跨域异构资源的调度方法及装置
By constructing a heuristic resource scheduling strategy based on a task directed graph and a node topology graph, the inefficiency problem in cross-domain heterogeneous resource management is solved, and the efficient execution of CAE simulation tasks and the improvement of resource utilization are achieved.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- INST OF SOFTWARE - CHINESE ACAD OF SCI
- Filing Date
- 2023-09-27
- Publication Date
- 2026-07-17
AI Technical Summary
Existing resource scheduling methods cannot effectively manage and allocate heterogeneous resources across domains, resulting in low efficiency of CAE simulation tasks in computationally intensive and large-scale tasks, and an inability to adapt to complex dependencies and latency issues in cross-regional data transmission.
A heuristic resource scheduling strategy is adopted. By constructing a task directed graph and a node topology graph, computing node information is obtained in real time, resource allocation and task scheduling are optimized, and efficient management of cross-domain heterogeneous resources is achieved.
It improves resource utilization, reduces computation time, optimizes task execution efficiency, supports flexible scheduling of heterogeneous resources, reduces network transmission burden, and adapts to dynamic resource environments.
Smart Images

Figure CN117290102B_ABST