A canal riverway ecological resilience revetment structure and a construction method thereof
Patent Information
- Application Number
- CN202311256490.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-27
- Publication Date
- 2026-10-27
- Estimated Expiration
- 2043-09-27
AI Technical Summary
[0004]本发明的目的在于提供一种运河河道生态韧性护岸结构及其施工方法,从而克服现有的护岸结构复杂,运营维护难度大,若在实际工程中大规模地使用,无法满足经济性要求的缺点
[0023]1.采用本发明的砌块呈H形状,两端凸出部分通过与水浪直接接触,相互碰撞,可以有效耗散水浪的能量,吸收能量,起到防冲刷的作用;砌块中部设计为上大下小的凹槽,且凹槽的下部通过连接管与排水管相连,起到集排水作用,同时也可消除一部分水浪的能量,稳定性好,安全性能高,结构简单,不使用任何机械设备或需要经常维护的预埋元件,运营维护难度低,可以在实际工程中大规模地使用,满足经济性的要求;
Smart Images

Figure CN117449252B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of riverbank protection technology, and in particular to an ecologically resilient revetment structure for canals and its construction method. Background Technology
[0002] With the booming development of inland waterway transportation in my country and the trend towards larger and faster ships, the hydrodynamic effect of ships in canals is increasingly enhanced. The waves generated by frequent ship traffic and the corresponding changes in water flow alter the original hydrodynamic conditions of the waterway, constantly impacting the riverbank revetment structures and posing a potential threat of erosion damage and even structural instability. Currently, while existing revetment structures can withstand frequent hydrodynamic impacts, they suffer from drawbacks such as complex structural forms and high operational and maintenance difficulties. Furthermore, existing revetment structures often do not consider the actual canal length and project scale, extensively using high-precision devices such as mechanical gears or waterwheels. Large-scale use in actual projects would be prohibitively expensive and does not meet economic requirements. Therefore, the selection of revetment type is extremely important. It must not only ensure the stability, safety, and economy of the bank slope and withstand frequent impacts, but also meet ecological requirements, integrating the revetment structure with the surrounding environment.
[0003] Therefore, there is an urgent need to develop an ecologically resilient revetment structure and its construction method for canals that not only meets the requirements of high toughness and ecological greenness, but also ensures a certain degree of economic efficiency and can be applied to practical engineering projects. Summary of the Invention
[0004] The purpose of this invention is to provide an ecologically resilient revetment structure for canal channels and its construction method, thereby overcoming the shortcomings of existing revetment structures, such as complexity, difficulty in operation and maintenance, and inability to meet economic requirements if used on a large scale in actual projects.
[0005] To achieve the above objectives, the present invention provides an ecologically resilient revetment structure for a canal, comprising: an earthen slope, which is set on the bank of the canal, the earthen slope sloping outward from bottom to top, the top surface of the earthen slope having a bank top plane, and the inner side of the bank top plane sloping outward from top to bottom; a retaining wall, which is set between the canal and the lower end of the earthen slope, the outer side of the retaining wall sloping outward from top to bottom, and the length of the retaining wall being distributed along the length direction of the canal; grouting anchors, with multiple grouting anchors spaced apart within the earthen slope; a plain concrete soil stabilization layer, the surface of the earthen slope being covered with the plain concrete soil stabilization layer; a intercepting ditch, the bank top plane having an intercepting ditch along the length direction of the canal, the bank top plane having multiple evenly distributed collection pits along the length direction of the intercepting ditch, the top of the collection pits communicating with the intercepting ditch; and drainage pipes, the surface of the plain concrete soil stabilization layer having multiple evenly distributed drainage pipes along the direction of the canal. The upper end of the drainage pipe corresponding to the sump is connected to the corresponding sump, and the upper ends of the remaining drainage pipes are sealed with end caps. The lower end of each drainage pipe passes through the retaining wall and connects to the river channel. Multiple interlocking blocks are laid on the surface of the plain concrete stabilization layer. The blocks are installed between the outer side of the retaining wall and the inner side of the bank top plane. Each block is H-shaped, and the top surface of the middle plane of the block has a recessed groove that is larger at the top and smaller at the bottom. A water pipe pre-drilled hole is provided at the bottom of the groove. When splicing, the multiple blocks are distributed in a matrix. The bottom of the H-shape formed by splicing the blocks from bottom to top in each column forms an installation channel distributed along the vertical direction. A drainage pipe is installed in each installation channel, and a connecting pipe connected to the drainage pipe is provided in each water pipe pre-drilled hole. A reinforcement layer is poured between the surface of the plain concrete stabilization layer and the blocks.
[0006] Preferably, in the above technical solution, the groove is a frustum-shaped structure that is larger at the top and smaller at the bottom.
[0007] Preferably, in the above technical solution, vegetation is planted in the groove of the block located on the upper part of the slope, and each groove planted with vegetation is provided with a filter screen, stone chips, geotextile and planting soil in sequence from bottom to top.
[0008] Preferably, in the above technical solution, each block includes two H-shaped half blocks that are spliced together vertically, and the block is divided into two H-shaped half blocks along the axial direction of the groove.
[0009] Preferably, in the above technical solution, on every four blocks that are spliced together and whose splice joints are cross-shaped, a connecting rod is provided in the middle of the cross-shaped splice joint. The axis of the connecting rod is perpendicular to the axis of the water pipe reserved hole of the block. The upper and lower sides of each block are recessed with connecting grooves for installing the connecting rod at positions corresponding to the connecting rod.
[0010] Preferably, in the above technical solution, the intercepting ditch between two adjacent water collection pits is inclined downward from the middle to the two corresponding water collection pits.
[0011] A construction method for an ecologically resilient revetment structure for a canal includes the following steps:
[0012] (1) First, the slope of the earth slope is excavated and trimmed and the retaining wall is constructed. The earth slope is initially excavated according to the design slope of the earth slope. Then, the retaining wall is positioned according to the design dimensions of the retaining wall and the excavation dimensions at the bottom of the retaining wall are determined. Finally, the retaining wall is constructed. After the retaining wall is constructed, the gap between the retaining wall and the earth slope is backfilled. Finally, the earth slope is trimmed to ensure that the slope of the earth slope meets the design slope.
[0013] (2) After the slope is repaired, grouting anchor rod construction is carried out. Grouting anchor rods are driven into the slope and grouting is performed. After the grouting anchor rod construction is completed, plain concrete soil stabilization layer is poured.
[0014] (3) On the plain concrete soil layer, water pipe fixing brackets are pre-installed according to the installation position of the blocks to determine the position of the drainage pipes. The distance between two adjacent drainage pipes is equal to the distance between the water pipe reserved holes of two adjacent blocks along the river direction. The drainage pipes are installed on the water pipe fixing brackets, and a connecting pipe connected to the drainage pipe is installed at the position corresponding to the water pipe reserved hole of the corresponding block. The lower end of the drainage pipe passes through the retaining wall and connects to the river.
[0015] (4) Lay the blocks according to the location of the connecting pipe, and fit the water pipe reserved hole of the block onto the corresponding connecting pipe; during construction, start laying the blocks from the bottom of the slope upwards.
[0016] (5) The bottom of the H-shape formed by laying each row of blocks from bottom to top forms an installation channel distributed in the vertical direction, which is used to accommodate the drainage pipe.
[0017] (6) After the blocks are laid, concrete is poured through the installation channel to form a reinforcement layer.
[0018] (7) After the reinforcement layer is completed, the top surface of the slope, the intercepting ditch and the sump are constructed. Finally, according to the position of the top intercepting ditch and the sump, the upper end of the drainage pipe corresponding to the sump is extended upward to the bottom of the corresponding sump and connected to the sump; the upper end of the remaining drainage pipes is sealed with end caps.
[0019] Preferably, in the above technical solution, in step (4), each block includes two H-shaped half blocks that are spliced together vertically. The block is divided into two H-shaped half blocks along the axial direction of the groove. On every four blocks that are spliced together with a cross-shaped joint, a connecting rod is provided in the middle of the cross-shaped joint. The axis of the connecting rod is perpendicular to the axis of the water pipe reserved hole of the corresponding block. The upper and lower sides of each block are recessed with connecting grooves at the positions corresponding to the connecting rods. When the blocks are laid, mortar is used to lay between the two H-shaped half blocks of each block, between the block and the retaining wall, and between the block and the top plane of the bank. The remaining blocks are connected with mortar using connecting rods.
[0020] Preferably, in the above technical solution, before step (6), the area to be planted with vegetation is determined according to the water level of the river. The vertical distance between the block to be planted and the water level is greater than 2m. In the groove of the block to be planted with vegetation, a filter screen, stone chips, geotextile and planting soil are set from bottom to top, and finally the vegetation is planted.
[0021] Preferably, in the above technical solution, in step (7), a water collection pit is set every 20m along the length of the intercepting ditch. The length, width and height of the water collection pit are all 1m. The intercepting ditch between two adjacent water collection pits is set downward from the middle to the two corresponding water collection pits, and the slope of the intercepting ditch is 5%. The upper end of the drain pipe corresponding to the water collection pit is connected to the lower part of the corresponding water collection pit.
[0022] Compared with the prior art, the present invention has the following beneficial effects:
[0023] 1. The block of the present invention is H-shaped, with the protruding parts at both ends directly contacting and colliding with the water waves, which can effectively dissipate and absorb the energy of the water waves and play a role in preventing erosion; the middle part of the block is designed as a groove that is larger at the top and smaller at the bottom, and the lower part of the groove is connected to the drainage pipe through a connecting pipe, which plays a role in collecting and draining water, and can also eliminate some of the energy of the water waves. It has good stability, high safety performance, simple structure, does not use any mechanical equipment or embedded components that require frequent maintenance, has low operation and maintenance difficulty, can be used on a large scale in actual projects, and meets the requirements of economy;
[0024] 2. The H-shaped blocks of this invention not only give the revetment structure excellent mechanical properties such as high toughness and impact resistance, but also ensure that the revetment structure has strong overall stability and safety. The protruding sides and the groove in the middle, which is larger at the top and smaller at the bottom, enable the H-shaped blocks to have the functions of energy absorption and energy dissipation as well as drainage. In addition, green plants can be planted in the grooves, which meets the requirements of green ecology and is low-carbon and environmentally friendly.
[0025] 3. The blocks of the present invention are H-shaped, with connecting grooves set in the middle of the protruding parts at both ends of the H-shaped blocks. Connecting rods are embedded between the blocks, and finally mortar is used for masonry. While ensuring that the blocks have good integrity, it also improves the overall strength and slope durability of the revetment structure.
[0026] 4. The construction method of the revetment structure of the present invention is simple and convenient, meets the requirements of low carbon and green construction, and reduces construction costs. Attached Figure Description
[0027] Figure 1 This is a schematic diagram of the ecologically resilient revetment structure for canals according to the present invention.
[0028] Figure 2 This is a schematic diagram of the planar structure of the block according to the present invention.
[0029] Figure 3 This is a schematic diagram of the structure of the H-shaped half-block according to the present invention.
[0030] Figure 4 This is a three-dimensional structural diagram of the block according to the present invention.
[0031] Figure 5 This is a three-dimensional structural diagram of the interlocking blocks according to the present invention.
[0032] Figure 6 This is a schematic diagram of the planar structure of the blocks spliced together according to the present invention.
[0033] Figure 7 It is based on Figure 1 A magnified structural diagram of part A in the diagram.
[0034] Explanation of key figure labels:
[0035] 1-River channel, 2-Water pipe fixing bracket, 3-Block, 4-Connecting rod, 5-Connecting pipe, 6-Reinforcement layer, 7-Plain concrete soil stabilization layer, 8-Cover plate, 9-Intercepting ditch, 10-Sump, 11-Grouting anchor, 12-Soil slope, 13-Retaining wall, 14-Drainage pipe, 15-H-shaped half-block, 16-Water pipe reserved hole, 17-Mortar, 18-Connecting groove, 19-Groove, 20-Vegetation, 21-Planting soil, 22-Geotextile, 23-Stone chips, 24-Filter screen. Detailed Implementation
[0036] The specific embodiments of the present invention will now be described in detail with reference to the accompanying drawings, but it should be understood that the scope of protection of the present invention is not limited to the specific embodiments.
[0037] Unless otherwise expressly stated, throughout the specification and claims, the term "comprising" or its variations such as "including" or "comprises" shall be understood to include the stated elements or components without excluding other elements or other components.
[0038] Figures 1 to 7 The diagram shows a structural schematic of an ecologically resilient revetment structure for a canal according to a preferred embodiment of the present invention. The revetment structure includes an earth slope 12, a retaining wall 13, grouting anchors 11, a plain concrete soil stabilization layer 7, a water interception ditch 9, a drainage pipe 14, masonry blocks 3, and a reinforcement layer 6.
[0039] refer to Figures 1 to 7An earthen slope 12 is situated on the bank of the river channel 1, sloping outwards from bottom to top. The top surface of the earthen slope 12 has a bank top plane, and the inner side of the bank top plane slopes outwards from top to bottom towards the outside of the river channel to facilitate the subsequent installation of masonry blocks 3. A retaining wall 13 is positioned between the river channel 1 and the lower end of the earthen slope 12. The outer side of the retaining wall 13 slopes outwards from top to bottom to facilitate the subsequent installation of masonry blocks 3, and the length of the retaining wall 13 is distributed along the length of the river channel 1 to prevent the earthen slope 12 from collapsing and to prevent the upper masonry blocks 3 from slipping during construction and operation. Multiple spaced grouting anchors 11 are installed within the earthen slope 12 to enhance the stability and durability of the strata. A plain concrete soil stabilization layer 7 is laid on the surface of the earthen slope 12 to stabilize the soil and prevent the earthen slope 12 from collapsing. A water interception ditch 9 is provided along the length of the river channel 1 on the top plane of the bank. Multiple evenly distributed collection pits 10 are provided along the length of the water interception ditch 9 on the top plane of the bank, and the top of the collection pits 10 is connected to the water interception ditch 9 to allow water in the water interception ditch 9 to flow into the collection pits 10. Through the action of the water interception ditch 9 and the collection pits 10, the flowing water on the top plane of the bank can be collected and temporarily stored. Multiple evenly distributed drainage pipes 14 are provided on the surface of the plain concrete soil stabilization layer 7 along the direction of the river channel 1. The length of each drainage pipe 14 is distributed along the vertical direction of the slope. The upper end of the drainage pipe 14 corresponding to the collection pit 10 is connected to the corresponding collection pit 10 to discharge water from the collection pit 10 into the river channel 1. The upper ends of the remaining drainage pipes 14 are sealed with end caps, and the lower end of each drainage pipe 14 passes through the retaining wall 13 and connects to the river channel 1. Multiple interlocking masonry blocks 3 are laid on the surface of the plain concrete soil stabilization layer 7, and the masonry blocks 3 are installed between the outer side of the retaining wall 13 and the inner side of the top plane of the bank. Each block 3 is H-shaped. The H-shaped blocks of this invention have protruding ends that directly contact and collide with the water waves, effectively dissipating and absorbing the energy of the waves, thus preventing erosion. This not only gives the revetment structure high toughness and excellent impact resistance, but also ensures strong overall stability and safety. Furthermore, the top surface of the middle plane of the block 3 has a recessed groove 19, wider at the top and narrower at the bottom, with a water pipe pre-drilled hole 16 at the bottom. The axis of the water pipe pre-drilled hole 16 is preferably collinear with the axis of the groove 19. During assembly, multiple blocks 3 are arranged in a matrix. The bottom of the H-shape formed by assembling each row of blocks 3 from bottom to top forms an installation channel distributed along the vertical direction. Each installation channel contains a drainage pipe 14, and each water pipe pre-drilled hole 16 contains a connecting pipe 5 connected to the drainage pipe 14. For ease of connection, the connecting pipe 5 is a T-shaped structure. The middle part of the block 3 is designed as a groove 19 that is larger at the top and smaller at the bottom. The lower part of the groove 19 is connected to the drainage pipe 14 through the connecting pipe 5, so that the H-shaped block 3 has the functions of energy absorption and energy dissipation and drainage. It plays the role of drainage and can also eliminate some of the energy of water waves. It has good stability and high safety performance. Green plants can be planted in the groove 19 to meet the requirements of green ecology.A reinforcing layer 6 is poured between the surface of the plain concrete soil stabilization layer 7 and the masonry block 3 to fix the drainage pipe 14 and the masonry block 3, and to further reinforce the soil slope 12. The revetment structure of the present invention is simple in structure, does not use any mechanical equipment or embedded components that require frequent maintenance, has low operation and maintenance difficulty, can be used on a large scale in actual projects, and meets the requirements of economy.
[0040] refer to Figures 2 to 6 The cross-section of the groove 19 can be rectangular, circular, elliptical, triangular, or other polygonal. Preferably, the groove 19 is a frustum shape, wider at the top and narrower at the bottom, which facilitates manufacturing and planting, as well as enhancing the energy absorption effect of water waves.
[0041] refer to Figure 1 and Figure 7 To meet the requirements of green ecology, preferably, vegetation 20 is planted in the grooves 19 of the blocks 3 located on the upper part of the slope 12, and each groove 19 planted with vegetation 20 is provided with a filter screen 24, stone chips 23, geotextile 22 and planting soil 21 from bottom to top to facilitate water absorption and filtration. The groove 19 planted with vegetation 20 is at a vertical distance of more than 2m from the water level line of the river channel 1.
[0042] refer to Figures 2 to 6 The block 3 can be a single structure or it can be formed by splicing two H-shaped half blocks 15. Preferably, each block 3 includes two H-shaped half blocks 15 that are spliced together vertically. The block 3 is divided into two H-shaped half blocks 15 along the axial direction of the groove 19 to facilitate handling, manufacturing and construction.
[0043] refer to Figures 2 to 6 The blocks 3 can be connected by mortar 17 or by a combination of mortar 17 and connecting rods 4. Preferably, on every four interlocking blocks 3 with cross-shaped joints, a connecting rod 4 is provided in the middle of the cross-shaped joint, and the axis of the connecting rod 4 is perpendicular to the axis of the water pipe pre-drilled hole 16 of the corresponding block 3. Connecting grooves 18 for installing the connecting rods 4 are recessed on the upper and lower sides of each block 3 at positions corresponding to the connecting rods 4. When each block 3 includes two interlocking H-shaped half-blocks 15, connecting grooves 18 are provided on the left and right sides of the bottom surface of the lower H-shaped half-block 15, and connecting grooves 18 are provided on the left and right sides of the top surface of the upper H-shaped half-block 15. During installation, connecting rods 4 are embedded between the blocks 3, and finally, mortar 17 is used for masonry. This ensures good integrity of the blocks 3 while also improving the overall strength and durability of the revetment structure.
[0044] refer to Figures 1 to 7The blocks 3, connecting rods 4, and retaining walls 13 can be made of ordinary concrete or steel fiber reinforced concrete. Preferably, the blocks 3, connecting rods 4, and retaining walls 13 are all made of steel fiber reinforced concrete, which has high strength.
[0045] refer to Figure 1 Preferably, the intercepting ditch 9 between two adjacent water collection pits 10 is inclined downward from the middle towards the two corresponding water collection pits 10, so as to facilitate the flow of water in the intercepting ditch 9 into the adjacent water collection pits 10. The top of the water collection pit 10 is provided with a corresponding cover plate 8, and the top of the intercepting ditch 9 is also provided with a corresponding cover plate 8, and the cover plate 8 is provided with a through hole for water supply.
[0046] refer to Figures 1 to 7 A construction method for an ecologically resilient revetment structure for a canal channel 1 includes the following steps:
[0047] (1) First, the slope of earthen slope 12 is excavated and trimmed, and the retaining wall 13 is constructed. The initial excavation of earthen slope 12 is carried out according to the designed slope of earthen slope 12. Then, the location of retaining wall 13 is determined according to the designed dimensions of retaining wall 13, and the excavation dimensions at the bottom of retaining wall 13 are determined. After ensuring the safety of retaining wall 13 construction, the gap between retaining wall 13 and earthen slope 12 is backfilled. The backfill material can be clay, sand and gravel mixture or plain concrete. Finally, earthen slope 12 is trimmed to ensure that the slope of earthen slope 12 meets the designed slope.
[0048] (2) After the slope 12 is repaired, the grouting anchor 11 is installed. The grouting anchor 11 is driven into the slope 12 and grout is injected. After the grouting anchor 11 is installed, plain concrete soil stabilization layer 7 is poured to fix the slope 12.
[0049] (3) On the plain concrete soil layer 7, water pipe fixing brackets 2 are pre-installed according to the installation positions of the blocks 3 to determine the position of the drainage pipes 14. The distance between two adjacent drainage pipes 14 is equal to the distance between the water pipe reserved holes 16 of two adjacent blocks 3 along the direction of the river channel 1. The drainage pipes 14 are installed on the water pipe fixing brackets 2, and connecting pipes 5 connected to the drainage pipes 14 are installed at the positions corresponding to the water pipe reserved holes 16 of the corresponding blocks 3. The connecting pipes 5 can play a positioning role to facilitate the subsequent installation of the blocks 3. The lower end of the drainage pipe 14 passes through the retaining wall 13 and connects to the river channel 1 to discharge the water in the groove 19 into the river channel 1.
[0050] (4) The blocks 3 are laid according to the position of the connecting pipe 5. The water pipe reserved hole 16 of the block 3 is fitted onto the corresponding connecting pipe 5 so that the water in the groove 19 is discharged into the drain pipe 14 through the connecting pipe 5 and finally discharged into the river channel 1. During construction, the blocks 3 are laid from the bottom of the earth slope 12 upwards, that is, the blocks 3 are laid from the inner side of the retaining wall 13 upwards. The blocks 3 and the inner side of the retaining wall 13 are laid with mortar 17.
[0051] (5) The bottom of the H-shape formed by laying each row of blocks 3 from bottom to top forms an installation channel distributed in the vertical direction. The installation channel is used to accommodate the drain pipe 14. During installation, the water pipe reserved hole 16 of each block 3 is connected to the corresponding connecting pipe 5, and the connecting pipe 5 plays a positioning role.
[0052] (6) After the masonry block 3 is completed, concrete is poured through the installation channel to form a reinforcement layer 6, which is used to fix the masonry block 3 and the drainage pipe 14, and can reinforce the slope 12.
[0053] (7) After the construction of the reinforcement layer 6 is completed, the top surface of the slope 12 is constructed, the intercepting ditch 9 and the sump 10 are constructed. Finally, according to the position of the top intercepting ditch 9 and the sump 10, the upper end of the drainage pipe 14 corresponding to the sump 10 is extended upward to the bottom of the corresponding sump 10 and connected to the sump 10 so as to discharge the water in the sump 10 into the river channel 1; the upper ends of the remaining drainage pipes 14 are sealed with end caps.
[0054] refer to Figures 1 to 7 Preferably, in step (4), each block 3 includes two H-shaped half blocks 15 that are spliced together vertically. The block 3 is divided into two H-shaped half blocks 15 along the axial direction of the groove 19. On every four blocks 3 that are spliced together with a cross-shaped splice, a connecting rod 4 is provided in the middle of the cross-shaped splice. The axis of the connecting rod 4 is perpendicular to the axis of the water pipe reserved hole 16 of the corresponding block 3. The upper and lower sides of each block 3 are recessed with connecting grooves 18 at the positions corresponding to the connecting rod 4. When the blocks 3 are being built, mortar 17 is used to build between the two H-shaped half blocks 15 of each block 3, between the block 3 and the retaining wall 13, and between the block 3 and the top plane of the bank. The remaining blocks 3 are connected to each other by connecting rod 4 and mortar 17.
[0055] refer to Figures 1 to 7 Preferably, before step (6), the area to be planted with vegetation 20 is determined according to the water level of the river 1, and the vertical distance between the block 3 for planting vegetation 20 and the water level is greater than 2m. A filter screen 24, stone chips 23, geotextile 22, and planting soil 21 are sequentially arranged from bottom to top in the groove 19 of the block 3 for planting vegetation 20, and finally, vegetation 20 is planted to meet the requirements of green ecology.
[0056] refer to Figures 1 to 7 Preferably, in step (7), a water collection pit 10 is set every 20m along the length of the intercepting ditch 9. The length, width, and height of the water collection pit 10 are all 1m. The intercepting ditch 9 between two adjacent water collection pits 10 is inclined downward from the middle to the two corresponding water collection pits 10, and the slope of the intercepting ditch 9 is 5%, so as to facilitate the flow of water in the intercepting ditch 9 into the water collection pit 10. The upper end of the drain pipe 14 corresponding to the water collection pit 10 is connected to the lower part of the corresponding water collection pit 10, and the distance between the drain pipe 14 and the bottom surface of the water collection pit 10 is no more than 0.3m.
[0057] The revetment structure and construction method of this invention are simple and convenient to construct, meet the requirements of low carbon and green construction, and reduce construction costs. Moreover, the revetment structure is simple and can integrate the properties of erosion prevention, energy absorption, drainage, high toughness, and low operation and maintenance difficulty, and can improve the overall strength and slope durability of the revetment structure.
[0058] The foregoing description of specific exemplary embodiments of the invention is for illustrative and explanatory purposes. These descriptions are not intended to limit the invention to the precise forms disclosed, and it will be apparent that many changes and variations can be made in accordance with the foregoing teachings. The exemplary embodiments were chosen and described in order to explain the specific principles of the invention and its practical application, thereby enabling those skilled in the art to implement and utilize various different exemplary embodiments of the invention, as well as various different choices and variations. The scope of the invention is intended to be defined by the claims and their equivalents.
Claims
1. A resilient ecological revetment structure for canal channels, characterized in that, include: An earthen slope is set on the bank of a river channel. The earthen slope slopes outward from bottom to top. The top surface of the earthen slope has a bank top plane, and the inner side of the bank top plane slopes outward from top to bottom. A retaining wall is set between the river channel and the lower end of the earthen slope. The outer side of the retaining wall slopes outward from top to bottom, and the length of the retaining wall is distributed along the length of the river channel. Grouting anchors, wherein multiple grouting anchors are spaced apart within the soil slope; Plain concrete soil stabilization layer, the surface of the soil slope is covered with the plain concrete soil stabilization layer; The intercepting ditch has a ditch on the top plane of the bank along the length of the river channel, and a plurality of evenly distributed water collection pits are provided on the top plane of the bank along the length of the intercepting ditch. The top of the water collection pits is connected to the intercepting ditch. The surface of the plain concrete soil layer is provided with multiple evenly distributed drainage pipes along the direction of the river. The upper end of the drainage pipe corresponding to the sump is connected to the corresponding sump. The upper ends of the remaining drainage pipes are sealed by end caps. The lower end of each drainage pipe passes through the retaining wall and is connected to the river. The surface of the plain concrete soil stabilization layer is covered with multiple interlocking blocks. These blocks are installed between the outer side of the retaining wall and the inner side of the bank top plane. Each block is H-shaped, with its protruding ends directly contacting and colliding with the water waves. The top surface of the middle plane of each block has a recessed groove, wider at the top and narrower at the bottom, forming a frustum shape. A pre-drilled hole for a water pipe is located at the bottom of the groove. During assembly, the blocks are arranged in a matrix. The bottom of the H-shape formed by the blocks in each row, from bottom to top, creates an installation channel running vertically. Each installation channel contains a drainage pipe, and each pre-drilled hole for the water pipe has a connection point for communication with the drainage pipe. The connecting pipe; wherein, vegetation is planted in the groove of the block located on the upper part of the slope, and each groove planted with vegetation is provided with a filter screen, stone chips, geotextile and planting soil from bottom to top; each block includes two H-shaped half blocks spliced together vertically along the slope, and the block is divided into two H-shaped half blocks along the axis of the groove; on every four blocks spliced together with cross-shaped joints, a connecting rod is provided in the middle of the cross-shaped joint, the axis of the connecting rod is perpendicular to the axis of the water pipe reserved hole of the corresponding block, and the upper and lower sides of each block are recessed with connecting grooves for installing the connecting rod at positions corresponding to the connecting rod; and A reinforcement layer is poured between the surface of the plain concrete soil stabilization layer and the masonry block.
2. The ecologically resilient revetment structure for canal channels according to claim 1, characterized in that, The intercepting ditch between two adjacent water collection pits is inclined downward from the middle towards the two corresponding water collection pits.
3. A construction method for an ecologically resilient revetment structure for canal channels as described in claim 1, characterized in that, Includes the following steps: (1) First, the slope of the earth slope is excavated and trimmed and the retaining wall is constructed. The earth slope is initially excavated according to the design slope of the earth slope. Then, the location is determined according to the design dimensions of the retaining wall, and the excavation dimensions at the bottom of the retaining wall are determined. Finally, the retaining wall is constructed. After the retaining wall is constructed, the gap between the retaining wall and the earth slope is backfilled. Finally, the earth slope is trimmed to ensure that the slope of the earth slope meets the design slope. (2) After the slope is repaired, grouting anchor rod construction is carried out. Grouting anchor rods are driven into the slope and grouting is performed. After the grouting anchor rod construction is completed, plain concrete soil stabilization layer is poured. (3) On the plain concrete soil layer, water pipe fixing brackets are pre-installed according to the installation position of the blocks to determine the position of the drainage pipe. The distance between two adjacent drainage pipes is equal to the distance between the water pipe reserved holes of two adjacent blocks along the river direction. The drainage pipe is installed on the water pipe fixing bracket, and a connecting pipe connected to the drainage pipe is installed at the position corresponding to the water pipe reserved hole of the corresponding block. The lower end of the drainage pipe passes through the retaining wall and connects to the river. (4) Lay the blocks according to the location of the connecting pipe, and fit the water pipe reserved hole of the block onto the corresponding connecting pipe; during construction, start laying the blocks from the bottom of the slope upwards. (5) The bottom of the H-shape formed by laying the blocks from bottom to top in each row forms an installation channel distributed in the vertical direction, which is used to accommodate the drainage pipe; (6) After the blocks are laid, concrete is poured through the installation channel to form a reinforcement layer; (7) After the reinforcement layer is completed, the top surface of the slope, the intercepting ditch and the sump are constructed. Finally, according to the position of the top intercepting ditch and the sump, the upper end of the drainage pipe corresponding to the sump is extended upward to the bottom of the corresponding sump and connected to the sump; the upper end of the remaining drainage pipes is sealed with end caps.
4. The construction method of the ecologically resilient revetment structure for canal channels according to claim 3, characterized in that, In step (4), each block includes two H-shaped half blocks that are spliced together vertically along the slope. The block is divided into two H-shaped half blocks along the axis of the groove. A connecting rod is provided in the middle of the cross-shaped splice on every four blocks that are spliced together. The axis of the connecting rod is perpendicular to the axis of the water pipe reserved hole of the corresponding block. A connecting groove is recessed on the upper and lower sides of each block at the position corresponding to the connecting rod. When the blocks are laid, mortar is used to lay between the two H-shaped half blocks of each block, between the block and the retaining wall, and between the block and the top plane of the bank. The remaining blocks are connected with mortar using connecting rods.
5. The construction method of the ecologically resilient revetment structure for canal channels according to claim 3, characterized in that, Before step (6), determine the area to be planted with vegetation based on the water level of the river. The vertical distance between the blocks to be planted and the water level is greater than 2m. In the groove of the blocks to be planted with vegetation, filter screen, stone chips, geotextile and planting soil are set from bottom to top, and finally the vegetation is planted.
6. The construction method of the ecologically resilient revetment structure for canal channels according to claim 3, characterized in that, In step (7), a water collection pit is set every 20m along the length of the intercepting ditch. The length, width and height of the water collection pit are all 1m. The intercepting ditch between two adjacent water collection pits is set downward from the middle to the two corresponding water collection pits, and the slope of the intercepting ditch is 5%. The upper end of the drain pipe corresponding to the water collection pit is connected to the lower part of the corresponding water collection pit.
Citation Information
Patent Citations
Energy dissipation anti-ice-push interlocking brick slope protection structure
CN105756016A
Porous cement brick
CN204703128U
Ecological bricklaying structure for ecological slope protection
CN210712743U
Bridge type brick for sponge city construction
CN212582318U
Water conservancy ecological protection slope
CN217810792U