Outdoor power supply control method and device, terminal equipment and computer storage medium

By monitoring the remaining power of outdoor power supplies and the electricity price during different times of the grid in real time, and utilizing off-peak electricity prices for orderly charging, the problem of energy waste and high costs caused by disorderly charging of outdoor power supplies is solved, and economical and efficient power management is achieved.

CN117353352BActive Publication Date: 2026-11-24SHENZHEN CPKD TECH CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202311138810.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-04
Publication Date
2026-11-24
Estimated Expiration
2043-09-04

AI Technical Summary

Technical Problem

The current outdoor power supply's charging and discharging methods are disordered, resulting in the inability to make reasonable use of grid power and increasing electricity costs.

Method used

By monitoring the remaining power of outdoor power supplies and the electricity price during different times of the grid in real time, the system can utilize off-peak electricity prices for orderly charging and adjust charging time and discharging strategies according to electricity prices to optimize power usage.

Benefits of technology

Effectively saves electricity costs, avoids energy waste, and improves the economic benefits of charging.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117353352B_ABST
    Figure CN117353352B_ABST
Patent Text Reader

Abstract

This application relates to the field of power supply technology, and in particular to an outdoor power supply control method, device, terminal equipment, and computer storage medium. The method includes: acquiring the remaining power of the outdoor power supply at the current moment; when the remaining power is less than or equal to a charging capacity threshold of the outdoor power supply, determining the time-limited electricity price of the mains power grid at the current moment; when the time-limited electricity price does not match the off-peak electricity price of the mains power grid, determining the charging duration of the outdoor power supply based on the charging time corresponding to the off-peak electricity price and the current moment; when the duration of the outdoor power supply's countdown from the current moment reaches the charging duration, connecting the mains power grid to the outdoor power supply to perform a charging action. This application saves on the electricity costs of outdoor power supplies.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of power supply technology, and in particular to an outdoor power supply control method, device, terminal equipment, and computer storage medium. Background Technology

[0002] Electricity is an economical, safe, and widely used high-quality energy source. Electricity supply methods typically include grid supply and power supply. Due to the limited coverage area of ​​the public power grid, energy storage power supplies play a role in supplying power to end-users in areas not covered by the public power grid. When disasters occur and the power transmission of the public power grid is interrupted, energy storage power supplies become one of the limited options for power supply.

[0003] Existing outdoor power supplies typically employ unordered charging, meaning they are charged as soon as the remaining battery capacity is used up. This unordered charging method has significant drawbacks. Since the daily electricity price fluctuates with varying electricity demand at different times, existing energy storage devices using this unordered charging method cannot effectively utilize grid power to achieve peak shaving and valley filling, thus increasing the electricity cost of outdoor power supplies. In other words, reducing the electricity cost of outdoor power supplies is a pressing technical problem that needs to be solved. Summary of the Invention

[0004] The main objective of this application is to provide an outdoor power supply control method, device, terminal equipment, and computer storage medium, which aims to save on the electricity costs of outdoor power supplies.

[0005] To achieve the above objectives, this application provides an outdoor power supply control method, the outdoor power supply control method comprising:

[0006] Get the remaining power of the outdoor power supply at the current moment;

[0007] When the remaining power is less than or equal to the charging power threshold of the outdoor power source, the time-limited electricity price of the mains power grid at the current moment is determined.

[0008] When the electricity price during the specified time period does not match the off-peak electricity price of the mains power grid, the charging duration of the outdoor power supply is determined based on the charging time corresponding to the off-peak electricity price and the current time.

[0009] When the outdoor power supply reaches the required charging time after the current time has elapsed, the mains power grid will be connected to the outdoor power supply to perform the charging operation.

[0010] Optionally, after determining the time-of-use electricity price of the mains power grid at the current moment, the outdoor power supply control method further includes:

[0011] Detect whether the electricity price during the specified time period is equal to the off-peak electricity price of the mains power grid;

[0012] If the time-period electricity price is equal to the off-peak electricity price, then it is determined that the time-period electricity price and the off-peak electricity price are matched, and the step of connecting the mains power grid to the outdoor power source to perform the charging action is executed;

[0013] If the time-period electricity price is not equal to the off-peak electricity price, then it is determined that the time-period electricity price and the off-peak electricity price do not match.

[0014] Optionally, when the remaining power is less than or equal to the charging capacity threshold of the outdoor power source, the outdoor power source control method further includes:

[0015] Determine the power demand information of the outdoor power supply to connect to an external load, wherein the power demand information includes at least the amount of charge to be applied to the external load;

[0016] After determining that the remaining power is greater than the amount to be charged, it is determined whether the remaining power is greater than or equal to the discharge power threshold of the outdoor power supply.

[0017] If the remaining power is greater than or equal to the discharge power threshold, then the external load is discharged based on the remaining power.

[0018] Optionally, the requested electricity information also includes the predetermined electricity price of the external load. After the step of determining whether the remaining power is greater than or equal to the discharge capacity threshold of the outdoor power source, the outdoor power source control method further includes:

[0019] If the remaining power is less than the discharge power threshold, the external load is discharged according to the matching result between the predetermined electricity price and the time period electricity price.

[0020] Optionally, the step of discharging the external load based on the matching result between the predetermined electricity price and the time-period electricity price includes:

[0021] When the matching result is that the predetermined electricity price is higher than the electricity price during the time period, the outdoor power supply is triggered to connect to the mains power grid to discharge to the external load.

[0022] When the matching result is that the reserved electricity price is lower than the electricity price during the time period, the access time when the external load accesses the requested electricity information is determined, and the reserved charging duration of the external load is determined based on the time interval between the access time and the charging time corresponding to the off-peak electricity price.

[0023] When the outdoor power supply reaches the scheduled charging time after the connection time, the step of triggering the outdoor power supply to connect to the mains power grid to discharge to the external load is executed.

[0024] Optionally, the outdoor power supply control method further includes:

[0025] After confirming that the outdoor power supply has finished charging, determine the full capacity of the outdoor power supply and obtain the historical power consumption data of the outdoor power supply in the previous month. There are multiple historical power consumption data, which are the daily discharge data of the outdoor power supply.

[0026] The predicted daily electricity consumption of the outdoor power supply is determined based on the historical electricity consumption data.

[0027] When the predicted electricity consumption does not match the full capacity, the total electricity consumption between the outdoor power supply's daily consumption and the full capacity is determined, and based on the difference between the predicted electricity consumption and the total electricity consumption, a target power supply connected in parallel with the outdoor power supply is determined. The target power supply is an energy storage device other than the outdoor power supply.

[0028] The full power capacity is adjusted to match the predicted power consumption based on the power output of the target power source.

[0029] Optionally, the step of adjusting the full-capacity power supply to match the predicted power consumption based on the power output of the target power supply includes:

[0030] The power output of the target power source is added to the full power capacity to obtain the updated full power capacity;

[0031] When the updated full power consumption is not equal to the predicted power consumption, the outdoor power source connected in parallel with the target power source is taken as the next outdoor power source, the updated full power consumption is taken as the next full power consumption, and the process returns to the step of determining the total power consumption between the daily power consumption of the outdoor power source and the full power consumption.

[0032] In addition, to achieve the above objectives, this application also provides an outdoor power control device, which includes:

[0033] The acquisition module is used to obtain the remaining power of the outdoor power supply at the current moment;

[0034] The power comparison module determines the time-of-use electricity price of the mains power grid at the current moment when the remaining power is less than or equal to the charging power threshold of the outdoor power source.

[0035] The electricity price matching module is used to determine the charging duration of the outdoor power supply based on the charging time corresponding to the off-peak electricity price and the current time when the electricity price during the specified time period does not match the off-peak electricity price of the mains power grid.

[0036] The charging module is used to connect the mains power grid to the outdoor power supply to perform a charging action when the duration of the time counted from the current moment of the outdoor power supply reaches the charging duration.

[0037] Each functional module of the outdoor power control device of this application implements the steps of the charging control method of this application as described above during operation.

[0038] In addition, to achieve the above objectives, this application also provides a terminal device, which includes a memory, a processor, and an outdoor power control program stored in the memory and executable on the processor. When the outdoor power control program is executed by the processor, it implements the steps of the above-described outdoor power control method.

[0039] In addition, to achieve the above objectives, this application also provides a computer storage medium storing an outdoor power control program, which, when executed by a processor, implements the steps of the above-described outdoor power control method.

[0040] This application can obtain the current remaining power of an outdoor power source in real time, and then compare this remaining power with the charging capacity threshold of the outdoor power source, thereby achieving the purpose of real-time detection of the remaining power of the outdoor power source. When the remaining power is less than or equal to the charging capacity threshold of the outdoor power source, the time-of-use electricity price of the grid at the current moment is determined in a timely manner. Then, based on the off-peak electricity price of the grid, the fluctuation of the grid electricity price in real time is detected. When the time-of-use electricity price does not match the off-peak electricity price of the grid, the charging time corresponding to the off-peak electricity price is used to accurately determine the charging time of the outdoor power source. When the time elapsed since the current moment reaches the charging time, the grid is automatically connected to the outdoor power source to perform the charging action. This realizes the improvement of the charging economic efficiency of the outdoor power source by utilizing off-peak electricity prices, avoiding the technical problems of energy waste and high electricity costs caused by existing disordered charging, and effectively saving electricity costs. Attached Figure Description

[0041] Figure 1 This is a schematic flowchart of the first embodiment of the outdoor power supply control method of this application;

[0042] Figure 2 This is a schematic flowchart of the second embodiment of the outdoor power supply control method of this application;

[0043] Figure 3This is a schematic diagram of the structure of the outdoor power control device involved in the embodiments of this application;

[0044] Figure 4 This is a schematic diagram of the structure of the terminal device involved in the embodiments of this application;

[0045] Figure 5 This is a schematic diagram of the structure of the computer storage medium involved in the embodiments of this application.

[0046] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation

[0047] This application provides an outdoor power supply control method, referring to... Figure 1 As shown, Figure 1 This is a flowchart illustrating the first embodiment of the outdoor power control method of this application.

[0048] Exemplary embodiments will now be described in detail, examples of which are illustrated in the accompanying drawings. When the following description relates to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with this application.

[0049] The outdoor power supply control method of this application is executed by a terminal device that controls the charging of the outdoor power supply. Specifically, the controller of the terminal device executes the following outdoor power supply control method, and the terminal device of this application includes, but is not limited to, the outdoor power supply and the host computer connected to the outdoor power supply.

[0050] The outdoor power supply control method of this application includes:

[0051] Step S10: Obtain the remaining power of the outdoor power supply at the current moment;

[0052] In this embodiment, the controller collects the remaining power of the outdoor power supply at the current moment through the BMS (Battery Management System) in the outdoor power supply.

[0053] It should be noted that the remaining power can be understood as the remaining power of the battery pack in the outdoor power supply. Specifically, it is the ratio of the remaining dischargeable power of the battery pack after a period of use or long-term storage to the fully charged power of the battery pack.

[0054] Additionally, it should be noted that outdoor power supplies can be understood as energy storage devices consisting of a controller, battery pack, inverter, and BMS system.

[0055] Step S20: When the remaining power is less than or equal to the charging power threshold of the outdoor power source, determine the time-of-use electricity price of the mains power grid at the current moment;

[0056] In this embodiment, after determining the remaining power of the outdoor power source at the current moment, the controller determines whether the remaining power is greater than the charging power threshold of the outdoor power source. If the remaining power is greater than the charging power threshold of the outdoor power source, it is determined that the outdoor power source does not need to perform a charging action at the current moment. If the remaining power is less than or equal to the charging power threshold of the outdoor power source, the time-limited electricity price of the mains power grid at the current moment is obtained in a timely manner.

[0057] It should be noted that the charging capacity threshold can be customized according to the user's actual needs. Specifically, the charging capacity threshold of the outdoor power supply is adaptively set based on the user's daily usage habits (such as recording their own daily output), the current power level, the estimated power consumption, and the time difference between the current time and the off-peak time. The ultimate goal is to ensure that the power is sufficient when the user needs to use it.

[0058] Step S30: When the time-period electricity price does not match the off-peak electricity price of the mains power grid, determine the charging duration of the outdoor power supply based on the charging time corresponding to the off-peak electricity price and the current time.

[0059] In this embodiment, the controller detects whether the current time-period electricity price of the mains power grid is the same as the off-peak electricity price of the mains power grid. If the current time-period electricity price of the mains power grid is different from the off-peak electricity price of the mains power grid, it is determined that the time-period electricity price does not match the off-peak electricity price of the mains power grid. Then, based on the time difference between the charging time corresponding to the off-peak electricity price and the current time, the charging time of the outdoor power supply is determined.

[0060] It should be noted that the controller has an integrated timing unit, or the controller is electrically connected to a timing module in the outdoor power supply for timing. The timing unit is equipped with a capacitor selection component and a sliding rheostat connected in series. The capacitor selection component includes multiple adjustable capacitors, and the capacitance value of each adjustable capacitor corresponds to a coarse adjustment range of time.

[0061] In a specific embodiment, the controller first obtains the time difference between the charging time corresponding to the off-peak electricity price and the current time, and determines the time coarse adjustment interval that matches the time difference. Then, it finds the target capacitor corresponding to the matching time coarse adjustment interval from multiple adjustment capacitors, and determines the initial timing duration of the outdoor power supply based on the capacitance value of the target capacitor. Then, it performs fine adjustment on the initial timing duration based on the sliding rheostat to obtain the charging duration of the outdoor power supply, and the expression of the charging duration is as shown in the following formula (1):

[0062] F(x) = β*Re*Ce

[0063] Where F(x) refers to the charging time of the outdoor power supply, β is a preset fixed value that can be customized according to the user's needs, Re refers to the resistance value of the sliding rheostat, and Ce refers to the capacitance value of the target capacitor.

[0064] Further, in another embodiment, the initial resistance value of the sliding rheostat is obtained, and the capacitance value of the target capacitor and the initial resistance value are calculated according to the above formula (1) to obtain the initial charging time of the outdoor power supply. When the initial charging time is within the accuracy range corresponding to the time difference, the initial charging time of the outdoor power supply is taken as the charging time of the outdoor power supply. When the initial charging time is not within the accuracy range corresponding to the time difference, the initial resistance value is adjusted according to the preset resistance adjustment coefficient, and the processed initial resistance value is taken as the next initial resistance value. Then, the step of calculating the capacitance value of the target capacitor and the initial resistance value according to the above formula (1) is returned to be executed.

[0065] Furthermore, in another embodiment, if the current time-of-use electricity price of the mains grid is the same as the off-peak electricity price of the mains grid, the controller connects the mains grid to the outdoor power source to perform a charging operation. Specifically, a relay is installed between the outdoor power source and the mains grid. The switch of this relay is an automatic switching element with isolation function. The outdoor power source is connected to the mains grid through the relay. That is, when the relay is in the open state, there is no circuit path between the mains grid and the outdoor power source; when the relay is in the closed state, the circuit between the mains grid and the outdoor power source is connected. In other words, after determining that the current time-of-use electricity price of the mains grid is the same as the off-peak electricity price of the mains grid, the controller triggers the closing action command of the relay and connects the mains grid to the outdoor power source according to the closing action command to perform a charging operation on the outdoor power source.

[0066] Step S40: When the duration of the outdoor power supply's timing from the current moment reaches the charging duration, connect the mains power grid to the outdoor power supply to perform the charging action.

[0067] In this embodiment, when the outdoor power supply reaches the required charging time after the current time has elapsed, a relay closing action command is triggered, and the mains power grid is automatically connected to the outdoor power supply according to the closing action command to perform a charging action on the outdoor power supply.

[0068] In summary, this application can obtain the current remaining power of the outdoor power supply in real time, and then compare this remaining power with the charging capacity threshold of the outdoor power supply, thereby achieving the purpose of real-time detection of the remaining power of the outdoor power supply. When the remaining power is less than or equal to the charging capacity threshold of the outdoor power supply, the time-of-use electricity price of the grid at the current moment is determined in a timely manner. Then, based on the off-peak electricity price of the grid, the fluctuation of the grid electricity price in real time is detected. When the time-of-use electricity price does not match the off-peak electricity price of the grid, the charging time corresponding to the off-peak electricity price is used to accurately determine the charging time of the outdoor power supply. When the time elapsed since the current moment reaches the charging time, the grid is automatically connected to the outdoor power supply to perform the charging action. This realizes the improvement of the charging economic efficiency of the outdoor power supply by utilizing off-peak electricity prices, avoiding the technical problems of energy waste and high electricity costs caused by existing disordered charging, and effectively saving electricity costs.

[0069] Furthermore, based on the first embodiment of the outdoor power control method of this application, a second embodiment of the outdoor power control method of this application is proposed.

[0070] Furthermore, in some feasible embodiments, after step S20 above: determining the time-of-use electricity price of the mains power grid at the current moment, the outdoor power supply control method further includes the following implementation steps:

[0071] Step A10: Detect whether the electricity price during the specified time period is equal to the off-peak electricity price of the mains power grid;

[0072] In this embodiment, refer to Figure 2 , Figure 2 This is a flowchart illustrating the second embodiment of the outdoor power supply control method of this application. The controller detects whether the current time-of-use electricity price of the mains power grid is the same as the off-peak electricity price of the mains power grid.

[0073] Step A20: If the time-period electricity price is equal to the off-peak electricity price, then it is determined that the time-period electricity price and the off-peak electricity price are matched, and the step of connecting the mains power grid to the outdoor power source to perform the charging action is executed;

[0074] In this embodiment, refer to Figure 2If the current time-of-use electricity price of the mains grid is the same as its off-peak price, the controller will connect the mains grid to the outdoor power source to perform a charging operation. Specifically, a relay is installed between the outdoor power source and the mains grid. The relay's switch is an automatic switching element with isolation function. The outdoor power source is connected to the mains grid through the relay. That is, when the relay is in the open state, there is no circuit path between the mains grid and the outdoor power source; when the relay is in the closed state, the circuit between the mains grid and the outdoor power source is connected. In other words, after determining that the current time-of-use electricity price of the mains grid is the same as its off-peak price, the controller triggers the relay's closing action command and connects the mains grid to the outdoor power source according to the closing action command to perform a charging operation on the outdoor power source.

[0075] Step A30: If the time-period electricity price is not equal to the off-peak electricity price, then it is determined that the time-period electricity price and the off-peak electricity price do not match.

[0076] In this embodiment, refer to Figure 2 If the current time-of-use electricity price of the grid is different from the off-peak electricity price of the grid, it is determined that the time-of-use electricity price and the off-peak electricity price of the grid do not match. Then, based on the time difference between the charging time corresponding to the off-peak electricity price and the current time, the charging time of the outdoor power supply is determined.

[0077] Furthermore, in some other feasible embodiments, when the remaining power is less than or equal to the charging capacity threshold of the outdoor power source, the outdoor power source control method further includes the following implementation steps:

[0078] Step B10: Determine the power demand information of the outdoor power supply to the external load, wherein the power demand information includes at least the amount of charge to be generated by the external load;

[0079] In this embodiment, at the same moment that the remaining power of the outdoor power source is determined to be less than or equal to the charging power threshold of the outdoor power source, the controller obtains the power request information of the outdoor power source connecting to the external load. The power request information includes at least the amount of charging to be done by the external load.

[0080] Step B20: After determining that the remaining power is greater than the amount to be charged, determine whether the remaining power is greater than or equal to the discharge power threshold of the outdoor power supply;

[0081] In this embodiment, it is determined whether the remaining power of the outdoor power supply is greater than the amount of the external load to be charged. If the remaining power of the outdoor power supply is greater than the amount of the external load to be charged, it is further determined whether the remaining power of the outdoor power supply is greater than or equal to the discharge power threshold of the outdoor power supply.

[0082] It should be noted that the discharge capacity threshold can be understood as the limited discharge capacity of the outdoor power supply when discharging to an external load, thereby effectively avoiding over-discharge of the outdoor power supply and further improving its service life.

[0083] Step B30: If the remaining power is greater than or equal to the discharge power threshold, then discharge the external load based on the remaining power.

[0084] In this embodiment, if the remaining power of the outdoor power supply is greater than or equal to the discharge power threshold, the external load is discharged based on the remaining power.

[0085] Furthermore, in some feasible embodiments, the requested electricity information also includes the predetermined electricity price of the external load. After step B20 above: determining whether the remaining power is greater than or equal to the discharge power threshold of the outdoor power source, the outdoor power source control method further includes the following implementation steps:

[0086] Step C10: If the remaining power is less than the discharge power threshold, discharge the external load according to the matching result between the predetermined electricity price and the time period electricity price.

[0087] In this embodiment, if the remaining power of the outdoor power supply is less than the discharge capacity threshold of the outdoor power supply, the external load is discharged according to the matching result between the predetermined electricity price and the time-period electricity price. Specifically, when the matching result is that the predetermined electricity price is higher than the time-period electricity price, the outdoor power supply is triggered to connect to the mains power grid to discharge the external load; when the matching result is that the predetermined electricity price is lower than the time-period electricity price, the access time when the external load accesses the requested electricity information is determined, and the scheduled charging duration of the external load is determined according to the time interval between the access time and the charging time corresponding to the off-peak electricity price; when the duration of the outdoor power supply from the access time reaches the scheduled charging duration, the step of triggering the outdoor power supply to connect to the mains power grid to discharge the external load is executed.

[0088] Furthermore, in some other feasible embodiments, step C10 above: discharging the external load based on the matching result between the predetermined electricity price and the time-period electricity price, further includes the following implementation steps:

[0089] Step C101: When the matching result is that the predetermined electricity price is higher than the electricity price during the time period, the outdoor power supply is triggered to connect to the mains power grid to discharge to the external load;

[0090] In this embodiment, when the matching result is that the predetermined electricity price is higher than the time period electricity price, the outdoor power supply is triggered to connect to the mains power grid to discharge to the external load.

[0091] Step C102: When the matching result is that the reserved electricity price is lower than the time period electricity price, determine the access time when the external load accesses the requested electricity information, and determine the reserved charging duration of the external load based on the time interval between the access time and the charging time corresponding to the off-peak electricity price;

[0092] In this embodiment, when the matching result is that the predetermined electricity price is lower than the time-of-use electricity price, the access time when the external load requests electricity information is determined, and the scheduled charging duration of the external load is determined based on the time interval between the access time and the charging time corresponding to the off-peak electricity price.

[0093] Step C103: When the time elapsed since the outdoor power supply was connected reaches the scheduled charging time, the step of triggering the outdoor power supply to connect to the mains power grid to discharge the external load is executed.

[0094] In this embodiment, when the outdoor power supply reaches the scheduled charging time after the connection time, the step of triggering the outdoor power supply to connect to the mains power grid to discharge to the external load is executed.

[0095] Furthermore, in some feasible embodiments, the outdoor power supply control method further includes the following implementation steps:

[0096] Step D10: After confirming that the outdoor power supply has finished charging, determine the full capacity of the outdoor power supply and obtain the historical power consumption data of the outdoor power supply in the previous month. There are multiple historical power consumption data, which are the daily discharge data of the outdoor power supply.

[0097] In this embodiment, after the outdoor power supply is fully charged, the full capacity of the outdoor power supply is determined, and the historical power consumption data of the outdoor power supply in the previous month is obtained. There are multiple historical power consumption data, which are the daily discharge data of the outdoor power supply.

[0098] Step D20: Determine the predicted electricity consumption of the outdoor power supply for the day based on the historical electricity consumption data;

[0099] In this embodiment, electricity consumption data corresponding to the previous month over many years is obtained. The electricity consumption data of multiple months is input into a preset learning model for training and learning to obtain a trained learning model. The daily discharge data matching the current day, which is found from the historical electricity consumption data of the previous month, is input into the trained learning model for model training to obtain the predicted electricity consumption of outdoor power sources for the day output by the trained learning model.

[0100] It should be noted that the preset learning model can be understood as a neural network learning model.

[0101] Step D30: When the predicted electricity consumption does not match the full capacity, determine the total electricity consumption between the outdoor power supply's daily consumption and the full capacity, and determine a target power supply to be connected in parallel with the outdoor power supply based on the electricity difference between the predicted electricity consumption and the total capacity. The target power supply is an energy storage device other than the outdoor power supply.

[0102] In this embodiment, when the predicted electricity consumption does not match the full capacity of the outdoor power supply (i.e., when the predicted electricity consumption is greater than the full capacity of the outdoor power supply), the total electricity consumption between the outdoor power supply's daily consumption and its full capacity is determined. Based on the difference between the predicted electricity consumption and the total electricity consumption, a target power supply to be connected in parallel with the outdoor power supply is determined. The target power supply is an energy storage device other than the outdoor power supply.

[0103] Step D40: Adjust the full power capacity to match the predicted power consumption based on the power output of the target power source.

[0104] In this embodiment, the power output of the target power source is superimposed on the full power capacity to obtain an updated full power capacity. When the updated full power capacity is not equal to the predicted power consumption, the outdoor power source connected in parallel with the target power source is taken as the next outdoor power source, and the updated full power capacity is taken as the next full power capacity. The process then returns to the step of determining the total power consumption between the outdoor power source's daily power consumption and the full power capacity.

[0105] Furthermore, in some other feasible embodiments, step D40 above: adjusting the full-capacity power supply to match the predicted power consumption based on the power output of the target power supply, may also include the following implementation steps:

[0106] Step D401: Add the power output of the target power source to the full power capacity to obtain the updated full power capacity;

[0107] Step D402: When the updated full power consumption is not equal to the predicted power consumption, the outdoor power supply connected in parallel with the target power supply is taken as the next outdoor power supply, the updated full power consumption is taken as the next full power consumption, and the process returns to the step of determining the total power consumption between the outdoor power supply's daily power consumption and the full power consumption.

[0108] In this embodiment, the power output of the target power source is superimposed on the full power capacity to obtain an updated full power capacity. When the updated full power capacity is not equal to the predicted power consumption, the outdoor power source connected in parallel with the target power source is taken as the next outdoor power source, and the updated full power capacity is taken as the next full power capacity. The process then returns to the step of determining the total power consumption between the outdoor power source's daily power consumption and the full power capacity.

[0109] In summary, this application can obtain the current remaining power of the outdoor power supply in real time, and then compare this remaining power with the charging capacity threshold of the outdoor power supply, thereby achieving the purpose of real-time detection of the remaining power of the outdoor power supply. When the remaining power is less than or equal to the charging capacity threshold of the outdoor power supply, the time-of-use electricity price of the grid at the current moment is determined in a timely manner. Then, based on the off-peak electricity price of the grid, the fluctuation of the grid electricity price in real time is detected. When the time-of-use electricity price does not match the off-peak electricity price of the grid, the charging time corresponding to the off-peak electricity price is used to accurately determine the charging time of the outdoor power supply. When the time elapsed since the current moment reaches the charging time, the grid is automatically connected to the outdoor power supply to perform the charging action. This realizes the improvement of the charging economic efficiency of the outdoor power supply by utilizing off-peak electricity prices, avoiding the technical problems of energy waste and high electricity costs caused by existing disordered charging, and effectively saving electricity costs.

[0110] In addition, this application also provides an outdoor power control device, please refer to... Figure 3 , Figure 3 This is a schematic diagram of the outdoor power control device involved in the embodiments of this application.

[0111] The outdoor power control device of this application includes:

[0112] The acquisition module H10 is used to acquire the remaining power of the outdoor power supply at the current moment;

[0113] The power comparison module H20 determines the time-of-use electricity price of the mains power grid at the current moment when the remaining power is less than or equal to the charging power threshold of the outdoor power source.

[0114] The electricity price matching module H30 is used to determine the charging duration of the outdoor power supply based on the charging time corresponding to the off-peak electricity price and the current time when the electricity price during the specified period does not match the off-peak electricity price of the mains power grid.

[0115] The charging module H40 is used to connect the mains power grid to the outdoor power supply to perform a charging action when the duration of the timer starting from the current moment of the outdoor power supply reaches the charging duration.

[0116] Optionally, the outdoor power control device of this application further includes a detection module, which further includes:

[0117] The electricity price detection unit is used to detect whether the electricity price during the specified time period is equal to the off-peak electricity price of the mains power grid;

[0118] The first execution unit is configured to determine that the time-period electricity price matches the off-peak electricity price if the time-period electricity price is equal to the off-peak electricity price, and then execute the step of connecting the mains power grid to the outdoor power source to perform the charging action.

[0119] The matching value output unit is used to determine that the time period electricity price and the off-peak electricity price are not matched if the time period electricity price is not equal to the off-peak electricity price.

[0120] Optionally, the power comparison module H20 may also include:

[0121] A request unit is used to determine the power demand information of the outdoor power supply to connect to an external load, wherein the power demand information includes at least the amount of charge to be applied to the external load.

[0122] The judgment unit is used to determine whether the remaining power is greater than or equal to the discharge power threshold of the outdoor power supply after determining that the remaining power is greater than the amount to be charged.

[0123] The first discharge unit is used to discharge the external load based on the remaining power if the remaining power is greater than or equal to the discharge power threshold.

[0124] Optionally, the power comparison module H20 may also include:

[0125] A pre-determining unit is used to discharge the external load based on the matching result between the pre-determined electricity price and the time period electricity price if the remaining power is less than the discharge power threshold.

[0126] Optionally, the power comparison module H20 may also include:

[0127] The second discharge unit is used to trigger the outdoor power supply to connect to the mains power grid and discharge to the external load when the matching result is that the predetermined electricity price is higher than the electricity price during the time period.

[0128] The reservation unit is used to determine the access time when the external load accesses the requested electricity information when the matching result is that the reserved electricity price is lower than the time period electricity price, and to determine the reserved charging duration of the external load based on the time interval between the access time and the charging time corresponding to the off-peak electricity price.

[0129] The timing unit is used to execute the step of triggering the outdoor power supply to connect to the mains power grid and discharge to the external load when the time elapsed since the outdoor power supply was connected reaches the scheduled charging time.

[0130] Optionally, the outdoor power control device of this application further includes a power acquisition module, which further includes:

[0131] The power consumption unit is used to determine the full capacity of the outdoor power supply after the outdoor power supply has finished charging, and to obtain the historical power consumption data of the outdoor power supply in the previous month. There are multiple historical power consumption data, and the historical power consumption data are the daily discharge data of the outdoor power supply.

[0132] The prediction unit is used to determine the predicted electricity consumption of the outdoor power supply for the day based on the historical electricity consumption data.

[0133] The consumption unit is used to determine the total amount of electricity consumed by the outdoor power source on the day and the total amount of electricity when the predicted electricity consumption does not match the full amount of electricity. Based on the difference between the predicted electricity consumption and the total amount of electricity, the unit determines a target power source connected in parallel with the outdoor power source. The target power source is an energy storage device other than the outdoor power source.

[0134] The adjustment unit is used to adjust the full power consumption to match the predicted power consumption based on the power output of the target power source.

[0135] Optionally, the power acquisition module further includes:

[0136] The superposition unit is used to superimpose the power output of the target power source onto the full power capacity to obtain an updated full power capacity;

[0137] The execution unit is used to determine the total amount of electricity between the updated full-capacity power consumption and the predicted power consumption when the updated full-capacity power consumption is not equal to the predicted power consumption. In this case, the outdoor power supply connected in parallel with the target power supply is used as the next outdoor power supply, the updated full-capacity power consumption is used as the next full-capacity power consumption, and the execution unit returns to the step of determining the total amount of electricity consumption between the outdoor power supply's daily power consumption and the full-capacity power consumption.

[0138] In addition, this application also provides a terminal device. Please refer to... Figure 4 , Figure 4 This is a schematic diagram of the terminal device involved in the embodiments of this application. Specifically, the terminal device in the embodiments of this application may be a device that locally runs an outdoor power control method.

[0139] like Figure 4As shown, the terminal device in this embodiment may include: a processor 1001, such as a CPU, a communication bus 1002, a user interface 1003, a network interface 1004, a memory 1005, and a sensing unit 1006. The communication bus 1002 is used to enable communication between these components. The user interface 1003 may include a display screen and an input unit such as a keyboard; optionally, the user interface 1003 may also include a standard wired interface or a wireless interface. The network interface 1004 may optionally include a standard wired interface or a wireless interface (such as a Wi-Fi interface).

[0140] The memory 1005 is disposed on the main body of the terminal device. The memory 1005 stores a program that performs corresponding operations when executed by the processor 1001. The memory 1005 is also used to store parameters for use by the terminal device. The memory 1005 can be a high-speed RAM or a stable, non-volatile memory, such as a disk drive. Optionally, the memory 1005 can also be a storage device independent of the aforementioned processor 1001.

[0141] Those skilled in the art will understand that Figure 4 The terminal device structure shown does not constitute a limitation on the terminal device and may include more or fewer components than shown, or combine certain components, or have different component arrangements.

[0142] like Figure 4 As shown, the memory 1005, which serves as a storage medium, may include an operating system, a network communication module, a user interface module, and an outdoor power control program for the terminal device.

[0143] exist Figure 4 In the terminal device shown, the processor 1001 can be used to call the outdoor power control program of the terminal device stored in the memory 1005 and execute the steps of the outdoor power control method described above.

[0144] In addition, please refer to Figure 5 , Figure 5 This is a schematic diagram of the structure of a computer storage medium involved in an embodiment of this application. This application provides a computer storage medium. This computer storage medium stores an outdoor power supply control program, which, when executed by a processor, implements the steps of the aforementioned outdoor power supply control method.

[0145] It should be noted that, in this document, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or system that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or system. Unless otherwise specified, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or system that includes that element.

[0146] The sequence numbers of the embodiments in this application are for descriptive purposes only and do not represent the superiority or inferiority of the embodiments.

[0147] Through the above description of the embodiments, those skilled in the art can clearly understand that the methods of the above embodiments can be implemented by means of software plus necessary general-purpose hardware platforms. Of course, they can also be implemented by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, can be embodied in the form of a software product. This computer software product is stored in a computer storage medium (such as ROM / RAM, magnetic disk, optical disk) as described above, and includes several instructions to cause a terminal device (which may be a mobile phone, computer, server, or network device, etc.) to execute the methods described in the various embodiments of this application.

[0148] The above are merely preferred embodiments of this application and do not limit the patent scope of this application. Any equivalent structural or procedural transformations made using the content of this application's specification and drawings, or direct or indirect applications in other related technical fields, are similarly included within the patent protection scope of this application.

Claims

1. An outdoor power supply control method, characterized in that, The outdoor power supply control method includes: Get the remaining power of the outdoor power supply at the current moment; When the remaining power is less than or equal to the charging power threshold of the outdoor power source, the time-limited electricity price of the mains power grid at the current moment is determined. When the electricity price during the specified time period does not match the off-peak electricity price of the mains power grid, the charging duration of the outdoor power supply is determined based on the charging time corresponding to the off-peak electricity price and the current time. When the time elapsed since the current moment when the outdoor power supply reaches the charging time, the mains power grid will be connected to the outdoor power supply to perform the charging action. After confirming that the outdoor power supply has finished charging, determine the full capacity of the outdoor power supply and obtain the historical power consumption data of the outdoor power supply in the previous month. There are multiple historical power consumption data, which are the daily discharge data of the outdoor power supply. The predicted daily electricity consumption of the outdoor power supply is determined based on the historical electricity consumption data. When the predicted electricity consumption does not match the full capacity, the total electricity consumption between the outdoor power supply's daily consumption and the full capacity is determined, and based on the difference between the predicted electricity consumption and the total electricity consumption, a target power supply connected in parallel with the outdoor power supply is determined. The target power supply is an energy storage device other than the outdoor power supply. The power output of the target power source is added to the full power capacity to obtain the updated full power capacity; When the updated full power consumption is not equal to the predicted power consumption, the outdoor power source connected in parallel with the target power source is taken as the next outdoor power source, the updated full power consumption is taken as the next full power consumption, and the process returns to the step of determining the total power consumption between the daily power consumption of the outdoor power source and the full power consumption.

2. The outdoor power supply control method as described in claim 1, characterized in that, After determining the time-of-use electricity price of the municipal power grid at the current moment, the outdoor power supply control method further includes: Detect whether the electricity price during the specified time period is equal to the off-peak electricity price of the mains power grid; If the time-period electricity price is equal to the off-peak electricity price, then it is determined that the time-period electricity price and the off-peak electricity price are matched, and the step of connecting the mains power grid to the outdoor power source to perform the charging action is executed; If the time-period electricity price is not equal to the off-peak electricity price, then it is determined that the time-period electricity price and the off-peak electricity price do not match.

3. The outdoor power supply control method as described in claim 1, characterized in that, When the remaining power is less than or equal to the charging capacity threshold of the outdoor power source, the outdoor power source control method further includes: Determine the power demand information of the outdoor power supply to connect to an external load, wherein the power demand information includes at least the amount of charge to be applied to the external load; After determining that the remaining power is greater than the amount to be charged, it is determined whether the remaining power is greater than or equal to the discharge power threshold of the outdoor power supply. If the remaining power is greater than or equal to the discharge power threshold, then the external load is discharged based on the remaining power.

4. The outdoor power supply control method as described in claim 3, characterized in that, The requested electricity information also includes the predetermined electricity price of the external load. After the step of determining whether the remaining power is greater than or equal to the discharge capacity threshold of the outdoor power supply, the outdoor power supply control method further includes: If the remaining power is less than the discharge power threshold, the external load is discharged according to the matching result between the predetermined electricity price and the time period electricity price.

5. The outdoor power supply control method as described in claim 4, characterized in that, The step of discharging the external load based on the matching result between the predetermined electricity price and the time-period electricity price includes: When the matching result is that the predetermined electricity price is higher than the electricity price during the time period, the outdoor power supply is triggered to connect to the mains power grid to discharge to the external load. When the matching result is that the reserved electricity price is lower than the electricity price during the time period, the access time when the external load accesses the requested electricity information is determined, and the reserved charging duration of the external load is determined based on the time interval between the access time and the charging time corresponding to the off-peak electricity price. When the outdoor power supply reaches the scheduled charging time after the connection time, the step of triggering the outdoor power supply to connect to the mains power grid to discharge to the external load is executed.

6. An outdoor power supply control device, characterized in that, The outdoor power control device includes: The acquisition module is used to obtain the remaining power of the outdoor power supply at the current moment; The power comparison module determines the time-of-use electricity price of the mains power grid at the current moment when the remaining power is less than or equal to the charging power threshold of the outdoor power source. The electricity price matching module is used to determine the charging duration of the outdoor power supply based on the charging time corresponding to the off-peak electricity price and the current time when the electricity price during the specified time period does not match the off-peak electricity price of the mains power grid. The charging module is used to connect the mains power grid to the outdoor power supply to perform a charging action when the time elapsed since the current moment reaches the charging time. The determination module is used to determine the full capacity of the outdoor power supply after it has been fully charged, and to obtain the historical electricity consumption data of the outdoor power supply for the previous month. There are multiple historical electricity consumption data points, which are the daily discharge data of the outdoor power supply. Based on the historical electricity consumption data, the module determines the predicted electricity consumption of the outdoor power supply for the current day. When the predicted electricity consumption does not match the full capacity, the module determines the total electricity consumption between the outdoor power supply's daily consumption and the full capacity, and based on the difference between the predicted electricity consumption and the total electricity consumption, determines a target power supply to be connected in parallel with the outdoor power supply. The target power supply is an energy storage device other than the outdoor power supply. The module adds the electricity output of the target power supply to the full capacity to obtain an updated full capacity. When the updated full capacity is not equal to the predicted electricity consumption, the module designates the outdoor power supply connected in parallel with the target power supply as the next outdoor power supply, uses the updated full capacity as the next full capacity, and returns to the step of determining the total electricity consumption between the outdoor power supply's daily consumption and the full capacity.

7. A terminal device, characterized in that, The terminal device includes a memory, a processor, and an outdoor power control program stored in the memory and executable on the processor. When the processor executes the outdoor power control program, it implements the steps of the outdoor power control method as described in claims 1-5.

8. A computer storage medium, characterized in that, The computer storage medium stores an outdoor power control program, which, when executed by a processor, implements the steps of the outdoor power control method as described in claims 1-5.

Citation Information

Patent Citations

  • Charging method and relevant equipment

    CN107623149A

  • Intelligent charging station management system

    CN111873841A

  • Outdoor power supply and charging control method thereof

    CN116094098A

  • Charging method and system of outdoor energy storage power supply and storage medium

    CN116488215A