Maintenance support system, maintenance support methods, and maintenance support procedures

By maintaining the support system and adjusting production plans, the problem of production stoppage caused by equipment maintenance was solved, achieving efficient equipment maintenance and improved production efficiency, and ensuring normal production of equipment during non-maintenance periods.

CN117296462BActive Publication Date: 2026-07-17PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD
Filing Date
2022-01-07
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In existing technologies, when the number of equipment elements required for maintenance operations exceeds the available resources, production cannot proceed in a timely manner, resulting in production stoppages. Furthermore, existing systems cannot effectively improve production efficiency.

Method used

Through the maintenance support system, the maintenance period determination department and the production changeover adjustment plan creation department formulate maintenance periods and production changeover adjustment plans for equipment elements based on the status monitoring and configuration information of equipment elements, ensuring normal production of equipment during non-maintenance periods and centralized maintenance during maintenance periods.

Benefits of technology

This effectively avoids production stoppages caused by maintenance, improves production efficiency, ensures normal production of equipment during non-maintenance periods, and improves equipment utilization through centralized maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117296462B_ABST
    Figure CN117296462B_ABST
Patent Text Reader

Abstract

The maintenance support method for equipment elements disclosed herein includes: a monitoring step (ST2) for monitoring the status of equipment elements; a maintenance period determination step (ST3) for determining the maintenance period of equipment elements based on the monitoring results; and a changeover adjustment plan creation step (ST8) for creating a changeover adjustment plan to change the equipment elements installed on the production equipment based on the current configuration information of the equipment elements and the configuration information used to produce new products. In the changeover adjustment plan creation step (ST8), if the equipment element installed on the production equipment can also be used for the production of new products, but will become a maintenance period during the production of new products, a changeover adjustment plan is created to replace the equipment element with another equipment element.
Need to check novelty before this filing date? Find Prior Art