A foundation for a power transmission tower for a bog environment

By using prefabricated reinforced concrete bases connected by helical anchors in swampy environments, combined with anti-corrosion coatings and waterproof tape for protection, the problems of insufficient foundation corrosion resistance and bearing capacity in swampy environments were solved, achieving efficient and economical construction.

CN117364827BActive Publication Date: 2026-11-24JILIN POWER SUPPLY COMPANY STATE GRID JILIN ELECTRIC POWER +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202311367214.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-10-21
Publication Date
2026-11-24
Estimated Expiration
2043-10-21

AI Technical Summary

Technical Problem

Existing prefabricated foundations have poor corrosion resistance and insufficient load-bearing capacity in swampy environments, require large amounts of materials, have long construction periods, and are costly, making it difficult to meet engineering requirements.

Method used

The prefabricated foundation uses a precast reinforced concrete base connected to a spiral anchor, combined with anti-corrosion coating and waterproof tape for protection. The spiral anchor is embedded in the soil, and the hemispherical inverted bowl-shaped base design improves pull-out resistance. Modular construction is employed.

Benefits of technology

It improves the corrosion resistance and load-bearing capacity of the foundation, saves materials, shortens the construction cycle, reduces costs, and facilitates large-scale promotion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117364827B_ABST
    Figure CN117364827B_ABST
Patent Text Reader

Abstract

The application discloses a transmission tower assembled foundation for a swamp environment, which comprises a base, a prefabricated concrete column, fixing bolts and a spiral anchor; the base is a hemispherical inverted bowl-shaped base, the top surface of the base is fixed with a lower flange plate, and a pouring hole and multiple reserved holes are formed in the hemispherical surface; the bottom end of the concrete column is fixed with an upper flange plate, the upper flange plate is bolted with the lower flange plate, and a foundation bolt is embedded in the top of the concrete column; the fixing bolts are arranged in the reserved holes; and the top end of the spiral anchor is deeply arranged in the reserved hole and bolted through the fixing bolts. The foundation is in the form of factory prefabrication and on-site assembly, thereby avoiding problems such as large land acquisition area, long time, high cost, difficult drainage of a foundation pit in summer, muddy road, difficulty of concrete tank truck access, long construction period, high cost, danger of burning charcoal for maintenance in winter, difficulty of quality guarantee and the like in on-site pouring of concrete in the swamp environment, and greatly shortens the construction period, improves the construction quality and saves the construction cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power transmission tower foundation technology, and more specifically to a prefabricated foundation for power transmission towers used in swampy environments. Background Technology

[0002] In recent years, with the vigorous development of power transmission line projects and the continuous increase in project investment, prefabricated foundations have been welcomed by the State Grid Corporation of China due to their convenient construction, quick assembly, and suitability for areas with difficult transportation and harsh site environments. While meeting foundation strength requirements, they have significantly accelerated the progress of foundation engineering. However, existing prefabricated foundation inventions are mainly designed for the environmental conditions of desert and permafrost regions, with fewer inventions for prefabricated foundations in marshy areas. Furthermore, in actual engineering design, the low bearing capacity of marshy environments necessitates increasing the foundation's bottom area, leading to material waste. Additionally, the influence of groundwater on foundation uplift design requires deepening the foundation's embedment depth, resulting in increased foundation height and further material waste.

[0003] For example, a utility model patent (authorization announcement number CN 212175843 U, authorization announcement date 2020.12.18) discloses a prefabricated foundation with a spiral anchor for high-voltage transmission line towers, including a steel beam, a steel truss support installed at the upper end of the steel beam, and a spiral anchor installed at the lower end of the steel beam. The spiral anchor can be drilled vertically into the undisturbed soil. It is a prefabricated foundation that uses spiral anchors to improve the bearing capacity of the foundation and reduce the amount of earthwork. It is mainly suitable for high-altitude areas in Tibet. However, its corrosion resistance cannot meet the requirements of actual engineering in swampy environments.

[0004] For example, a utility model patent (authorization announcement number CN 21613065 A, authorization announcement date 2022.03.25) discloses a prefabricated foundation structure for transmission line towers. Two expansion plates are slidably connected to the mounting base, with connecting plates fixedly connected to the expansion plates. Connecting rods are rotatably connected to the connecting plates, and the same adjusting block is rotatably connected to the two connecting rods. The adjusting block is slidably connected to the mounting base and has an elastic structure. Designing the mounting base as adjustable facilitates its transport and increases its load-bearing area. When the mounting base is fixed to the ground by concrete pouring, the fixing effect is better, improving safety. However, the adjustment range of the foundation bottom area is small, which does not significantly increase the pull-out resistance and cannot improve the compressive bearing capacity of the foundation.

[0005] Therefore, how to provide a prefabricated foundation for transmission towers in swampy environments and its construction method, so that the transmission tower foundation has strong corrosion resistance, good load-bearing capacity, can save material usage, and is suitable for use in swampy environments, is a problem that urgently needs to be solved by those skilled in the art. Summary of the Invention

[0006] In view of this, the present invention provides a prefabricated foundation for transmission towers in swampy environments, aiming to solve the above-mentioned technical problems.

[0007] To achieve the above objectives, the present invention adopts the following technical solution: A prefabricated foundation for a power transmission tower in a swampy environment, comprising: A precast reinforced concrete base, wherein the precast reinforced concrete base is a hemispherical inverted bowl-shaped base, and a lower flange is fixed on the top surface of the hemispherical inverted bowl-shaped base, and a grouting hole and multiple reserved holes are opened on its hemispherical surface; A precast reinforced concrete column, wherein an upper flange is fixed at the bottom end of the precast reinforced concrete column, the upper flange is connected to the lower flange by bolts, and anchor bolts are pre-embedded at the top of the precast reinforced concrete column, with the threaded end of the anchor bolt exposed on the top surface of the precast reinforced concrete column. A fixing bolt is provided in the reserved hole; A helical anchor, the top of which is inserted into the reserved hole and bolted to it by the fixing bolt, and the helical end of the helical anchor is anchored into the foundation pit for installing the precast reinforced concrete base.

[0008] The beneficial effects of the above technical solution are that by connecting the precast reinforced concrete base and the helical anchor into a whole by fixing bolts, and by connecting the precast reinforced concrete base and the precast reinforced concrete column into a whole by flanges, the construction of the transmission tower foundation is realized in a prefabricated manner, which reduces the construction cycle of the transmission tower foundation and improves construction efficiency. The helical end of the helical anchor is anchored into the foundation soil layer, which improves the pull-out resistance of the foundation. The hemispherical inverted bowl-shaped foundation form can save a lot of concrete and reduce construction costs.

[0009] Preferably, the prefabricated foundation for a transmission tower in a swampy environment further includes a protective cap, which covers the top surface of the precast reinforced concrete column, with the threaded end located inside the protective cap. The protective cap prevents the threaded end of the anchor bolts from corroding due to contact with the atmosphere, thus avoiding interference with the connection to the upper column of the transmission tower.

[0010] Preferably, in the above-mentioned prefabricated foundation for a transmission tower in a swampy environment, waterproof tape is wrapped around the threads of the anchor bolts. The waterproof tape further protects the threaded ends of the anchor bolts, preventing water vapor generated inside the protective sleeve from corroding the threaded ends and affecting the connection.

[0011] Preferably, in the aforementioned prefabricated foundation for a transmission tower in a swampy environment, both the upper and lower flanges are made of Q345 steel, and their outer surfaces are coated with anti-corrosion paint. This is superior to the method where the precast reinforced concrete base and precast reinforced concrete column are bolted together to form a whole. After installation, the upper and lower flanges are exposed to the external environment, and their corrosion resistance is increased by coating them with anti-corrosion material, thus solving the problem of easy corrosion in swampy environments.

[0012] Preferably, in the above-mentioned prefabricated foundation for a transmission tower in a swampy environment, the injection hole is a funnel-shaped hole with internal threads at a 60° angle to the horizontal plane. The funnel-shaped injection hole allows mud to be injected into the hemispherical, inverted bowl-shaped base cavity, filling it and improving its load-bearing capacity.

[0013] Preferably, in the above-mentioned prefabricated foundation for transmission towers in swampy environments, the helical anchor includes a steel cylinder and helical plates; one end of the steel cylinder has an internal thread for bolting with a fixing bolt; the helical plates are helically welded to the outer wall of the steel cylinder. The internal thread at the top of the steel cylinder can be bolted to a fixing bolt in a pre-drilled hole, and the helical plates welded to the outer wall of the steel cylinder anchor into the underground layer, increasing the pull-out bearing capacity of the entire foundation.

[0014] Preferably, in the above-mentioned prefabricated foundation for transmission towers in swampy environments, the helical anchor is made of Q235 steel, with its outer circumference galvanized and coated with anti-corrosion material. Due to the poor geological conditions in swampy environments, coating with high-quality anti-corrosion material prevents the underground portion of the helical anchor from corroding in the swampy environment, thereby improving the service life of the foundation.

[0015] This invention also provides a construction method for a prefabricated foundation for a transmission tower in a swampy environment. The method, employing the prefabricated foundation for a transmission tower in a swampy environment described above, includes the following steps: S1. Prefabricate all assembly components in the factory, including prefabricated reinforced concrete base, prefabricated reinforced concrete column, fixing bolts, spiral anchors and protective caps; S2. The foundation is laid out through measurement, the foundation pit is excavated and leveled, and a concrete cushion layer is poured. S3. After the concrete cushion layer reaches the required strength, the position of the drilling rig is adjusted, and the auger is driven into the underground part of the foundation pit and drilled to the design elevation. S4. The precast reinforced concrete base is hoisted by inserting the top of the spiral anchor into the reserved hole of the hemispherical inverted bowl-shaped base and connecting the hemispherical inverted bowl-shaped base and the spiral anchor into a whole by fixing bolts. S5. Hoist the precast reinforced concrete column and fasten the lower flange to the upper flange with bolts; after the overall installation is completed, inject grout into the precast reinforced concrete base through the grouting hole. S6. Use the same soil to backfill and compact the foundation pit. Compact the soil after every 300mm of soil is filled, and each compaction should reach the original soil density.

[0016] Preferably, the construction method of the above-mentioned prefabricated foundation for transmission towers in swampy environments further includes a spiral plug. After the mud is injected, the spiral plug is inserted into the injection hole to seal the precast reinforced concrete base as a whole.

[0017] Preferably, the construction method for the prefabricated foundation of the transmission tower in a swampy environment further includes a rubber protective sleeve, which is fitted inside the reserved hole and located above the fixing bolt to prevent the fixing bolt from contacting the outside air and corroding, thus affecting its service life.

[0018] As can be seen from the above technical solution, compared with the prior art, the present invention discloses a prefabricated foundation for transmission towers in swampy environments and its construction method, which has the following beneficial effects: 1. The foundation adopts a factory prefabrication and on-site assembly method, which avoids the problems encountered in on-site concrete pouring in swampy environments, such as large land acquisition area, long time and high cost, difficult drainage of foundation pit in summer construction, muddy roads, difficulty in concrete mixer truck access, long construction period and high cost, dangerous charcoal curing in winter construction, and difficulty in quality assurance. It greatly shortens the construction period, improves construction quality and saves construction costs.

[0019] 2. The prefabricated foundation is mainly made of concrete. The exposed upper and lower flanges are coated with anti-corrosion paint, avoiding the corrosion problem of steel foundations in swampy environments, ensuring corrosion resistance and durability. Through the modular prefabrication and on-site assembly scheme, the weight of each prefabricated component can be controlled to no more than 5 tons, requiring a small area. Small cranes can complete the lifting task, making construction convenient and economical.

[0020] 3. The unique hemispherical inverted bowl-shaped precast reinforced concrete foundation design not only saves on concrete usage, but also improves the tensile bearing capacity of the foundation by increasing the pressure difference between the inside and outside of the hemisphere when the foundation is under tension; the spiral anchor can be drilled vertically into the original soil, reducing the amount of earthwork and concrete, reasonably controlling investment, and the drilling speed is faster, which can significantly shorten the construction period and reduce the project cost.

[0021] 4. This prefabricated foundation adopts modular manufacturing and standardized application, facilitating large-scale promotion. The foundation can be designed into different modules according to voltage level and load-bearing capacity. These modules are prefabricated in the factory according to standardized requirements. In actual projects, different module levels can be selected and installed according to the module manual. This facilitates widespread promotion throughout the entire power grid system and can achieve good economic benefits. Attached Figure Description

[0022] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the provided drawings without creative effort.

[0023] Figure 1 A schematic diagram of the prefabricated foundation structure provided by the present invention; Figure 2 A sectional view of the assembled foundation provided by the present invention; Figure 3 This is a schematic diagram of the precast reinforced concrete base structure provided by the present invention; Figure 4 A schematic diagram of a precast reinforced concrete column structure provided by the present invention; Figure 5 This is a schematic diagram of the spiral anchor bolt connection provided by the present invention; Figure 6 This is a cross-sectional view of the internal reinforcement of the prefabricated foundation provided by the present invention. Figure 7 This is a schematic diagram of the screw plug structure used in the present invention; Figure 8 This is a schematic diagram of the rubber protective sleeve structure provided by the present invention; in: 1-Precast reinforced concrete base; 11-Base concrete; 12-Grouting hole; 13-Reserved hole; 14-Lower flange; 2-Helical anchor; 21-Steel cylinder; 22-Helical blade; 3-Fixing bolts; 4-Precast reinforced concrete column; 41-Upper flange; 42-Anchor bolt; 5- Protective cap; 6-Screw plug; 7-Rubber protective sleeve. Detailed Implementation

[0024] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention. Example 1

[0025] See appendix Figures 1-5 This invention discloses a prefabricated foundation for a power transmission tower in a swampy environment, comprising: The precast reinforced concrete base 1 is a hemispherical inverted bowl-shaped base. The top surface of the hemispherical inverted bowl-shaped base is fixed with a lower flange 14, and a grouting hole 12 and multiple reserved holes 13 are opened on its hemispherical surface. The precast reinforced concrete column 4 has an upper flange 41 fixed at its bottom end. The upper flange 41 is connected to the lower flange 14 by bolts. Anchor bolts 42 are embedded in the top of the precast reinforced concrete column 4, and the threaded ends of the anchor bolts 42 are exposed on the top surface of the precast reinforced concrete column 4. Fixing bolt 3 is installed in the reserved hole 13; The top of the spiral anchor 2 is inserted into the reserved hole 13 and bolted by the fixing bolt 3. The spiral end of the spiral anchor 2 is anchored into the foundation pit for installing the precast reinforced concrete base 1.

[0026] The protective cap 5 covers the top surface of the precast reinforced concrete column 4, and the threaded end is located inside the protective cap 5.

[0027] See appendix Figure 1 In this embodiment, the injection hole is located on the hemispherical surface of the hemispherical inverted bowl-shaped base, and four pre-reserved holes are symmetrically arranged around the hemispherical surface of the hemispherical inverted bowl-shaped base.

[0028] See appendix Figure 2 In this embodiment, the injection hole 12 is a funnel-shaped hole with internal threads at a 60° angle to the horizontal plane.

[0029] To further optimize the above technical solution and prevent the anchor bolts from corroding, waterproof tape is wrapped around the threads of the anchor bolt 42 for further protection.

[0030] To further optimize the above technical solution and prevent corrosion of the upper and lower flanges exposed to the external environment, both the upper flange 41 and the lower flange 14 are made of Q345 steel and their outer surfaces are coated with anti-corrosion paint.

[0031] To further optimize the above technical solution and improve the corrosion resistance and service life of the spiral anchor, the spiral anchor 2 is made of Q235 steel, with its outer circumference galvanized and coated with anti-corrosion material.

[0032] To further optimize the above technical solution, ensure the connection performance between the fixing bolt and the spiral anchor, and improve the service life of the fixing bolt, the fixing bolt 4 is made of Q235 steel, its outer surface is galvanized, and coated with a corrosion-resistant material with strong adhesion.

[0033] To further optimize the above technical solution, the precast reinforced concrete column 4 is, but not limited to, a square column and a circular column. Example 2

[0034] See appendix Figures 6-8 This invention discloses a construction method for a prefabricated foundation for a transmission tower in a swampy environment. The method employs the prefabricated foundation for a transmission tower in a swampy environment described in Example 1, and includes the following steps: S1. Prefabricate all assembly components in the factory, including prefabricated reinforced concrete base, prefabricated reinforced concrete column, fixing bolts, spiral anchors and protective caps; See appendix Figure 3 and 6 The precast reinforced concrete base 1 is supported by two spherical templates with different radii and other templates. The templates are equipped with a ring-shaped steel cage. The lower flange 14 has barbs on its lower plate surface and is welded to the ring-shaped steel cage. After the templates are installed, the base concrete 11 is poured. See appendix Figure 4 and 6 The precast reinforced concrete column 4 is equipped with a column reinforcement cage. The upper plate of the upper flange is provided with a barb and is installed with the column reinforcement cage. After the formwork is installed, the column concrete is poured. See appendix Figure 5 In order to improve the anchoring performance of the spiral anchor and enhance the pull-out resistance of the foundation, the spiral anchor 2 includes a steel cylinder 21 and a spiral blade 22; one end of the steel cylinder 21 is provided with an internal thread for bolting with the fixing bolt 3; the spiral blade 22 is spirally welded to the outer wall of the steel cylinder 21.

[0035] To further optimize the above technical solution, a nut is welded to the top of the steel cylinder 21 to facilitate its connection with the fixing bolt 3 and ensure the effectiveness of its connection performance.

[0036] To further optimize the above technical solutions, adding mineral powder, fly ash, and silica fume to the concrete of precast reinforced concrete bases and precast reinforced concrete columns can improve their corrosion resistance.

[0037] S2. The foundation is laid out through measurement, the foundation pit is excavated and leveled, and a concrete cushion layer is poured. S3. After the concrete cushion layer reaches the required strength, the position of the drilling rig is adjusted, and the auger is driven into the underground part of the foundation pit and drilled to the design elevation. S4. The precast reinforced concrete base is hoisted by inserting the top of the helical anchor into the pre-drilled hole in the hemispherical inverted bowl-shaped base, and then connecting the hemispherical inverted bowl-shaped base to the helical anchor as a whole using fixing bolts; see appendix. Figure 1 and 8 After the precast reinforced concrete base 1 is placed and the fixing bolts 3 are bolted to the spiral anchor 2, the rubber protective sleeve 7 is placed in the reserved hole 13 and positioned above the fixing bolts 3 to prevent the fixing bolts 3 from contacting the outside air and corroding, thus affecting their service life.

[0038] To further optimize the above technical solution, the rubber protective sleeve 7 is made of rubber material, with its outer diameter slightly larger than the inner diameter of the reserved hole, and a bolt head groove reserved at the bottom.

[0039] S5. Hoist the precast reinforced concrete column and fasten the lower flange to the upper flange with bolts; after the overall installation is completed, inject grout into the precast reinforced concrete base through the injection hole; see appendix. Figure 1 and 7 After the mud is injected, clean the injection hole and insert the spiral plug 6 into the injection hole 12 to seal the precast reinforced concrete base 1 as a whole.

[0040] To further optimize the above technical solution, when prefabricating the reinforced concrete base 1, lifting eye bolts can be installed on the lower flange 14 to facilitate the hoisting of the steel hoisting rope through the crane, so that the top of the spiral anchor enters the reserved hole, and the lifting eye bolts are removed after the hoisting is completed.

[0041] To further optimize the above technical solution, when hoisting the precast reinforced concrete column 4, a lifting eye nut can be installed on the anchor bolt 42 to facilitate hoisting by passing through the steel hoisting rope of the crane, so that the bolt holes of the upper flange 41 and the lower flange 14 are aligned and fastened with bolts. After hoisting is completed, the lifting eye nut is removed.

[0042] To further optimize the above technical solution, the spiral plug 6 is made of rubber material and has external threads on its surface, which are threaded to the internal threads of the injection hole.

[0043] S6. Use the same soil to backfill and compact the foundation pit. Compact the soil after every 300mm of soil is filled, and each compaction should reach the original soil density.

[0044] This invention provides a prefabricated foundation for transmission towers in swampy environments and its construction method. The concrete material improves the corrosion resistance of the foundation, while the hemispherical bowl-shaped reinforced concrete base and spiral anchor improve the pull-out resistance of the foundation. The modular fabrication of the foundation facilitates lifting and simple assembly, greatly shortening the construction cycle and saving construction costs.

[0045] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on its differences from other embodiments. Similar or identical parts between embodiments can be referred to interchangeably. For the apparatus disclosed in the embodiments, since they correspond to the methods disclosed in the embodiments, the description is relatively simple; relevant parts can be referred to the method section.

[0046] The above description of the disclosed embodiments enables those skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A fabricated foundation for a power transmission tower for use in a boggy environment, characterised in that, include: A precast reinforced concrete base (1) is a hemispherical inverted bowl-shaped base. A lower flange (14) is fixed on the top surface of the hemispherical inverted bowl-shaped base, and a grouting hole (12) and a plurality of reserved holes (13) are opened on its hemispherical surface. The grouting hole (12) is a funnel-shaped hole with internal threads at a 60° angle to the horizontal plane. A precast reinforced concrete column (4) is provided with an upper flange (41) fixed at its bottom end. The upper flange (41) is connected to the lower flange (14) by bolts. Anchor bolts (42) are embedded in the top of the precast reinforced concrete column (4), and the threaded ends of the anchor bolts (42) are exposed on the top surface of the precast reinforced concrete column (4). Both the upper flange (41) and the lower flange (14) are made of Q345 steel and their outer surfaces are coated with anti-corrosion paint. Fixing bolt (3), the fixing bolt (3) is provided in the reserved hole (13); The spiral anchor (2) has its top end inserted into the reserved hole (13) and bolted by the fixing bolt (3). The spiral end of the spiral anchor (2) is anchored into the foundation pit for installing the precast reinforced concrete base (1). The spiral anchor (2) is made of Q235 steel, its outer circumference is galvanized and coated with anti-corrosion material. A rubber protective sleeve (7) is fitted inside the reserved hole (13) and located above the fixing bolt (3) to prevent the fixing bolt (3) from corroding. During construction, Prefabricate all assembly components in the factory; excavate and level the foundation pit, and pour a concrete cushion layer; drill the spiral anchor (2) to the design elevation using a drilling rig; hoist the precast reinforced concrete base (1), and connect the precast reinforced concrete base (1) and the spiral anchor (2) into a whole by fixing bolts (3); hoist the precast reinforced concrete column (4), and fasten the lower flange (14) and the upper flange (41) with bolts; after installation, inject mud into the precast reinforced concrete base (1) through the grouting hole; after the mud is injected, insert the spiral plug (6) into the grouting hole (12) to seal the precast reinforced concrete base (1) as a whole; backfill and compact the foundation pit.

2. A foundation for a transmission tower for a boggy environment according to claim 1, characterized in that It also includes a protective cap (5) that covers the top surface of the precast reinforced concrete column (4) and the threaded end is located inside the protective cap (5).

3. A foundation for a transmission tower for a boggy environment according to claim 2, characterised in that, Waterproof tape is wrapped around the threads of the anchor bolt (42).

4. A foundation for a transmission tower for a boggy environment according to claim 1, characterized in that The spiral anchor (2) includes a steel cylinder (21) and a spiral blade (22); one end of the steel cylinder (21) is provided with an internal thread for bolting to the fixing bolt (3); the spiral blade (22) is spirally welded to the outer wall of the steel cylinder (21).

Citation Information

Patent Citations

  • Prefabricated shell screw anchor composite foundation and construction method thereof

    CN110241840A

  • Assembled plate type foundation adopting hollow bottom plate and method

    CN113756357A

  • Electric power tower base

    CN218204519U