An automatic true triaxial splitting grouting physical simulation test system
By designing an automated true triaxial splitting grouting physical simulation test system, the problem of the inability of existing technologies to efficiently explore the improvement of rock and soil mechanical properties by splitting grouting has been solved, achieving high experimental efficiency and performance testing, and reducing stress loss.
Patent Information
- Application Number
- CN202311318646.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-12
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2043-10-12
AI Technical Summary
Existing technologies lack automated true triaxial splitting grouting physical simulation test systems, making it impossible to efficiently explore the improvement effect of splitting grouting on the mechanical properties of rock and soil.
An automated true triaxial splitting grouting physical simulation test system was designed, including a true triaxial loading system, an automatic loading system, a drilling and grouting system, and a control system. It realizes automatic filling and splitting grouting, and can compare the performance of samples before and after grouting.
It improves experimental efficiency, enables automated testing of the mechanical properties of soil and rock, allows for in-depth investigation of the improvement effect of splitting grouting, and reduces stress loss.
Smart Images

Figure CN117388078B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of rock mechanics testing equipment technology, specifically to an automated true triaxial splitting grouting physical simulation test system. Background Technology
[0002] With the rapid development of the national economy, many underground engineering projects under construction and about to be built are increasingly extending into deeper areas. Studying the fracture evolution process of rocks under three-dimensional geostress, temperature, and fluid action is a cutting-edge issue in the field of underground engineering. A deep understanding of the mechanical and physical properties of rocks under three-dimensional geostress and the effects of temperature and fluid action is of great significance for underground engineering construction and deep energy development.
[0003] Fracture grouting refers to high-pressure grouting within a borehole. When the grouting pressure exceeds the bearing capacity of the soil and rock mass, cracks will form. The grout then flows along these cracks from areas of lower soil strength to areas of higher strength, splitting the soil and forming a network or framework that reinforces the soil. After fracture grouting, the original stress balance of the soil and rock mass is disrupted, and a new stress balance is generated. At the same time, the grout fills the existing cracks in the strata and the cracks created by the grouting, greatly improving the integrity and impermeability of the soil and rock mass.
[0004] Therefore, exploring the effect of splitting grouting on improving the mechanical properties of soil and rock, and clarifying the mechanism by which splitting grouting improves the mechanical properties of soil and rock, is of great significance for guiding underground engineering practice. Based on this, it is necessary to design an automated true triaxial splitting grouting physical simulation test system. Summary of the Invention
[0005] The main objective of this invention is to provide an automated true triaxial splitting grouting physical simulation test system to solve the problems existing in the prior art.
[0006] To achieve the above objectives, the present invention adopts the following technical solution:
[0007] An automated true triaxial splitting grouting physical simulation test system includes a true triaxial loading system, an automatic loading system, a drilling and grouting system, a power system, and a control system. The control system is electrically connected to the true triaxial loading system, the automatic loading system, the drilling and grouting system, and the power system, respectively.
[0008] The true triaxial loading system includes a reaction frame, a loading chamber, an X-axis loading system, a Y-axis loading system, and a Z-axis loading system. The reaction frame is fixedly installed on the ground, and the loading chamber is installed on top of the reaction frame. The X-axis loading system, Y-axis loading system, and Z-axis loading system are used to load the sample inside the loading chamber in the X-axis, Y-axis, and Z-axis directions, respectively.
[0009] The automatic loading system and the drilling and injection system are both located on the top of the reaction frame. The automatic loading system and the Y-axis loading system are located on opposite sides of the loading chamber, and the drilling and injection system and the X-axis loading system are located on opposite sides of the loading chamber.
[0010] Furthermore, the X-axis loading system, Y-axis loading system, and Z-axis loading system each include a loading cylinder, a piston extension rod, a guide frame, a loading plate, a displacement sensor, and a pressure sensor. The loading cylinders of the X-axis and Y-axis loading systems are fixedly mounted on the top of the reaction frame. The loading cylinder of the Z-axis loading system is fixedly connected to the reaction frame via a fixing frame. The piston extension rod is connected to the output end of the loading cylinder, and the loading plate is connected to the output end of the piston extension rod. The guide frame is located between the loading cylinder and the sample, and the loading plate is slidably connected to the guide frame. The displacement sensor is fixedly mounted on the side of the piston extension rod, with one end of the displacement sensor abutting against the loading plate. The pressure sensor is fixedly mounted on the end of the piston extension rod, with the other end of the pressure sensor abutting against the loading plate.
[0011] Furthermore, the loading chamber has a cubic structure with a closed bottom. The loading chamber has loading holes on the side corresponding to the X-axis loading system, Y-axis loading system, and Z-axis loading system. The loading chamber has a loading hole on the side corresponding to the automatic loading system and a drilling hole on the side corresponding to the drilling system. The axes of the loading holes, loading holes, and drilling holes are aligned with the axes of the corresponding surfaces of the loading chamber.
[0012] Furthermore, the loading plate has a square cross-section.
[0013] Furthermore, the loading chamber is provided with pads, and three pads are respectively arranged at the bottom of the loading chamber, on the side opposite to the X-axis loading system, and on the side opposite to the Y-axis loading system. The pads on the side opposite to the X-axis loading system and the pads on the side opposite to the Y-axis loading system are respectively provided with water passage holes and packing passage holes.
[0014] Furthermore, a heating box is also provided inside the loading chamber. The heating box is located on a pad at the bottom of the loading chamber. The heating box has a cubic structure. Temperature sensors and heating elements are evenly distributed on the six sides of the heating box. Insulation partitions are provided on the four sides and the top of the heating box. The insulation partitions have an openable structure and their cross-sectional shape is the same as that of the loading plate.
[0015] Furthermore, the heating box is equipped with a clamping block, which has a cubic structure. The clamping block has a loading connection block on each side corresponding to the X-axis loading system, Y-axis loading system and Z-axis loading system. The clamping block has an opening on each side corresponding to the automatic loading system and the drilling system, and a disassembly cover is threaded to the opening.
[0016] Furthermore, the automatic loading system includes a propulsion cylinder, a propulsion shaft, a propulsion guide rail, and a sample tray. The propulsion cylinder and the propulsion guide rail are both mounted on the reaction frame. The propulsion guide rail is located between the propulsion cylinder and the loading chamber. The propulsion shaft is connected to the output end of the propulsion cylinder. The sample tray is connected to the output end of the propulsion shaft, and the sample tray is slidably mounted on the propulsion guide rail.
[0017] Furthermore, the drilling and injection system includes an integrated drilling and injection power head, a power head bracket, and a power head slide rail. A fixed frame is provided on the reaction frame. The power head slide rail is disposed between the fixed frame and the loading chamber. The power head bracket is slidably disposed on the power head slide rail. The integrated drilling and injection power head is slidably disposed on the power head bracket. Both the integrated drilling and injection power head and the power head bracket are driven by the power system.
[0018] Furthermore, the integrated drilling and grouting power head includes a hole-forming power head and a grouting power head, which are arranged side by side on the power head bracket.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] The system has a high degree of automation, which can significantly improve experimental efficiency. It can realize automatic filling and splitting grouting; it can realize integrated drilling and grouting, and can test the mechanical properties and permeability of the grouted samples and compare them with the samples before grouting to explore the improvement effect of splitting grouting on the samples in depth; it uses a square loading plate to load the samples, which reduces the stress loss caused by the cross-sectional conversion due to the circular oil cylinder. Attached Figure Description
[0021] Figure 1 This is a schematic diagram of the overall structure of the present invention.
[0022] Figure 2 This is a schematic diagram of the internal structure of the present invention.
[0023] Figure 3 This is a schematic diagram of the seepage test conducted according to the present invention.
[0024] Figure 4 This is a schematic diagram of the structure of the clamping block in this invention.
[0025] The components include: Z-axis loading system 1-1, propulsion shaft 1-2, sample tray 1-3, propulsion guide rail 1-4, loading chamber 1-5, X-axis loading system 1-6, reaction frame 1-7, Y-axis loading system 1-8, power head bracket 1-9, hole-forming power head 1-10, grouting power head 1-11, power head slide rail 1-12, displacement sensor 2-2, guide frame 2-3, loading cylinder 2-4, piston extension rod 2-5, pressure sensor 2-6, pad block 2-7, heating box 2-8, sample 2-9, loading connection block 2-10, water passage hole 2-11, clamping block 2-12, drilling and grouting system 2-13, water tank 3-1, water pump 3-2, and flow meter 3-3. Detailed Implementation
[0026] The technical solution of the present invention will be further described below with reference to the accompanying drawings and embodiments.
[0027] Combination Figures 1 to 4 The present invention provides an automated true triaxial splitting grouting physical simulation test system, including a true triaxial loading system, an automatic loading system, a drilling and grouting system 2-13, a power system and a control system, wherein the control system is electrically connected to the true triaxial loading system, the automatic loading system, the drilling and grouting system 2-13 and the power system respectively;
[0028] The true triaxial loading system includes a reaction frame 1-7, a loading chamber 1-5, an X-axis loading system 1-6, a Y-axis loading system 1-8, and a Z-axis loading system 1-1. The reaction frame 1-7 is fixedly installed on the ground, and the loading chamber 1-5 is installed on top of the reaction frame 1-7. The X-axis loading system 1-6, the Y-axis loading system 1-8, and the Z-axis loading system 1-1 are respectively used to load the sample 2-9 inside the loading chamber 1-5 in the X-axis direction, Y-axis direction, and Z-axis direction.
[0029] The automatic loading system and the drilling and injection system 2-13 are both located on the top of the reaction frame 1-7. The automatic loading system and the Y-axis loading system 1-8 are located on opposite sides of the loading chamber 1-5, and the drilling and injection system 2-13 and the X-axis loading system 1-6 are located on opposite sides of the loading chamber 1-5.
[0030] In this embodiment, the control system can monitor the displacement, load, temperature and other data of the sample in real time and control the drilling system 2-13 and the automatic filling system to perform grouting and filling. The power system provides power for equipment loading and splitting grouting. The control system and the power system are both existing technologies and will not be described in detail here.
[0031] Preferably, the X-axis loading system 1-6, Y-axis loading system 1-8, and Z-axis loading system 1-1 each include a loading cylinder 2-4, a piston extension rod 2-5, a guide frame 2-3, a loading plate, a displacement sensor 2-2, and a pressure sensor 2-6. The loading cylinders 2-4 of the X-axis loading system 1-6 and Y-axis loading system 1-8 are fixedly mounted on the top of the reaction frame 1-7. The loading cylinder 2-4 of the Z-axis loading system 1-1 is fixedly connected to the reaction frame 1-7 via a fixing bracket. The piston extension rod 2-5 is connected to the... The loading plate is connected to the output end of the loading cylinder 2-4, the loading plate is connected to the output end of the piston extension rod 2-5, the guide frame 2-3 is located between the loading cylinder 2-4 and the sample, the loading plate is slidably connected to the guide frame 2-3, the displacement sensor 2-2 is fixedly installed on the side of the piston extension rod 2-5, and one end of the displacement sensor 2-2 abuts against the loading plate, the pressure sensor 2-6 is fixedly installed at the end of the piston extension rod 2-5, and the other end of the pressure sensor 2-6 abuts against the loading plate.
[0032] In this embodiment, the loading plate is used to load the soil and rock sample. The cross-section of the loading plate is square, which can effectively reduce the thrust of the hydraulic cylinder and the load loss when converting the load on the sample. During operation, the piston extension rod 2-5 pushes the loading plate along the guide frame 2-3 to load the sample. The pressure sensor 2-6 can measure the pressure applied to the sample, and the displacement sensor 2-2 can measure the moving distance of the loading plate. The control system can control the loading rate and deformation rate during the experiment based on the data fed back by the pressure sensor 2-6 and the displacement sensor 2-2.
[0033] Preferably, the loading chamber 1-5 has a cubic structure and a closed bottom. The loading chamber 1-5 has loading holes on the side corresponding to the X-axis loading system 1-6, the Y-axis loading system 1-8, and the Z-axis loading system 1-1. The loading chamber 1-5 has a loading hole on the side corresponding to the automatic loading system and a drilling hole on the side corresponding to the drilling system 2-13. The axes of the loading holes, loading holes, and drilling holes are consistent with the axes of the corresponding surfaces of the loading chamber 1-5.
[0034] In this embodiment, the loading holes facilitate the X-axis loading system 1-6, Y-axis loading system 1-8 and Z-axis loading system 1-1 to enter the loading chamber 1-5 to load the sample, the filling holes facilitate the automatic filling system to push the sample into the loading chamber 1-5, and the drilling holes facilitate the drilling system 2-13 to drill and grout the test in the loading chamber 1-5.
[0035] Preferably, the loading chamber 1-5 is provided with pads 2-7. Three pads 2-7 are respectively arranged at the bottom of the loading chamber 1-5, on the opposite side of the X-axis loading system 1-6, and on the opposite side of the Y-axis loading system 1-8. The pads 2-7 on the opposite side of the X-axis loading system 1-6 and the opposite side of the Y-axis loading system 1-8 are respectively provided with water passage holes 2-11 and packing passage holes. The pads 2-7 can provide reaction force for sample loading.
[0036] Preferably, the loading chamber 1-5 is further provided with a heating box 2-8, which is located on the pad 2-7 at the bottom of the loading chamber 1-5. The heating box 2-8 has a cubic structure, and temperature sensors and heating elements are evenly distributed on the six sides of the heating box 2-8. The four sides and the top of the heating box 2-8 are provided with heat insulation partitions, which have an openable structure and their cross-sectional shape is the same as that of the loading plate.
[0037] In this embodiment, temperature sensors and heating elements are evenly distributed on the six surfaces of the heating chamber 2-8 to control and apply a uniform temperature field. The insulation partition will automatically open when the loading plate loads the test, allowing the loading plate to pass through and thus facilitating the loading plate to load the test.
[0038] Preferably, the heating box 2-8 is provided with a clamping block 2-12, which has a cubic structure. The clamping block 2-12 is provided with a loading connection block 2-10 on the side corresponding to the X-axis loading system 1-6, the Y-axis loading system 1-8 and the Z-axis loading system 1-1. The clamping block 2-12 is provided with an opening on the side corresponding to the automatic loading system and the drilling system 2-13. The opening is threaded with a disassembly cover.
[0039] In this embodiment, a waterproof rubber sleeve is provided inside the disassembly cover, which makes the sealing and waterproof performance better after the disassembly cover is threadedly connected to the clamping block 2-12. The disassembly cover can be disassembled to reserve the cross section for split grouting and automatic filling. The disassembly cover is removed when loading and grouting, and then installed when loading and measuring.
[0040] Preferably, the automatic loading system includes a propulsion cylinder, a propulsion shaft 1-2, a propulsion guide rail 1-4, and a sample tray 1-3. The propulsion cylinder and the propulsion guide rail 1-4 are both mounted on the reaction frame 1-7. The propulsion guide rail 1-4 is located between the propulsion cylinder and the loading chamber 1-5. The propulsion shaft 1-2 is connected to the output end of the propulsion cylinder. The sample tray 1-3 is connected to the output end of the propulsion shaft 1-2, and the sample tray 1-3 is slidably mounted on the propulsion guide rail 1-4.
[0041] Preferably, the drilling and injection system 2-13 includes an integrated drilling and injection power head, a power head bracket 1-9, and a power head slide rail 1-12. A fixed frame is provided on the reaction frame 1-7. The power head slide rail 1-12 is disposed between the fixed frame and the loading chamber 1-5. The power head bracket 1-9 is slidably disposed on the power head slide rail 1-12. The integrated drilling and injection power head is slidably disposed on the power head bracket 1-9. Both the integrated drilling and injection power head and the power head bracket 1-9 are driven by the power system.
[0042] In this embodiment, the integrated drilling and grouting power head includes a hole-forming power head 1-10 and a grouting power head 1-11. The hole-forming power head 1-10 and the grouting power head 1-11 are arranged side by side on the power head bracket 1-9. The clamping block 2-12 has water passage holes 2-11 on both sides in the X-axis direction. The water passage hole 2-11 on the side closer to the X-axis loading system 1-6 is connected to a water pipeline and a flow meter. The water passage hole 2-11 on the side away from the X-axis loading system 1-6 is connected to the grouting power head 1-11 to inject water into the sample.
[0043] The grouting power head 1-11 can be connected to a grouting pipeline to perform split grouting on the sample, or it can be connected to a water pipeline to inject water into the sample and use a flow meter to measure its permeability coefficient after grouting.
[0044] Working principle:
[0045] During the experiment, multiple samples are first prepared and placed on the sample tray 1-3 of the automatic loading system. The sample tray 1-3 moves along the push guide rail 1-4 to align the sample with the loading hole of the loading chamber 1-5. The push shaft 1-2 pushes the sample into the loading chamber 1-5 under the push of the push cylinder. The sample enters the clamping block 2-12 through the filler hole of the pad block 2-7. The clamping block 2-12 is then assembled with the disassembly cover to fix the sample.
[0046] Then, a true triaxial loading system was used to apply confining pressure and axial pressure to the sample, and its mechanical properties were measured.
[0047] After completing the test of the sample without splitting grouting, the sample is replaced by the automatic loading system and the drilling and grouting system 2-13 is used to form a hole and grout: the integrated drilling and grouting power head moves along the forward slide rail and approaches the drilling hole of the loading chamber 1-5. First, the hole forming power head 1-10 is used to form a hole on the sample. Then, the power head bracket 1-9 is used to switch the grouting power head 1-11 to perform splitting grouting. After the splitting grouting is completed and it is allowed to solidify, its mechanical properties are tested by the true triaxial loading system.
[0048] If it is necessary to test the physical and mechanical properties of the sample under a certain temperature field, the temperature of the heating chamber 2-8 inside the loading chamber 1-5 can be adjusted using the control system.
[0049] When testing the effect of split grouting on the permeability of the sample, the water passage 2-11 on the side of the clamping block 2-12 near the X-axis loading system 1-6 is connected to an external drainage pipe and a flow meter 3-3. The water passage 2-11 on the side away from the X-axis loading system 1-6 is connected to the grouting power head 1-11 of the drilling and grouting system 2-13. The grouting power head 1-11 is then connected to an external water pump 3-2 and a water tank 3-1. Water is injected into the water passage 2-11 by the grouting power head 1-11 to form seepage. The permeability of the sample can be tested based on the flow difference on both sides.
[0050] The above description is merely a preferred embodiment of the present invention and does not constitute any limitation on the technical scope of the present invention. Therefore, any minor modifications, equivalent changes and alterations made to the above embodiments based on the technical essence of the present invention shall still fall within the scope of the technical solution of the present invention.
Claims
1. An automated true triaxial splitting grouting physical simulation test system, characterized in that, It includes a true triaxial loading system, an automatic loading system, a drilling and injection system, a power system, and a control system, wherein the control system is electrically connected to the true triaxial loading system, the automatic loading system, the drilling and injection system, and the power system, respectively; The true triaxial loading system includes a reaction frame, a loading chamber, an X-axis loading system, a Y-axis loading system, and a Z-axis loading system. The reaction frame is fixedly installed on the ground, and the loading chamber is installed on top of the reaction frame. The X-axis loading system, Y-axis loading system, and Z-axis loading system are used to load the sample inside the loading chamber in the X-axis, Y-axis, and Z-axis directions, respectively. The automatic loading system and the drilling and injection system are both located on the top of the reaction frame. The automatic loading system and the Y-axis loading system are located on opposite sides of the loading chamber, and the drilling and injection system and the X-axis loading system are located on opposite sides of the loading chamber.
2. The automated true triaxial splitting grouting physical simulation test system as described in claim 1, characterized in that, The X-axis, Y-axis, and Z-axis loading systems each include a loading cylinder, a piston extension rod, a guide frame, a loading plate, a displacement sensor, and a pressure sensor. The loading cylinders of the X-axis and Y-axis loading systems are fixedly mounted on the top of the reaction frame. The loading cylinder of the Z-axis loading system is fixedly connected to the reaction frame via a fixing frame. The piston extension rod is connected to the output end of the loading cylinder, and the loading plate is connected to the output end of the piston extension rod. The guide frame is located between the loading cylinder and the sample, and the loading plate is slidably connected to the guide frame. The displacement sensor is fixedly mounted on the side of the piston extension rod, with one end of the displacement sensor abutting against the loading plate. The pressure sensor is fixedly mounted on the end of the piston extension rod, with the other end of the pressure sensor abutting against the loading plate.
3. The automated true triaxial splitting grouting physical simulation test system as described in claim 2, characterized in that, The loading chamber has a cubic structure with a closed bottom. Each side of the loading chamber corresponding to the X-axis loading system, Y-axis loading system, and Z-axis loading system has a loading hole. The side of the loading chamber corresponding to the automatic feeding system has a feeding hole. The side of the loading chamber corresponding to the drilling and injection system has a drilling and injection hole. The axes of the loading hole, feeding hole, and drilling and injection hole are aligned with the axes of the corresponding surfaces of the loading chamber.
4. The automated true triaxial splitting grouting physical simulation test system as described in claim 2, characterized in that, The loading plate has a square cross-section.
5. An automated true triaxial splitting grouting physical simulation test system as described in claim 1 or 2, characterized in that, The loading chamber is equipped with pads. Three pads are respectively arranged at the bottom of the loading chamber, on the side opposite to the X-axis loading system, and on the side opposite to the Y-axis loading system. Water passage holes and packing passage holes are respectively provided on the pads on the X-axis loading system side and the pads on the Y-axis loading system side.
6. The automated true triaxial splitting grouting physical simulation test system as described in claim 5, characterized in that, The loading chamber is also equipped with a heating box, which is located on a pad at the bottom of the loading chamber. The heating box has a cubic structure, and temperature sensors and heating elements are evenly distributed on its six sides. The four sides and the top of the heating box are equipped with heat insulation partitions, which are switchable structures and have the same cross-sectional shape as the loading plate.
7. The automated true triaxial splitting grouting physical simulation test system as described in claim 5, characterized in that, The heating box is equipped with a clamping block, which has a cubic structure. The clamping block has a loading connection block on each side corresponding to the X-axis loading system, Y-axis loading system and Z-axis loading system. The clamping block has an opening on each side corresponding to the automatic loading system and drilling system, and a disassembly cover is threaded to the opening.
8. The automated true triaxial splitting grouting physical simulation test system as described in claim 1, characterized in that, The automatic loading system includes a propulsion cylinder, a propulsion shaft, a propulsion guide rail, and a sample tray. The propulsion cylinder and the propulsion guide rail are both mounted on the reaction frame. The propulsion guide rail is located between the propulsion cylinder and the loading chamber. The propulsion shaft is connected to the output end of the propulsion cylinder. The sample tray is connected to the output end of the propulsion shaft and is slidably mounted on the propulsion guide rail.
9. The automated true triaxial splitting grouting physical simulation test system as described in claim 5, characterized in that, The drilling and injection system includes an integrated drilling and injection power head, a power head bracket, and a power head slide rail. A fixed frame is provided on the reaction frame. The power head slide rail is disposed between the fixed frame and the loading chamber. The power head bracket is slidably disposed on the power head slide rail. The integrated drilling and injection power head is slidably disposed on the power head bracket. Both the integrated drilling and injection power head and the power head bracket are driven by the power system.
10. The automated true triaxial splitting grouting physical simulation test system as described in claim 9, characterized in that, The integrated drilling and grouting power head includes a hole-forming power head and a grouting power head, which are arranged side by side on the power head bracket.
Citation Information
Patent Citations
True triaxial test system and method for simulating influence of different temperatures on deep rock mass
CN110595909A
True triaxial rock mass hydraulic fracturing and fracturing grouting simulation test device
CN213456463U
