale photovoltaic grid integration, the system safety verification subproblem under normal operating conditions is as follows: (18) The operating states of conventional and photovoltaic units obtained from optimizing the main problem are then tested in each subproblem. If the output of a unit corresponding to a certain subproblem is unreliable, a corresponding linear inequality constraint (Benders cut set) is generated and this inequality set is then used in the main problem for correction.
[0056] The safety constraint subproblem is a multi-time-period optimization problem, requiring consideration of constraints such as backup requirements for photoelectric fluctuations in adjacent time periods. Using the Benders decomposition method, constraints coupled with adjacent time periods are incorporated into the main problem. Therefore, during the verification process of the line safety subproblem, the line N safety verification under each time period T and each scenario S is independent. To reduce redundant solutions to the Benders decomposition subproblem and improve the efficiency of the iterative solution, a strategy of unified verification across the entire line, all time periods, and all scenarios, and generating Benders cut sets by time period and scenario, is adopted, resulting in the following Benders cut sets: (19) N-1 Fault Correction: For system N-1 faults, the unit's adjustment capability is fully considered, and new variables are introduced, leading to a difference between the optimization solution space and the main problem. The optimization objective of the subproblem... With the corrected unit output This is a linear correspondence. For each subproblem, a Benders cut set containing the corrected unit output information is generated and acts as a constraint to ensure error-free correction of the subproblems by the main problem. The model for the N-1 safety verification subproblem is as follows: (20) In the formula, g represents the load supply and demand deviation caused by the N-1 fault.
[0057] The Benders cut set includes the adjusted output vectors of the units that are not included in the main problem, which makes the optimization variables of the main problem and the subproblems directly coupled, ensuring the correctness and effectiveness of the N-1 correction.
[0058] Model Solution Process: Scenario analysis is used to describe the uncertainty of photovoltaic power prediction. In the safety verification, the impact of grid N-1 faults on system operation and photovoltaic power consumption is considered, leading to the proposal of a multi-scenario corrective unit combination model. The model adopts the following... Figure 8 The multi-scenario correction type unit combination solution algorithm shown has the following specific steps: I) Based on the daily power prediction curve of photovoltaic power plants, generate multiple typical photovoltaic output scenarios to describe the uncertainty of photovoltaic prediction, and combine the distribution characteristics of photovoltaic prediction errors in the region to solve the probability of occurrence of the corresponding photovoltaic output scenarios; II) Introduce the occurrence probability of typical photovoltaic power output scenarios into the model, establish a multi-scenario unit combination model that considers photovoltaic uncertainties, and solve the unit start-up and shutdown status and power output of the unit combination problem without considering safety constraints; III) Decompose the network security constraints of the calibration model into security sub-problems under normal operation and fault conditions, and verify them using a unified verification method covering all time periods and all scenarios; IV) Under normal operating conditions, if the line transmission power exceeds the allowable transmission limit under normal conditions, a Benders cut set containing unit output information is formed and fed back to the unit combination main problem; under fault conditions, if short-term adjustment of unit output still cannot eliminate the line transmission power exceeding the limit, a Benders cut set containing corrected unit output information is formed, and relevant constraints are identified and fed back to the main problem. V) Resolve the subproblem correction information containing safety subproblem correction information and fault subproblem correction information that constrains the main problem, and repeat steps III-V until a unit combination scheme that satisfies the safety subproblem verification is obtained.
[0059] Evaluation of optimized energy storage configuration schemes: The confidence capacity of photovoltaic power generation is assessed by ensuring that the system's power generation reliability remains unchanged before and after grid connection. Selection of power shortage expectation... As an indicator of the reliability of system power generation: (twenty one) Where N is the number of hours in a year, For the first Available capacity per hour for Hourly load level, For the first The power output of the photovoltaic power station studied in the past few hours; For the first system after photovoltaic power generation is connected The amount of power generation capacity that can be reduced per hour.
[0060] Calculation using the sequential Monte Carlo method It can retain the time-series information of power generation output, and perform time-series sampling of the annual power of photovoltaic power plants and conventional units. Statistics can be compiled from the equivalent load and the annual available capacity sequence of conventional units, i.e.: (twenty two) in: Total number of years; This indicates a power outage. For the first The duration of the power outage.
[0061] Using variance coefficient As a criterion for evaluating computational accuracy, namely: (twenty three) when When fully large, there are: (twenty four) Under ideal conditions, given a confidence level, reliability index The true value and the estimated value calculated by Monte Carlo. The error is in Within the range.
[0062] The multi-scenario corrective unit combination model is a multi-time-period, multi-scenario, nonlinear mixed-integer programming problem. Transforming it into a linear mixed-integer programming problem using linearization methods can accelerate the solution process. However, under multiple scenarios of normal and N-1 fault conditions, the computational dimensionality of safety constraints increases exponentially, posing new challenges to the model solution. To address the computation of multi-scenario, high-dimensional safety constraints, the Benders decomposition algorithm for solving large-scale optimization problems is employed. This algorithm decomposes the multi-scenario unit combination model into a unit combination problem without network security constraints, a normal state safety subproblem, and an N-1 fault safety subproblem, which are then solved separately.
[0063] The above description is merely a preferred embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
Claims
1. A method for optimal unit commitment of a photovoltaic power plant with energy storage based on multi-scenario analysis, characterized in that, include: Acquire short-term forecast curve data of photovoltaic power plant power, and construct a photovoltaic power plant unit combination model based on the short-term forecast curve data. Specifically, this includes: generating several typical photovoltaic output scenarios based on the short-term forecast curve data of photovoltaic power plant power; obtaining the occurrence probability data of each typical photovoltaic output scenario based on the several typical photovoltaic output scenarios and combined with the distribution characteristics of regional photovoltaic forecast errors; using the balance between economic utilization and maximum utilization of photovoltaic power as the first objective function, and setting a first constraint condition; and constructing the photovoltaic power plant unit combination model based on the first objective function, the first constraint condition, and the occurrence probability data of each typical photovoltaic output scenario. The first objective function is: In the formula, For the context The probability of occurrence; The number of scenarios simulating photovoltaic power output; The optimization cycle for unit combination problems; This refers to the number of grid-connected photovoltaic power plants in the system; and respectively scenarios Below, photovoltaic power station exist Available output power and actual output power during the time period; A unified model of the energy storage system is constructed, and the coordinated operation of photovoltaic power generation and energy storage system is taken as the control objective. The unified model of the energy storage system is introduced into the photovoltaic power station unit combination model to obtain a multi-scenario correction unit combination model. The multi-scenario correction unit combination model is solved using Benders decomposition theory to obtain an optimal energy storage configuration scheme, specifically including: Step 1: Decompose the network security constraints of the multi-scenario correction type unit combination model into security sub-problems under normal operation and security sub-problems under fault conditions; Step 2: Verify each security sub-problem; Step 3: Under normal operating conditions, if the line transmission power exceeds the allowable transmission power limit under normal conditions, a Benders cut set containing unit output information is generated and fed back to the main unit combination problem as safety sub-problem correction information. In a fault state, if short-term adjustment of the unit output cannot eliminate the line transmission power exceeding the limit, a Benders cut set containing the corrected unit output information is generated, and the relevant constraints are identified to obtain a constraint set that constrains the main problem. The Benders cut set containing the corrected unit output information and the constraint set are fed back to the main problem as fault subproblem correction information. Step 4: Resolve the safety sub-problem correction information and the fault sub-problem correction information, and repeat steps 1 to 4 to obtain an energy storage optimization configuration scheme that satisfies the safety sub-problem verification.
2. The method for optimizing the combination of photovoltaic power station units with energy storage based on multi-scenario analysis as described in claim 1. The first constraint includes: Power balance constraints, reserve capacity demand constraints, and line active power constraints for photovoltaic injection power; The power balance constraint condition is as follows: In the formula, The total load demand of the system during time period t. Let t be the output of a conventional unit under scenario s. scene Photovoltaic power station exist Actual output power during the time period; The constraints on the reserve capacity requirement are as follows: In the formula, This refers to the start-up and shutdown status of a conventional generating unit. For system reserve rate, For the context Photovoltaic power station exist Available output power during the time period; This represents the total load requirement of the system. This is the maximum output of a conventional unit; Available output power of photovoltaic power station j under scenario s The constraints are: The active power constraint condition for the photovoltaic injection power is as follows: In the formula, B is the system coefficient matrix. For matrix The row vector corresponding to the generator, For matrix The row vector corresponding to the grid-connected photovoltaic power station access point, Let be the vector representing the amount of line transmission power exceeding the limit at different time periods under scenario s. For matrix The row vector corresponding to the load, , For the reactance of the branch circuit, l Let L be the number of system branches, and L be the connection matrix of the system branch nodes. P L This is the branch power constraint vector; P d This represents the total load requirement of the system.
3. The method for optimizing the combination of photovoltaic power station units with energy storage based on multi-scenario analysis according to claim 1, characterized in that, The process of constructing the unified model of the energy storage system specifically includes: Several energy storage device models are obtained, and energy storage unification processing is performed on the several energy storage device models according to the internal and external characteristics of the energy storage system model to obtain the unified model of the energy storage system.
4. The method for optimizing the combination of photovoltaic power station units with energy storage based on multi-scenario analysis according to claim 3, characterized in that, The constraints of the unified model include: system constraints, energy storage system constraints, and network constraints.
5. The method for optimizing the combination of photovoltaic power station units with energy storage based on multi-scenario analysis according to claim 1, characterized in that, Each security sub-problem is validated, specifically including: A unified verification method covering all time periods and all scenarios is used to verify each security sub-problem.
Citation Information
Patent Citations
Joint optimization method and system for planning and operation of energy storage system in photovoltaic-containing power distribution network
CN110556847A
Energy storage comprehensive constant volume method based on high-proportion photovoltaic access power system
CN111725826A