Solid ammonia injection control method and system

By installing an ammonia storage tank, electric heating equipment, and control valve in the solid ammonia system, and combining it with a status judgment and injection control module, efficient ammonia injection under different start-up states is achieved. This solves the problem that existing systems cannot meet high emission standards and improves the accuracy and efficiency of injection control.

CN117449945BActive Publication Date: 2026-11-24FAW JIEFANG AUTOMOTIVE CO
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311091340.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-08-28
Publication Date
2026-11-24
Estimated Expiration
2043-08-28

AI Technical Summary

Technical Problem

Existing solid ammonia systems are unable to meet higher emission standards, especially in different vehicle startup states, where efficient and accurate ammonia injection control is not possible.

Method used

By setting up a first ammonia storage tank, a second ammonia storage tank, an electric heating device, a control valve, and an ammonia nozzle in the solid ammonia system, and combining a status judgment module, a pressure building module, and an injection control module, the valve status and injection volume are adjusted according to the initial pressure, start-up status, and nitrogen content of the tail gas, so as to achieve precise control of ammonia injection.

Benefits of technology

It improves the accuracy of solid ammonia injection in different vehicle startup states, meets stricter emission standards, and enhances the system's response efficiency and injection control precision.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117449945B_ABST
    Figure CN117449945B_ABST
Patent Text Reader

Abstract

This application relates to a solid ammonia injection control method and system. The method includes: taking the end of the second ammonia storage tank connected to the first control valve as the target end, obtaining the initial pressure of the target end, and determining the current starting state of the vehicle based on the initial pressure; adjusting the opening and closing states of the first and second control valves according to the current starting state until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions; obtaining the nitrogen content in the vehicle's exhaust gas, and when the nitrogen content is greater than a first preset threshold, calculating the ammonia injection demand of the ammonia nozzle based on the real-time ammonia pressure and real-time temperature in the ammonia gas rail, and controlling the ammonia nozzle to inject according to the ammonia injection demand. This application provides a dual-nozzle solid ammonia system and control system, which, by controlling the dual-nozzle solid ammonia system, achieves control of solid ammonia injection under different starting states of the vehicle, improving the accuracy of solid ammonia injection during vehicle operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of intelligent control technology, and in particular to a solid ammonia injection control method and system. Background Technology

[0002] To meet the ultra-low emission requirements of emission regulations, solid ammonia is widely used in automotive emission systems because it does not produce urea crystals or urea-like particulate matter emissions. Specifically, solid ammonia systems store ammonia gas in a solid form in a specific tank. After the vehicle starts, the temperature of the exhaust gas heats the ammonia storage material, releasing the ammonia gas. This ammonia gas is then injected into the aftertreatment system in a metered and pressurized manner to catalyze the reaction of nitrogen oxides. Preliminary research comparing the system to Euro 7 emission standards indicates that meeting current emission requirements necessitates a two-stage reducing agent injection system. Therefore, a dual-injection solid ammonia system and its control strategy are urgently needed to meet these higher emission requirements. Summary of the Invention

[0003] Therefore, it is necessary to provide a method, system, device, computer equipment, computer-readable storage medium, and computer program product that can efficiently and quickly control solid ammonia injection, addressing the aforementioned technical problems.

[0004] In a first aspect, this application provides a solid ammonia injection control method. The method is applied to an injection controller, which controls the operation of a solid ammonia system. The solid ammonia system includes: a first ammonia storage tank, a second ammonia storage tank, a first control valve, a second control valve, an ammonia gas rail, and an ammonia nozzle. Both the first and second ammonia storage tanks are used to store ammonia and each includes a corresponding electric heating device externally for heating the respective storage tank. One end of the first ammonia storage tank is connected to one end of the first control valve, and the other end of the first control valve is connected to one end of the second ammonia storage tank. One end of the second ammonia storage tank is also connected to the second control valve. The first control valve controls whether ammonia is input or output from the first ammonia storage tank. The second control valve controls whether ammonia in the first or second ammonia storage tank is input into the ammonia gas rail. The ammonia nozzle is used to inject ammonia from the ammonia gas rail. The method includes:

[0005] The end of the second ammonia storage tank connected to the first control valve is taken as the target end. The initial pressure of the target end is obtained, and the current starting status of the vehicle is determined based on the initial pressure.

[0006] Based on the current startup status, adjust the opening and closing status of the first control valve and the second control valve until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions.

[0007] The nitrogen content in the vehicle exhaust gas is obtained. When the nitrogen content is greater than a first preset threshold, the real-time ammonia pressure and real-time temperature in the ammonia gas rail are obtained.

[0008] Based on the real-time ammonia pressure and temperature, calculate the ammonia emission demand of the ammonia nozzle, and control the ammonia nozzle to spray according to the ammonia emission demand.

[0009] In one embodiment, determining the current start-up state of the vehicle based on the initial pressure includes:

[0010] If the initial pressure is less than the second preset threshold, the current starting state of the vehicle is determined to be a cold start state.

[0011] If the initial pressure is not less than the second preset threshold, the current starting state of the vehicle is determined to be a hot start state.

[0012] In one embodiment, based on the current startup state, the opening and closing states of the first control valve and the second control valve are adjusted until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions, including:

[0013] When the current startup state is cold start, control the electric heating equipment corresponding to the second ammonia storage tank to start, and control the first control valve to close;

[0014] The real-time pressure at the target end is obtained. If the real-time pressure is not less than the third preset threshold, the second control valve is opened until the ammonia pressure in the ammonia gas rail meets the corresponding preset conditions.

[0015] When the real-time pressure is not less than the fourth preset threshold, the electric heating device corresponding to the first ammonia storage tank is started, and after a preset time, the electric heating device corresponding to the second ammonia storage tank is turned off and the first control valve is opened.

[0016] Among them, the second preset threshold is less than the fourth preset threshold, and the fourth preset threshold is less than the third preset threshold.

[0017] In one embodiment, after controlling the electric heating equipment corresponding to the second ammonia storage tank to shut down and controlling the first control valve to open, the method further includes:

[0018] The real-time pressure at the target end is obtained, and if the real-time pressure is not less than the third preset threshold, the electric heating equipment corresponding to the first ammonia storage tank is controlled to shut down.

[0019] When the real-time pressure is less than the third preset threshold, the electric heating equipment corresponding to the second ammonia storage tank is started until the real-time pressure is not less than the third preset threshold, at which point the electric heating equipment corresponding to the first and second ammonia storage tanks is turned off.

[0020] In one embodiment, based on the current startup state, the opening and closing states of the first control valve and the second control valve are adjusted until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions, including:

[0021] When the current startup state is hot start, the electric heating equipment corresponding to the first and second ammonia storage tanks will be started.

[0022] The real-time pressure at the target end is obtained. If the real-time pressure is not less than the third preset threshold, the second control valve is opened until the ammonia pressure in the ammonia gas rail is not less than the fourth preset threshold.

[0023] Among them, the second preset threshold is less than the fourth preset threshold, and the fourth preset threshold is less than the third preset threshold.

[0024] In one embodiment, the solid ammonia system further includes multiple metering valves for controlling the ammonia injection rate from the ammonia nozzle; correspondingly, controlling the ammonia nozzle to inject ammonia according to the ammonia injection demand includes:

[0025] Based on the ideal gas law of ammonia and the flow rates of multiple metering valves, the ammonia emission demand is converted into the total opening time of the metering valves.

[0026] Obtain the vehicle exhaust pipe temperature status corresponding to each metering valve, and determine the opening sub-duration of each metering valve based on the vehicle exhaust pipe temperature status corresponding to each metering valve and the total opening time of the metering valve.

[0027] Secondly, this application also provides a solid ammonia injection control device. The device is applied to an injection controller, which controls the operation of a solid ammonia system. The solid ammonia system includes: a first ammonia storage tank, a second ammonia storage tank, a first control valve, a second control valve, an ammonia gas rail, and an ammonia nozzle. Both the first and second ammonia storage tanks are used to store ammonia and each includes corresponding electric heating devices externally for heating the respective storage tanks. One end of the first ammonia storage tank is connected to one end of the first control valve, and the other end of the first control valve is connected to one end of the second ammonia storage tank. One end of the second ammonia storage tank is also connected to the second control valve. The first control valve controls whether ammonia is input or output from the first ammonia storage tank. The second control valve controls whether ammonia in the first or second ammonia storage tank is input into the ammonia gas rail. The ammonia nozzle is used to inject ammonia from the ammonia gas rail. The device includes:

[0028] The status judgment module is used to take the end of the second ammonia storage tank connected to the first control valve as the target end, obtain the initial pressure of the target end, and determine the current start-up status of the vehicle based on the initial pressure.

[0029] The pressure building module is used to adjust the opening and closing states of the first and second control valves according to the current startup status until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions.

[0030] The data acquisition module is used to acquire the nitrogen content in the vehicle exhaust gas. When the nitrogen content is greater than a first preset threshold, it acquires the real-time ammonia pressure and real-time temperature in the ammonia gas rail.

[0031] The injection control module is used to calculate the ammonia injection demand of the ammonia nozzle based on the real-time ammonia pressure and temperature, and to control the ammonia nozzle to inject ammonia according to the injection demand.

[0032] Thirdly, this application also provides a solid ammonia injection control system, the system including an injection controller and a solid ammonia system;

[0033] The solid ammonia system includes: a first ammonia storage tank, a second ammonia storage tank, a first control valve, a second control valve, an ammonia gas rail, and an ammonia nozzle. Both the first and second ammonia storage tanks are used to store ammonia and are externally equipped with corresponding electric heating devices for heating their respective storage tanks. One end of the first ammonia storage tank is connected to one end of the first control valve, and the other end of the first control valve is connected to one end of the second ammonia storage tank. One end of the second ammonia storage tank is also connected to the second control valve. The first control valve controls whether ammonia is input or output from the first ammonia storage tank. The second control valve controls whether ammonia from the first or second ammonia storage tank is input into the ammonia gas rail. The ammonia nozzle is used to spray ammonia from the ammonia gas rail.

[0034] The injection controller is used to control the operation of the solid ammonia system, specifically to execute any of the steps in the above-mentioned solid ammonia injection control method.

[0035] Fourthly, this application also provides a computer device. The computer device includes a memory and a processor, the memory storing a computer program, and the processor executing the computer program to perform the following steps:

[0036] The end of the second ammonia storage tank connected to the first control valve is taken as the target end. The initial pressure of the target end is obtained, and the current starting status of the vehicle is determined based on the initial pressure.

[0037] Based on the current startup status, adjust the opening and closing status of the first control valve and the second control valve until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions.

[0038] The nitrogen content in the vehicle exhaust gas is obtained. When the nitrogen content is greater than a first preset threshold, the real-time ammonia pressure and real-time temperature in the ammonia gas rail are obtained.

[0039] Based on the real-time ammonia pressure and temperature, calculate the ammonia emission demand of the ammonia nozzle, and control the ammonia nozzle to spray according to the ammonia emission demand.

[0040] Fifthly, this application also provides a computer-readable storage medium. The computer-readable storage medium stores a computer program thereon, which, when executed by a processor, performs the following steps:

[0041] The end of the second ammonia storage tank connected to the first control valve is taken as the target end. The initial pressure of the target end is obtained, and the current starting status of the vehicle is determined based on the initial pressure.

[0042] Based on the current startup status, adjust the opening and closing status of the first control valve and the second control valve until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions.

[0043] The nitrogen content in the vehicle exhaust gas is obtained. When the nitrogen content is greater than a first preset threshold, the real-time ammonia pressure and real-time temperature in the ammonia gas rail are obtained.

[0044] Based on the real-time ammonia pressure and temperature, calculate the ammonia emission demand of the ammonia nozzle, and control the ammonia nozzle to spray according to the ammonia emission demand.

[0045] Sixthly, this application also provides a computer program product. The computer program product includes a computer program that, when executed by a processor, performs the following steps:

[0046] The end of the second ammonia storage tank connected to the first control valve is taken as the target end. The initial pressure of the target end is obtained, and the current starting status of the vehicle is determined based on the initial pressure.

[0047] Based on the current startup status, adjust the opening and closing status of the first control valve and the second control valve until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions.

[0048] The nitrogen content in the vehicle exhaust gas is obtained. When the nitrogen content is greater than a first preset threshold, the real-time ammonia pressure and real-time temperature in the ammonia gas rail are obtained.

[0049] Based on the real-time ammonia pressure and temperature, calculate the ammonia emission demand of the ammonia nozzle, and control the ammonia nozzle to spray according to the ammonia emission demand.

[0050] The aforementioned solid ammonia injection control method and system take the end connected to the second ammonia storage tank and the first control valve as the target end, obtains the initial pressure of the target end, and determines the current starting state of the vehicle based on the initial pressure; according to the current starting state, adjusts the opening and closing states of the first and second control valves until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions; obtains the nitrogen content in the vehicle's exhaust gas, and if the nitrogen content is greater than a first preset threshold, obtains the real-time ammonia pressure and real-time temperature in the ammonia gas rail; calculates the ammonia injection demand of the ammonia nozzle based on the real-time ammonia pressure and real-time temperature, and controls the ammonia nozzle to inject according to the ammonia injection demand. This application provides a dual-nozzle solid ammonia system and control system, which, by controlling the dual-nozzle solid ammonia system, realizes the control of solid ammonia injection under different starting states of the vehicle, improving the accuracy of solid ammonia injection during vehicle operation. Attached Figure Description

[0051] Figure 1 This is a schematic diagram of the solid ammonia system in one embodiment;

[0052] Figure 2 This is a flowchart illustrating a solid ammonia injection control method in one embodiment;

[0053] Figure 3 This is a flowchart illustrating the solid ammonia injection control method in another embodiment;

[0054] Figure 4 This is a flowchart illustrating the solid ammonia injection control method in yet another embodiment;

[0055] Figure 5 This is a structural block diagram of a solid ammonia injection control device in one embodiment;

[0056] Figure 6 This is an internal structural diagram of a computer device in one embodiment. Detailed Implementation

[0057] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.

[0058] The solid ammonia injection control method provided in this application embodiment is applied to an injection controller, which is used to control the operation of a solid ammonia system, such as... Figure 1As shown, the solid ammonia system includes: a first ammonia storage tank 101, a second ammonia storage tank 102, a first control valve 103, a second control valve 104, an ammonia gas rail 105, and an ammonia nozzle 106; both the first ammonia storage tank 101 and the second ammonia storage tank 102 are used to store ammonia and each includes corresponding electric heating devices 107 and 108 externally, which are used to heat the corresponding ammonia storage tanks; one end of the first ammonia storage tank 101 is connected to one end of the first control valve 103, and the other end of the first control valve 103 is connected to one end of the second ammonia storage tank 102; one end of the second ammonia storage tank 102 is also connected to the second control valve 104; the first control valve 103 is used to control whether ammonia is input or output from the first ammonia storage tank 101; the second control valve 104 is used to control whether the ammonia in the first ammonia storage tank 101 or the second ammonia storage tank 102 is input into the ammonia gas rail 105; the ammonia nozzle 106 is used to spray ammonia into the ammonia gas rail 105; as shown Figure 2 As shown, taking the application of this method to the server corresponding to the injection controller as an example, the method includes:

[0059] Step 202: Take the end of the second ammonia storage tank connected to the first control valve as the target end, obtain the initial pressure of the target end, and determine the current starting state of the vehicle based on the initial pressure;

[0060] The target end refers to the ammonia output end of the first or second ammonia storage tank. The target end is set to determine whether the ammonia in the first or second ammonia storage tank can enter the ammonia gas rail based on the ammonia pressure at the target end. The ammonia in the ammonia gas rail is supplied by the first and second ammonia storage tanks. A second control valve is installed between the first and second ammonia storage tanks and the ammonia gas rail. The second control valve controls whether ammonia enters the ammonia gas rail, and its opening is controlled by the ammonia pressure at the target end. Figure 1 In the diagram, point A is the target end, which is the connection point of the second ammonia storage tank 102, the first control valve 103, and the second control valve 104.

[0061] The initial pressure refers to the gas pressure at the target end obtained at the initial moment of controlling the vehicle's solid ammonia system. In one embodiment, a pressure sensor is installed at the target end, which can directly detect the ammonia gas pressure at the target end; that is, the initial pressure is directly obtained through the gas sensor. The current startup state refers to the vehicle's operating state at the initial moment of executing the solid ammonia injection control method. It should be noted that if the vehicle has not been started for a long time, since the solid ammonia system is not working, that is, neither the first nor the second ammonia storage tank is inputting ammonia into the ammonia gas rail, the ammonia pressure at the target end should be consistent with the current ambient gas pressure. In this case, the initial pressure should be less than the pressure required for ammonia injection within the solid ammonia system. If the vehicle is started again after a period of inactivity, the gas pressure at the target end has not yet returned to the ambient pressure. If the vehicle is started again at this time, different control procedures are required due to the different initial pressure.

[0062] Step 204: Based on the current startup status, adjust the opening and closing status of the first control valve and the second control valve until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions.

[0063] The preset conditions corresponding to the target end refer to the gas pressure conditions that must be met at the target end when the gas can enter the ammonia gas rail under the action of the pressure difference. The preset conditions corresponding to the ammonia gas rail refer to the pressure conditions that must be met when the ammonia in the ammonia gas rail cannot flow back to the target end and can be ejected from the ammonia nozzle.

[0064] Based on the vehicle's current startup status, the opening and closing of the first and second control valves are controlled to control the entry of ammonia gas into the ammonia gas rail and achieve pressure build-up, ensuring that the ammonia nozzles can spray ammonia gas normally. Specifically, the first and second ammonia storage tanks store ammonia storage materials, which can release ammonia gas through heating by corresponding electric heating equipment. Therefore, when ammonia gas generated in the first ammonia storage tank enters the ammonia gas rail through the target end via the first and second control valves, or when ammonia gas generated in the second ammonia storage tank enters the ammonia gas rail through the target end via the first control valve, the ammonia gas pressure at the target end and in the ammonia gas rail will change.

[0065] Step 206: Obtain the nitrogen content in the vehicle exhaust gas. If the nitrogen content is greater than the first preset threshold, obtain the real-time ammonia pressure and real-time temperature in the ammonia gas rail.

[0066] It is known that a vehicle's solid ammonia system releases ammonia gas to react with the vehicle's exhaust gases, converting nitrogen oxides in the exhaust into nitrogen and water, thereby meeting exhaust emission standards. Therefore, whether the ammonia nozzles in the solid ammonia system inject ammonia gas is also related to whether the vehicle emits exhaust gases or the nitrogen content in the exhaust gases.

[0067] The first preset threshold refers to the critical value of nitrogen content in the exhaust gas when exhaust gas treatment is required. Specifically, when the gas pressure in the ammonia gas rail of the solid ammonia system reaches the pressure build-up requirement, the nitrogen content in the vehicle exhaust gas is compared with the first preset threshold to determine whether the vehicle requires ammonia injection. If ammonia injection is required, the solid ammonia system is controlled to inject ammonia to treat the vehicle exhaust gas.

[0068] Step 208: Calculate the ammonia injection demand of the ammonia nozzle based on the real-time ammonia pressure and real-time temperature, and control the ammonia nozzle to inject ammonia according to the ammonia injection demand.

[0069] The real-time ammonia pressure refers to the real-time ammonia pressure in the ammonia gas rail, i.e., the real-time ammonia gas pressure. The real-time temperature refers to the real-time temperature of the ammonia in the ammonia gas rail. It should be noted that the higher the ammonia pressure, the higher its condensation temperature; the condensation temperature is lower at normal pressure. Since the solid ammonia system requires the injected ammonia to be in a gaseous state to better react with vehicle exhaust gases, the influence of the ammonia pressure and temperature in the ammonia gas rail on ammonia injection needs to be considered. Given the real-time ammonia pressure and temperature, the required ammonia injection quantity for the vehicle exhaust gases at the current moment is calculated based on the ideal gas state equation for ammonia, and then the ammonia nozzle is controlled to inject the ammonia.

[0070] In the method provided in the above embodiments, the end connected to the second ammonia storage tank and the first control valve is taken as the target end. The initial pressure of the target end is obtained, and the current starting state of the vehicle is determined based on the initial pressure. According to the current starting state, the opening and closing states of the first control valve and the second control valve are adjusted until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions. The nitrogen content in the vehicle exhaust gas is obtained. When the nitrogen content is greater than a first preset threshold, the real-time ammonia pressure and real-time temperature in the ammonia gas rail are obtained. Based on the real-time ammonia pressure and real-time temperature, the ammonia injection demand of the ammonia nozzle is calculated, and the ammonia nozzle is controlled to inject ammonia according to the ammonia injection demand. This application provides a dual-nozzle solid ammonia system and a control system. By controlling the dual-nozzle solid ammonia system, the injection of solid ammonia under different starting states of the vehicle can be controlled, thereby improving the accuracy of solid ammonia injection during vehicle operation.

[0071] In one embodiment, determining the current start-up state of the vehicle based on the initial pressure includes:

[0072] If the initial pressure is less than the second preset threshold, the current starting state of the vehicle is determined to be a cold start state.

[0073] If the initial pressure is not less than the second preset threshold, the current starting state of the vehicle is determined to be a hot start state.

[0074] The second preset threshold is the gas pressure, used to determine the vehicle's starting state. For example, if the second preset threshold is 101 kPa, and the initial pressure is less than 101 kPa, the vehicle is considered to be in a cold start state, meaning that the heat generated during vehicle operation has dissipated due to the vehicle not being started for a long time. If the initial pressure is not less than 101 kPa, it indicates that the vehicle was in operation for a period of time before the start-up, and the heat generated during vehicle operation has not yet dissipated. The residual heat will act on the solid ammonia system, and the vehicle in this state is defined as a hot start state.

[0075] It should be noted that, since the residual heat during a hot start will act on the solid ammonia system, the solid ammonia system can be quickly started to treat vehicle exhaust emissions through the normal valve processing procedure. However, when the vehicle is in a cold start state, since both the first and second ammonia storage tanks store solid ammonia, if it is necessary to quickly start the solid ammonia system to treat exhaust emissions, an additional heating step is required to quickly respond to the vehicle's operating status and improve the ammonia release efficiency of the solid ammonia system.

[0076] In the method provided in the above embodiments, the initial pressure at the target end is judged by preset gas pressure, which can quickly determine the current starting state of the vehicle and improve the injection control efficiency of the vehicle's solid ammonia system.

[0077] In one embodiment, such as Figure 3 As shown, based on the current startup status, adjust the opening and closing states of the first and second control valves until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions, including:

[0078] Step 302: If the current startup state is cold start, control the electric heating equipment corresponding to the second ammonia storage tank to start and control the first control valve to close.

[0079] Step 304: Obtain the real-time pressure at the target end. If the real-time pressure is not less than the third preset threshold, control the second control valve to open until the ammonia pressure in the ammonia gas rail meets the corresponding preset conditions.

[0080] Step 306: When the real-time pressure is not less than the fourth preset threshold, control the electric heating device corresponding to the first ammonia storage tank to start, and after a preset time, control the electric heating device corresponding to the second ammonia storage tank to shut down and control the first control valve to open.

[0081] Among them, the second preset threshold is less than the fourth preset threshold, and the fourth preset threshold is less than the third preset threshold.

[0082] The second preset threshold is used to determine the current starting state of the vehicle, the third preset threshold is used to determine the pressure build-up state at the target end, and the fourth preset threshold is used to determine the ammonia injection state in the ammonia gas rail. Therefore, the second preset threshold is less than the fourth preset threshold, and the fourth preset threshold is less than the third preset threshold. It should be noted that in some embodiments, the fourth preset threshold is used in the preset conditions. The specific process is as follows.

[0083] When the vehicle is in a cold start state, the electric heating device corresponding to the second ammonia storage tank is activated, causing ammonia gas to be released from the second ammonia storage tank. At this time, the first control valve needs to be closed to prevent the ammonia gas released from the second ammonia storage tank from flowing back into the first ammonia storage tank, thereby allowing the ammonia gas in the output pipeline of the second ammonia storage tank to quickly reach a pressurized state. Specifically, as the heating device corresponding to the second ammonia storage tank is activated, the second ammonia storage tank is heated and releases ammonia gas. The ammonia content in the pipeline between the second ammonia storage tank and the second control valve gradually increases, and the real-time pressure at the target end also gradually increases as the ammonia gas is released from the second ammonia storage tank. The real-time pressure at the target end is judged by a third preset threshold to determine the pressurization status at the target end. During this time, the first ammonia storage tank is not operating.

[0084] After the pressure build-up process at the target end is completed (the real-time pressure at the target end is not less than the third preset threshold), the second control valve is opened, allowing ammonia gas released from the second ammonia storage tank to enter the ammonia gas rail, thus building up the pressure in the ammonia gas rail. Similarly, the completion of pressure build-up in the ammonia gas rail is determined by preset conditions based on the ammonia gas pressure in the ammonia gas rail. Specifically, a fourth preset threshold is set to represent the gas pressure at which the ammonia nozzles on the ammonia gas rail can inject ammonia gas. The real-time ammonia gas pressure is obtained through the rail pressure sensor in the ammonia gas rail, and compared with the fourth preset threshold to determine whether the pressure build-up state has been reached.

[0085] It should be noted that after the second control valve is opened to purge the ammonia gas rail, the real-time pressure at the target end will decrease for a short period of time due to the limited ammonia release rate of the second ammonia storage tank. Then, as the second ammonia storage tank continues to release, the pressure gradually increases until the ammonia gas rail reaches the pressurization state. At this time, the real-time pressure at the target end should be the same as the ammonia pressure in the ammonia gas rail and should be maintained above the fourth preset threshold.

[0086] In the solid ammonia system provided in this application embodiment, the second ammonia storage tank is actually an auxiliary ammonia storage tank, while the first ammonia storage tank is the main ammonia storage tank. Therefore, after rapidly pressurizing the ammonia gas rail through the second ammonia storage tank, the ammonia pressure at the ammonia outlet of the first ammonia storage tank needs to be adjusted so that the first ammonia storage tank is also under pressurization, in order to provide ammonia to the ammonia gas rail normally and safely. Therefore, after pressurizing the ammonia gas rail through the second ammonia storage tank, that is, when the real-time pressure at the target end is not less than the fourth preset threshold, the electric heating device corresponding to the first ammonia storage tank is turned on, so that the first ammonia storage tank releases ammonia until the output end of the first ammonia storage tank reaches the pressurization state.

[0087] Specifically, by setting the heating time of the first ammonia storage tank to a preset time, the output end of the first ammonia storage tank is deemed to have reached the pressure build-up state after the preset heating time. The preset time can be an initial time determined by the pressure value corresponding to the pressure build-up state and the current output pressure value of the first ammonia storage tank. In some embodiments, the initial time can also be corrected by the ambient temperature and then set as the preset time.

[0088] In the method provided in the above embodiments, when the vehicle is in a cold start state, the second ammonia storage tank is used to quickly pressurize the ammonia gas rail, and then the first ammonia storage tank is pressurized, which can quickly respond to the cold start state of the vehicle.

[0089] In one embodiment, after controlling the electric heating equipment corresponding to the second ammonia storage tank to shut down and controlling the first control valve to open, the method further includes:

[0090] The real-time pressure at the target end is obtained, and if the real-time pressure is not less than the third preset threshold, the electric heating equipment corresponding to the first ammonia storage tank is controlled to shut down.

[0091] When the real-time pressure is less than the third preset threshold, the electric heating equipment corresponding to the second ammonia storage tank is started until the real-time pressure is not less than the third preset threshold, at which point the electric heating equipment corresponding to the first and second ammonia storage tanks is turned off.

[0092] After the first control valve is opened, the first ammonia storage tank is connected to the ammonia gas rail via the first and second control valves. The first ammonia storage tank supplies ammonia to the ammonia gas rail, and the real-time pressure at the target end will fluctuate. At this time, it is determined whether the implemented pressure is less than the third preset threshold. If not, it means that the first ammonia storage tank can supply ammonia to the ammonia gas rail normally, and the electric heating equipment corresponding to the first ammonia storage tank can be turned off. If yes, it means that although the first ammonia storage tank can supply ammonia to the ammonia gas rail, the concentration of the supplied ammonia is not enough to make the ammonia gas rail spray ammonia normally. Therefore, it is necessary to open the second ammonia storage tank to assist in supplying ammonia.

[0093] It should be noted that, in one embodiment, after the electric heating device corresponding to the second ammonia storage tank is turned on, if the real-time pressure at the target end cannot be made not less than a third preset threshold within a preset time period through the first and second ammonia storage tanks, then the electric heating devices corresponding to the first and second ammonia storage tanks are turned off, the second control valve is closed, and an error is reported. During normal operation, after heating stops, the second ammonia storage tank will cool and absorb the ammonia gas released from the first ammonia storage tank to ensure that the ammonia gas in the second ammonia storage tank is always full.

[0094] In the method provided in the above embodiments, the second ammonia storage tank assists the first ammonia storage tank and the ammonia gas rail in the pressurization process, ensuring that the solid ammonia system is activated when the vehicle is cold-started.

[0095] In one embodiment, such as Figure 4 As shown, based on the current startup status, adjust the opening and closing states of the first and second control valves until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions, including:

[0096] Step 402: If the current startup state is a hot start state, control the electric heating equipment corresponding to the first ammonia storage tank and the second ammonia storage tank to start.

[0097] Step 404: Obtain the real-time pressure at the target end. If the real-time pressure is not less than the third preset threshold, control the second control valve to open until the ammonia pressure in the ammonia gas rail is not less than the fourth preset threshold.

[0098] Among them, the second preset threshold is less than the fourth preset threshold, and the fourth preset threshold is less than the third preset threshold.

[0099] When the vehicle is currently in a hot start state, ammonia can be released into the ammonia rail simultaneously through the first and second ammonia storage tanks to achieve pressure build-up. Specifically, the electric heating devices corresponding to the first and second ammonia storage tanks are activated, and the real-time pressure at the target end is acquired. If the real-time pressure at the target end is not less than a third preset threshold, the target end is considered to have reached the pressure build-up state and can build pressure into the ammonia rail. At this time, the second control valve is opened to allow ammonia to enter the ammonia rail until the ammonia pressure in the ammonia rail is not less than a fourth preset threshold, thus completing the pressure build-up of the ammonia rail.

[0100] In the method provided in the above embodiments, when the vehicle is in a hot start state, the pressure requirement can be quickly met by simultaneously building pressure in two ammonia storage tanks, thereby improving the efficiency of solid ammonia injection control.

[0101] In one embodiment, the solid ammonia system further includes multiple metering valves for controlling the ammonia injection rate from the ammonia nozzle; correspondingly, controlling the ammonia nozzle to inject ammonia according to the ammonia injection demand includes:

[0102] Based on the ideal gas law of ammonia and the flow rates of multiple metering valves, the ammonia emission demand is converted into the total opening time of the metering valves.

[0103] Obtain the vehicle exhaust pipe temperature status corresponding to each metering valve, and determine the opening sub-duration of each metering valve based on the vehicle exhaust pipe temperature status corresponding to each metering valve and the total opening time of the metering valve.

[0104] The total duration of metering valve opening refers to the total duration of operation of multiple ammonia nozzles in the solid ammonia system. It can be understood that the ammonia emission demand is the total amount of ammonia that needs to be emitted, which is then ejected from the ammonia nozzles. Therefore, given the flow rate of the metering valve corresponding to each ammonia nozzle, the total duration required for all ammonia nozzles to eject the required amount of ammonia can be calculated.

[0105] After determining the total opening time of the metering valves, the injection of ammonia gas from the nozzles needs to be allocated, that is, the injection time of each nozzle needs to be determined. Specifically, the exhaust pipe temperature status corresponding to each metering valve is obtained, and the opening sub-time of each metering valve is determined based on the exhaust pipe temperature status corresponding to each metering valve and the total opening time of the metering valves. For example, in one embodiment, the solid ammonia system has a pre-stage metering valve and a post-stage metering valve. Based on the current exhaust temperature status, the opening time ratio of the pre-stage metering valve and the post-stage metering valve is determined to control the opening of the metering valves. Ammonia gas is injected through the ammonia injection nozzles into the injection pipeline, and the injection frequency is preferably 1Hz. It is preferable that the injection timing of the pre-stage and post-stage metering valves differs by 0.5s to ensure more stable ammonia injection pressure. An electric heating wire is designed outside the injection pipeline to heat the gas in real time during injection, preventing ammonia gas from condensing and forming liquid ammonia.

[0106] In the method provided in the above embodiments, the opening duration of each metering valve is determined by the flow rate of each metering valve and the total ammonia injection flow rate, thereby achieving precise ammonia injection.

[0107] In one embodiment, the solid ammonia injection control method further includes:

[0108] When the vehicle is detected to be idling after startup, the number of devices in the vehicle whose power consumption is greater than the preset power is obtained. If the number of devices whose power consumption is greater than the preset number, the heating device and the first control valve corresponding to the first ammonia storage tank are shut down. The number of devices whose power consumption is greater than the preset number can be the number of devices or the amount of power consumed by the devices (i.e., power).

[0109] Obtain the initial ammonia storage in the first ammonia storage tank, record the cumulative ammonia consumption during vehicle operation, determine the remaining ammonia level based on the initial ammonia storage and cumulative ammonia consumption, and visualize the remaining ammonia level; if the remaining ammonia level is less than the preset remaining level, issue a replacement warning;

[0110] After detecting the replacement of the first ammonia storage tank, the remaining ammonia level is updated by receiving an instruction from the ammonia tank reset button.

[0111] It should be understood that although the steps in the flowcharts of the above embodiments are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the flowcharts of the above embodiments may include multiple steps or multiple stages. These steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the steps or stages of other steps.

[0112] Based on the same inventive concept, this application also provides a solid ammonia injection control device for implementing the aforementioned solid ammonia injection control method. The solution provided by this device is similar to the solution described in the above method; therefore, the specific limitations in one or more embodiments of the solid ammonia injection control device provided below can be found in the limitations of the solid ammonia injection control method described above, and will not be repeated here.

[0113] In one embodiment, such as Figure 5 As shown, a solid ammonia injection control device is provided, applied to an injection controller. The injection controller controls the operation of a solid ammonia system, which includes: a first ammonia storage tank, a second ammonia storage tank, a first control valve, a second control valve, an ammonia gas rail, and an ammonia nozzle. Both the first and second ammonia storage tanks are used to store ammonia and each includes corresponding external electric heating devices for heating the respective storage tanks. One end of the first ammonia storage tank is connected to one end of the first control valve, and the other end of the first control valve is connected to one end of the second ammonia storage tank. One end of the second ammonia storage tank is also connected to the second control valve. The first control valve controls whether ammonia is input or output from the first ammonia storage tank. The second control valve controls whether ammonia in the first or second ammonia storage tank is input into the ammonia gas rail. The ammonia nozzle is used to inject ammonia into the ammonia gas rail. The device includes:

[0114] The status judgment module 501 is used to take the end of the second ammonia storage tank connected to the first control valve as the target end, obtain the initial pressure of the target end, and determine the current start-up status of the vehicle based on the initial pressure.

[0115] The pressure building module 502 is used to adjust the opening and closing states of the first control valve and the second control valve according to the current start-up state until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions.

[0116] The data acquisition module 503 is used to acquire the nitrogen content in the vehicle exhaust gas, and when the nitrogen content is greater than a first preset threshold, to acquire the real-time ammonia pressure and real-time temperature in the ammonia gas rail.

[0117] The injection control module 504 is used to calculate the ammonia injection demand of the ammonia nozzle based on the real-time ammonia pressure and real-time temperature, and to control the ammonia nozzle to inject ammonia according to the ammonia injection demand.

[0118] In one embodiment, the state determination module 501 is further configured to:

[0119] If the initial pressure is less than the second preset threshold, the current starting state of the vehicle is determined to be a cold start state.

[0120] If the initial pressure is not less than the second preset threshold, the current starting state of the vehicle is determined to be a hot start state.

[0121] In one embodiment, the pressure-building module 502 is further configured to:

[0122] When the current startup state is cold start, control the electric heating equipment corresponding to the second ammonia storage tank to start, and control the first control valve to close;

[0123] The real-time pressure at the target end is obtained. If the real-time pressure is not less than the third preset threshold, the second control valve is opened until the ammonia pressure in the ammonia gas rail meets the corresponding preset conditions.

[0124] When the real-time pressure is not less than the fourth preset threshold, the electric heating device corresponding to the first ammonia storage tank is started, and after a preset time, the electric heating device corresponding to the second ammonia storage tank is turned off and the first control valve is opened.

[0125] Among them, the second preset threshold is less than the fourth preset threshold, and the fourth preset threshold is less than the third preset threshold.

[0126] In one embodiment, the pressure-building module 502 is further configured to:

[0127] The real-time pressure at the target end is obtained, and if the real-time pressure is not less than the third preset threshold, the electric heating equipment corresponding to the first ammonia storage tank is controlled to shut down.

[0128] When the real-time pressure is less than the third preset threshold, the electric heating equipment corresponding to the second ammonia storage tank is started until the real-time pressure is not less than the third preset threshold, at which point the electric heating equipment corresponding to the first and second ammonia storage tanks is turned off.

[0129] In one embodiment, the pressure-building module 502 is further configured to:

[0130] When the current startup state is hot start, the electric heating equipment corresponding to the first and second ammonia storage tanks will be started.

[0131] The real-time pressure at the target end is obtained. If the real-time pressure is not less than the third preset threshold, the second control valve is opened until the ammonia pressure in the ammonia gas rail is not less than the fourth preset threshold.

[0132] Among them, the second preset threshold is less than the fourth preset threshold, and the fourth preset threshold is less than the third preset threshold.

[0133] In one embodiment, the injection control module 504 is further configured to:

[0134] Based on the ideal gas law of ammonia and the flow rates of multiple metering valves, the ammonia emission demand is converted into the total opening time of the metering valves.

[0135] Obtain the vehicle exhaust pipe temperature status corresponding to each metering valve, and determine the opening sub-duration of each metering valve based on the vehicle exhaust pipe temperature status corresponding to each metering valve and the total opening time of the metering valve.

[0136] Each module in the aforementioned solid ammonia injection control device can be implemented entirely or partially through software, hardware, or a combination thereof. These modules can be embedded in or independent of the processor in a computer device, or stored in the computer device's memory as software, so that the processor can call and execute the corresponding operations of each module.

[0137] In one embodiment, a computer device is provided, which may be a terminal, and its internal structure diagram may be as follows: Figure 6 As shown, the computer device includes a processor, memory, communication interface, display screen, and input devices connected via a system bus. The processor provides computing and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system and computer programs. The internal memory provides an environment for the operation of the operating system and computer programs in the non-volatile storage media. The communication interface is used for wired or wireless communication with external terminals; wireless communication can be achieved through Wi-Fi, mobile cellular networks, NFC (Near Field Communication), or other technologies. When the computer program is executed by the processor, it implements a solid ammonia injection control method. The display screen can be an LCD screen or an e-ink screen. The input devices can be a touch layer covering the display screen, buttons, a trackball, or a touchpad on the computer device's casing, or an external keyboard, touchpad, or mouse.

[0138] Those skilled in the art will understand that Figure 6 The structure shown is merely a block diagram of a portion of the structure related to the present application and does not constitute a limitation on the computer device to which the present application is applied. Specific computer devices may include more or fewer components than those shown in the figure, or combine certain components, or have different component arrangements.

[0139] In one embodiment, a computer device is provided, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to perform the following steps:

[0140] The end of the second ammonia storage tank connected to the first control valve is taken as the target end. The initial pressure of the target end is obtained, and the current starting state of the vehicle is determined based on the initial pressure.

[0141] Based on the current startup status, adjust the opening and closing status of the first control valve and the second control valve until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions.

[0142] The nitrogen content in the vehicle exhaust gas is obtained. When the nitrogen content is greater than a first preset threshold, the real-time ammonia pressure and real-time temperature in the ammonia gas rail are obtained.

[0143] Based on the real-time ammonia pressure and temperature, calculate the ammonia emission demand of the ammonia nozzle, and control the ammonia nozzle to spray according to the ammonia emission demand.

[0144] In one embodiment, the processor, when executing a computer program, also performs the following steps:

[0145] If the initial pressure is less than the second preset threshold, the current starting state of the vehicle is determined to be a cold start state.

[0146] If the initial pressure is not less than the second preset threshold, the current starting state of the vehicle is determined to be a hot start state.

[0147] In one embodiment, the processor, when executing a computer program, also performs the following steps:

[0148] When the current startup state is cold start, control the electric heating equipment corresponding to the second ammonia storage tank to start, and control the first control valve to close;

[0149] The real-time pressure at the target end is obtained. If the real-time pressure is not less than the third preset threshold, the second control valve is opened until the ammonia pressure in the ammonia gas rail meets the corresponding preset conditions.

[0150] When the real-time pressure is not less than the fourth preset threshold, the electric heating device corresponding to the first ammonia storage tank is started, and after a preset time, the electric heating device corresponding to the second ammonia storage tank is turned off and the first control valve is opened.

[0151] Among them, the second preset threshold is less than the fourth preset threshold, and the fourth preset threshold is less than the third preset threshold.

[0152] In one embodiment, the processor, when executing a computer program, also performs the following steps:

[0153] The real-time pressure at the target end is obtained, and if the real-time pressure is not less than the third preset threshold, the electric heating equipment corresponding to the first ammonia storage tank is controlled to shut down.

[0154] When the real-time pressure is less than the third preset threshold, the electric heating equipment corresponding to the second ammonia storage tank is started until the real-time pressure is not less than the third preset threshold, at which point the electric heating equipment corresponding to the first and second ammonia storage tanks is turned off.

[0155] In one embodiment, the processor, when executing a computer program, also performs the following steps:

[0156] When the current startup state is hot start, the electric heating equipment corresponding to the first and second ammonia storage tanks will be started.

[0157] The real-time pressure at the target end is obtained. If the real-time pressure is not less than the third preset threshold, the second control valve is opened until the ammonia pressure in the ammonia gas rail is not less than the fourth preset threshold.

[0158] Among them, the second preset threshold is less than the fourth preset threshold, and the fourth preset threshold is less than the third preset threshold.

[0159] In one embodiment, the processor, when executing a computer program, also performs the following steps:

[0160] Based on the ideal gas law of ammonia and the flow rates of multiple metering valves, the ammonia emission demand is converted into the total opening time of the metering valves.

[0161] Obtain the vehicle exhaust pipe temperature status corresponding to each metering valve, and determine the opening sub-duration of each metering valve based on the vehicle exhaust pipe temperature status corresponding to each metering valve and the total opening time of the metering valve.

[0162] In one embodiment, a computer-readable storage medium is provided having a computer program stored thereon, the computer program performing the following steps when executed by a processor:

[0163] The end of the second ammonia storage tank connected to the first control valve is taken as the target end. The initial pressure of the target end is obtained, and the current starting state of the vehicle is determined based on the initial pressure.

[0164] Based on the current startup status, adjust the opening and closing status of the first control valve and the second control valve until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions.

[0165] The nitrogen content in the vehicle exhaust gas is obtained. When the nitrogen content is greater than a first preset threshold, the real-time ammonia pressure and real-time temperature in the ammonia gas rail are obtained.

[0166] Based on the real-time ammonia pressure and temperature, calculate the ammonia emission demand of the ammonia nozzle, and control the ammonia nozzle to spray according to the ammonia emission demand.

[0167] In one embodiment, when the computer program is executed by a processor, it further performs the following steps:

[0168] If the initial pressure is less than the second preset threshold, the current starting state of the vehicle is determined to be a cold start state.

[0169] If the initial pressure is not less than the second preset threshold, the current starting state of the vehicle is determined to be a hot start state.

[0170] In one embodiment, when the computer program is executed by a processor, it further performs the following steps:

[0171] When the current startup state is cold start, control the electric heating equipment corresponding to the second ammonia storage tank to start, and control the first control valve to close;

[0172] The real-time pressure at the target end is obtained. If the real-time pressure is not less than the third preset threshold, the second control valve is opened until the ammonia pressure in the ammonia gas rail meets the corresponding preset conditions.

[0173] When the real-time pressure is not less than the fourth preset threshold, the electric heating device corresponding to the first ammonia storage tank is started, and after a preset time, the electric heating device corresponding to the second ammonia storage tank is turned off and the first control valve is opened.

[0174] Among them, the second preset threshold is less than the fourth preset threshold, and the fourth preset threshold is less than the third preset threshold.

[0175] In one embodiment, when the computer program is executed by a processor, it further performs the following steps:

[0176] The real-time pressure at the target end is obtained, and if the real-time pressure is not less than the third preset threshold, the electric heating equipment corresponding to the first ammonia storage tank is controlled to shut down.

[0177] When the real-time pressure is less than the third preset threshold, the electric heating equipment corresponding to the second ammonia storage tank is started until the real-time pressure is not less than the third preset threshold, at which point the electric heating equipment corresponding to the first and second ammonia storage tanks is turned off.

[0178] In one embodiment, when the computer program is executed by a processor, it further performs the following steps:

[0179] When the current startup state is hot start, the electric heating equipment corresponding to the first and second ammonia storage tanks will be started.

[0180] The real-time pressure at the target end is obtained. If the real-time pressure is not less than the third preset threshold, the second control valve is opened until the ammonia pressure in the ammonia gas rail is not less than the fourth preset threshold.

[0181] Among them, the second preset threshold is less than the fourth preset threshold, and the fourth preset threshold is less than the third preset threshold.

[0182] In one embodiment, when the computer program is executed by a processor, it further performs the following steps:

[0183] Based on the ideal gas law of ammonia and the flow rates of multiple metering valves, the ammonia emission demand is converted into the total opening time of the metering valves.

[0184] Obtain the vehicle exhaust pipe temperature status corresponding to each metering valve, and determine the opening sub-duration of each metering valve based on the vehicle exhaust pipe temperature status corresponding to each metering valve and the total opening time of the metering valve.

[0185] In one embodiment, a computer program product is provided, including a computer program that, when executed by a processor, performs the following steps:

[0186] The end of the second ammonia storage tank connected to the first control valve is taken as the target end. The initial pressure of the target end is obtained, and the current starting state of the vehicle is determined based on the initial pressure.

[0187] Based on the current startup status, adjust the opening and closing status of the first control valve and the second control valve until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions.

[0188] The nitrogen content in the vehicle exhaust gas is obtained. When the nitrogen content is greater than a first preset threshold, the real-time ammonia pressure and real-time temperature in the ammonia gas rail are obtained.

[0189] Based on the real-time ammonia pressure and temperature, calculate the ammonia emission demand of the ammonia nozzle, and control the ammonia nozzle to spray according to the ammonia emission demand.

[0190] In one embodiment, when the computer program is executed by a processor, it further performs the following steps:

[0191] If the initial pressure is less than the second preset threshold, the current starting state of the vehicle is determined to be a cold start state.

[0192] If the initial pressure is not less than the second preset threshold, the current starting state of the vehicle is determined to be a hot start state.

[0193] In one embodiment, when the computer program is executed by a processor, it further performs the following steps:

[0194] When the current startup state is cold start, control the electric heating equipment corresponding to the second ammonia storage tank to start, and control the first control valve to close;

[0195] The real-time pressure at the target end is obtained. If the real-time pressure is not less than the third preset threshold, the second control valve is opened until the ammonia pressure in the ammonia gas rail meets the corresponding preset conditions.

[0196] When the real-time pressure is not less than the fourth preset threshold, the electric heating device corresponding to the first ammonia storage tank is started, and after a preset time, the electric heating device corresponding to the second ammonia storage tank is turned off and the first control valve is opened.

[0197] Among them, the second preset threshold is less than the fourth preset threshold, and the fourth preset threshold is less than the third preset threshold.

[0198] In one embodiment, when the computer program is executed by a processor, it further performs the following steps:

[0199] The real-time pressure at the target end is obtained, and if the real-time pressure is not less than the third preset threshold, the electric heating equipment corresponding to the first ammonia storage tank is controlled to shut down.

[0200] When the real-time pressure is less than the third preset threshold, the electric heating equipment corresponding to the second ammonia storage tank is started until the real-time pressure is not less than the third preset threshold, at which point the electric heating equipment corresponding to the first and second ammonia storage tanks is turned off.

[0201] In one embodiment, when the computer program is executed by a processor, it further performs the following steps:

[0202] When the current startup state is hot start, the electric heating equipment corresponding to the first and second ammonia storage tanks will be started.

[0203] The real-time pressure at the target end is obtained. If the real-time pressure is not less than the third preset threshold, the second control valve is opened until the ammonia pressure in the ammonia gas rail is not less than the fourth preset threshold.

[0204] Among them, the second preset threshold is less than the fourth preset threshold, and the fourth preset threshold is less than the third preset threshold.

[0205] In one embodiment, when the computer program is executed by a processor, it also performs the following steps:

[0206] Based on the ideal gas law of ammonia and the flow rates of multiple metering valves, the ammonia emission demand is converted into the total opening time of the metering valves.

[0207] Obtain the vehicle exhaust pipe temperature status corresponding to each metering valve, and determine the opening sub-duration of each metering valve based on the vehicle exhaust pipe temperature status corresponding to each metering valve and the total opening time of the metering valve.

[0208] Those skilled in the art will understand that all or part of the processes in the methods of the above embodiments can be implemented by a computer program instructing related hardware. The computer program can be stored in a non-volatile computer-readable storage medium, and when executed, it can include the processes of the embodiments of the above methods. Any references to memory, databases, or other media used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM can take many forms, such as Static Random Access Memory (SRAM) or Dynamic Random Access Memory (DRAM). The databases involved in the embodiments provided in this application may include at least one type of relational database and non-relational database. Non-relational databases may include, but are not limited to, blockchain-based distributed databases. The processors involved in the embodiments provided in this application may be general-purpose processors, central processing units, graphics processing units, digital signal processors, programmable logic devices, quantum computing-based data processing logic devices, etc., and are not limited to these.

[0209] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0210] The embodiments described above are merely illustrative of several implementation methods of this application, and while the descriptions are specific and detailed, they should not be construed as limiting the scope of this patent application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this application should be determined by the appended claims.

Claims

1. A method for controlling solid ammonia injection, characterized in that, An injection controller is applied to control the operation of a solid ammonia system, which includes: a first ammonia storage tank, a second ammonia storage tank, a first control valve, a second control valve, an ammonia gas rail, and an ammonia nozzle. Both the first and second ammonia storage tanks are used to store ammonia and are externally equipped with corresponding electric heating devices for heating the respective storage tanks. One end of the first ammonia storage tank is connected to one end of the first control valve, and the other end of the first control valve is connected to one end of the second ammonia storage tank. One end of the second ammonia storage tank is also connected to the second control valve. The first control valve controls whether ammonia is input or output from the first ammonia storage tank. The second control valve controls whether the ammonia in the first or second ammonia storage tank is input into the ammonia gas rail. The ammonia nozzle is used to inject ammonia into the ammonia gas rail. The method includes: The end of the second ammonia storage tank connected to the first control valve is taken as the target end, and the initial pressure of the target end is obtained. Determining the current starting state of the vehicle based on the initial pressure includes: determining the current starting state of the vehicle as a cold start state when the initial pressure is less than a second preset threshold; and determining the current starting state of the vehicle as a hot start state when the initial pressure is not less than the second preset threshold. Based on the current startup state, adjust the opening and closing states of the first control valve and the second control valve until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions. This includes: when the current startup state is a cold start state, controlling the electric heating device corresponding to the second ammonia storage tank to start and controlling the first control valve to close; acquiring the real-time pressure at the target end, and when the real-time pressure is not less than a third preset threshold, controlling the second control valve to open until the ammonia pressure in the ammonia gas rail meets the corresponding preset conditions; and when the real-time pressure is not less than a fourth preset threshold, controlling the second control valve to open. The electric heating device corresponding to the first ammonia storage tank is started, and after a preset time, the electric heating device corresponding to the second ammonia storage tank is turned off and the first control valve is opened; when the current start-up state is a hot start-up state, the electric heating devices corresponding to the first and second ammonia storage tanks are both started; the real-time pressure at the target end is obtained, and when the real-time pressure is not less than a third preset threshold, the second control valve is opened until the ammonia gas pressure in the ammonia gas rail is not less than a fourth preset threshold; wherein, the second preset threshold is less than the fourth preset threshold, and the fourth preset threshold is less than the third preset threshold; The nitrogen content in the vehicle exhaust gas is obtained, and when the nitrogen content is greater than a first preset threshold, the real-time ammonia pressure and real-time temperature in the ammonia gas rail are obtained. Based on the real-time ammonia pressure and temperature, the ammonia emission demand of the ammonia nozzle is calculated, and the ammonia nozzle is controlled to spray according to the ammonia emission demand.

2. The method according to claim 1, characterized in that, After controlling the electric heating device corresponding to the second ammonia storage tank to shut down and controlling the first control valve to open, the method further includes: The real-time pressure at the target end is obtained, and if the real-time pressure is not less than the third preset threshold, the electric heating equipment corresponding to the first ammonia storage tank is controlled to shut down. When the real-time pressure is less than the third preset threshold, the electric heating device corresponding to the second ammonia storage tank is started until the real-time pressure is not less than the third preset threshold, at which point the electric heating devices corresponding to both the first and second ammonia storage tanks are turned off.

3. The method according to claim 1, characterized in that, The solid ammonia system also includes multiple metering valves for controlling the ammonia injection rate from the ammonia nozzle; correspondingly, controlling the ammonia nozzle to inject ammonia according to the ammonia injection demand includes: Based on the ideal gas law of ammonia and the flow rates of the multiple metering valves, the ammonia emission demand is converted into the total opening time of the metering valves. Obtain the vehicle exhaust pipe temperature status corresponding to each metering valve, and determine the opening sub-duration of each metering valve based on the vehicle exhaust pipe temperature status corresponding to each metering valve and the total opening time of the metering valve.

4. A solid ammonia injection control device, comprising solid ammonia injection control using the method described in any one of claims 1-3, characterized in that, An injection controller is used to control the operation of a solid ammonia system. The solid ammonia system includes: a first ammonia storage tank, a second ammonia storage tank, a first control valve, a second control valve, an ammonia gas rail, and an ammonia nozzle. Both the first and second ammonia storage tanks are used to store ammonia and each includes a corresponding external electric heating device for heating the respective storage tank. One end of the first ammonia storage tank is connected to one end of the first control valve, and the other end of the first control valve is connected to one end of the second ammonia storage tank. One end of the second ammonia storage tank is also connected to the second control valve. The first control valve controls whether ammonia is input or output from the first ammonia storage tank. The second control valve controls whether the ammonia in the first or second ammonia storage tank is input into the ammonia gas rail. The ammonia nozzle is used to inject ammonia into the ammonia gas rail. The device includes: The status judgment module is used to take the end of the second ammonia storage tank connected to the first control valve as the target end, obtain the initial pressure of the target end, and determine the current start-up status of the vehicle based on the initial pressure. The pressure building module is used to adjust the opening and closing states of the first control valve and the second control valve according to the current start-up state until the pressure at the target end and the ammonia pressure in the ammonia gas rail both meet the corresponding preset conditions. The data acquisition module is used to acquire the nitrogen content in the vehicle exhaust gas, and when the nitrogen content is greater than a first preset threshold, to acquire the real-time ammonia pressure and real-time temperature in the ammonia gas rail. The injection control module is used to calculate the ammonia injection demand of the ammonia nozzle based on the real-time ammonia pressure and real-time temperature, and control the ammonia nozzle to inject ammonia according to the ammonia injection demand.

5. A solid ammonia injection control system, the system comprising an injection controller and a solid ammonia system; in, The solid ammonia system includes: a first ammonia storage tank, a second ammonia storage tank, a first control valve, a second control valve, an ammonia gas rail, and an ammonia nozzle; both the first and second ammonia storage tanks are used to store ammonia and each includes a corresponding electric heating device for heating the respective storage tank; one end of the first ammonia storage tank is connected to one end of the first control valve, and the other end of the first control valve is connected to one end of the second ammonia storage tank; one end of the second ammonia storage tank is also connected to the second control valve; the first control valve controls whether ammonia is input or output from the first ammonia storage tank; the second control valve controls whether the ammonia in the first or second ammonia storage tank is input into the ammonia gas rail; and the ammonia nozzle is used to spray ammonia into the ammonia gas rail. The injection controller is used to control the operation of the solid ammonia system, specifically to perform the method steps of any one of claims 1-3.

6. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that, When the processor executes the computer program, it implements the steps of the method according to any one of claims 1 to 3.

7. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1 to 3.

8. A computer program product, comprising a computer program, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1 to 3.

Citation Information

Patent Citations

  • Release of stored ammonia at start-up

    CN102171147A

  • Ammonia gas generation system and vehicle tail gas treatment system

    CN109458244A