Integrated ore dressing reagent preparation and distribution system and control method thereof
By using an integrated mineral processing reagent preparation and delivery system, ionization plates and adsorption plates are used to adsorb steam dust, and high-pressure air is returned to the digestion tank, which solves the problem of reduced activity during lime slurry preparation and achieves consistent raw material ratios and improved preparation efficiency.
Patent Information
- Application Number
- CN202311446884.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-02
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-11-02
AI Technical Summary
During the preparation of lime slurry, a mineral processing reagent, the steam generated by exothermic reactions can easily carry calcium oxide and calcium hydroxide away from the digestion zone, resulting in a decrease in the activity and quality of the prepared lime slurry.
An integrated mineral processing reagent preparation and distribution system is adopted. Raw materials are transported through conveying pipes and subjected to initial screening. Dust in the steam is adsorbed by ionization plates and adsorption plates. The steam heat is used to heat the air in the pressurization chamber. The high-pressure air is returned to the digester for reaction, ensuring that the proportion of raw materials is consistent and improving the mixing efficiency.
Ensuring a consistent ratio of raw materials to water improves the efficiency and quality of lime slurry preparation, avoids dust pollution, and enhances the precision and efficiency of the preparation process.
Smart Images

Figure CN117447099B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of mineral processing reagent preparation, specifically an integrated mineral processing reagent preparation and distribution system and its control method. Background Technology
[0002] Mineral processing reagents are a general term for various types and uses of chemical agents used in different stages of the mineral processing process. They mainly refer to collectors, frothers, depressants, flocculants, and modifiers. Among mineral processing reagents, lime slurry is a common additive used to adjust the pH of the slurry, thereby helping the mineral processing process to proceed more effectively.
[0003] The preparation of lime slurry is an exothermic reaction, which usually involves the generation of a large amount of steam. The steam carries a lot of dust, which will cause significant air pollution if directly released into the air. Dust can easily damage equipment when it adheres to it, and it can also cause harm to the operator's body if inhaled.
[0004] To avoid direct dust emissions during the preparation of lime slurry, a mineral processing reagent, Chinese patent document CN107673636B describes a novel environmentally friendly lime digester. The digester is divided into an upper digestion zone and a lower digestion zone. The upper digestion zone includes primary and secondary digestion tanks arranged side-by-side, while the lower digestion zone includes a tertiary digestion tank located below the secondary digestion tank. The feed inlet and water inlet at the top of the digester are located at the front end of the primary digestion tank. The rear ends of the primary and secondary digestion tanks are connected, as are the front ends of the secondary and tertiary digestion tanks. The discharge outlet at the bottom of the digester is located at the rear end of the tertiary digestion tank. The primary digestion tank contains two parallel primary conveying and stirring paddles, the secondary digestion tank contains two parallel secondary conveying and stirring paddles, and the tertiary digestion tank contains one tertiary conveying and stirring paddle. A water dust collector is installed corresponding to the smoke outlet at the center of the top of the digester.
[0005] The aforementioned device uses a water precipitator to adsorb dust from the discharged steam into the precipitator through water spraying, thereby reducing the amount of dust carried in the discharged steam. However, the amount of dust generated during the preparation of lime slurry is relatively large, and its dust components are mainly composed of calcium oxide and calcium hydroxide. If the calcium oxide and calcium hydroxide are collected by the water precipitator, the calcium oxide content required for the original lime slurry preparation will decrease, and the ratio of calcium oxide to water will change, which will lead to a decrease in the activity and quality of the prepared lime slurry. Summary of the Invention
[0006] The purpose of this invention is to provide an integrated mineral processing reagent preparation and distribution system and its control method, which solves the problem that during the preparation of lime slurry, the exothermic steam easily carries calcium oxide and calcium hydroxide away from the digestion zone, resulting in a decrease in the activity and quality of the prepared lime slurry.
[0007] To achieve the above objectives, the technical solution of the present invention is as follows: An integrated mineral processing reagent preparation and distribution system includes a storage tank, a conveying pipe connected to the bottom of the storage tank, the conveying pipe being arranged at an incline, a spiral conveying blade rotatably connected inside the conveying pipe, a first reduction motor connected to the spiral conveying blade on the outer wall of the conveying pipe, a primary screening mechanism for screening raw materials connected to the end of the conveying pipe away from the storage tank, a digestion mechanism connected to the bottom of the primary screening mechanism, the digestion mechanism including a digestion tank and a drive unit, the drive unit being fixedly connected to one end of the digestion tank, a stirring shaft rotatably connected inside the digestion tank, the stirring shaft being connected to the drive unit, a water inlet pipe and an exhaust pipe sequentially arranged at the top of the digestion tank, and a secondary screening mechanism for screening finished products connected to the end of the digestion tank;
[0008] An inflation mechanism is provided at the end of the conveying pipe near the storage tank. The inflation mechanism is used to inflate the inside of the conveying pipe while the first reduction motor is running.
[0009] An ionization plate and an adsorption plate are sequentially arranged inside the exhaust pipe. Both the ionization plate and the adsorption plate are electrically connected to a DC power supply. A recovery box is installed on the side wall of the exhaust pipe where the adsorption plate is located. A partition is installed on the inner side wall of the recovery box, which divides the recovery box into a heating chamber and a pressurizing chamber. The heating chamber is filled with a heat exchange medium and is equipped with several heat exchange tubes. The other end of the heat exchange tubes extends into the exhaust pipe, and a circulation pump is connected to the heat exchange tubes.
[0010] The pressurization chambers on both sides of the exhaust pipe are independent of each other. One of the pressurization chambers is connected to the exhaust pipe by a first pressure relief valve, and the side wall is connected to a first air intake check valve. The other pressurization chamber is connected to the exhaust pipe by a second air intake check valve, and the side wall is connected to a return pipe. The return pipe is connected to a second pressure relief valve, and the end of the return pipe away from the recovery box is connected to the digestion tank.
[0011] The technical principles of the above solution are as follows:
[0012] The raw materials to be prepared are stored in storage tanks. When preparation is to begin, the raw materials are delivered to the initial screening mechanism via a conveyor pipe for preliminary screening. This step removes raw materials that do not meet the requirements. Subsequently, the stirring shaft in the digestion tank mixes the pre-screened raw materials, and water is introduced into the digestion tank through the water inlet pipe. The raw material for preparing lime slurry is usually calcium oxide. Calcium oxide reacts with water to form lime slurry, and this reaction is exothermic. The generated steam carries some unreacted calcium oxide dust to the discharge point. Inside the trachea, the calcium oxide dust comes into contact with an ionization plate and an adsorption plate in sequence. Upon contact with the ionization plate, the calcium oxide dust carries a negative charge, while the adsorption plate carries a positive charge. Through the principle of electrostatic adsorption, the calcium oxide dust is adsorbed onto the surface of the adsorption plate. High-temperature steam heats the heat exchange tube, thereby increasing the temperature of the medium in the heating chamber, which in turn gradually increases the air pressure in the pressurization chamber. When the air pressure in the pressurization chamber reaches the opening pressure of the first and second pressure relief valves, the air in the pressurization chamber carries the calcium oxide dust back to the digestion tank through the reflux pipe via the adsorption plate for reaction. The finished product after the reaction is completed is screened by a secondary screening mechanism and then output from the system.
[0013] The above approach has the following beneficial effects:
[0014] 1. In this solution, during the raw material delivery stage, high-pressure air is supplied to the transmission pipe through an inflation mechanism. The supplied high-pressure air passes through the spiral space formed between the transmission pipe and the spiral conveyor blades, which accelerates the delivery of raw materials on the one hand, and conveys any residual raw materials in the transmission pipe to the primary screening mechanism on the other hand. This ensures that the raw materials added to the storage tank are fully delivered to the primary screening mechanism. After the air is delivered to the digestion tank, the pressure gradually decreases, promoting the mixing of the raw materials that have just entered the digestion tank. Compared with the existing technology, this solution can avoid the residue of raw materials during the delivery process, ensure that sufficient raw materials are delivered to the digestion tank for reaction, ensure that the ratio of raw materials to water is consistent with the predetermined ratio, improve the efficiency of the raw material delivery process, and accelerate the initial mixing efficiency of raw materials.
[0015] 2. This scheme uses the combination of ionization plates and adsorption plates to temporarily adsorb and collect dust carried in the steam. The high-temperature steam heat generated during the lime slurry preparation process is used to increase the pressure in the pressurization chamber. When the pressure reaches the preset value, the high-pressure air passes through the dust adsorbed on the surface of the adsorption plates. The dust is then transported back to the digester through the return pipe to continue the reaction. Compared with the existing technology, this scheme can avoid the steam carrying some raw materials out of the digester, ensure that the ratio of raw materials to water is consistent with the predetermined ratio, and improve the quality of the prepared lime slurry.
[0016] 3. In this scheme, the raw materials are preliminarily screened before reacting with water to ensure that the particle size of the raw materials meets the preparation requirements, thereby ensuring the reaction and mixing efficiency of the raw materials and water in the digester. At the same time, since the high temperature and high pressure air in the pressurization chamber is intermittently transported back to the digester, the temperature in the digester can be controlled to accelerate the formation of lime milk, thereby improving the lime milk preparation efficiency.
[0017] In summary, this system not only ensures the precision of raw material preparation but also improves the efficiency of raw material delivery and preparation, enabling the rapid and accurate preparation of lime slurry.
[0018] Furthermore, the ionization plate includes a first rotating shaft rotatably connected to the side wall of the exhaust pipe, and a first electrode plate evenly distributed around the side wall of the first rotating shaft. The first electrode plate is electrically connected to the negative terminal of a DC power supply.
[0019] The adsorption plate includes a second rotating shaft rotatably connected to the side wall of the exhaust pipe, and a second electrode plate evenly distributed around the side wall of the second rotating shaft. The second electrode plate is electrically connected to the positive terminal of a DC power supply.
[0020] Beneficial effects: Using steam as a power source to drive the first and second rotating shafts to rotate promotes more thorough contact between the first and second electrode plates and the dust in the steam, thereby improving the dust adsorption effect.
[0021] Furthermore, the axes of the first pressure relief valve and the second intake check valve coincide, and the axes of the first pressure relief valve and the second intake check valve pass through the rotation path of the second electrode plate, and the axes of the first pressure relief valve and the second intake check valve are parallel to the second electrode plate.
[0022] Beneficial effect: By aligning the openings of the first pressure relief valve and the second air inlet check valve, it can be ensured that when high-temperature and high-pressure air is output from the pressurization chamber, it can smoothly pass through the second electrode plate and carry the dust adsorbed on its surface back into the digestion tank.
[0023] Furthermore, a venturi tube is connected to the reflux pipe between the second pressure relief valve and the digester.
[0024] Beneficial effect: The Venturi tube can accelerate the return of high-temperature and high-pressure air to the digester.
[0025] Furthermore, the primary screening mechanism includes a primary screening box, with one end of the primary screening box connected to the conveying pipe. The bottom of the primary screening box is provided with a material discharge port and a waste discharge port. The material discharge port is connected to the digester. A primary screening hood is rotatably connected to the inner side wall of the primary screening box. A second reduction motor is provided on the outer side wall of the primary screening box. The output shaft of the second reduction motor is coaxially and fixedly connected to the primary screening hood. A one-way feed port is provided on the side wall of the primary screening hood near the conveying pipe. Spiral blades are fixedly connected inside the primary screening hood. Several material selection holes are provided on the side wall of the primary screening hood above the material discharge port. Several waste holes are provided on the side wall of the primary screening hood above the waste discharge port.
[0026] Beneficial effects: By screening raw materials using a drum, raw materials that do not meet the particle size requirements can be removed and discharged through the waste discharge port. The raw materials can be replenished based on the quality of the discharged raw materials that do not meet the particle size requirements, thus ensuring that the amount of raw materials added meets the requirements.
[0027] Furthermore, the secondary screening mechanism includes a first secondary screening hood and a second secondary screening hood fixedly connected to the digester. The second secondary screening hood is fitted inside the first secondary screening hood and extends outside the first secondary screening hood. The side walls of the first secondary screening hood and the second secondary screening hood are respectively provided with a plurality of first secondary screening holes and second secondary screening holes. Spiral conveying plates are provided inside the first secondary screening hood and between the first secondary screening hood and the second secondary screening hood.
[0028] Beneficial effects: The prepared finished products are conveyed forward by the spiral conveyor plate, and screening is carried out simultaneously during the conveying process. Finished products that do not meet the quality requirements can be effectively screened out without the need for a separate screening process. Screening is completed during the conveying process.
[0029] Furthermore, the side wall of the first secondary screening hood is equipped with a dust adsorption pipe.
[0030] Beneficial effects: The dust adsorption tube can prevent dust generated during the finished product transportation process from affecting the preparation environment.
[0031] Furthermore, a vibrator is installed on the side wall of the storage tank.
[0032] Beneficial effect: The operation of the vibrator can prevent raw materials from adhering to the inner wall of the storage tank.
[0033] A control method for an integrated mineral processing reagent preparation and distribution system, characterized by comprising the following steps:
[0034] S1: The raw materials to be prepared are stored in storage tanks and delivered to the primary screening mechanism for preliminary screening through conveying pipes.
[0035] S2: The raw materials after preliminary screening are mixed by the stirring shaft in the digester, and water is introduced into the digester through the water inlet pipe so that the raw materials react fully with the water.
[0036] S3: The steam generated by the reaction of raw materials and water passes through the ion plate and adsorption plate in sequence. The dust in the steam is adsorbed by the adsorption plate, and the heat of the steam is transferred to the medium in the heating chamber through the heat exchange tube.
[0037] S4: The internal pressure of the pressurization chamber gradually increases as it is heated. When the pressure in the pressurization chamber reaches the opening pressure of the first and second pressure relief valves, the first and second pressure relief valves open. Air passes through the adsorption plate, carrying the dust on the adsorption plate to the return pipe, and then transports the dust back to the digester through the return pipe.
[0038] S5: The prepared product is screened by a secondary screening mechanism to complete the preparation of mineral processing reagents.
[0039] Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. Attached Figure Description
[0040] Figure 1 This is a schematic diagram of the overall structure of an embodiment of the integrated mineral processing reagent preparation and delivery system of the present invention;
[0041] Figure 2 This is a schematic diagram of the exhaust pipe structure of an embodiment of the integrated mineral processing reagent preparation and delivery system of the present invention;
[0042] Figure 3 This is a schematic diagram of the screening mechanism structure in an embodiment of the integrated mineral processing reagent preparation and delivery system of the present invention;
[0043] Figure 4 This is a schematic diagram of the complex screening mechanism structure of an embodiment of the integrated mineral processing reagent preparation and delivery system of the present invention;
[0044] Figure 5 This is a schematic diagram of the processor circuit connection in an embodiment of the integrated mineral processing reagent preparation and delivery system of the present invention;
[0045] Figure 6 This is a flowchart illustrating an embodiment of the integrated mineral processing reagent preparation and distribution system control method of the present invention. Detailed Implementation
[0046] Embodiments of the present invention are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.
[0047] In the description of this invention, it should be understood that the terms "longitudinal", "lateral", "vertical", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", and "outer" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.
[0048] In the description of this invention, unless otherwise specified and limited, it should be noted that the terms "installation", "connection" and "linking" should be interpreted broadly. For example, they can refer to mechanical or electrical connections, or internal connections between two components. They can be direct connections or indirect connections through an intermediate medium. Those skilled in the art can understand the specific meaning of the above terms according to the specific circumstances.
[0049] The following detailed description illustrates the specific implementation method:
[0050] The reference numerals in the accompanying drawings include: 1. Storage tank; 2. Vibrator; 3. Support frame; 4. Air pump; 5. Air supply pipe; 6. Support plate; 7. Conveying pipe; 8. First geared motor; 9. Third geared motor; 10. Gearbox; 11. Primary screening box; 12. Second geared motor; 13. Exhaust pipe; 14. Water inlet pipe; 15. First conveying pipe; 16. Second conveying pipe; 17. First secondary screening hood; 18. Dust adsorption pipe; 19. Digestion tank; 20. Circulation pump; 21. Heating chamber; 22. Pressurization chamber. 22. Second pressure relief valve; 23. Venturi tube; 24. Return pipe; 25. First electrode plate; 26. First rotating shaft; 27. Second air inlet check valve; 28. Second electrode plate; 29. First air inlet check valve; 30. First pressure relief valve; 31. Second rotating shaft; 32. Heat exchange tube; 33. Feed inlet; 34. One-way feed inlet; 35. Primary screening hood; 36. Material selection discharge port; 37. Waste discharge port; 38. Waste hole; 39. Material selection hole; 40. Screw conveyor plate; 41. Second secondary screening hood; 42.
[0051] Implementation, for example, attached Figure 1-5 As shown: An integrated mineral processing reagent preparation and distribution system includes a storage tank 1. A support frame 3 is bolted to the side of the storage tank 1, and a bearing plate 6 is bolted to the bottom of the support frame 3. The storage tank 1 is used to temporarily store raw materials for preparing mineral processing reagents. In this embodiment, the preparation of lime slurry is taken as an example. Calcium oxide is temporarily stored in the storage tank 1. Since calcium oxide is easily reacted with moisture in the air, it is necessary to ensure that the storage tank 1 is sealed. A vibrator 2 is fixedly connected to the side wall of the storage tank 1. When discharging calcium oxide from the storage tank 1, the operation of the vibrator 2 can prevent calcium oxide from adhering to the side wall of the storage tank 1.
[0052] The bottom of the storage tank 1 is conical, and the discharge area is cylindrical. The end of the cylindrical structure at the bottom of the storage tank 1 is connected to the conveying pipe 7. To ensure that the calcium oxide in the storage pipe is delivered to the conveying pipe 7 when it is needed for preparation, a valve can be set in the discharge area of the storage tank 1. The delivery of calcium oxide can be controlled by opening and closing the valve.
[0053] The conveying pipe 7 is arranged at an angle, with the end closer to the storage tank 1 having a lower height. The conveying pipe 7 is rotatably connected to a spiral conveying blade (not shown in the attached figure). The outer wall of the conveying pipe 7 is fixedly connected to a first reduction motor 8 that is driven by the spiral conveying blade. The end of the conveying pipe 7 away from the storage tank 1 is connected to a primary screening mechanism for screening raw materials.
[0054] The bottom of the primary screening mechanism is connected to a digestion mechanism, which includes a digestion tank 19 and a drive unit. The drive unit consists of a third reduction motor 9 and a reduction gearbox 10. The drive unit is fixedly connected to the left end of the digestion tank 19. A stirring shaft is rotatably connected inside the digestion tank 19. The stirring shaft is connected to the reduction gearbox 10 for transmission. The top of the digestion tank 19 is fixedly connected to a water inlet pipe 14 and an exhaust pipe 13 in sequence. There are three sets of water inlet pipes 14. Water is supplied to the digestion tank 19 simultaneously through the three sets of water inlet pipes 14. A solenoid valve can be connected to the water inlet pipe 14 to intelligently control whether water is supplied, which can promote the contact between calcium oxide and water. The end of the digestion tank 19 is connected to a secondary screening mechanism for screening the finished product.
[0055] This embodiment provides a specific structure for a primary screening mechanism: the primary screening mechanism includes a primary screening box 11, one end of which is connected to a conveying pipe 7. When calcium oxide in the conveying pipe 7 is conveyed to the top of the conveying pipe 7, it falls naturally into the primary screening box 11 due to gravity. The bottom of the primary screening box 11 is provided with a material discharge port 37 and a waste discharge port 38. The material discharge port 37 is connected to a digester 19. The material discharge port 37 and the waste discharge port 38 are arranged alternately. The material discharge port 37 conveys the screened calcium oxide to the digester. Inside 19, a primary screening hood 36 is rotatably connected to the inner side wall of the primary screening box 11, and a second reduction motor 12 is fixedly connected to the outer side wall of the primary screening box 11. The output shaft of the second reduction motor 12 is coaxially fixedly connected to the primary screening hood 36. A one-way feed port 35 is opened on the side wall of the primary screening hood 36 near the conveying pipe 7. Spiral blades are fixedly connected inside the primary screening hood 36. Several material selection holes 40 are opened on the side wall of the primary screening hood 36 above the material selection discharge port 37. Several waste holes 39 are opened on the side wall of the primary screening hood 36 above the waste discharge port 38.
[0056] The diameter of the material selection hole 40 is smaller than that of the waste hole 39, which allows smaller calcium oxide particles to be screened out through the material selection hole 40 and directly transported into the digester 19, while larger calcium oxide particles are transported out of the primary screening box 11 through the waste hole 39. The operator needs to measure the mass of the calcium oxide screened out of the primary screening box 11 to replenish the calcium oxide that needs to be transported into the digester 19.
[0057] This embodiment provides a specific structure for a secondary screening mechanism: the secondary screening mechanism includes a first secondary screening cover 17 and a second secondary screening cover 42 fixedly connected to the digester 19. The second secondary screening cover 42 is fitted inside the first secondary screening cover 17. In this embodiment, the first secondary screening cover 17 and the second secondary screening cover 42 remain stationary during the operation of the secondary screening mechanism, and the second secondary screening cover 42 extends outside the first secondary screening cover 17. The side walls of the first secondary screening cover 17 and the second secondary screening cover 42 are respectively provided with a plurality of first secondary screening holes 40 and second secondary screening holes 40. A spiral conveyor plate 41 is provided inside the first secondary screening cover 17 and between the first secondary screening cover 17 and the second secondary screening cover 42. The spiral conveyor plate 41 can be driven by a geared motor.
[0058] The diameter of the first secondary screening hole 40 is larger than that of the second secondary screening hole 40. The prepared lime slurry is driven forward by the conveyor plate within the second secondary screening hood 42, undergoing preliminary screening through the second secondary screening hole 40. It is then screened again through the first secondary screening hole 40. Unqualified lime slurry is conveyed forward by the conveyor plate, and finally, qualified lime slurry is conveyed and collected through the first conveying pipe 15, while unqualified lime slurry is conveyed and processed through the second conveying pipe 16. Furthermore, the prepared lime slurry can be dried by installing a drying device within the second secondary screening hood 42.
[0059] To avoid dust pollution of the surrounding environment during the preparation of lime slurry by secondary screening, a dust adsorption pipe 18 is provided on the side wall of the first secondary screening hood 17. During system operation, the dust adsorption pipe 18 continuously adsorbs and collects the dust outward from the first secondary screening hood 17, thereby avoiding pollution to the surrounding environment.
[0060] An air-filling mechanism is provided at one end of the conveying pipe near the storage tank 1. The air-filling mechanism is used to fill the conveying pipe 7 with air while the first reduction motor 8 is running. Specifically, a combination of air pump 4 and air-filling pipe 5 can be used. One end of the air-filling pipe 5 is connected to the bottom of the conveying pipe 7, and the other end is connected to the air pump 4. High-pressure air is continuously delivered through the air pump 4.
[0061] An ionization plate and an adsorption plate are sequentially arranged inside the exhaust pipe 13. Specifically, the ionization plate includes a first rotating shaft 27 rotatably connected to the side wall of the exhaust pipe 13, and a first electrode plate 26 evenly distributed around the side wall of the first rotating shaft 27. The first electrode plate 26 is electrically connected to the negative terminal of a DC power supply. The adsorption plate includes a second rotating shaft 32 rotatably connected to the side wall of the exhaust pipe 13, and a second electrode plate 29 evenly distributed around the side wall of the second rotating shaft 32. The second electrode plate 29 is electrically connected to the positive terminal of a DC power supply.
[0062] The steam generated during the preparation of lime slurry passes sequentially through the first electrode plate 26 and the second electrode plate 29, driving the first rotating shaft 27 and the second rotating shaft 32 to rotate, so that the calcium oxide dust carried in the steam can come into contact with the first electrode plate 26 and the second electrode plate 29, thereby adsorbing the calcium oxide dust through the principle of electrostatic adsorption.
[0063] A recovery box is installed on the side wall of the exhaust pipe 13, which is equipped with an adsorption plate. A partition is fixedly connected to the inner side wall of the recovery box, dividing the recovery box into a heating chamber 21 and a pressurizing chamber 22. The heating chamber 21 is filled with a heat exchange medium and is fixedly connected with several heat exchange tubes 33. The heat exchange tubes 33 are arranged in a U-shape in the heating chamber 21, and the other end of the heat exchange tubes 33 extends into the exhaust pipe 13. A circulation pump 20 is connected to the heat exchange tubes 33. By filling the heating chamber 21 and the heat exchange tubes 33 with the medium, the pressurizing chamber 22 can be heated by steam. Another way to heat the pressurizing chamber 22 is to directly connect the heat exchange tubes 33 to the exhaust pipe 13 and introduce high-temperature steam into the heat exchange tubes 33 through the circulation pump 20. The heat exchange tubes 33 contact the medium in the heating chamber 21, thereby heating the pressurizing chamber 22.
[0064] The pressurization chambers 22 on both sides of the exhaust pipe 13 are independent of each other. A first pressure relief valve 31 is connected between any one of the pressurization chambers 22 and the exhaust pipe 13, and a first intake check valve 30 is connected to the side wall. A second intake check valve 28 is connected between the other pressurization chamber 22 and the exhaust pipe 13, and a return pipe 25 is connected to the side wall. A second pressure relief valve 23 is connected to the return pipe 25. The end of the return pipe 25 away from the recovery box is connected to the digestion tank 19.
[0065] As the pressurizing chamber 22 is continuously heated, the air pressure inside the pressurizing chamber 22 gradually increases. When the air pressure inside the pressurizing chamber 22 reaches the opening pressure of the first pressure relief valve 31 and the second pressure relief valve 23, the air inside the pressurizing chamber 22 carries the calcium carbonate dust back to the digester 19 through the reflux pipe 25 via the adsorption plate for reaction.
[0066] Preferably, the first pressure relief valve 31 and the second air intake check valve 28 have their axes coincident, and the axes of the first pressure relief valve 31 and the second air intake check valve 28 pass through the rotation path of the second electrode plate 29, and the axes of the first pressure relief valve 31 and the second air intake check valve 28 are parallel to the second electrode plate 29; a venturi tube 24 is connected to the reflux pipe 25 between the second pressure relief valve 23 and the digester 19.
[0067] When the openings of the first pressure relief valve 31 and the second air inlet check valve 28 are aligned, the high-temperature and high-pressure air passing through the second electrode plate 29 can carry the calcium oxide dust on its surface into the return pipe 25. When the high-temperature and high-pressure air passes through the venturi tube 24, the flow rate is further increased, thereby quickly transporting it into the digester 19 for reaction.
[0068] This embodiment also connects the processor to various electrical devices via signal connection. The processor controls the operation of the vibrator 2 to ensure that the raw materials in the storage tank 1 are fully discharged. The processor controls the synchronous operation of the air pump 4 and the first geared motor 8 to accelerate the conveying of materials in the conveying pipe 7 and reduce the residue of materials in the conveying pipe 7. The processor controls the operation of the second geared motor 12 and the third geared motor 9 to intelligently realize the initial screening and mixing of raw materials. After the processor is connected to the solenoid valve, it can intelligently control the water supply of the water inlet pipe 14, etc.
[0069] The specific implementation process of the above system is as follows:
[0070] The raw materials to be prepared are stored in the storage tank 1. The raw materials are delivered to the primary screening mechanism through the conveying pipe 7 for preliminary screening to remove unqualified calcium oxide. The qualified calcium oxide is transported to the digester 19 for mixing and reaction. A predetermined amount of water is introduced through the water inlet pipe 14. The steam generated during the reaction enters the exhaust pipe 13 and adsorbs the calcium oxide dust through the first electrode plate 26 and the second electrode plate 29. The adsorbed calcium oxide dust is transported back to the digester 19 along with the high-temperature and high-pressure air by the heat of the steam, thereby maintaining the original amount of calcium oxide added. At the same time, the input of high-temperature and high-pressure air can also promote the preparation of lime milk in the digester 19.
[0071] Example 2
[0072] As attached Figure 6 As shown, a control method for an integrated mineral processing reagent preparation and distribution system includes the following steps:
[0073] S1: The raw materials to be prepared are stored in the storage tank 1 and delivered to the primary screening mechanism for preliminary screening through the conveying pipe 7.
[0074] S2: The raw materials after preliminary screening are mixed by the stirring shaft in the digester 19, and water is introduced into the digester 19 through the water inlet pipe 14 so that the raw materials react fully with the water.
[0075] S3: The steam generated by the reaction of raw materials and water passes through the ion plate and the adsorption plate in sequence. The dust in the steam is adsorbed by the adsorption plate, and the heat of the steam is transferred to the medium in the heating chamber 21 through the heat exchange tube 33.
[0076] S4: The internal pressure of the pressurization chamber 22 gradually increases as it is heated. When the pressure inside the pressurization chamber 22 reaches the opening pressure of the first pressure relief valve 31 and the second pressure relief valve 23, the first pressure relief valve 31 and the second pressure relief valve 23 open. Air passes through the adsorption plate and carries the dust on the adsorption plate to the return pipe 25, and then transports the dust back to the digestion tank 19 through the return pipe 25.
[0077] S5: The prepared product is screened by a secondary screening mechanism to complete the preparation of mineral processing reagents.
[0078] The above descriptions are merely embodiments of the present invention, and common knowledge such as specific structures and / or characteristics in the solutions are not described in detail here. It should be noted that those skilled in the art can make various modifications and improvements without departing from the structure of the present invention, and these should also be considered within the scope of protection of the present invention. These modifications and improvements will not affect the effectiveness of the implementation of the present invention or the practicality of the patent. The scope of protection claimed in this application should be determined by the content of its claims, and the specific embodiments described in the specification can be used to interpret the content of the claims.
Claims
1. An integrated mineral processing reagent preparation and delivery system, characterized in that: The system includes a storage tank, a conveying pipe connected to the bottom of the storage tank, the conveying pipe being inclined, a spiral conveying blade rotatably connected inside the conveying pipe, a first reduction motor connected to the spiral conveying blade on the outer wall of the conveying pipe, a primary screening mechanism for screening raw materials connected to the end of the conveying pipe away from the storage tank, a digestion mechanism connected to the bottom of the primary screening mechanism, the digestion mechanism including a digestion tank and a drive unit, the drive unit being fixedly connected to one end of the digestion tank, a stirring shaft rotatably connected inside the digestion tank, the stirring shaft being connected to the drive unit, a water inlet pipe and an exhaust pipe sequentially arranged at the top of the digestion tank, and a secondary screening mechanism for screening finished products connected to the end of the digestion tank. An inflation mechanism is provided at the end of the conveying pipe near the storage tank. The inflation mechanism is used to inflate the inside of the conveying pipe while the first reduction motor is running. An ionization plate and an adsorption plate are sequentially arranged inside the exhaust pipe. Both the ionization plate and the adsorption plate are electrically connected to a DC power supply. A recovery box is installed on the side wall of the exhaust pipe where the adsorption plate is located. A partition is installed on the inner side wall of the recovery box, which divides the recovery box into a heating chamber and a pressurizing chamber. The heating chamber is filled with a heat exchange medium and is equipped with several heat exchange tubes. The other end of the heat exchange tubes extends into the exhaust pipe, and a circulation pump is connected to the heat exchange tubes. The pressurization chambers on both sides of the exhaust pipe are independent of each other. A first pressure relief valve is connected between any one of the pressurization chambers and the exhaust pipe, and a first air intake check valve is connected to the side wall. A second air intake check valve is connected between the other pressurization chamber and the exhaust pipe, and a return pipe is connected to the side wall. A second pressure relief valve is connected to the return pipe, and the end of the return pipe away from the recovery box is connected to the digestion tank. The ionization plate includes a first rotating shaft rotatably connected to the side wall of the exhaust pipe, and a first electrode plate evenly distributed around the side wall of the first rotating shaft. The first electrode plate is electrically connected to the negative terminal of a DC power supply. The adsorption plate includes a second rotating shaft rotatably connected to the side wall of the exhaust pipe, and a second electrode plate evenly distributed around the side wall of the second rotating shaft. The second electrode plate is electrically connected to the positive terminal of a DC power supply. The first pressure relief valve and the second intake check valve have their axes coincident, and the axes of the first pressure relief valve and the second intake check valve pass through the rotation path of the second electrode plate. The axes of the first pressure relief valve and the second intake check valve are parallel to the second electrode plate.
2. The integrated mineral processing reagent preparation and delivery system according to claim 1, characterized in that: A venturi tube is connected to the reflux pipe between the second pressure relief valve and the digester.
3. The integrated mineral processing reagent preparation and delivery system according to claim 1, characterized in that: The primary screening mechanism includes a primary screening box, with one end of the primary screening box connected to a conveying pipe. The bottom of the primary screening box has a material discharge port and a waste discharge port. The material discharge port is connected to the digester. A primary screening hood is rotatably connected to the inner side wall of the primary screening box. A second reduction motor is installed on the outer side wall of the primary screening box. The output shaft of the second reduction motor is coaxially and fixedly connected to the primary screening hood. A one-way feed port is opened on the side wall of the primary screening hood near the conveying pipe. Spiral blades are fixedly connected inside the primary screening hood. Several material selection holes are opened on the side wall of the primary screening hood above the material discharge port. Several waste holes are opened on the side wall of the primary screening hood above the waste discharge port.
4. The integrated mineral processing reagent preparation and delivery system according to claim 3, characterized in that: The secondary screening mechanism includes a first secondary screening hood and a second secondary screening hood fixedly connected to the digester. The second secondary screening hood is fitted inside the first secondary screening hood and extends outside the first secondary screening hood. The side walls of the first secondary screening hood and the second secondary screening hood are respectively provided with a plurality of first secondary screening holes and second secondary screening holes. Spiral conveyor plates are provided inside the second secondary screening hood and between the first secondary screening hood and the second secondary screening hood.
5. The integrated mineral processing reagent preparation and delivery system according to claim 4, characterized in that: The first screening hood is equipped with a dust adsorption pipe on its side wall.
6. The integrated mineral processing reagent preparation and delivery system according to claim 5, characterized in that: The storage tank is equipped with a vibrator on its side wall.
7. A control method for an integrated mineral processing reagent preparation and distribution system, based on the integrated mineral processing reagent preparation and distribution system according to any one of claims 1-6, characterized in that, Includes the following steps: S1: The raw materials to be prepared are stored in storage tanks and delivered to the primary screening mechanism for preliminary screening through conveying pipes. S2: The raw materials after preliminary screening are mixed by the stirring shaft in the digester, and water is introduced into the digester through the water inlet pipe so that the raw materials react fully with the water. S3: The steam generated by the reaction of raw materials and water passes through the ionization plate and the adsorption plate in sequence. The dust in the steam is adsorbed by the adsorption plate, and the heat of the steam is transferred to the medium in the heating chamber through the heat exchange tube. S4: The internal pressure of the pressurization chamber gradually increases as it is heated. When the pressure in the pressurization chamber reaches the opening pressure of the first and second pressure relief valves, the first and second pressure relief valves open. Air passes through the adsorption plate, carrying the dust on the adsorption plate to the return pipe, and then transports the dust back to the digester through the return pipe. S5: The prepared product is screened by a secondary screening mechanism to complete the preparation of mineral processing reagents.
Citation Information
Patent Citations
New type of environmentally friendly lime digester
CN107673636B
Jaw crusher with dust recovery device
CN211988804U
Quicklime digestion dust removal system
CN216259843U