Black start system and method based on diesel generator coupled to combustion engine
By using a black-start system that couples a diesel generator to a gas turbine, the black-start capability of the gas turbine is realized, solving the problem of the lack of black-start capability of the gas turbine, reducing system complexity and cost, and ensuring the rapid recovery and safety of the power grid.
Patent Information
- Application Number
- CN202311048151.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-18
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2043-08-18
AI Technical Summary
In existing technologies, gas turbine generator sets lack black start capability, and configuring electrochemical energy storage systems is complex and costly, making them unsuitable for all units and posing safety risks and significant load switching disturbances.
The black start system, which couples diesel generators to a gas turbine, uses multiple diesel generators to couple with the gas turbine and uses a tie switch to achieve seamless switching control. It is directly connected to the gas turbine plant service system, avoiding the need to configure an electrochemical energy storage system and using a soft switching method for load transfer.
It enables black start capability of gas turbines, reduces system complexity and cost, ensures the success rate of black start and rapid grid recovery, and avoids the safety risks and load switching impacts of electrochemical energy storage systems.
Smart Images

Figure CN117353386B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of black start technology for power plants, and in particular to a black start system and method based on a diesel generator coupled with a gas turbine. Background Technology
[0002] Currently, in new power systems primarily based on new energy sources, power outages frequently occur due to the volatility and uncontrollability of these sources, as well as environmental factors such as frequent typhoons in coastal areas. Therefore, the demand for ancillary services in the power grid is further increasing. Black start, as a power grid ancillary service, is mainly used to quickly restore power to the grid after a complete blackout, reducing power outage losses and rapidly supplying power to industrial, commercial, and residential users. Black start improves the grid's ability to withstand accidents and has significant economic and social benefits. Therefore, the adoption rate of black start technology is gradually increasing.
[0003] Among them, the main generator units for black start are hydroelectric generator units, which rely on their self-storage or external power supply to achieve black start. However, most gas turbine generator units do not have black start capability because they are not designed with black start function requirements. Therefore, to enable this type of gas turbine to have black start capability, the gas turbine needs to be upgraded and modified, and equipped with an external starting power supply to achieve black start.
[0004] In related technologies, electrochemical energy storage systems are typically configured in gas turbine power plants to achieve black start of the gas turbines. The energy stored in the electrochemical energy storage system provides starting power for the auxiliary equipment in the gas turbine plant, assisting in the black start of the gas turbine. At the same time, when there is no need for black start in the power grid, the energy storage system can also participate in the primary and secondary frequency regulation of the power grid in conjunction with the gas turbine.
[0005] However, the solutions mentioned above are not applicable to all gas turbine units, and are not suitable for units without frequency regulation capabilities. Furthermore, electrochemical energy storage systems are expensive, and their implementation leads to a more complex black-start system structure, posing safety risks during actual operation and causing significant disturbances during load switching. Summary of the Invention
[0006] This application aims to at least partially address one of the technical problems in the related art.
[0007] Therefore, the first objective of this application is to propose a black start system based on a diesel generator coupled with a gas turbine. This system realizes seamless switching control between the diesel generator and the gas turbine during and after the black start process, reduces the impact of the gas turbine auxiliary machine on the islanded operation of the diesel generator and the gas turbine, ensures the success rate of black start, gains valuable black start time, and can alleviate the power supply pressure under the condition of complete grid blackout.
[0008] The second objective of this application is to propose a black start method based on a diesel generator coupled with a gas turbine.
[0009] The third objective of this application is to provide a non-transitory computer-readable storage medium.
[0010] To achieve the above objectives, a first aspect of this application provides a black-start system based on a diesel generator coupled to a gas turbine. This system includes: a first gas turbine generator, a second gas turbine generator, a first circuit breaker, a second circuit breaker, a third circuit breaker, a first voltage transformer, a second voltage transformer, a third voltage transformer, a fourth voltage transformer, a fifth voltage transformer, a sixth voltage transformer, a tie switch, a first diesel generator, and a second diesel generator, wherein...
[0011] The first gas turbine generator is connected to the first voltage transformer, the first voltage transformer is also connected to the first terminal of the first circuit breaker, the second terminal of the first circuit breaker is connected to the first 10KV working section, and the first 10KV working section is also connected to the second voltage transformer and the 10KV working section of the diesel generator respectively.
[0012] The second gas turbine generator is connected to the third voltage transformer. The third voltage transformer is also connected to the first terminal of the second circuit breaker. The second terminal of the second circuit breaker is connected to the second 10KV working section. The second 10KV working section is also connected to the fourth voltage transformer and the fifth voltage transformer. The fifth voltage transformer is also connected to the first terminal of the third circuit breaker. The second terminal of the third circuit breaker is connected to the 10KV working section of the diesel generator.
[0013] The first 10kV working section is connected to the second 10kV working section through the tie switch. The diesel generator 10kV working section is also connected to the sixth voltage transformer, the first diesel generator and the second diesel generator respectively.
[0014] Optionally, in one embodiment of this application, the system further includes: a first gas turbine grid-connection switch, a first main transformer, a first gas turbine 10kV reactor, a fourth circuit breaker, a fifth circuit breaker, a sixth circuit breaker, and a seventh voltage transformer. The first gas turbine generator is connected to a first terminal of the first gas turbine grid-connection switch, and the second terminal of the first gas turbine grid-connection switch is connected to both the first terminal of the first main transformer and the first terminal of the first gas turbine 10kV reactor. The second terminal of the first main transformer is connected to a first 110kV power grid, and the second terminal of the first gas turbine 10kV reactor is connected to the first voltage transformer. The first terminal of the fourth circuit breaker is connected to the first 10kV operating section, and the second terminal of the fourth circuit breaker is connected to the first terminal of the fifth circuit breaker. The second terminal of the fifth circuit breaker is connected to the 10kV operating section of the diesel generator. The first terminal of the sixth circuit breaker is connected to the 10kV operating section of the diesel generator, and the second terminal of the sixth circuit breaker is connected to the seventh voltage transformer. The seventh voltage transformer is also connected to the first diesel generator.
[0015] Optionally, in one embodiment of this application, the system further includes: a second gas turbine grid-connection switch, a second main transformer, a second gas turbine 10kV reactor, a seventh circuit breaker, an eighth circuit breaker, and an eighth voltage transformer. The second gas turbine generator is connected to the first terminal of the second gas turbine grid-connection switch; the second terminal of the second gas turbine grid-connection switch is connected to the first terminal of the second main transformer and the first terminal of the second gas turbine 10kV reactor, respectively. The second terminal of the second main transformer is connected to the second 110kV power grid; the second terminal of the second gas turbine 10kV reactor is connected to the third voltage transformer. The first terminal of the seventh circuit breaker is connected to the second 10kV operating section; the second terminal of the seventh circuit breaker is connected to the fifth voltage transformer. The first terminal of the eighth circuit breaker is connected to the 10kV operating section of the diesel generator; the second terminal of the eighth circuit breaker is connected to the eighth voltage transformer; and the eighth voltage transformer is also connected to the second diesel generator.
[0016] To achieve the above objectives, a second aspect of this application proposes a black start method based on a diesel generator coupled with a gas turbine. This method is applied to the black start system based on a diesel generator coupled with a gas turbine described in the first aspect of this application. The method includes the following steps:
[0017] During the black start-up phase, a first synchronization point and multiple first target voltage transformers are selected to control the first diesel generator and the second diesel generator to connect to the first gas turbine generator. After grid connection is completed, the first diesel generator and the second diesel generator are shut down so that the first gas turbine generator can perform islanded operation with its own first 10KV working section.
[0018] Select a second synchronization point and multiple second target voltage transformers, control the first diesel generator and the second diesel generator to connect to the second gas turbine generator, and control the first diesel generator and the second diesel generator to shut down after grid connection is completed, so that the second gas turbine generator can perform islanded operation with its own second 10KV working section.
[0019] During the black start shutdown phase, a third synchronization point and multiple third target voltage transformers are selected to control the first diesel generator and the second diesel generator to connect to the first gas turbine generator. After grid connection is completed, the load of the first 10KV working section is transferred to the first diesel generator and the second diesel generator, and the first gas turbine generator is shut down.
[0020] Select the third synchronization point and multiple third target voltage transformers, control the first diesel generator and the second diesel generator to connect to the second gas turbine generator, and after the grid connection is completed, control the load of the second 10KV working section to transfer to the first diesel generator and the second diesel generator, and control the second gas turbine generator to shut down.
[0021] Optionally, in one embodiment of this application, selecting a first synchronization point and a plurality of first target voltage transformers includes: selecting a first circuit breaker as the first synchronization point, and selecting a first voltage transformer and a second voltage transformer as the plurality of first target voltage transformers; controlling the first diesel generator and the second diesel generator to connect to the first gas turbine generator includes: sending a voltage regulation command and a speed regulation command to the controller of the diesel generator through the synchronization device, and selecting the first gas turbine generator as the target gas turbine to be connected; controlling the first diesel generator and the second diesel generator to shut down after grid connection is completed includes: sending a shutdown command to the controller of the diesel generator through the synchronization device, and disconnecting the third circuit breaker.
[0022] Optionally, in one embodiment of this application, selecting a second synchronization point and a plurality of second target voltage transformers includes: selecting a second circuit breaker as the second synchronization point, and selecting a third voltage transformer and a fourth voltage transformer as the plurality of second target voltage transformers.
[0023] Optionally, in one embodiment of this application, selecting a third synchronization point and multiple third target voltage transformers includes: selecting the third circuit breaker as the third synchronization point, and selecting the fifth voltage transformer and the sixth voltage transformer as the multiple third target voltage transformers; the step of controlling the load transfer of the first 10KV working section to the first diesel generator and the second diesel generator after grid connection is completed includes: sending a shutdown command to the first circuit breaker through the synchronization device, and disconnecting the first circuit breaker.
[0024] Optionally, in one embodiment of this application, controlling the load transfer of the second 10KV working section to the first diesel generator and the second diesel generator after grid connection is completed includes: sending a shutdown command to the second circuit breaker through the synchronizing device and disconnecting the second circuit breaker.
[0025] Optionally, in one embodiment of this application, the method further includes: during the black start-up phase, detecting whether a black start has been successfully completed under the current line; if the black start fails, switching to the backup circuit for a black start.
[0026] To achieve the above objectives, a third aspect of the present invention provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements a black-start method based on a diesel generator coupled to a gas turbine as described in any of the second aspects of this application.
[0027] The technical solution provided by the embodiments of this application brings at least the following beneficial effects: This application enables black start-up of gas turbines by coupling multiple diesel generators with corresponding gas turbines, allowing gas turbines without black start capability to achieve black start, facilitating rapid grid connection in complete darkness, and providing emergency power for the entire gas turbine power plant, ensuring the plant's auxiliary system never loses power, and guaranteeing the safety and stability of the main unit's operation. Furthermore, this application avoids configuring an electrochemical energy storage system for frequency regulation; the system has no intermediate transformer stage and can be directly connected to the gas turbine plant's auxiliary system. Black start-up of two gas turbines is achieved using a tie switch. The system structure is simple and clear, without the use of a complex electrochemical energy storage system, facilitating practical implementation, reducing overall construction and operation and maintenance costs, and enriching the applicable scenarios for black start-up. Moreover, this application, based on a soft switching method, achieves seamless switching control between the diesel generator and the gas turbine during and after the black start-up process by reasonably setting the switching point. During the black start-up phase, the two gas turbines achieve a smooth transfer of load takeover by the diesel generator and the gas turbine's own power generation, reducing the impact of power switching in the auxiliary system. After a successful black start shutdown, the diesel generator can smoothly take over the plant's auxiliary load, ensuring that the gas turbine can be shut down safely and without interruption of power supply.
[0028] Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. Attached Figure Description
[0029] The above and / or additional aspects and advantages of this application will become apparent and readily understood from the following description of the embodiments taken in conjunction with the accompanying drawings, wherein:
[0030] Figure 1 This is a schematic diagram of a black start system based on a diesel generator coupled with a gas turbine, as proposed in an embodiment of this application.
[0031] Figure 2 This is a schematic diagram of a specific black start system based on a diesel generator coupled with a gas turbine, as proposed in an embodiment of this application.
[0032] Figure 3 This is a flowchart illustrating a black start method based on a diesel generator coupled with a gas turbine, as proposed in an embodiment of this application. Detailed Implementation
[0033] Embodiments of the present invention are described in detail below, examples of which are illustrated in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain the present invention, and should not be construed as limiting the present invention.
[0034] It should be noted that in the black start schemes of the relevant embodiments, the load switching process of gas turbine black start technology involves significant disturbances, and the switching between the start-up and shutdown processes is not yet clearly defined, resulting in low flexibility. For black start schemes involving diesel generators coupled with gas turbines, it is impossible to achieve seamless black start switching control for multiple coupled gas turbines. Furthermore, in current cases where black start has been implemented, the diesel generators use a low-voltage 400V level. If connected to the high-voltage plant power system of the gas turbine, the wiring methods are complex and varied, requiring additional transformer equipment. Additionally, low-voltage losses are significant, resulting in low efficiency.
[0035] Therefore, this application proposes a black start system and method based on a diesel generator coupled with a gas turbine. The output voltage level is as high as 10kV, with no intermediate transformer stage, and it can be directly connected to the gas turbine plant service system. A tie switch is used to achieve black start of two gas turbines. Furthermore, it achieves bumpless switching control for black start of the diesel generator coupled with the gas turbine.
[0036] The following describes in detail, with reference to the accompanying drawings, a black start system and method based on a diesel generator coupled with a gas turbine, as proposed in the embodiments of the present invention.
[0037] Figure 1 This is a schematic diagram of a black start system based on a diesel generator coupled with a gas turbine, as proposed in an embodiment of this application. Figure 1 As shown, the system includes: a first gas turbine generator 1, a second gas turbine generator 2, a first circuit breaker 3, a second circuit breaker 4, a third circuit breaker 5, a first voltage transformer 6, a second voltage transformer 7, a third voltage transformer 8, a fourth voltage transformer 9, a fifth voltage transformer 10, a sixth voltage transformer 11, a tie switch 12, a first diesel generator 13, and a second diesel generator 14.
[0038] Among them, the first gas turbine generator 1 is connected to the first voltage transformer 6, the first voltage transformer 6 is also connected to the first end of the first circuit breaker 3, the second end of the first circuit breaker 3 is connected to the first 10KV working section, and the first 10KV working section is also connected to the second voltage transformer 7 and the 10KV working section of the diesel generator respectively.
[0039] The second gas turbine generator 2 is connected to the third voltage transformer 8. The third voltage transformer 8 is also connected to the first terminal of the second circuit breaker 4. The second terminal of the second circuit breaker 4 is connected to the second 10KV working section. The second 10KV working section is also connected to the fourth voltage transformer 9 and the fifth voltage transformer 10 respectively. The fifth voltage transformer 10 is also connected to the first terminal of the third circuit breaker 5. The second terminal of the third circuit breaker 5 is connected to the 10KV working section of the diesel generator.
[0040] The first 10kV working section is connected to the second 10kV working section through the tie switch 12. The diesel generator 10kV working section is also connected to the sixth voltage transformer 11, the first diesel generator 13, and the second diesel generator 14, respectively.
[0041] It should be noted that in the embodiments of this application, terms such as "first end" and "second end" are used to distinguish different connection ends of related equipment, and the specific ports referred to can be determined from the accompanying drawings in conjunction with the relevant descriptions. A diesel generator is a small power generation device that uses diesel fuel or the like as fuel and a diesel engine as the prime mover to drive the generator to generate electricity. In the embodiments of this application, a diesel generator can be abbreviated as "diesel generator," and a gas turbine generator can be abbreviated as "gas turbine," etc.
[0042] In this application, two gas turbine generator sets are sequentially connected to the 10kV working section of the diesel generator via multiple voltage transformers, multiple circuit breakers, and a 10kV working section. Two diesel generators are also connected to the 10kV working section of the diesel generator. By controlling the relevant equipment in the black start system based on diesel generator coupled with gas turbines, a smooth transfer of load takeover and gas turbine power generation during the black start-up phase can be achieved. Furthermore, after a successful black start shutdown, the diesel generators can smoothly take over the plant service load, ensuring uninterrupted and safe shutdown of the gas turbine generators. The specific implementation process is described in subsequent embodiments.
[0043] To better suit the actual working scenarios in gas turbine power plants and meet the application requirements of various devices, one embodiment of this application also proposes a specific black-start system based on a diesel generator coupled with a gas turbine. Figure 2 This is a schematic diagram of a specific black-start system based on a diesel generator coupled with a gas turbine, as proposed in an embodiment of this application. Figure 2 As shown, Figure 1In this embodiment, the first gas turbine generator 1, the second gas turbine generator 2, the first circuit breaker 3, the second circuit breaker 4, the third circuit breaker 5, the first voltage transformer 6, the second voltage transformer 7, the third voltage transformer 8, the fourth voltage transformer 9, the fifth voltage transformer 10, the sixth voltage transformer 11, the first diesel generator 13, and the second diesel generator 14 correspond to, respectively. Figure 2 The components include #1 gas turbine, #2 gas turbine, 61DL circuit breaker, 62DL circuit breaker, 622DL circuit breaker, 1PT voltage transformer, 2PT voltage transformer, 3PT voltage transformer, 4PT voltage transformer, 5PT voltage transformer, 6PT voltage transformer, #1 diesel generator, and #2 diesel generator.
[0044] Furthermore, the system in Figure 1 Based on the embodiment, it also includes: a first gas turbine grid connection switch (#1 gas turbine grid connection switch), a first main transformer (#1 main transformer), a first gas turbine 10KV reactor (#1 gas turbine 10KV plant service reactor), a fourth circuit breaker (611DL circuit breaker), a fifth circuit breaker (623DL circuit breaker), a sixth circuit breaker (631DL circuit breaker), and a seventh voltage transformer (7PT voltage transformer).
[0045] The numbers in parentheses represent the specifications of the aforementioned devices. Figure 2 The corresponding representation in [the text]. From [the text] Figure 2 It can be seen that the first gas turbine generator is connected to the first terminal of the first gas turbine grid connection switch, and the second terminal of the first gas turbine grid connection switch is connected to the first terminal of the first main transformer and the first terminal of the first gas turbine 10kV reactor. The second terminal of the first main transformer is connected to the first 110kV power grid, and the second terminal of the first gas turbine 10kV reactor is connected to the first voltage transformer. The first terminal of the fourth circuit breaker is connected to the first 10kV operating section, the second terminal of the fourth circuit breaker is connected to the first terminal of the fifth circuit breaker, and the second terminal of the fifth circuit breaker is connected to the 10kV operating section of the diesel generator; the first terminal of the sixth circuit breaker is connected to the 10kV operating section of the diesel generator, and the second terminal of the sixth circuit breaker is connected to the seventh voltage transformer, which is also connected to the first diesel generator.
[0046] Continue to refer to Figure 2 For example, based on the above, the system also includes: a second gas turbine grid connection switch (#2 gas turbine grid connection switch), a second main transformer (#2 main transformer), a second gas turbine 10KV reactor (#2 gas turbine 10KV plant service reactor), a seventh circuit breaker (621DL circuit breaker), an eighth circuit breaker (632DL circuit breaker), and an eighth voltage transformer (8PT voltage transformer).
[0047] The second gas turbine generator is connected to the first terminal of the second gas turbine grid connection switch. The second terminal of the second gas turbine grid connection switch is connected to the first terminal of the second main transformer and the first terminal of the second gas turbine 10kV reactor. The second terminal of the second main transformer is connected to the second 110kV power grid, and the second terminal of the second gas turbine 10kV reactor is connected to the third voltage transformer. The first terminal of the seventh circuit breaker is connected to the second 10kV operating section, and the second terminal of the seventh circuit breaker is connected to the fifth voltage transformer. The first terminal of the eighth circuit breaker is connected to the 10kV operating section of the diesel generator, and the second terminal of the eighth circuit breaker is connected to the eighth voltage transformer, which is also connected to the second diesel generator.
[0048] To more clearly illustrate the specific implementation process of black start control and bumpless switching control in the diesel generator-coupled gas turbine black start system of this application, this application also proposes a black start method based on a diesel generator-coupled gas turbine. That is, the black start method based on a diesel generator-coupled gas turbine of this application is applied to the black start system based on a diesel generator-coupled gas turbine in the above embodiments to control the system. The various devices involved in this method are those described above. Figure 1 and Figure 2 The device in the embodiment.
[0049] The following is a detailed description of the black start method based on a diesel generator coupled with a gas turbine. Figure 3 This is a flowchart illustrating a black start method based on a diesel generator coupled with a gas turbine, as proposed in an embodiment of this application.
[0050] like Figure 3 As shown, the method includes the following steps:
[0051] Step S101: During the black start-up phase, select the first synchronization point and multiple first target voltage transformers, control the first diesel generator and the second diesel generator to connect to the first gas turbine generator, and control the first diesel generator and the second diesel generator to stop after grid connection is completed, so that the first gas turbine generator can perform islanded operation with its own first 10KV working section.
[0052] This step involves performing black start islanding operation of the #1 gas turbine. The synchronization point is the point where power from different systems converges. The first target voltage transformer is the voltage transformer required during the black start islanding operation phase of the #1 gas turbine, and may include multiple transformers.
[0053] In one embodiment of this application, selecting a first synchronization point and a plurality of first target voltage transformers includes: selecting a first circuit breaker as the first synchronization point, and selecting a first voltage transformer and a second voltage transformer as a plurality of first target voltage transformers. Controlling the first diesel generator and the second diesel generator to connect to the first gas turbine generator includes: sending voltage regulation commands and speed regulation commands to the controller of the diesel generators via a synchronization device, and selecting the first gas turbine generator as the target gas turbine to be connected. After grid connection is completed, controlling the first diesel generator and the second diesel generator to shut down includes: sending a shutdown command to the controller of the diesel generators via a synchronization device, and disconnecting the third circuit breaker.
[0054] Specifically, the synchronization point is set to a 61DL circuit breaker, the system target is selected as a 1PT voltage transformer, and the system to be connected is selected as a 2PT voltage transformer. The synchronization device sends voltage regulation and speed regulation commands to the controllers of the #1 and #2 diesel generators, respectively. These commands include the gas turbine to be connected to the diesel generator, which in this step is the #1 gas turbine. Thus, the connection of the #1 and #2 diesel generators to the #1 gas turbine can be achieved.
[0055] A synchronizing device is an indicator, monitoring, and control device used during grid connection in the operation of a power system. It can detect whether parameters such as the grid frequency and voltage amplitude on both sides of the connection point meet the conditions to achieve automatic grid connection. In this embodiment, the synchronizing device can be pre-selected.
[0056] Furthermore, after successful grid connection, the aforementioned synchronization device sends shutdown commands to the controllers of the #1 and #2 diesel generators respectively, causing the #1 and #2 diesel generators to execute the shutdown process and disconnect 622DL. Thus, the #1 gas turbine achieves islanded operation with its own 10kV working section I power supply.
[0057] Step S102: Select the second synchronization point and multiple second target voltage transformers, control the first diesel generator and the second diesel generator to connect to the second gas turbine generator, and control the first diesel generator and the second diesel generator to shut down after grid connection is completed, so that the second gas turbine generator can perform islanded operation with its own second 10KV working section.
[0058] This step involves performing black start islanding operation of the #2 gas turbine. The second target voltage transformer is the voltage transformer required during the black start islanding operation phase of the #2 turbine, and may include multiple transformers.
[0059] It should be noted that in practical applications, steps S102 and S101 can be executed in parallel, that is, the black boot island operation of machine #1 and machine #2 can be performed simultaneously.
[0060] In one embodiment of this application, selecting a second synchronization point and a plurality of second target voltage transformers includes: selecting a second circuit breaker as the second synchronization point, and selecting a third voltage transformer and a fourth voltage transformer as a plurality of second target voltage transformers.
[0061] Specifically, in this step, the synchronization point is set to a 62DL circuit breaker, the target system is selected as a 3PT voltage transformer, and the system to be connected is selected as a 4PT voltage transformer. The synchronization device in the above embodiment can send voltage regulation and speed regulation commands to the controllers of #1 and #2 diesel generators, respectively. The commands include the gas turbine to be connected to the diesel generator, which in this step is gas turbine #2. Thus, the connection of #1 and #2 diesel generators to gas turbine #2 can be achieved.
[0062] Furthermore, after successful grid connection, the aforementioned synchronization device sends shutdown commands to the controllers of the #1 and #2 diesel generators respectively, causing the #1 and #2 diesel generators to execute the shutdown process and disconnect 622DL. Thus, the #2 gas turbine achieves islanded operation with its own 10kV working section I power supply.
[0063] Step S103: During the black start-up and shutdown phase, select the third synchronization point and multiple third target voltage transformers, control the first diesel generator and the second diesel generator to connect to the first gas turbine generator, and after the grid connection is completed, control the load of the first 10KV working section to transfer to the first diesel generator and the second diesel generator, and control the first gas turbine generator to shut down.
[0064] During the black start-up and shutdown phase, this step executes the black start-up and shutdown of gas turbine #1. The third target voltage transformer is the voltage transformer required during the shutdown phase of gas turbine #1.
[0065] In one embodiment of this application, selecting a third synchronization point and multiple third target voltage transformers includes: selecting a third circuit breaker as the third synchronization point, and selecting a fifth voltage transformer and a sixth voltage transformer as multiple third target voltage transformers. After grid connection is completed, controlling the load transfer of the first 10kV working section to the first diesel generator and the second diesel generator includes: sending a shutdown command to the first circuit breaker through a synchronization device, and disconnecting the first circuit breaker.
[0066] Specifically, the synchronization point is set to a 622DL circuit breaker, the target voltage transformer is selected as 5PT, and the system to be connected is selected as 6PT. Voltage regulation and speed regulation commands are sent from the aforementioned synchronization device to the controllers of #1 and #2 diesel generators, respectively. These commands include the gas turbine to be connected to the diesel generator, which in this step is gas turbine #1. Thus, the connection of #1 and #2 diesel generators to #1 gas turbine can be achieved.
[0067] Furthermore, after successful grid connection, a shutdown command is sent to the 61DL circuit breaker via the aforementioned synchronization device, causing the 61DL circuit breaker to disconnect. Subsequently, the load of the 10kV operating section I is transferred to the #1 and #2 diesel generators, and the #1 gas turbine is controlled to execute the shutdown procedure.
[0068] Step S104: Select the third synchronization point and multiple third target voltage transformers, control the first diesel generator and the second diesel generator to connect to the second gas turbine generator, and after the grid connection is completed, control the load of the second 10KV working section to transfer to the first diesel generator and the second diesel generator, and control the second gas turbine generator to shut down.
[0069] This step involves performing a black start shutdown of the #2 gas turbine. The selected synchronization point and target voltage transformer are the same as in step S103.
[0070] In one embodiment of this application, after grid connection is completed, controlling the load transfer of the second 10KV working section to the first diesel generator and the second diesel generator includes: sending a shutdown command to the second circuit breaker through a synchronizing device and disconnecting the second circuit breaker.
[0071] Specifically, in this step, the synchronization point is set to a 622DL circuit breaker, the target system is selected as a 5PT voltage transformer, and the system to be connected is selected as a 6PT voltage transformer. The aforementioned synchronization device sends voltage regulation and speed regulation commands to the controllers of the #1 and #2 diesel generators, respectively. The commands include the gas turbine to be connected to the diesel generator, which in this step is the #2 gas turbine. Thus, the connection of the #1 and #2 diesel generators to the #2 gas turbine can be achieved.
[0072] Furthermore, after successful grid connection, a shutdown command is sent to the 62DL circuit breaker via the aforementioned synchronization device, causing the 62DL circuit breaker to disconnect. Subsequently, the load of the 10kV operating section II is transferred to the #1 and #2 diesel generators, and the #2 gas turbine is controlled to execute the shutdown procedure.
[0073] Therefore, this application achieves black start by coupling a diesel generator with a gas turbine, with an output voltage level up to 10kV, and achieves seamless switching between black start load transfer and shutdown.
[0074] In one embodiment of this application, the method further includes: during the black start-up phase, detecting whether a black start has been successfully completed under the current line; if the black start fails, switching to the backup circuit to perform a black start.
[0075] Specifically, see Figure 2As can be seen, the black-start system based on a diesel generator coupled with a gas turbine in this application also includes a backup starting circuit. When the main circuit fails to start under normal conditions, the backup circuit can be used for emergency black-start. For example, the circuits belonging to the fifth circuit breaker (623DL circuit breaker) and the sixth circuit breaker (631DL circuit breaker) can be used for backup black-start. Therefore, this embodiment improves the fault tolerance and reliability of black-start, making it easier to apply in practice.
[0076] In summary, the black start method based on diesel generator coupled gas turbine in this application embodiment enables gas turbines without black start capability to achieve black start by coupling multiple diesel generators with corresponding gas turbines. This facilitates rapid grid connection in complete darkness and provides emergency power to the entire gas turbine power plant, ensuring the plant's auxiliary system operates without power outages and guaranteeing the safety and stability of the main unit's operation. Furthermore, this method avoids the need for an electrochemical energy storage system for frequency regulation, eliminates intermediate transformer stages, and can be directly connected to the gas turbine plant's auxiliary system. The black start of two gas turbines is achieved using a tie switch, resulting in a simple and clear system structure. The absence of a complex electrochemical energy storage system facilitates practical implementation, reduces overall construction and operation / maintenance costs, and expands the applicable scenarios for black start. Moreover, this method is based on soft switching, achieving seamless switching control between the diesel generator and gas turbine during and after the black start process by rationally setting the switching point. During the black start-up phase, the two gas turbines smoothly transfer the load taken over by the diesel generator and generate electricity themselves, reducing the impact of power switching on the auxiliary system. After a successful black start shutdown, the diesel generator can smoothly take over the plant's auxiliary load, ensuring that the gas turbine can be shut down safely and without interruption of power supply.
[0077] To implement the above embodiments, the present invention also proposes a non-transitory computer-readable storage medium storing a computer program thereon, which, when executed by a processor, implements the black start method based on a diesel generator coupled to a gas turbine as described in the second aspect of the present application.
[0078] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of this application. In this specification, the use of illustrative expressions for the above terms in multiple embodiments or examples does not imply that these embodiments or examples are identical. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.
[0079] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this application, "multiple" means at least two, such as two, three, etc., unless otherwise explicitly specified.
[0080] Any process or method description in the flowchart or otherwise herein can be understood as representing a module, segment, or portion of code comprising one or more executable instructions for implementing custom logic functions or processes, and the scope of the preferred embodiments of this application includes additional implementations in which functions may be performed not in the order shown or discussed, including substantially simultaneously or in reverse order depending on the functions involved, as should be understood by those skilled in the art to which embodiments of this application pertain.
[0081] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as a sequenced list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by, or in conjunction with, an instruction execution system, apparatus, or device (such as a computer-based system, a processor-included system, or other system that can fetch and execute instructions from, an instruction execution system, apparatus, or device). For the purposes of this specification, "computer-readable medium" can be any means that can contain, store, communicate, propagate, or transmit programs for use by, or in conjunction with, an instruction execution system, apparatus, or device. More specific examples (a non-exhaustive list) of computer-readable media include: an electrical connection having one or more wires (electronic device), a portable computer disk drive (magnetic device), random access memory (RAM), read-only memory (ROM), erasable and editable read-only memory (EPROM or flash memory), fiber optic devices, and portable optical disc read-only memory (CDROM). Alternatively, the computer-readable medium may be paper or other suitable media on which the program can be printed, since the program can be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, interpreting, or otherwise processing as necessary, and then stored in a computer memory.
[0082] It should be understood that various parts of this application can be implemented using hardware, software, firmware, or a combination thereof. In the above embodiments, multiple steps or methods can be implemented using software or firmware stored in memory and executed by a suitable instruction execution system. For example, if implemented in hardware as in another embodiment, it can be implemented using any one or a combination of the following techniques known in the art: discrete logic circuits having logic gates for implementing logical functions on data signals, application-specific integrated circuits (ASICs) having suitable combinational logic gates, programmable gate arrays (PGAs), field-programmable gate arrays (FPGAs), etc.
[0083] Those skilled in the art will understand that all or part of the steps of the methods in the above embodiments can be implemented by a program instructing related hardware. The program can be stored in a computer-readable storage medium, and when executed, the program includes one or a combination of the steps of the method embodiments.
[0084] Furthermore, the functional units in the various embodiments of this application can be integrated into a processing module, or each unit can exist physically separately, or two or more units can be integrated into a module. The integrated module can be implemented in hardware or as a software functional module. If the integrated module is implemented as a software functional module and sold or used as an independent product, it can also be stored in a computer-readable storage medium.
[0085] The storage medium mentioned above can be a read-only memory, a disk, or an optical disk, etc. Although embodiments of this application have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting this application. Those skilled in the art can make changes, modifications, substitutions, and variations to the above embodiments within the scope of this application.
Claims
1. A black start system based on a diesel generator coupled with a gas turbine, characterized in that, include: The system comprises a first gas turbine generator, a second gas turbine generator, a first circuit breaker, a second circuit breaker, a third circuit breaker, a first voltage transformer, a second voltage transformer, a third voltage transformer, a fourth voltage transformer, a fifth voltage transformer, a sixth voltage transformer, a tie switch, a first diesel generator, and a second diesel generator, wherein... The first gas turbine generator is connected to the first voltage transformer, the first voltage transformer is also connected to the first terminal of the first circuit breaker, the second terminal of the first circuit breaker is connected to the first 10KV working section, and the first 10KV working section is also connected to the second voltage transformer and the 10KV working section of the diesel generator respectively. The second gas turbine generator is connected to the third voltage transformer. The third voltage transformer is also connected to the first terminal of the second circuit breaker. The second terminal of the second circuit breaker is connected to the second 10KV working section. The second 10KV working section is also connected to the fourth voltage transformer and the fifth voltage transformer. The fifth voltage transformer is also connected to the first terminal of the third circuit breaker. The second terminal of the third circuit breaker is connected to the 10KV working section of the diesel generator. The first 10kV working section is connected to the second 10kV working section through the tie switch. The diesel generator 10kV working section is also connected to the sixth voltage transformer, the first diesel generator and the second diesel generator respectively.
2. The black start system based on a diesel generator coupled with a gas turbine according to claim 1, characterized in that, Also includes: The system includes the first gas turbine grid connection switch, the first main transformer, the first gas turbine 10kV reactor, the fourth circuit breaker, the fifth circuit breaker, the sixth circuit breaker, and the seventh voltage transformer. The first gas turbine generator is connected to the first terminal of the first gas turbine grid connection switch, and the second terminal of the first gas turbine grid connection switch is connected to the first terminal of the first main transformer and the first terminal of the first gas turbine 10KV reactor, respectively. The second end of the first main transformer is connected to the first 110KV power grid, and the second end of the first gas turbine 10KV reactor is connected to the first voltage transformer. The first end of the fourth circuit breaker is connected to the first 10KV working section, the second end of the fourth circuit breaker is connected to the first end of the fifth circuit breaker, and the second end of the fifth circuit breaker is connected to the 10KV working section of the diesel generator. The first terminal of the sixth circuit breaker is connected to the 10KV working section of the diesel generator, and the second terminal of the sixth circuit breaker is connected to the seventh voltage transformer, which is also connected to the first diesel generator.
3. The black start system based on a diesel generator coupled with a gas turbine according to claim 2, characterized in that, Also includes: The system includes the second gas turbine grid connection switch, the second main transformer, the second gas turbine 10kV reactor, the seventh circuit breaker, the eighth circuit breaker, and the eighth voltage transformer. The second gas turbine generator is connected to the first terminal of the second gas turbine grid connection switch, and the second terminal of the second gas turbine grid connection switch is connected to the first terminal of the second main transformer and the first terminal of the second gas turbine 10KV reactor, respectively. The second terminal of the second main transformer is connected to the second 110kV power grid, and the second terminal of the second gas turbine 10kV reactor is connected to the third voltage transformer. The first terminal of the seventh circuit breaker is connected to the second 10KV working section, and the second terminal of the seventh circuit breaker is connected to the fifth voltage transformer. The first terminal of the eighth circuit breaker is connected to the 10KV working section of the diesel generator, the second terminal of the eighth circuit breaker is connected to the eighth voltage transformer, and the eighth voltage transformer is also connected to the second diesel generator.
4. A black start method based on a diesel generator coupled with a gas turbine, characterized in that, The black-start method based on a diesel generator coupled with a gas turbine, applicable to any one of claims 1-3, includes the following steps: During the black start-up phase, a first synchronization point and multiple first target voltage transformers are selected to control the first diesel generator and the second diesel generator to connect to the first gas turbine generator. After grid connection is completed, the first diesel generator and the second diesel generator are shut down so that the first gas turbine generator can perform islanded operation with its own first 10KV working section. Select a second synchronization point and multiple second target voltage transformers, control the first diesel generator and the second diesel generator to connect to the second gas turbine generator, and control the first diesel generator and the second diesel generator to shut down after grid connection is completed, so that the second gas turbine generator can perform islanded operation with its own second 10KV working section. During the black start shutdown phase, a third synchronization point and multiple third target voltage transformers are selected to control the first diesel generator and the second diesel generator to connect to the first gas turbine generator. After grid connection is completed, the load of the first 10KV working section is transferred to the first diesel generator and the second diesel generator, and the first gas turbine generator is shut down. Select the third synchronization point and multiple third target voltage transformers, control the first diesel generator and the second diesel generator to connect to the second gas turbine generator, and after the grid connection is completed, control the load of the second 10KV working section to transfer to the first diesel generator and the second diesel generator, and control the second gas turbine generator to shut down.
5. The black start method based on a diesel generator coupled with a gas turbine according to claim 4, characterized in that, The selection of the first synchronization point and multiple first target voltage transformers includes: The first circuit breaker is selected as the first synchronization point, and the first voltage transformer and the second voltage transformer are selected as the plurality of first target voltage transformers. The control of the first diesel generator and the second diesel generator connected to the first gas turbine generator includes: The synchronous device sends pressure regulation and speed regulation commands to the controller of the diesel generator and selects the first gas turbine generator as the target gas turbine to be connected. The step of controlling the shutdown of the first and second diesel generators after grid connection is completed includes: The synchronizing device sends a shutdown command to the controller of the diesel generator and disconnects the third circuit breaker.
6. The black start method based on a diesel generator coupled with a gas turbine according to claim 5, characterized in that, The selection of the second synchronization point and multiple second target voltage transformers includes: The second circuit breaker is selected as the second synchronization point, and the third and fourth voltage transformers are selected as the plurality of second target voltage transformers.
7. The black start method based on a diesel generator coupled with a gas turbine according to claim 5, characterized in that, The selection of the third synchronization point and multiple third target voltage transformers includes: The third circuit breaker is selected as the third synchronization point, and the fifth and sixth voltage transformers are selected as the plurality of third target voltage transformers. The step of controlling the load transfer of the first 10KV working section to the first diesel generator and the second diesel generator after grid connection is completed includes: The synchronization device sends a shutdown command to the first circuit breaker and disconnects the first circuit breaker.
8. The black start method based on a diesel generator coupled with a gas turbine according to claim 6, characterized in that, The step of controlling the load transfer of the second 10KV working section to the first diesel generator and the second diesel generator after grid connection is completed includes: The synchronization device sends a shutdown command to the second circuit breaker and disconnects the second circuit breaker.
9. The black start method based on a diesel generator coupled with a gas turbine according to claim 4, characterized in that, Also includes: During the black start-up phase, it is detected whether the black start was successfully completed under the current line. In the event of a failed black boot, switch to the backup circuit to perform a black boot.
10. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by the processor, it implements the black start method based on a diesel generator coupled to a gas turbine as described in any one of claims 4-9.
Citation Information
Patent Citations
Diesel generator system considering accident security and black start and starting method
CN111628567A
9E and 9F gas turbine combined black start electrical system and working method thereof
CN112290669A
