一种大坝土方回填筑埂装置及方法
By designing a combination of a limiting slide and a compaction mechanism, the problem of filling in the sunken areas during dam backfilling was solved, achieving efficient automatic filling and leveling, and improving construction efficiency.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- ZHUMADIAN WATER CONSERVANCY SURVEY DESIGN & RES CO LTD
- Filing Date
- 2023-10-24
- Publication Date
- 2026-07-17
AI Technical Summary
During the backfilling process of the dam, some areas suffered severe subsidence when the compactor was used to compact the earth, which required refilling and affected efficiency.
Design a device for backfilling and embankment construction of dam earthwork, including a limiting slide, a compaction mechanism and a filling mechanism. Through the cooperation of the compaction block of the compaction mechanism and the filling mechanism, automatic filling and compaction of the depressed area can be achieved.
This improved the efficiency of dam backfilling, ensuring that sunken areas could be filled and flattened in a timely manner, avoiding splashing of fill material, and improving construction efficiency.