Multi-stage voltage calculation method and system for power grid under wind power access

By rapidly calculating the multi-stage voltage after a fault in wind power grid connection, this system solves the problem of slow voltage recovery after a fault in wind power grid connection, and achieves rapid assessment and accurate calculation of system voltage. It is suitable for voltage calculation systems for wind power grid connection.

CN117458629BActive Publication Date: 2026-11-24STATE GRID SHANDONG ELECTRIC POWER CO LIAOCHENG POWER SUPPLY CO +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311390393.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-10-24
Publication Date
2026-11-24
Estimated Expiration
2043-10-24

AI Technical Summary

Technical Problem

In wind power connected to the grid, the system voltage recovers slowly after a fault. The voltage drop at the load end of the induction motor leads to a decrease in speed, making it impossible to quickly recover to the pre-fault level. Existing technologies make it difficult to quickly assess the impact of the fault on the system voltage.

Method used

By obtaining the equivalent impedance of the induction motor, the subtransient electromotive force of the synchronous generator, and the internal potential of the equivalent controlled voltage source of the wind farm, the voltage drop and recovery process after a fault can be quickly calculated using network equations and numerical integration methods. The equivalent impedance and internal potential are updated by considering the fault ride-through characteristics of the wind farm and the dynamic characteristics of the induction motor, thus realizing multi-stage voltage calculation.

Benefits of technology

It enables rapid assessment of the impact of faults on system voltage, with calculation time significantly faster than simulation calculations, high accuracy, and the ability to quickly assess the spatial distribution characteristics of fault voltages, while the calculation error remains within the acceptable range for engineering applications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117458629B_ABST
    Figure CN117458629B_ABST
Patent Text Reader

Abstract

This invention relates to the field of power grid fault technology, and discloses a method and system for calculating multi-stage voltage during power grid faults under wind power integration. The method includes: calculating the initial voltage drop after a fault occurs based on the equivalent impedance of a secondary induction motor, the subtransient electromotive force of a synchronous generator, and the internal potential of the equivalent controlled voltage source of the wind farm using network equations; updating the equivalent impedance of the induction motor by calculating the post-fault rotational speed of each induction motor using a numerical integration method based on the initial voltage drop; updating the internal potential of the equivalent controlled voltage source using a wind farm controlled voltage source model based on the initial voltage drop; and calculating the voltage before fault clearance using network equations based on the updated equivalent impedance of the induction motor, the updated internal potential of the equivalent controlled voltage source, and the transient electromotive force of the synchronous generator. This method enables rapid calculation of multi-stage voltages after a system fault.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power grid fault technology, and in particular to a method and system for calculating multi-stage voltage of power grid faults under wind power integration. Background Technology

[0002] The statements in this section merely refer to the background art related to this invention and do not necessarily constitute prior art.

[0003] When a short-circuit fault occurs somewhere in a power system, the system voltage undergoes a dynamic process of first dropping and then recovering. During the fault, the electromagnetic torque of the induction motors decreases to less than the mechanical torque due to the drop in voltage at the load end, causing their speed to decrease. After the fault is cleared, these induction motors absorb a large amount of reactive power, preventing the system voltage from quickly returning to its pre-fault level. Summary of the Invention

[0004] To address the shortcomings of existing technologies, this invention provides a method and system for calculating multi-stage voltage of grid faults under wind power integration. Considering the fault ride-through characteristics of wind farms and the dynamic characteristics of induction motors, it enables rapid calculation of multi-stage voltages after system faults. Its calculation time is significantly faster than simulation calculation methods, allowing for rapid assessment of the impact of faults on system voltages and calculation of the spatial distribution characteristics of fault voltages.

[0005] In a first aspect, the present invention provides a method for calculating the multi-stage voltage of grid faults under wind power integration;

[0006] A method for calculating multi-stage voltage during grid faults when wind power is integrated, including:

[0007] Obtain the equivalent impedance of the induction motor in the power system, the subtransient electromotive force of the synchronous generator, the transient electromotive force of the synchronous generator, and the internal potential of the equivalent controlled voltage source of the wind farm.

[0008] Based on the equivalent impedance of the induction motor, the subtransient electromotive force of the synchronous generator, and the internal potential of the equivalent controlled voltage source of the wind farm, the initial value of the voltage drop after the fault is calculated through network equations.

[0009] Based on the initial voltage drop value, using the induction motor model, the rotational speed of each induction motor after the voltage drop is calculated by numerical integration, and then the equivalent impedance of the induction motor is updated.

[0010] Based on the initial voltage drop value, the internal potential of the equivalent controlled voltage source is updated using the wind farm controlled voltage source model.

[0011] Based on the updated equivalent impedance of the induction motor, the internal potential of the updated equivalent controlled voltage source, and the transient electromotive force of the synchronous generator, the voltage before fault clearance is calculated through network equations.

[0012] Furthermore, the controlled voltage source model for the wind farm is as follows:

[0013]

[0014] In the formula, The internal potential of the equivalent controlled voltage source is given by δ, where δ is the equivalent power angle and x is the internal potential. eq For equivalent reactance, I p0 U is the active current before the fault. E The voltage at the grid connection point of the wind farm, θ u k represents the phase of the wind farm's grid connection point. q This is the dynamic reactive current ratio coefficient of the wind farm.

[0015] Furthermore, the induction motor model includes: rotor motion equation, electromagnetic torque equation, and equivalent impedance equation.

[0016] Furthermore, the network equation is as follows:

[0017]

[0018] In the formula, U is the voltage vector. X is the internal potential of the equivalent controlled voltage source. G Take the subtransient reactance, Take the next transient electromotive force, k q Z is the dynamic reactive current proportionality coefficient of the wind farm. L Z is the static load impedance. m Z is the equivalent impedance of the induction motor. f Y1 is the fault impedance, Y1 is the network node admittance matrix, and Z is the fault impedance. m This is the equivalent impedance.

[0019] Furthermore, if the node voltage changes linearly from the initial voltage drop after the fault occurs to the voltage before the fault is cleared during the fault period, then the equivalent impedance of the induction motor is updated a second time after updating the speed after the drop using the induction motor model.

[0020] Furthermore, it also includes calculating the corrected pre-fault clearance voltage through network equations based on the equivalent impedance of the induction motor after the second update and the internal potential of the updated equivalent controlled voltage source.

[0021] Furthermore, based on the corrected voltage before fault clearance, the internal potential of the equivalent controlled voltage source is updated through the network equation, and the reciprocal of the fault impedance is set to zero to calculate the voltage after fault recovery.

[0022] Secondly, this invention provides a multi-stage voltage calculation system for grid faults under wind power integration;

[0023] The data acquisition module is configured to acquire the equivalent impedance of the induction motor, the subtransient electromotive force of the synchronous generator, the transient electromotive force of the synchronous generator, and the internal potential of the equivalent controlled voltage source of the wind farm in the power system.

[0024] The first voltage calculation module is configured to: calculate the initial voltage drop value after a fault occurs by means of network equations based on the equivalent impedance of the sub-induction motor, the subtransient electromotive force of the synchronous generator and the internal potential of the equivalent controlled voltage source of the wind farm.

[0025] The first update module is configured to: based on the initial value of the voltage drop, use the induction motor model to calculate the speed after the voltage drop for each induction motor by numerical integration, and then update the equivalent impedance of the induction motor.

[0026] The second update module is configured to: update the internal potential of the equivalent controlled voltage source based on the initial voltage drop value and the controlled voltage source model of the wind farm;

[0027] The second voltage calculation module is configured to calculate the voltage before fault clearance based on the updated equivalent impedance of the induction motor, the internal potential of the updated equivalent controlled voltage source, and the transient electromotive force of the synchronous generator through network equations.

[0028] Thirdly, the present invention provides an electronic device, comprising:

[0029] Memory, used for non-transitory storage of computer-readable instructions; and

[0030] Processor, for executing the computer-readable instructions,

[0031] When the computer-readable instructions are executed by the processor, they perform the method described in the first aspect above.

[0032] Fourthly, the present invention also provides a storage medium for non-transitory storage of computer-readable instructions, wherein, when the non-transitory computer-readable instructions are executed by a computer, the instructions for the method described in the first aspect are executed.

[0033] Compared with the prior art, the beneficial effects of the present invention are:

[0034] This invention considers the fault ride-through characteristics of wind farms and the dynamic characteristics of induction motors, and realizes rapid calculation of multi-stage voltage after system faults. Its calculation time is much faster than simulation calculation methods, and it can quickly assess the impact of faults on system voltage and calculate the spatial distribution characteristics of fault voltage. Attached Figure Description

[0035] The accompanying drawings, which form part of this application, are used to provide a further understanding of this application. The illustrative embodiments of this application and their descriptions are used to explain this application and do not constitute an undue limitation of this application.

[0036] Figure 1 This is a flowchart of the multi-stage voltage calculation method for grid faults under wind power access described in Example 1;

[0037] Figure 2 This is a schematic diagram of the controlled voltage source model of the wind farm described in Example 1;

[0038] Figure 3 The equivalent circuit diagram of the induction motor described in Embodiment 1 is shown below.

[0039] Figure 4 This is a schematic diagram of the synchronization machine model described in Embodiment 1;

[0040] Figure 5 This is a schematic diagram of the New England 39-node system described in Example 1;

[0041] Figure 6 This is a graph showing the voltage change at node 10 as described in Example 1;

[0042] Figure 7 This is a graph showing the voltage change at node 17 as described in Example 1;

[0043] Figure 8 This is a graph showing the voltage change at node 23 as described in Example 1;

[0044] Figure 9 This is a graph showing the voltage change at node 28 as described in Example 1;

[0045] Figure 10 This is a comparison chart of the initial value U1 of the fault voltage drop described in Example 1;

[0046] Figure 11 This is a comparison chart of the voltage U3 results after fault clearance as described in Example 1. Detailed Implementation

[0047] It should be noted that the following detailed descriptions are exemplary and intended to provide further explanation of this application. Unless otherwise specified, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application pertains.

[0048] It should be noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the exemplary embodiments according to this application. As used herein, the singular form is intended to include the plural form as well, unless the context clearly indicates otherwise. Furthermore, it should be understood that when the terms "comprising" and / or "including" are used in this specification, they indicate the presence of features, steps, operations, devices, components, and / or combinations thereof.

[0049] Example 1

[0050] This embodiment provides a method for calculating the multi-stage voltage of grid faults under wind power integration.

[0051] The multi-stage voltage calculation method for grid faults under wind power access provided in this embodiment considers the fault ride-through characteristics of wind farms and the dynamic characteristics of induction motors. It can quickly calculate the multi-stage voltage after a system fault, and its calculation time is much faster than that of simulation calculation methods. It can quickly assess the impact of faults on system voltage and calculate the spatial distribution characteristics of fault voltage.

[0052] Model 1: Wind farm fault ride-through model.

[0053] The wind farm has fault ride-through capability, and when the voltage drops at the grid connection point, the reactive current meets the following requirements:

[0054] I q =k q (0.9-U)×I N (1)

[0055] In the formula, U is the per-unit voltage at the grid connection point of the wind farm, and k q I is the dynamic reactive current proportionality coefficient of the wind farm. N This is the rated current of the wind farm, expressed in amperes (A).

[0056] The phase-controlled voltage source model during wind turbine faults (hereinafter referred to as the wind farm controlled voltage source model), such as... Figure 2 As shown.

[0057]

[0058] In the formula, Let δ be the internal potential of the equivalent controlled voltage source, δ be the equivalent work angle of the model, and x be the internal potential of the equivalent controlled voltage source. eq I is the equivalent reactance of the model. p0 U is the active current before the fault. E The voltage at the grid connection point of the wind farm, θ u This refers to the phase of the wind farm's grid connection point.

[0059] Model 2: Induction motor model.

[0060] In this embodiment, the induction motor models all adopt a first-order mechanical transient model, and their equivalent circuits are as follows: Figure 3 As shown.

[0061] The rotor motion equation is:

[0062]

[0063] In the formula, J is the moment of inertia, with units of kg·m. 2 ω is the mechanical rotational speed, in rad / s, T e Electromagnetic power, measured in N·m and T. m The mechanical torque of the load is expressed in N·m.

[0064] The electromagnetic torque equation is:

[0065]

[0066] In the formula, R S X is the stator resistance. S For stator leakage reactance, R R X is the rotor resistance. R For rotor leakage reactance, X M For the magnetizing reactance, ω n Rated mechanical speed, in rad / s, m ​​is the number of phases, and s is the slip rate.

[0067] The equivalent impedance equation is:

[0068]

[0069] Model 3: Synchronous generator model.

[0070] like Figure 4 The image shows a synchronous machine model.

[0071]

[0072] in, This refers to the synchronous machine port voltage. X is the electromotive force of the synchronous machine. G For the stator reactance of the synchronous machine, This refers to the stator current of the synchronous machine. E varies depending on the fault stage. G Let E be the subtransient electromotive force. G "and transient electromotive force E" G ', X G It is also correspondingly taken as the subtransient reactance X. G "and transient reactance X" G '.

[0073] The multi-stage voltage calculation method for grid faults under wind power integration provided in this embodiment is as follows: Figure 1 As shown, it includes the following steps:

[0074] Step 1: Initial state input.

[0075] Input the initial power flow state of the power system and the initial motor speed. The initial system voltage is denoted as U0, and the initial motor speed is denoted as ω0. Calculate using equation (2) (i.e., the controlled voltage source model of the wind farm). The equivalent impedance Z of the induction motor is calculated using equation (5) (i.e., the induction motor model). m The subtransient electromotive force of the synchronous generator is calculated using equation (6) (i.e., the synchronous generator model). and transient electromotive force

[0076] Step 2: Calculate the initial voltage drop value.

[0077] Write the network equations of the system:

[0078]

[0079] In the formula, U is the voltage vector of the system, U G U is the synchronous machine port voltage vector. E U is the port voltage vector of the wind farm. L U is the static load port voltage vector. m U is the voltage vector at the load port of the induction motor. f X is the voltage at the fault point. G Take the subtransient reactance, Take the next transient electromotive force, k q Z is the dynamic reactive current proportionality coefficient of the wind farm. L Z is the static load impedance. m Z is the equivalent impedance of the induction motor. f Y is the fault impedance, Y1 is the network node admittance matrix, and j is the imaginary unit.

[0080] The voltage vector of the system calculated using equation (7) is the initial value of the voltage drop at each node after the fault occurs, denoted as U1.

[0081] Step 3: Calculate the motor speed.

[0082] Assuming the voltage remains at U1 during the fault and the mechanical torque remains constant, the speed drop for each induction motor is calculated using equations (3) and (4) (i.e., the induction motor model) through numerical integration. The speed drop after the speed drop is denoted as ω1. Then, ω1 is used as ω to calculate the equivalent impedance Z of the induction motor using equation (5). m .

[0083] The phase of U1 is taken as the phase θ of the wind farm node voltage. u Substitute into equation (2) (the controlled voltage source model of a wind farm), keeping other quantities unchanged, and recalculate. The changed Z m and Substituting into equation (7), at the same time The corresponding transient electromotive force, X G Taking the transient reactance, while keeping other quantities consistent with step 2, the calculated system voltage vector is the voltage before fault clearance, denoted as U. 12 .

[0084] Assume that the node voltage changes linearly from U1 to U during the fault. 12 Using the torque equations (3) and (4), the speed drop is recalculated, and the speed after the drop is denoted as ω2.

[0085] Step 4: Calculate the voltage before clearing the fault.

[0086] Using ω2 as ω, the equivalent impedance Z of the induction motor is calculated using equation (5). m This refers to the equivalent impedance of the secondary updated induction motor. Then, the changed Z... m Substituting into equation (7), with other quantities remaining consistent with step 3, the recalculated voltage vector of the system is the corrected pre-fault clearance voltage, denoted as U2. That is, based on the equivalent impedance of the induction motor after the second update and the internal potential of the updated equivalent controlled voltage source, the corrected pre-fault clearance voltage is calculated through network equations.

[0087] Step 5: Voltage calculation after fault clearing.

[0088] Substitute U2 into equation (7) and recalculate. Then, 1 / Z in equation (7) f Set the reciprocal of the fault impedance to 0, and keep other quantities consistent with step 4. The calculated voltage vector of the system is the voltage after the fault is recovered, denoted as U3.

[0089] In this embodiment, a system as follows was built in DIgSILENT Powerfactory: Figure 5 The proposed calculation method was verified through simulation using the IEEE 39-bus system model shown. Conventional turbines connected to nodes 32 and 36 were replaced with wind turbines, and the synchronous turbines used the default AVR controller. The load adopted a 50% induction motor + 50% constant impedance model. The induction motor load parameters are shown in Table 1, and the load is a constant torque load. Here, H represents the inertial time constant.

[0090] Table 1. Parameters of Induction Motor

[0091] <![CDATA[R S / p.u.]]> <![CDATA[X S / p.u.]]> <![CDATA[X M / p.u.]]> <![CDATA[R R / p.u.]]> <![CDATA[X R / p.u.]]> H / s 0.064 0.091 2.23 0.059 0.071 0.34

[0092] A three-phase short-circuit fault is simulated at node 16, and the fault is cleared after 0.2 seconds. The simulated initial fault voltage drop value U1 and the voltage U3 after fault clearance are compared with the results obtained by the method proposed in this embodiment, and the relative error is calculated. A typical node voltage change curve is shown below. Figure 6 , Figure 7 , Figure 8 and Figure 9 As shown, the error pairs are as follows: Figure 10 , Figure 11 As shown in Tables 2 and 3.

[0093] Table 2. Comparison of initial fault voltage drop values ​​U1 results

[0094]

[0095]

[0096]

[0097] Table 3. Comparison of voltage U3 results after fault clearance

[0098]

[0099]

[0100]

[0101] It is evident that the voltage calculation error in the initial stage after a fault is within 8%, and the voltage calculation error after the fault is cleared is within 6%. The calculation accuracy meets engineering requirements, and the calculation speed is fast, allowing for rapid assessment of the impact of a fault on the system voltage and calculation of the spatial distribution characteristics of the fault voltage.

[0102] Example 2

[0103] This embodiment provides a multi-stage voltage calculation system for grid faults under wind power integration;

[0104] A multi-stage voltage calculation system for grid faults under wind power integration includes:

[0105] The data acquisition module is configured to acquire the equivalent impedance of the induction motor, the subtransient electromotive force of the synchronous generator, the transient electromotive force of the synchronous generator, and the internal potential of the equivalent controlled voltage source of the wind farm in the power system.

[0106] The first voltage calculation module is configured to: calculate the initial voltage drop value after a fault occurs by means of network equations based on the equivalent impedance of the sub-induction motor, the subtransient electromotive force of the synchronous generator and the internal potential of the equivalent controlled voltage source of the wind farm.

[0107] The first update module is configured to: based on the initial value of the voltage drop, use the induction motor model to calculate the speed after the voltage drop for each induction motor by numerical integration, and then update the equivalent impedance of the induction motor.

[0108] The second update module is configured to: update the internal potential of the equivalent controlled voltage source based on the initial voltage drop value and the controlled voltage source model of the wind farm;

[0109] The second voltage calculation module is configured to calculate the voltage before fault clearance based on the updated equivalent impedance of the induction motor, the internal potential of the updated equivalent controlled voltage source, and the transient electromotive force of the synchronous generator through network equations.

[0110] The detailed process of each component has been described in Example 1.

[0111] Example 3

[0112] This embodiment also provides an electronic device, including: one or more processors, one or more memories, and one or more computer programs; wherein, the processor is connected to the memory, and the one or more computer programs are stored in the memory. When the electronic device is running, the processor executes the one or more computer programs stored in the memory to cause the electronic device to perform the method described in Embodiment 1.

[0113] It should be understood that in this embodiment, the processor can be a central processing unit (CPU), or it can be other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor can be a microprocessor or any conventional processor, etc.

[0114] Memory may include read-only memory and random access memory, and provides instructions and data to the processor. A portion of memory may also include non-volatile random access memory. For example, memory may also store information about the device type.

[0115] In the implementation process, each step of the above method can be completed by the integrated logic circuits in the processor hardware or by software instructions.

[0116] The method in Embodiment 1 can be directly implemented by a hardware processor, or implemented by a combination of hardware and software modules within the processor. The software modules can reside in readily available storage media in the art, such as random access memory, flash memory, read-only memory, programmable read-only memory, electrically erasable programmable memory, or registers. This storage medium is located in memory; the processor reads information from the memory and, in conjunction with its hardware, completes the steps of the above method. To avoid repetition, a detailed description is not provided here.

[0117] Those skilled in the art will recognize that the units and algorithm steps described in connection with the various examples of this embodiment can be implemented in electronic hardware or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this invention.

[0118] Example 4

[0119] This embodiment also provides a computer-readable storage medium for storing computer instructions, which, when executed by a processor, complete the method described in Embodiment 1.

[0120] The above description is merely a preferred embodiment of this application and is not intended to limit this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the protection scope of this application.

Claims

1. A method for calculating multi-stage voltage during grid faults under wind power integration, characterized by: include: Obtain the equivalent impedance of the induction motor in the power system, the subtransient electromotive force of the synchronous generator, the transient electromotive force of the synchronous generator, and the internal potential of the equivalent controlled voltage source of the wind farm. Based on the equivalent impedance of the induction motor, the transient electromotive force of the synchronous generator, and the internal potential of the equivalent controlled voltage source of the wind farm, the initial voltage drop after the fault is calculated through network equations. Based on the initial voltage drop value, using the induction motor model, the rotational speed of each induction motor after the voltage drop is calculated by numerical integration, and then the equivalent impedance of the induction motor is updated. Based on the initial voltage drop value, the internal potential of the equivalent controlled voltage source is updated using the wind farm controlled voltage source model; the wind farm controlled voltage source model is as follows: In the formula, E eq The internal potential amplitude of the equivalent controlled voltage source. This is the internal potential of the equivalent controlled voltage source. δ For the equivalent work angle, x eq For equivalent reactance, I p0 This represents the active current before the fault. U E The voltage at the wind farm's grid connection point θ u For the phase of the wind farm's grid connection point, k q This is the dynamic reactive current proportionality coefficient for wind farms. Based on the updated equivalent impedance of the induction motor, the updated internal potential of the equivalent controlled voltage source, and the transient electromotive force of the synchronous generator, the voltage before fault clearance is calculated using network equations; the network equations are as follows: In the formula, U For voltage vectors, This is the internal potential of the equivalent controlled voltage source. X G Take the subtransient reactance, Take the next transient electromotive force, k q This is the dynamic reactive current proportionality coefficient for wind farms. Z L This is the static load impedance. Z m This is the equivalent impedance of the induction motor. Z f For fault impedance, Y 1 represents the network node admittance matrix. This is the equivalent impedance.

2. The method for calculating multi-stage voltage of grid faults under wind power integration as described in claim 1, characterized in that, The induction motor model includes: rotor motion equation, electromagnetic torque equation, and equivalent impedance equation.

3. The method for calculating multi-stage voltage of grid faults under wind power integration as described in claim 1, characterized in that, If the node voltage changes linearly from the initial voltage drop after the fault occurs to the voltage before the fault is cleared during the fault period, then the equivalent impedance of the induction motor is updated a second time using the induction motor model after the speed drop.

4. The method for calculating multi-stage voltage of grid faults under wind power integration as described in claim 3, characterized in that, It also includes calculating the corrected pre-fault clearance voltage using network equations based on the equivalent impedance of the induction motor after the second update and the internal potential of the updated equivalent controlled voltage source.

5. The method for calculating multi-stage voltage of grid faults under wind power integration as described in claim 4, characterized in that, Based on the corrected voltage before fault clearance, the voltage after fault recovery is calculated by updating the internal potential of the equivalent controlled voltage source through the network equation, setting the reciprocal of the fault impedance to zero.

6. A multi-stage voltage calculation system for grid faults under wind power integration, characterized in that, The method for calculating the multi-stage voltage of grid faults under wind power integration as described in any one of claims 1-5 includes: The data acquisition module is configured to acquire the equivalent impedance of the induction motor, the subtransient electromotive force of the synchronous generator, the transient electromotive force of the synchronous generator, and the internal potential of the equivalent controlled voltage source of the wind farm in the power system. The first voltage calculation module is configured to: calculate the initial voltage drop value after a fault occurs by means of network equations based on the equivalent impedance of the induction motor, the subtransient electromotive force of the synchronous generator and the internal potential of the equivalent controlled voltage source of the wind farm. The first update module is configured to: based on the initial value of the voltage drop, use the induction motor model to calculate the speed after the voltage drop for each induction motor by numerical integration, and then update the equivalent impedance of the induction motor. The second update module is configured to: update the internal potential of the equivalent controlled voltage source based on the initial voltage drop value and the controlled voltage source model of the wind farm; The second voltage calculation module is configured to calculate the voltage before fault clearance based on the updated equivalent impedance of the induction motor, the internal potential of the updated equivalent controlled voltage source, and the transient electromotive force of the synchronous generator through network equations.

7. An electronic device, characterized in that it comprises: Memory is used to store computer-readable instructions in a non-transitory manner. as well as Processor, for executing the computer-readable instructions, When the computer-readable instructions are executed by the processor, they perform the method described in any one of claims 1-5.

8. A storage medium, characterized in that, The computer-readable instructions are stored non-temporarily, wherein when the computer-readable instructions are executed by a computer, the instructions of the method according to any one of claims 1-5 are executed.

Citation Information

Patent Citations

  • Low-voltage ride-through control method based on stator series multistage dynamic impedance

    CN111953019A

  • Power grid reactive power calculation method under short circuit fault disturbance

    CN113937776A