Method for waterborne displacement of large-span waterborne lifting equipment

By setting up parallel foundation platforms and mobile platforms on large-span lifting equipment on water, and utilizing sliding rails, winches, and hydraulic push rod devices, combined with suction cylinders and vacuum devices, the complexity of waterborne relocation construction was solved, achieving simple and efficient equipment relocation and improved photovoltaic construction efficiency.

CN117361341BActive Publication Date: 2026-11-20天津港航工程有限公司
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311572783.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-23
Publication Date
2026-11-20
Estimated Expiration
2043-11-23

AI Technical Summary

Technical Problem

Large-span lifting equipment on water is complex to operate and faces technical bottlenecks during water relocation construction. Existing construction techniques are limited and not simple enough.

Method used

The system employs parallel working and mobile foundation platforms, using slide rails, winches, towers, and hydraulic push rods to move the equipment. Suction cylinders and levels ensure platform stability and docking accuracy, while air compressors and vacuum devices control the platform's floating and sinking.

Benefits of technology

It has enabled the simplified operation of large-span lifting equipment on water, reduced construction costs, and improved the on-site efficiency of waterborne photovoltaic construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117361341B_ABST
    Figure CN117361341B_ABST
Patent Text Reader

Abstract

The application discloses a water-based large-span hoisting equipment water-based displacement operation method, which is realized based on operation base platforms and mobile base platforms arranged side by side on each single side of the water-based large-span hoisting equipment; on the top surface of each base platform, two sets of slide rails are symmetrically laid along the direction perpendicular to the span direction of the hoisting equipment; on the operation base platform, two winches are slidingly arranged on one set of slide rails, and two tower supports arranged side by side are slidingly arranged on the other set of slide rails; in actual application, the operation base platform and the mobile base platform are alternately transversely displaced until the operation base platform reaches the construction position of the next row of single-row photovoltaic facilities; the water-based large-span hoisting equipment water-based displacement operation method and the water-based large-span hoisting equipment displacement process have the advantages of simple operation, low construction cost and reusability, and can effectively improve the on-site construction efficiency in the water-based photovoltaic construction process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of photovoltaic technology for water surfaces, lakes, nearshore and offshore areas, and particularly to a method for moving large-span lifting equipment on water. Background Technology

[0002] Floating photovoltaic (PV) projects started later than traditional PV projects. Currently, various types of crane vessels and large lifting equipment are typically used as the main machinery in floating PV construction. During construction, these cranes need to be moved across the water to work on multiple work surfaces. However, the complex and variable environment on water demands high stability from the construction equipment, creating a technical bottleneck for the movement of large-span cranes. Currently, there are few reports on the construction techniques for moving large-span cranes on water, and the existing methods are quite complex. Summary of the Invention

[0003] The purpose of this invention is to provide a method for relocating large-span lifting equipment on water to solve the above-mentioned technical problems.

[0004] Therefore, the technical solution of the present invention is as follows:

[0005] A method for relocating a large-span floating crane is provided, which is based on a working base platform and a mobile base platform set side by side on each side of the large-span floating crane. On the top surface of each base platform, two sets of slide rails are symmetrically laid along the span direction perpendicular to the crane. On the working base platform, two winches are slidably mounted on one set of slide rails, and two towers set side by side are slidably mounted on the other set of slide rails. This allows the ends of two flexible hoisting cables on the large-span floating crane to pass over the top pulley groups of the two towers on the same side of the working base platform and wrap around the two winches.

[0006] The steps of this shifting operation method are as follows:

[0007] S1. On each side of the large-span water-based lifting equipment, there are working foundation platforms and mobile foundation platforms arranged side by side. The two platforms are sunk to the design position and connected. The two flexible hoisting cables of the large-span water-based lifting equipment are connected at both ends to the working foundation platform on the same side to complete the construction of a single row of photovoltaic facilities.

[0008] S2. Float the mobile base platform and drag it to the other side of the working base platform so that the mobile base platform is once again docked side by side with the working base platform.

[0009] S3. Lower the mobile foundation platform until its top surface is flush with the top surface of the working foundation platform, so that the two sets of slide rails installed on the two platforms can be connected respectively. Then, connect the working foundation platform and the mobile foundation platform into one unit.

[0010] S4. Move the winch and tower on the working foundation platform synchronously to the designated position on the mobile foundation platform via two sets of slide rails and position them. At this time, the mobile foundation platform equipped with the winch and tower becomes the working foundation platform, and the original working foundation platform becomes the mobile foundation platform.

[0011] S5. Repeat steps S2 to S4, alternating between moving the work base platform and the mobile base platform laterally until the work base platform reaches the construction position of the next row of single-row photovoltaic facilities.

[0012] Furthermore, both the working base platform and the mobile base platform adopt a suction cylinder base platform, which consists of a horizontally arranged truss platform and multiple suction cylinders evenly distributed and fixed on the bottom surface of the platform along the circumference; an air compressor and a vacuuming device are installed on the top surface of the truss platform; the air compressor is connected to the exhaust pipe of each suction cylinder through an exhaust pipe, and an exhaust valve is installed on the exhaust pipe; the vacuuming device is connected to the air intake pipe of each suction cylinder through an air intake pipe, and an air intake valve is installed on the air intake pipe.

[0013] Furthermore, a level is installed at each of the four corners of the top surface of the working base platform and the mobile base platform.

[0014] Furthermore, concave slots and convex blocks are respectively provided on the opposite side walls of the working base platform and the mobile base platform. The concave slots and convex blocks are symmetrically arranged and can be fitted together, so that the working base platform and the mobile base platform arranged side by side can be docked and connected together through the concave slots and convex blocks located on the opposite side walls.

[0015] Furthermore, a hydraulic push rod device is provided on each side of the slider of the slide rail; the hydraulic push rod device has its movable rod facing the direction of slider movement, the front end of the movable rod is fixed on the slider, and the rear end of its cylinder is connected to a fixed plate. The fixed plate is vertically arranged and has two insertion holes spaced apart on it; several insertion holes are symmetrically opened on the two side rail walls along the length of the rail, and the spacing between adjacent insertion holes is the same as the spacing between two insertion holes on the fixed plate, so that the rear end of the hydraulic push rod device is connected to the rail through fixing pins that are sequentially inserted into the two side rail walls and the fixed plate.

[0016] Further, in step S3, the method for moving the winch and the tower is as follows: the hydraulic push rod device extends the movable rod to its longest state from the initial retracted state, so that the slider connected to the hydraulic push rod device moves a certain distance; the fixing pin between the fixed plate and the track is removed, and the hydraulic push rod device is restored to the initial retracted state; the fixed plate is reconnected to the track through the fixing pin; the above steps are repeated until the hydraulic push rod device pushes the slider to the designated position.

[0017] Furthermore, in step S3, the method for fixing the winch and tower after they have been moved into place is as follows: the winch and tower are held in the designated position by a hydraulic push rod device, and a fixing pin is inserted into two pairs of holes on the front and rear sides of the slider to limit the slider.

[0018] Furthermore, multiple berthing vessel components are installed on each side wall of the working base platform and the mobile base platform; the multiple berthing vessel components are evenly distributed at equal intervals, and each berthing vessel component consists of a berthing vessel fixing plate and multiple buffer columns; the berthing vessel fixing plate is vertically arranged, and one end of the multiple buffer columns is symmetrically fixed to the back side plate of the berthing vessel fixing plate, and the other end is fixed to the side wall of the truss platform; both the berthing vessel fixing plate and the buffer columns are made of rubber.

[0019] Compared with existing technologies, this method for moving large-span lifting equipment on water has the advantages of simple operation, low construction cost, and reusability. It can effectively improve on-site construction efficiency in the process of photovoltaic construction on water and has good application and promotion prospects. Attached Figure Description

[0020] Figure 1 This is a schematic diagram of the structure of the working foundation platform and the moving foundation platform arranged side by side in the waterborne relocation operation method of the large-span waterborne lifting equipment of the present invention;

[0021] Figure 2 This is a side view of the hydraulic push rod device installed on the slide rail in the waterborne relocation operation method of the large-span lifting equipment on water in this invention;

[0022] Figure 3 for Figure 1 A magnified view of a portion of the image. Detailed Implementation

[0023] The present invention will be further described below with reference to the accompanying drawings and specific embodiments, but the following embodiments are by no means intended to limit the present invention.

[0024] See Figure 1 and Figure 3 The method for relocating large-span floating cranes is based on a working base platform 1 and a mobile base platform 2 arranged side-by-side on each side of the large-span floating crane; wherein,

[0025] The working foundation platform 1 and the mobile foundation platform 2 have the same structure. They are only divided according to different construction contents. Specifically, the working foundation platform 1 is used for normal construction operations of crane equipment, and the mobile foundation platform 2 is used for moving crane equipment. At the same time, the working foundation platform 1 and the mobile foundation platform 2 have the same size and are adapted to the spacing of two adjacent rows of single-row photovoltaic facilities.

[0026] Both the working base platform 1 and the mobile base platform 2 adopt suction cylinder base platforms, which are specifically composed of a horizontally set truss platform and multiple suction cylinders evenly distributed and fixed on the bottom surface of the platform along the circumference. An air compressor 4 and a vacuuming device 5 are set at the center of the top surface of the truss platform. Specifically, the air compressor 4 is connected to the exhaust pipe of each suction cylinder through an exhaust pipe, and an exhaust valve 6 is set on the exhaust pipe. By controlling the opening of the air compressor 4 and the exhaust valve 6, each suction cylinder can be floated to a movable state by inputting air. The vacuuming device 5 is connected to the air inlet pipe of each suction cylinder through an air inlet pipe, and an air inlet valve 7 is set on the air inlet pipe. By controlling the opening of the vacuuming device 5 and the air inlet valve 7, each suction cylinder can be sunk into the underwater silt and fixed by vacuuming.

[0027] A level 8 is also installed at each of the four corners of the top surface of the truss platform, so as to monitor the real-time sinking of the foundation platform based on the readings of the four level 8 during the sinking process of the suction cylinder foundation platform, and ensure that the truss platform sinks horizontally and is fixed.

[0028] On the opposite sidewall of the truss platform, concave slots 11 and convex blocks 12 are respectively provided, and the concave slots 11 and convex blocks 12 are symmetrically arranged, so that the working base platform 1 and the mobile base platform 2 can be connected and docked through the concave slots 11 and convex blocks 12 on their opposite sides. Then, by welding and fixing connecting plates on the top surfaces of the concave slots 11 and convex blocks 12, the working base platform 1 and the mobile base platform 2 are connected and fixed as a whole. In this embodiment, the concave slots 11 are formed by two strip columns that are spaced apart and symmetrically welded and fixed in the middle of the sidewall of the platform truss; the convex blocks 12 are formed by a strip column that is centrally welded and fixed in the opposite sidewall of the platform truss. Through the structural cooperation of the concave slots 11 and convex blocks 12, the mobile base platform 2 can quickly dock with the working base platform 1 after displacement. At the same time, the two can also play a guiding role during the process of the mobile base platform 2 sinking back into place.

[0029] Two sets of slide rails 10 are spaced apart on the top surface of the truss platform, symmetrically laid along the direction perpendicular to the span of the lifting equipment. One set of slide rails 10 is a single slide rail with two movable sliders; the other set of slide rails 10 is a double slide rail with six sliders on each side of the track. The two ends of the slide rails 10 extend to the outside of the truss platform, connecting the working base platform 1 and the mobile base platform 2 into one unit. The two sets of slide rails 10 can also be connected to form a slide rail that runs through the two base platforms. To avoid gaps between the slide rails 10 when the working base platform 1 and the mobile base platform 2 are connected, one or both ends of the slide rails 10 extend to an appropriate distance outside the platform.

[0030] Two winches and two towers 9 are also installed on the working platform 1. The two winches are fixed on two sliders on a single slide rail, so that the two winches can move back and forth on the single slide rail. The two towers 9 are arranged side by side, and the six bottom ends of each tower 9 are fixed on six sliders on a double slide rail, so that the two towers 9 can move back and forth on the double slide rail.

[0031] The large-span lifting equipment on water is an existing device, the structure of which is described in patent application CN202310865374.9. The large-span lifting equipment on water includes two flexible lifting cables. Each flexible lifting cable includes a cable composed of a load-bearing steel wire rope and a traction steel wire rope, and two lifting trolleys spaced apart on the cable. In practical applications, the ends of the two flexible lifting cables on the large-span lifting equipment on water pass around the top pulley blocks of two towers 9 on the same side of the working foundation platform 1 and are wound around two winches.

[0032] A hydraulic push rod device 13 is provided on each side of the slider 1002 of the slide rail 10. The hydraulic push rod device 13 has its movable rod facing the moving direction of the slider 1002. The front end of its movable rod is fixed to the slider 1002, and the rear end of its cylinder is connected to a fixing plate 1301. The fixing plate 1301 is vertically arranged and has two insertion holes spaced apart on it. Several insertion holes 1001 are symmetrically opened on the two side rail walls along the length of the rail. The distance between adjacent insertion holes 1001 is the same as the distance between two insertion holes on the fixing plate, so that the rear end of the hydraulic push rod device 13 is connected to the rail by fixing pins 1302 that are sequentially inserted into the two side rail walls and the fixing plate. As a preferred technical solution of this embodiment, after the slider 1002 moves into place, in addition to the hydraulic push rod device 13 keeping the slider 1002 from moving, a fixing pin 1302 is inserted into each of the two pairs of insertion holes 1001 located on the front and rear sides of the slider 1002 to limit the slider 1002.

[0033] During the construction process, the working base platform 1 and the mobile base platform 2 are connected. After the construction is completed, the connection between the working base platform 1 and the mobile base platform 2 is disconnected, and the air inlet valve 7 of the suction cylinder of the mobile base platform 2 is opened. The air compressor 4 is used to inflate the platform, and the mobile base platform 2 is floated by reducing the pressure difference between the inside and outside of the suction cylinder.

[0034] The specific steps of the relocation operation method based on operation base platform 1 and mobile base platform 2 are as follows:

[0035] S1. On each side of the large-span water-based crane, there are two parallel working foundation platforms 1 and mobile foundation platforms 2, which are sunk to the design position and connected. Two flexible hoisting cables on each side of the large-span water-based crane are connected to the working foundation platform 1 to complete the construction of a single row of photovoltaic facilities.

[0036] S2. Use a tugboat to tow the floating mobile base platform 2 to the opposite side of the working base platform 1 for docking; specifically, the tugboat is connected to the floating mobile base platform 2 through the berthing vessel component 14 set on one side of the mobile base platform 2.

[0037] Multiple berthing vessel components 14 are installed on each side wall of the working base platform 1 and the mobile base platform 2. The multiple berthing vessel components 14 are evenly spaced on the side walls of the platform. Each berthing vessel component 14 consists of a berthing vessel fixing plate and three buffer columns. The berthing vessel fixing plate is vertically arranged. One end face of the three buffer columns is symmetrically fixed to the back side plate of the berthing vessel fixing plate, and the other end face is fixed to the side wall of the truss platform. The berthing vessel fixing plate and the buffer columns are both made of rubber to provide a buffering effect against the impact of berthing vessels (such as tugboats) on the mobile base platform 2.

[0038] S3. After the mobile base platform 2 and the working base platform 1 are connected through the concave slot 11 and the convex block 12, the exhaust valve 6 of the suction cylinder of the mobile base platform 2 is opened, and the vacuum pump 5 is used to create a vacuum, causing the suction cylinder of the mobile base platform 2 to sink under negative pressure. The sinking situation is monitored in real time by several levels 8 set on the truss structure 3 to ensure that the base platform sinks horizontally. At the same time, the sinking depth of several suction cylinders of the mobile base platform is controlled by controlling the platform air inlet valve to ensure that the top surfaces of the mobile base platform 2 and the working base platform 1 are flush, and that the two sets of slide rails 10 on the two are properly connected. Then, a connecting plate is welded to the top of the concave slot 11 of the working base platform 1 and the convex slot 12 of the mobile base platform 2 to connect and fix the mobile base platform 2 and the working base platform 1 into one unit.

[0039] S4. Hydraulic push rod devices 13 are installed on each side of the slider of the two sets of slide rails 10, so that the tower 9 and the winch on the working foundation platform 1 can move synchronously and slowly to the mobile foundation platform 2 under the action of the hydraulic push rod device 13 pushing the slider; according to different construction tasks, the surveyors make position marks on the mobile foundation platform 2 in advance, and stop moving after the tower 9 reaches the designated position.

[0040] Specifically, taking a slider 1002 that moves the tower 9 as an example, the working principle of the hydraulic push rod device 13 is described; see [link to relevant documentation]. Figure 2The hydraulic push rod device 13 is initially in a retracted state, with its movable rod connected to the slider 1002 and its cylinder connected to the track of the slide rail 10 via the fixing plate 1301. Then, the movable rod of the hydraulic push rod device 13 is extended to its maximum length to push the slider 1002 and move the tower in the specified direction. After that, the connection between the fixing plate 1301 and the track is removed, the movable rod of the hydraulic push rod device 13 is retracted, close to the slider, and the fixing plate 1301 is reconnected to the track. This cycle repeats, and the hydraulic push rod device 13 located on the side adjacent to the slider 1002 pushes the tower to move in a reciprocating creeping motion until it reaches the specified position.

[0041] S5. Repeat steps S2 to S4 above, and alternately move the working base platform 1 and the mobile base platform 2 laterally until the working base platform 1 reaches both sides of the construction position of the next row of photovoltaic structures, and complete the installation of the new row of photovoltaic structures.

[0042] The foregoing has shown and described the basic principles, main features, and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The embodiments and descriptions in the specification are merely principles of the invention. Various changes and modifications can be made to the invention without departing from its spirit and scope, and all such changes and modifications fall within the scope of the claimed invention. The scope of protection claimed by the appended claims and their equivalents is defined.

Claims

1. A method for relocating a large-span lifting device on water, characterized in that, It is based on the working base platform (1) and the mobile base platform (2) set side by side on each side of the large-span water crane; wherein, on the top surface of each base platform, two sets of slide rails (10) are laid at intervals along the span direction perpendicular to the crane; on the working base platform (1), two winches are slidably set on one set of slide rails (10), and two towers (9) set side by side are slidably set on another set of slide rails (10), so that the ends of the two flexible hoisting cables on the large-span water crane pass around the top pulley group of the two towers (9) on the working base platform (1) on the same side and are wound around the two winches; The steps of this shifting operation method are as follows: S1. On each side of the large-span water-based crane, there are two parallel working foundation platforms (1) and mobile foundation platforms (2), which are lowered to the design position and connected. The two flexible hoisting cables of the large-span water-based crane are connected to the working foundation platform (1) on the same side to complete the construction of a single row of photovoltaic facilities. S2. Float the mobile base platform (2) and drag it to the other side of the working base platform (1) so that the mobile base platform (2) is docked side by side with the working base platform (1) again. S3. Sink the mobile foundation platform (2) until its top surface is flush with the top surface of the working foundation platform (1), so that the two sets of slide rails (10) set on the two are connected respectively. Then, connect the working foundation platform (1) and the mobile foundation platform (2) into one unit. S4. Move the winch and tower (9) on the working base platform (1) to the designated position on the mobile base platform (2) and position them simultaneously through two sets of slide rails (10); at this time, the mobile base platform (2) equipped with the winch and tower (9) becomes the working base platform (1), and the original working base platform (1) becomes the mobile base platform (2). S5. Repeat steps S2 to S4, and alternately move the working base platform (1) and the mobile base platform (2) laterally until the working base platform (1) reaches the construction position of the next row of single-row photovoltaic facilities.

2. The method for waterborne relocation of large-span lifting equipment according to claim 1, characterized in that, Both the working base platform (1) and the mobile base platform (2) adopt suction cylinder base platforms, which consist of a horizontally set truss platform and multiple suction cylinders evenly distributed and fixed on the bottom surface of the platform along the circumference; an air compressor (4) and a vacuum device (5) are installed on the top surface of the truss platform; the air compressor (4) is connected to the exhaust pipe of each suction cylinder through an exhaust pipe, and an exhaust valve (6) is installed on the exhaust pipe; the vacuum device (5) is connected to the air inlet pipe of each suction cylinder through an air inlet pipe, and an air inlet valve (7) is installed on the air inlet pipe.

3. The method for relocating a large-span lifting equipment on water as described in claim 1, characterized in that, A level (8) is also installed at each of the four corners of the top surface of the working base platform (1) and the mobile base platform (2).

4. The method for relocating large-span lifting equipment on water as described in claim 1, characterized in that, On the opposite sidewalls of the working base platform (1) and the mobile base platform (2), there are concave slots (11) and convex blocks (12), respectively. The concave slots (11) and convex blocks (12) are symmetrically arranged and can be fitted together, so that the working base platform (1) and the mobile base platform (2) arranged side by side can be connected together through the concave slots (11) and convex blocks (12) located on the opposite sidewalls.

5. The method for relocating a large-span lifting equipment on water as described in claim 1, characterized in that, A hydraulic push rod device (13) is provided on each side of the slider of the slide rail (10); the hydraulic push rod device (13) is set with its movable rod facing the direction of slider movement, the front end of its movable rod is fixed on the slider, and the rear end of its cylinder is connected to a fixed plate. The fixed plate is set vertically and has two insertion holes spaced apart on it; several insertion holes are symmetrically opened on the two side rail walls along the length of the rail, and the distance between adjacent insertion holes is the same as the distance between two insertion holes on the fixed plate, so that the rear end of the hydraulic push rod device (13) is connected to the rail by fixing pins that are sequentially inserted on the two side rail walls and the fixed plate.

6. The method for relocating a large-span lifting equipment on water as described in claim 5, characterized in that, In step S3, the method of moving the winch and the tower (9) is as follows: the hydraulic push rod device (13) extends the movable rod to its longest state from the initial retracted state, so that the slider connected to the hydraulic push rod device (13) moves a certain distance; the fixing pin between the fixing plate and the track is removed, and the hydraulic push rod device (13) is restored to the initial retracted state; the fixing plate is reconnected to the track through the fixing pin; the above steps are repeated until the hydraulic push rod device (13) pushes the slider to the designated position.

7. The method for relocating a large-span lifting equipment on water as described in claim 5, characterized in that, In step S3, the method for fixing the winch and tower (9) after they have been moved into place is as follows: the winch and tower (9) are held in the designated position by means of a hydraulic push rod device (13), and a fixing pin is inserted into two pairs of holes on the front and rear sides of the slider to limit the slider.

8. The method for relocating a large-span lifting equipment on water as described in claim 1, characterized in that, Multiple berthing vessel components (14) are provided on each side wall of the working base platform (1) and the mobile base platform (2); the multiple berthing vessel components (14) are evenly distributed at equal intervals, and each berthing vessel component (14) consists of a berthing vessel fixing plate and multiple buffer columns; the berthing vessel fixing plate is vertically arranged, and one end of the multiple buffer columns is symmetrically fixed to the back side plate of the berthing vessel fixing plate, and the other end is fixed to the side wall of the truss platform; the berthing vessel fixing plate and the buffer columns are both made of rubber.

Citation Information

Patent Citations

  • Overwater large-span hoisting equipment and hoisting process

    CN116924250A

  • Construction hoist conveying system

    US3952836A