Reactor direct injection of the flow simulation experiment device and simulation experiment method

By designing a reactor direct injection bypass simulation experimental device, the flow of steam and coolant during a reactor accident was simulated. This solved the problem that existing devices could not effectively simulate backflow restrictions and bypass phenomena, improved the operation and maintenance level of nuclear power plants, and ensured the safety and stability of the reactor.

CN117423485BActive Publication Date: 2026-11-20CHINA NUCLEAR POWER TECH RES INST CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311259329.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-26
Publication Date
2026-11-20
Estimated Expiration
2043-09-26

Smart Images

  • Figure CN117423485B_ABST
    Figure CN117423485B_ABST
Patent Text Reader

Abstract

The present application relates to reactor direct injection of flow simulation experiment device and simulation experiment method, the reactor direct injection of flow simulation experiment device includes: reactor simulation body, it includes simulation body ontology and steam pipeline, circulating pipeline and output pipeline;Steam simulation system is connected to the reactor simulation body through the steam pipeline;Two-phase flow measurement system is connected to the reactor simulation body through the output pipeline;And water supply system, including direct water supply system and indirect water supply system, the direct water supply system is connected to the steam simulation system and circulating pipeline respectively;The indirect water supply system is connected to the reactor simulation body.Because the reactor simulation body in the present application can simulate the reactor internal situation, steam simulation system, two-phase flow measurement system and water supply system can simulate the reactor accident in-pile environment, so as to simulate the reactor accident, so as to improve the operation and maintenance level of nuclear power plant.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of nuclear reactor hydraulic experiment technology, and more specifically, to a reactor direct injection bypass simulation experimental device and simulation experimental method. Background Technology

[0002] In the operation and maintenance of nuclear power plants, the handling of accidents involving nuclear reactors often requires ensuring the effectiveness of the handling methods. For large-break loss-of-coolant accidents in direct-injection reactors, the accident handling process typically includes a refilling phase and a reflooding phase.

[0003] During the refilling phase, the coolant in a direct-injection reactor may be affected by the reverse flow of steam in the descending annulus, causing the coolant to flow out through the breach and fail to enter the core, thus preventing normal core cooling and resulting in reverse flow restriction. During the reflooding phase, the coolant may be affected by the lateral flow of steam in the intact cold section, preventing the coolant from smoothly entering the core and causing direct bypass. As the liquid level in the descending annulus gradually recovers, the steam in the intact cold section may purge and carry the amphibious injection water above the liquid level out through the breach, causing purging bypass.

[0004] When the aforementioned backflow restriction, direct bypass, or purge bypass phenomena occur, the coolant injection efficiency is affected, leading to uncontrollable core temperature and even core meltdown, threatening the safety and integrity of the reactor vessel and internal components. Therefore, to avoid these situations, direct reactor bypass simulation experiments are needed to assess the operation and maintenance level of nuclear power plants; however, currently, no experimental setup is available to perform these simulations. Summary of the Invention

[0005] The technical problem to be solved by this application is to provide a reactor direct injection bypass simulation experimental device and simulation experimental method.

[0006] The technical solution adopted by this application to solve its technical problem is: constructing a reactor direct injection bypass simulation experimental device, including:

[0007] A reactor simulator for simulating conditions inside a reactor includes a simulator body and steam pipes, circulation pipes and output pipes connected to the simulator body.

[0008] A steam simulation system is connected to the reactor simulation body via the steam pipeline;

[0009] A two-phase flow measurement system is connected to the reactor simulator via the output pipeline; and;

[0010] The water supply system includes a direct water supply system and an indirect water supply system. The direct water supply system is connected to the steam simulation system and the circulation pipeline, and is connected to the reactor simulator through the circulation pipeline. The indirect water supply system is connected to the reactor simulator through the circulation pipeline.

[0011] In some embodiments, the steam simulation system includes a first steam generating device and a second steam generating device, and the steam pipeline includes a first steam pipeline, a second steam pipeline and a third steam pipeline. The first steam generating device is connected to the first steam pipeline; the second steam generating device is connected to the second steam pipeline and the third steam pipeline; and the first steam pipeline, the second steam pipeline and the third steam pipeline are connected to the simulation body.

[0012] In some embodiments, the first steam generating device includes a first flow meter, and the steam simulation system further includes a merging pipeline, through which the steam generated by the first steam generating device and the second steam generating device merges and flows into the simulation body through the first flow meter. The merging pipeline is also provided with a shut-off valve.

[0013] In some embodiments, the two-phase flow measurement system includes a shut-off valve and a steam-water separator connected to the shut-off valve, the steam-water separator including a steam output end and a water output end; the two-phase flow measurement system also includes a gas measurement system and a liquid measurement system, the gas measurement system including a flow meter, a regulating valve and a shut-off valve connected in sequence, and also including a flow meter, a regulating valve and a shut-off valve arranged in parallel with the flow meter, the regulating valve and the shut-off valve.

[0014] In some embodiments, the liquid measurement system includes a flow distribution valve and a first weighing tank and a second weighing tank respectively connected to the output of the flow distribution valve.

[0015] In some embodiments, the indirect water supply system includes a first cooling circulation pipeline connected to the body of the simulation body, which includes a shut-off valve, a water pump, a heat exchanger, a shut-off valve, a flow meter, and a shut-off valve connected in sequence; the first cooling circulation pipeline also includes regulating valves respectively connected to the two ends of the heat exchanger and the shut-off valve.

[0016] In some embodiments, the indirect water supply system includes a second cooling circulation pipeline connected to the body of the simulation body, which includes a shut-off valve, a water pump, a heat exchanger, a shut-off valve, a flow meter, and a shut-off valve connected in sequence; the second cooling circulation pipeline also includes regulating valves connected to the two ends of the heat exchanger and the shut-off valve respectively.

[0017] A simulation experiment method is also provided for use in the reactor direct injection bypass simulation experiment apparatus described in any of the above claims, the simulation experiment method comprising the following steps:

[0018] S1: Pre-test inspection; Conduct sealing tests to check the sealing performance of the reactor simulator, steam simulation system, two-phase flow measurement system, and makeup water system;

[0019] S2: Pre-test preparation; to bring the reactor simulator to the state of a simulated reactor;

[0020] S3: Achieve the target parameters; adjust the steam, water temperature, water level, power, and pressure parameters according to the experimental purpose;

[0021] S4: Conduct the experiment; record the parameters of temperature, pressure, pressure difference, voltage, current, flow rate, liquid level, mass, and dryness.

[0022] In some embodiments, S2: the pre-test preparation step includes the following sub-steps:

[0023] S21: Water injection and venting; Water is injected into the two-phase flow measurement system and the makeup water system, and venting is performed. Then, the reactor simulator and the steam simulation system are filled with water.

[0024] S22: Establish the vapor phase space of the reactor simulator; start the steam simulation system, heat the deionized water to the saturation temperature, and connect the steam simulation system and the reactor simulator; increase the heating power of the steam simulation system to heat the saturated water to generate saturated steam, so that the liquid level in the reactor simulator reaches the predetermined level;

[0025] S23: Reactor simulator preheating; Connect the reactor simulator and the two-phase flow measurement system to preheat the reactor simulator to a predetermined temperature.

[0026] In some embodiments, the simulation experiment method further includes the following steps:

[0027] S5: Cooling and depressurizing. After obtaining the test data, gradually reduce the heating power of the steam simulation system.

[0028] Implementing this invention has at least the following beneficial effects: Since the reactor simulator can simulate the conditions inside the reactor, the steam simulation system, the two-phase flow measurement system, and the makeup water system can simulate the in-reactor environment of a reactor accident, thereby enabling the simulation of reactor accidents and improving the operation and maintenance level of nuclear power plants. Attached Figure Description

[0029] The present application will be further described below with reference to the accompanying drawings and embodiments. In the accompanying drawings:

[0030] Figure 1This is a schematic diagram of the piping structure of the simulation experimental device in some embodiments of this application. Detailed Implementation

[0031] To provide a clearer understanding of the technical features, objectives, and effects of this application, the specific embodiments of this application are now described in detail with reference to the accompanying drawings. In the following description, it should be understood that the orientations or positional relationships indicated by terms such as "front," "rear," "upper," "lower," "left," "right," "longitudinal," "horizontal," "vertical," "horizontal," "top," "bottom," "inner," "outer," "head," and "tail" are based on the orientations or positional relationships shown in the accompanying drawings, and are constructed and operated in a specific orientation. They are only for the convenience of describing this technical solution and do not indicate that the device or component referred to must have a specific orientation; therefore, they should not be construed as limitations on this application.

[0032] It should also be noted that, unless otherwise explicitly specified and limited, terms such as "installation," "connection," "joining," "fixing," and "setting" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. When an component is referred to as being "on" or "below" another component, that component can be located "directly" or "indirectly" on the other component, or there may be one or more intermediary components. The terms "first," "second," "third," etc., are only for the convenience of describing this technical solution and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Therefore, features defined with "first," "second," "third," etc., may explicitly or implicitly include one or more of that feature. For those skilled in the art, the specific meaning of the above terms in this application can be understood according to the specific circumstances.

[0033] In the following description, specific details such as particular system architectures and techniques are set forth for illustrative purposes and not for limitation, in order to provide a thorough understanding of the embodiments of this application. However, those skilled in the art will understand that this application may also be implemented in other embodiments without these specific details. In other instances, detailed descriptions of well-known systems, apparatuses, circuits, and methods have been omitted so as not to obscure the description of this application with unnecessary detail.

[0034] Figure 1 The diagram illustrates a reactor direct safety injection bypass simulation experimental apparatus 1 in some embodiments of the present invention. This reactor direct safety injection bypass simulation experimental apparatus 1 can be used to simulate safety injection bypass experiments to conduct countercurrent flow restriction experiments, direct bypass experiments, or purging bypass experiments for reactors.

[0035] In some embodiments, the reactor direct injection bypass simulation experimental apparatus 1 may include a reactor simulator 10, a steam simulation system 20, a two-phase flow measurement system 30, a makeup water system 40, an instrumentation and control system 50, and an electrical system 60. In some embodiments, the reactor simulator 10 can be used to simulate a reactor to simulate the flow of liquids and / or gases within the reactor. The steam simulation system 20 is connected to the reactor simulator 10, generates steam, and transmits the steam to the reactor simulator 10, thereby providing the reactor simulator 10 with the steam required for its simulated reactor to conduct countercurrent flow restriction experiments, direct bypass experiments, or purge run bypass experiments. The two-phase flow measurement system 30 is connected to the reactor simulator 10. Steam and / or liquid flowing out of the reactor simulator 10 can flow into the two-phase flow measurement system 30. The two-phase flow measurement system 30 can measure the flow rate of steam and / or liquid, thereby obtaining experimental data of reactor countercurrent flow restriction experiment, direct bypass experiment or purging bypass experiment conducted in the reactor simulator 10.

[0036] The water replenishment system 40 is connected to both the reactor simulator 10 and the steam simulation system 20, providing liquid to both systems. This ensures the continuous steam generation by the steam simulation system 20 and allows the reactor simulator 10 to successfully conduct simulation experiments. The instrumentation and control system 50 and the electrical system 60 are connected to the reactor simulator 10, the steam simulation system 20, the two-phase flow measurement system 30, and the water replenishment system 40, respectively, making it safer and more convenient for users to operate the reactor direct injection bypass simulation experimental device 1.

[0037] In some embodiments, the reactor simulator 10 may include a simulator body 100 and a steam pipe 101, a circulation pipe 102, and an output pipe 103 connected to the simulator body 100. The steam pipe 101 connects the steam simulation system 20 and the simulator body 100, and can transport steam generated in the steam simulation system 20 to the simulator body 100. The circulation pipe 102 connects the makeup water system 40 and the simulator body 100, respectively, and can cool the ambulance water deposited in the simulator body 100 and re-inject water into the simulator body 100, thereby realizing the operation of circulating ambulance water replenishment for the simulator body 100. The output pipe 103 connects the two-phase flow measurement system 30 and the simulator body 100, respectively, and can output the steam and liquid output from the simulator body 100 after simulating the reactor to the two-phase flow measurement system 30 to measure experimental results, thereby completing the reactor simulation experiment.

[0038] Specifically, in some embodiments, the steam pipe 101 may include a first steam pipe 1011, a second steam pipe 1012, and a third steam pipe 1013 respectively connected to the simulation body 100. In some embodiments, the circulation pipe 102 may include a first circulation pipe 1021 output from the simulation body 100 and a second circulation pipe 1022 and a third circulation pipe 1023 input to the simulation body 100. The first circulation pipe 1021 is connected to the water replenishment system 40 and introduces the water generated by the water replenishment system 40 into the simulation body 100, thereby realizing the operation of replenishing water to the simulation body 100.

[0039] In some embodiments, the steam simulation system 20 may include a first steam generating device 21 and a second steam generating device 22. The first steam generating device 21 is connected to the first steam pipeline 1011; the second steam generating device 22 is connected to the second steam pipeline 1012 and the third steam pipeline 1013, respectively, thereby inputting the steam it generates into the simulation body 100. Specifically, due to the structure of the simulation body 100, the second steam generating device 22 needs to input steam into its interior from the second steam pipeline 1012 and the third steam pipeline 1013, respectively. The third steam pipeline 1013 is also equipped with a flow meter and a shut-off valve to control the output steam flow rate.

[0040] In some embodiments, the first steam generating device 21 may include a first steam generator 211, a first safety valve 212 connected to the first steam generator 211, a first shut-off valve 213 connected to the first steam generator 211, and a first flow meter 214 connected to the first steam generator 211.

[0041] The first steam generator 211 can be used to heat water to form steam, thereby obtaining the steam required for simulation; the first safety valve 212 can release pressure when the internal pressure of the first steam generator 211 is too high, so as to ensure the safe operation of the first steam generator 211; the first shut-off valve 213 can be used to open or close the pipeline for transporting the steam generated by the first steam generator 211 to the simulation body 100; the first flow meter 214 is installed on the pipeline for transporting the steam generated by the first steam generator 211 to the simulation body 100, and can be used to measure the amount of steam output by the first steam generating device 21.

[0042] In some embodiments, the second steam generating device 22 may include a second steam generator 221, a second safety valve 222 connected to the second steam generator 221, a second shut-off valve 223 connected to the second steam generator 221, and a second flow meter 224 connected to the second steam generator 221.

[0043] The second steam generator 221 can be used to heat water to generate steam, thereby obtaining the steam required for simulation; the second safety valve 222 can release pressure when the internal pressure of the second steam generator 221 is too high, so as to ensure the safe operation of the second steam generator 221; the second shut-off valve 223 can be used to open or close the pipeline for transporting the steam generated by the second steam generator 221 to the simulation body 100; the second flow meter 224 is installed on the pipeline for transporting the steam generated by the second steam generator 221 to the simulation body 100, and can be used to measure the amount of steam output by the second steam generator 221.

[0044] In some embodiments, the steam simulation system 20 further includes a merging pipe 2202, through which the steam generated by the first steam generator 211 and the second steam generator 221 can be combined and flow into the simulation body 100 through the first flow meter 214 in the first steam generating device 21. The merging pipe 2202 is also provided with a shut-off valve 2203.

[0045] Specifically, when merging is required, the first shut-off valve 213 and the second shut-off valve 2203 are in the open state, the second shut-off valve 223 is in the closed state, and the output pipeline 2201 is in the closed state; at this time, the flow rate measured by the first flow meter 214 is the sum of the steam flow rates output by the first steam generating device 21 and the second steam generating device 22. When it is necessary for the steam to flow separately into the simulation body 100, the first shut-off valve 213 and the second shut-off valve 223 are in the open state, and the shut-off valve 2203 is in the closed state; at this time, the first flow meter 214 and the second flow meter 224 respectively measure the steam flow rates output by the first steam generating device 21 and the second steam generating device 22.

[0046] The two-phase flow measurement system 30 is connected to the output pipeline 103, and in some embodiments may include a shut-off valve 301 and a steam-water separator 302 connected to the shut-off valve 301. The steam-water separator 302 can output steam and water separately, and includes a steam output end and a water output end. The steam-water separator 302 is also provided with a safety valve 303 to prevent excessive pressure inside the steam-water separator 302 from causing safety risks.

[0047] At the steam output end, the two-phase flow measurement system 30 also includes a gas measurement system, which includes a flow meter 304, a regulating valve 305, and a shut-off valve 306 connected in sequence. Steam flows sequentially through the flow meter 304, regulating valve 305, and shut-off valve 306 to measure the amount of steam generated by the simulated body 100. In some embodiments, the gas measurement system also includes a flow meter 307, a regulating valve 308, and a shut-off valve 309 connected in parallel with the pipeline of the sequentially connected flow meter 304, regulating valve 305, and shut-off valve 306. When the steam flow rate is large, the steam flow rate can be measured through two steam paths to obtain a more accurate steam flow rate value. In some embodiments, the gas measurement system also includes a heat exchanger 310 connected to the tail of the shut-off valve 306 and shut-off valve 309, which can cool and liquefy the output steam and allow it to flow into the makeup water system 40 for circulation. Furthermore, the gas measurement system also includes a flow meter 311 and a shut-off valve 312 connected to the heat exchanger 310, which can be used to introduce water generated by steam condensation into the water supply system.

[0048] At the water output end, the two-phase flow measurement system 30 also includes a liquid measurement system, which includes a flow distribution valve 313 and a first weighing water tank 314 and a second weighing water tank 315 respectively connected to the output end of the flow distribution valve 313. Flow meters 316 and 317 are respectively installed between the flow distribution valve 313 and the first weighing water tank 314 and the second weighing water tank 315 to measure the flow rate of the liquid flowing into the first weighing water tank 314 and the second weighing water tank 315. The first weighing water tank 314 and the second weighing water tank 315 are also connected to the flow distribution valve 313 through a balancing pipeline shut-off valve 318 and a balancing pipeline shut-off valve 319 respectively to maintain stable pressure in the first weighing water tank 314 and the second weighing water tank 315, thereby ensuring the accuracy of the weighing data.

[0049] In some embodiments, the water replenishment system 40 may include a direct water replenishment system 41 and an indirect water replenishment system 42. The direct water replenishment system 41 can directly replenish the reactor simulator 10 or the steam simulation system 20 with external water. The indirect water replenishment system 42 can cool the deposition ampere water output from the reactor simulator 10 and then reintroduce it into the reactor simulator 10. The indirect water replenishment system 42 is connected to the circulation pipeline 102.

[0050] In some embodiments, the direct water supply system 41 may include a water storage tank 410 and a first water supply pipe 411, a second water supply pipe 412, and a third water supply pipe 413 respectively connected to the water storage tank 410. The first water supply pipe 411 is connected to the first steam generator 211 of the first steam generating device 21 to supply water for the first steam generator 211 to generate steam; the second water supply pipe 412 is connected to the second steam generator 221 of the second steam generating device 22 to supply water for the second steam generator 221 to generate steam. The third water supply pipe 413 is indirectly connected to the simulation body 100 through the first circulation pipe 1021 to supply water for the simulation body 100 to simulate the experiment. The water storage tank 410 is also equipped with a safety valve 4100, which can release pressure when the internal pressure of the water storage tank 410 is too high to ensure the safe operation of the water storage tank 410.

[0051] In some embodiments, the first water supply pipeline 411 may include a shut-off valve 4111, a water pump 4112, a flow meter 4113, and a shut-off valve 4114 arranged sequentially along the pipeline. In some embodiments, the second water supply pipeline 412 may include a shut-off valve 4121, a water pump 4122, a flow meter 4123, and a shut-off valve 4124 arranged sequentially along the pipeline. In some embodiments, the third water supply pipeline 413 may include a shut-off valve 4131, a water pump 4132, a flow meter 4133, and a shut-off valve 4134 arranged sequentially along the pipeline.

[0052] Specifically, the shut-off valves 4111 and 4114, 4121 and 4124, and 4131 and 4134 can be used to control the opening or closing of the first water supply pipeline 411, the second water supply pipeline 412, and the third water supply pipeline 413, respectively. Simultaneously closing the shut-off valves 4111 and 4114, 4121 and 4124, or 4131 and 4134 facilitates maintenance or disassembly of the water pump 4112 and flow meter 4113, the water pump 4122 and flow meter 4123, or the water pump 4132 and flow meter 4133, respectively.

[0053] In some embodiments, the indirect water supply system 42 may include a first cooling circulation pipeline connected to the reactor simulator 100, which includes a shut-off valve 4201, a water pump 4202, a heat exchanger 4203, a shut-off valve 4204, a flow meter 4205, and a shut-off valve 4206 connected in sequence. The sedimentation water output from the reactor simulator 10 passes through the shut-off valve 4201, water pump 4202, heat exchanger 4203, shut-off valve 4204, flow meter 4205, and shut-off valve 4206 in sequence before being reintroduced into the reactor simulator 10.

[0054] In some embodiments, the first cooling circulation pipeline further includes regulating valves 4207 connected to both ends of the heat exchanger 4203 and the shut-off valve 4204, respectively. The regulating valves 4207 can be used to adjust the heat exchange efficiency of the heat exchanger 4203. The first cooling circulation pipeline also includes a shut-off valve 4208 and a flow meter 4209 connected to the heat exchanger 4203. Cooling water generated in the circulating cooling water system can enter the heat exchanger 4203 through the shut-off valve 4208 and the flow meter 4209 for heat exchange and cooling.

[0055] The indirect water supply system 42 also includes a second cooling circulation pipeline, which may include a shut-off valve 4211, a water pump 4212, a heat exchanger 4213, a shut-off valve 4214, a flow meter 4215, and a shut-off valve 4216 connected in sequence. The sedimentation ampere water output from the reactor simulator 10 flows back into the reactor simulator 10 after passing through the shut-off valve 4211, water pump 4212, heat exchanger 4213, shut-off valve 4214, flow meter 4215, and shut-off valve 4216 in sequence, thereby simulating the ampere flow rate.

[0056] In some embodiments, the second cooling circulation pipeline further includes regulating valves 4217 connected to both ends of the heat exchanger 4213 and the shut-off valve 4214, respectively. The regulating valves 4217 can be used to adjust the heat exchange efficiency of the heat exchanger 4213. The second cooling circulation pipeline also includes a shut-off valve 4218 and a flow meter 4219 connected to the heat exchanger 4213. A mixture of cooling water from the circulating cooling water system can enter the heat exchanger 4213 through the shut-off valve 4218 and the flow meter 4219 for heat exchange and cooling.

[0057] This invention also discloses a simulation experiment method for a reactor direct injection bypass simulation experimental device 1. In some embodiments, this simulation experiment method may include the following steps:

[0058] S1: Pre-test inspection.

[0059] Check the status of the reactor simulator 10, steam simulation system 20, two-phase flow measurement system 30, makeup water system 40, instrumentation and control system 50, and electrical system 60 to ensure they meet the testing requirements. Specifically, a sealing test can be conducted to check the sealing performance of the reactor simulator 10, steam simulation system 20, two-phase flow measurement system 30, and makeup water system 40.

[0060] S2: Pre-test preparations to bring reactor simulator 10 to the state of a simulated reactor;

[0061] In some embodiments, the pre-experiment preparation steps include the following:

[0062] S21: Water injection and venting. Water is injected into the two-phase flow measurement system 30 and the water replenishment system 40, and the system equipment and instruments are vented. Then, the reactor simulator 10 and the steam simulation system 20 are filled with water.

[0063] S22: Establish the vapor phase space of reactor simulator 10. Start the steam simulation system 20, heat the deionized water to saturation temperature, and connect the steam simulation system 20 and reactor simulator 10. Increase the heating power of the steam simulation system 20 to heat the saturated water to generate saturated steam, and open the drain valve of reactor simulator 10 to drain the water to the predetermined level before closing the drain valve, thereby establishing the vapor phase space of reactor simulator 10.

[0064] S23: Reactor simulator preheating. Connect the reactor simulator and the steam-water separator, and fully open the steam outlet pipeline valve. Use the high-temperature steam generated by the steam generator to preheat the reactor simulator to the predetermined temperature.

[0065] S3: The target parameters have been achieved.

[0066] Different steam injection modes can be achieved by adjusting the shut-off valves on the first steam generating device 21 and the second steam generating device 22 according to the experimental purpose.

[0067] The steam injection flow rate is adjusted by regulating the heating power of the first steam generating device 21 and the second steam generating device 22.

[0068] The flow rate is adjusted by adjusting the frequency of water pumps 4202 and 4212 in the indirect water supply system 42.

[0069] The injection water temperature can be adjusted by regulating valves 4207 and 4217.

[0070] Adjust the system pressure by regulating the steam outlet pipeline shut-off valves 306 and 309.

[0071] The liquid level in the descending annular cavity is adjusted by regulating the flow rate of the water pump 4132.

[0072] Adjust the parameters as described above until each parameter reaches the target parameter and meets the test requirements.

[0073] S4: Conduct experiments.

[0074] When the parameters of each system and equipment meet the test requirements, the computer of the measurement and control system executes the corresponding test program to automatically record parameters such as temperature, pressure, differential pressure, voltage, current, flow rate, liquid level, mass, and dryness, which can then be used to analyze the safety injection bypass characteristics of the reactor descending annular cavity DVI.

[0075] S5: Cooling and pressure reduction.

[0076] After obtaining the test data, the heating power of the steam generating device is gradually reduced to achieve cooling and pressure reduction of the loop system until the target value is reached.

[0077] It is understood that the above embodiments only illustrate some implementation methods of the present invention, and their descriptions are relatively specific and detailed, but they should not be construed as limiting the scope of the present invention. It should be noted that for those skilled in the art, the above technical features can be freely combined, and several modifications and improvements can be made without departing from the concept of the present invention, all of which fall within the protection scope of the present invention. Therefore, all equivalent transformations and modifications made with respect to the scope of the claims of the present invention should fall within the scope of the claims of the present invention.

Claims

1. A reactor direct safety injection bypass simulation experimental device, characterized in that, include: A reactor simulator (10) for simulating conditions inside a reactor includes a simulator body (100) and a steam pipe (101), a circulation pipe (102) and an output pipe (103) connected to the simulator body (100). A steam simulation system (20) is connected to the reactor simulation body (10) via the steam pipeline (101); the steam simulation system (20) includes a first steam generating device (21) and a second steam generating device (22), the steam pipeline (101) includes a first steam pipeline (1011), a second steam pipeline (1012) and a third steam pipeline (1013), the first steam generating device (21) is connected to the first steam pipeline (1011); the second steam generating device (22) is connected to the second steam pipeline (1012) and the third steam pipeline (1013); the first steam... Steam pipe (1011), second steam pipe (1012) and third steam pipe (1013) are connected to the simulation body (100); the first steam generating device (21) includes a first flow meter (214), and the steam simulation system (20) also includes a merging pipe (2202). The steam generated by the first steam generating device (21) and the second steam generating device (22) merge through the merging pipe (2202) and flow into the simulation body (100) through the first flow meter (214). The merging pipe (2202) is also provided with a first shut-off valve (2203). A two-phase flow measurement system (30) is connected to the reactor simulator (10) via the output pipe (103); and The water supply system (40) includes a direct water supply system (41) and an indirect water supply system (42). The direct water supply system is connected to the steam simulation system (20) and the circulation pipeline (102) respectively, and is connected to the reactor simulation body (10) through the circulation pipeline (102); the indirect water supply system (42) is connected to the reactor simulation body (10) through the circulation pipeline (102).

2. The reactor direct injection bypass simulation experimental apparatus according to claim 1, characterized in that, The two-phase flow measurement system (30) includes a second shut-off valve (301) and a steam-water separator (302) connected to the second shut-off valve (301). The steam-water separator (302) includes a steam output end and a water output end. The two-phase flow measurement system (30) also includes a gas measurement system and a liquid measurement system. The gas measurement system includes a second flow meter (304), a first regulating valve (305), and a third shut-off valve (306) connected in sequence. It also includes a third flow meter (307), a second regulating valve (308), and a fourth shut-off valve (309) connected in parallel with the second flow meter (304), the first regulating valve (305), and the third shut-off valve (306).

3. The reactor direct injection bypass simulation experimental apparatus according to claim 2, characterized in that, The liquid measurement system includes a flow distribution valve (313) and a first weighing tank (314) and a second weighing tank (315) respectively connected to the output end of the flow distribution valve (313).

4. The reactor direct injection bypass simulation experimental apparatus according to claim 1, characterized in that, The indirect water supply system (42) includes a first cooling circulation pipeline connected to the simulated body (100), which includes a fifth shut-off valve (4201), a first water pump (4202), a first heat exchanger (4203), a sixth shut-off valve (4204), a fourth flow meter (4205), and a seventh shut-off valve (4206) connected in sequence; the first cooling circulation pipeline also includes a third regulating valve (4207) connected to both ends of the first heat exchanger (4203) and the sixth shut-off valve (4204).

5. The reactor direct injection bypass simulation experimental apparatus according to claim 4, characterized in that, The indirect water supply system (42) includes a second cooling circulation pipeline connected to the simulated body (100), which includes an eighth shut-off valve (4211), a second water pump (4212), a second heat exchanger (4213), a ninth shut-off valve (4214), a fifth flow meter (4215), and a tenth shut-off valve (4216) connected in sequence; the second cooling circulation pipeline also includes a fourth regulating valve (4217) connected to both ends of the second heat exchanger (4213) and the ninth shut-off valve (4214).

6. A simulation experiment method for use in the reactor direct injection bypass simulation experiment apparatus according to any one of claims 1 to 5, characterized in that, The simulation experiment method includes the following steps: S1: Pre-test inspection; Conduct a sealing test to check the sealing performance of the reactor simulator (10), steam simulation system (20), two-phase flow measurement system (30), and water supply system (40); S2: Pre-test preparation; to bring the reactor simulator (10) to the state of a simulated reactor; S3: Achieve the target parameters; adjust the steam, water temperature, water level, power, and pressure parameters according to the experimental purpose; S4: Conduct the experiment; record the parameters of temperature, pressure, pressure difference, voltage, current, flow rate, liquid level, mass, and dryness.

7. The simulation experiment method according to claim 6, characterized in that, S2: The pre-test preparation steps include the following sub-steps: S21: Water injection and venting; Water is injected into the two-phase flow measurement system (30) and the water replenishment system (40), and venting is performed. Then, water is injected into the reactor simulator (10) and the steam simulation system (20). S22: Establish the vapor phase space of the reactor simulator (10); start the steam simulation system (20), heat the deionized water to the saturation temperature, connect the steam simulation system (20) and the reactor simulator (10); increase the heating power of the steam simulation system (20), heat the saturated water to generate saturated steam, so that the liquid level in the reactor simulator (10) reaches the predetermined liquid level; S23: Reactor simulator preheating; Connect the reactor simulator (10) and the two-phase flow measurement system (30) to preheat the reactor simulator (10) to a predetermined temperature.

8. The simulation experiment method according to claim 6, characterized in that, The simulation experiment method also includes the following steps: S5: Reduce temperature and pressure. After obtaining the test data, gradually reduce the heating power of the steam simulation system (20).