A resilient power grid restoration decision method and system
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- XI AN JIAOTONG UNIV
- Filing Date
- 2023-09-22
- Publication Date
- 2026-06-19
AI Technical Summary
Existing methods for post-disaster recovery of power distribution networks fail to effectively utilize limited resources for system recovery and neglect the balance between economic efficiency and load loss.
Establish a pre-disaster EV scheduling model and the deployment location of mobile energy storage temporary warehouses. Combine this with electric vehicle V2G to construct a post-disaster resilient distribution network economic recovery model and optimize resource scheduling to reduce system power loss and scheduling costs.
When rapidly restoring the power distribution network after a disaster, by comprehensively considering the economics of mobile energy storage and V2G electric vehicles, the system power loss can be reduced and dispatch costs can be saved, thereby improving the economy and reliability of post-disaster recovery.
Smart Images

Figure CN117335468B_ABST