Cable running state monitoring method, device, system and electronic equipment
By monitoring the trends of cable load current and grounding current changes, the cable status can be determined in real time, solving the problem that existing technologies cannot monitor cable operating status in real time, reducing manual maintenance workload and improving safety.
Patent Information
- Application Number
- CN202311618486.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-29
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-11-29
AI Technical Summary
Existing technology cannot monitor the operating status of cables in real time, which makes it impossible to detect abnormalities in time, easily leading to safety accidents, and also requires a large amount of manual maintenance work.
By acquiring the cable's load current and grounding current, allocating them to different current ranges, and comparing the changing trends of the load current and grounding current within each range, the system outputs information on whether the cable's operating status is normal or abnormal based on these trends.
It enables real-time monitoring of cable operating status, reduces manual maintenance workload, promptly detects abnormal cables, and lowers the risk of safety accidents.
Smart Images

Figure CN117471222B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of cable monitoring technology, specifically to a method, device, system, and electronic equipment for monitoring the operating status of cables. Background Technology
[0002] Currently, most cable lines are laid underground, making it impossible to have a direct and accurate understanding of their operating status. If cable abnormalities occur, it can easily lead to increased losses and potentially cause safety accidents. In existing technology, workers typically determine the cable's operating status through periodic manual inspections, which cannot provide real-time information and involves a significant workload. Summary of the Invention
[0003] To address the aforementioned technical problems, embodiments of this application provide a cable operation status monitoring method, apparatus, system, and electronic device, which can monitor the cable operation status in real time and reduce the workload of staff.
[0004] Firstly, a method for monitoring the operating status of cables is provided, including:
[0005] Obtain the load current and grounding current of the cable;
[0006] Distribute the load current of the cable into different current ranges;
[0007] Within each current interval, the changing trends of the load current and the grounding current are compared to obtain the results; and
[0008] Based on the changing trend, output information indicating whether the cable's operating status is normal or abnormal.
[0009] According to a first aspect of this application, before distributing the load current of each phase of the cable to different current ranges, the cable operating status monitoring method further includes:
[0010] Obtain the maximum load current that the cable can withstand;
[0011] The current range is divided into multiple intervals with a preset spacing, within the range from zero to the maximum load current.
[0012] According to a first aspect of this application, obtaining the maximum load current that the cable can withstand includes:
[0013] Obtain the voltage level, cross-sectional area, and core material information of the cable;
[0014] Based on the voltage level information, the cross-sectional area information, and the core material information, the maximum load current that the cable can withstand is obtained.
[0015] According to a first aspect of this application, comparing the changing trends of the load current and the grounding current within each current interval includes:
[0016] Within each current region, the load currents are arranged sequentially according to the detection time.
[0017] According to the order of the detection time, the grounding current is compared with the corresponding load current in turn to obtain the changing trends of the load current and the grounding current.
[0018] According to a first aspect of this application, the step of outputting information on whether the cable's operating status is normal or abnormal based on the changing trend includes:
[0019] If the trend indicates that the load current and the grounding current are positively correlated, output information that the cable is operating normally;
[0020] If the trend indicates that the load current and the grounding current are not positively correlated, information indicating that the cable is in an abnormal operating state will be output.
[0021] According to a first aspect of this application, after outputting information indicating whether the cable's operating status is normal or abnormal based on the changing trend, the cable operating status monitoring method further includes:
[0022] The control information viewing device displays information indicating whether the cable is operating normally or abnormally.
[0023] Secondly, a cable operation status monitoring device is also provided, comprising:
[0024] The first acquisition module is configured to acquire the load current and grounding current of the cable;
[0025] The distribution module is configured to distribute the load current of the cable into different current ranges;
[0026] The first comparison module is configured to compare the changing trends of the load current and the grounding current within each current range; and
[0027] The first output module is configured to output information about whether the cable is operating normally or abnormal based on the changing trend.
[0028] Thirdly, a cable operation status monitoring system is also provided, including:
[0029] Current acquisition device, used to acquire the load current and grounding current of the cable;
[0030] The cable operation status monitoring device described above is communicatively connected to the current acquisition device.
[0031] According to a third aspect of this application, the cable operation status monitoring system further includes:
[0032] An information viewing device is communicatively connected to the cable operation status monitoring device, and the information viewing device is used to display information indicating whether the cable operation status is normal or abnormal.
[0033] Fourthly, an electronic device is also provided, comprising:
[0034] processor;
[0035] And a memory for storing the processor's executable instructions;
[0036] The processor is used to execute the cable operation status monitoring method described in the above embodiments.
[0037] The cable operation status monitoring method, device, system, and electronic equipment provided in this application first acquire the cable's load current and grounding current, then distribute the cable's load current into different current ranges, and then compare the changing trends of the load current and grounding current within each current range. Based on the changing trends, information on whether the cable's operation status is normal or abnormal is output. In this way, the cable's operation status can be determined in real time based on the changing trends of the load current and grounding current without the aid of manual maintenance, and cables with abnormal operation status can be detected in a timely manner, which can effectively reduce the workload of staff. Attached Figure Description
[0038] The above and other objects, features, and advantages of this application will become more apparent from the more detailed description of the embodiments of this application in conjunction with the accompanying drawings. The drawings are provided to further illustrate the embodiments of this application and form part of the specification. They are used together with the embodiments of this application to explain this application and do not constitute a limitation thereof. In the drawings, the same reference numerals generally represent the same components or steps.
[0039] Figure 1 This is a flowchart illustrating a cable operation status monitoring method provided as an exemplary embodiment of this application.
[0040] Figure 2 A flowchart illustrating a cable operation status monitoring method provided as another exemplary embodiment of this application.
[0041] Figure 3 This is a schematic diagram of a process for obtaining the maximum load current that a cable can withstand, provided as an exemplary embodiment of this application.
[0042] Figure 4 This is a flowchart illustrating the comparison of the changing trends of load current and ground current within each current range, provided as an exemplary embodiment of this application.
[0043] Figure 5 A flowchart illustrating a cable operation status monitoring method provided as another exemplary embodiment of this application.
[0044] Figure 6 A flowchart illustrating a cable operation status monitoring method provided as another exemplary embodiment of this application.
[0045] Figure 7 A structural block diagram of a cable operation status monitoring device provided as another exemplary embodiment of this application.
[0046] Figure 8 A structural block diagram of a cable operation status monitoring device provided as another exemplary embodiment of this application.
[0047] Figure 9 A structural block diagram of a cable operation status monitoring system provided for an exemplary embodiment of this application.
[0048] Figure 10 A structural block diagram of a cable operation status monitoring system provided as another exemplary embodiment of this application.
[0049] Figure 11 A structural block diagram of an electronic device provided for an exemplary embodiment of this application. Detailed Implementation
[0050] Hereinafter, exemplary embodiments according to this application will be described in detail with reference to the accompanying drawings. Obviously, the described embodiments are merely some embodiments of this application, and not all embodiments of this application. It should be understood that this application is not limited to the exemplary embodiments described herein.
[0051] Figure 1 This is a flowchart illustrating a cable operation status monitoring method provided as an exemplary embodiment of this application. Figure 1 As shown, the cable operation status monitoring method provided in this application embodiment may include:
[0052] S210: Obtain the load current and grounding current of the cable.
[0053] In a real-time example, a first current sensor can be installed on the main line of the cable to collect the load current of the cable.
[0054] In one embodiment, a second current sensor can be installed on the grounding lead of the cable to collect the grounding current of the cable.
[0055] It should be noted that in practical applications, the cable's load current changes with the load, and during this process, the cable's grounding current also changes accordingly. Furthermore, if the cable is in normal operating condition, the grounding circuit and load current are positively correlated. Therefore, the cable's load current and grounding current can be used as reference data for determining its operating status.
[0056] S220: Distributes the load current of the cable into different current ranges.
[0057] It should be noted that the span of different current ranges can be the same or different.
[0058] In one embodiment, each current interval has the same span, which makes it easy to assign different detected load currents to the corresponding current intervals.
[0059] S230: Within each current range, compare the changing trends of load current and grounding current.
[0060] Specifically, compared to the overall comparison process, step S230 compares the load current and the grounding current in each current interval. This allows for a more accurate comparison of the corresponding load current and grounding current, and reduces the likelihood of the compared load current and grounding current being at different times. Thus, based on the comparison results of each current interval, the changing trends of the load current and grounding current can be determined more accurately.
[0061] In one embodiment, the trend of change can be represented by the change curves of load current and ground current. By comparing the change curves of load current and ground current, the changes of load current and ground current can be reflected more intuitively.
[0062] S240: Based on the changing trend, output information indicating whether the cable's operating status is normal or abnormal.
[0063] Specifically, since the trends of load current and grounding current when the cable is in normal operating condition are different from those when the cable is in abnormal operating condition, the cable's operating condition can be determined based on the trends of load current and grounding current.
[0064] The cable operation status monitoring method provided in this application first acquires the cable's load current and grounding current, then distributes the cable's load current into different current ranges, and then compares the changing trends of the load current and grounding current within each current range. Based on the changing trends, it outputs information indicating whether the cable's operation status is normal or abnormal. In this way, without the aid of manual maintenance, the cable's operation status can be determined in real time based on the changing trends of the load current and grounding current, and cables with abnormal operation status can be detected in a timely manner, which can effectively reduce the workload of staff.
[0065] It should be noted that, for three-phase cables, the cable operation status monitoring method in this application embodiment can be applied to each phase cable. In other words, the cable operation status monitoring method provided in this application embodiment can monitor all three phase cables simultaneously, with a larger monitoring range, which can further reduce the maintenance workload of the staff.
[0066] Figure 2 A flowchart illustrating a cable operation status monitoring method provided as another exemplary embodiment of this application. Figure 2 As shown, prior to step S220, the cable operating status monitoring method further includes:
[0067] S250: Obtain the maximum load current that the cable can withstand.
[0068] It should be noted that the maximum load current a cable can withstand is a characteristic of the cable itself; for a given cable, its maximum load current is fixed.
[0069] Generally, the maximum load current that a cable can withstand is related to the cable's operating voltage level, cross-sectional area, and core material.
[0070] S260: Divide the current range into multiple intervals within the range of zero to maximum load current using a preset spacing.
[0071] Specifically, taking a preset spacing of 3A and a maximum load current of 12A as an example, it can be divided into multiple current ranges such as [0A~3A), [3A~6A), [6A~9A), and [9A~12A).
[0072] It should be understood that dividing the current range into multiple ranges with a preset interval can make the span of each current range the same, simplify the division process, and also help improve the efficiency of load current distribution.
[0073] It should be understood that the preset spacing can be set according to the actual situation, and this application does not make specific limitations on the preset spacing.
[0074] Figure 3This is a schematic diagram illustrating a process for obtaining the maximum load current that a cable can withstand, provided as an exemplary embodiment of this application. Figure 3 As shown, step S250 may include:
[0075] S251: Obtain information on the cable's voltage level, cross-sectional area, and core material.
[0076] S252: Based on the voltage level, cross-sectional area, and core material information, the maximum load current that the cable can withstand is obtained.
[0077] Specifically, the maximum load current that a cable can withstand is affected by factors such as the cable's voltage rating, cross-sectional area, and core material. Different voltage ratings, cross-sectional areas, and core materials result in different maximum load currents that the cables can withstand.
[0078] In practical applications, the voltage rating, cross-sectional area, and core material information of cables can be pre-stored in the system and bound to the corresponding maximum load current. After identifying the cable to be monitored, the corresponding voltage rating, cross-sectional area, and core material information can be retrieved to obtain the maximum load current that the cable can currently withstand. This enables the rapid determination of the cable's maximum load current and the quick division of current ranges.
[0079] Figure 4 This is a flowchart illustrating the comparison of the changing trends of load current and ground current within each current range, provided as an exemplary embodiment of this application. Figure 4 As shown, step S230 may include:
[0080] S231: Within each current region, the load currents are arranged sequentially according to the detection time.
[0081] S232: According to the detection time sequence, the grounding current is compared with the corresponding load current in turn to obtain the changing trend of the load current and the grounding current.
[0082] Specifically, by executing steps S231 and S232, the load currents are arranged in order of detection time, and then the ground currents are compared with the corresponding load currents in chronological order. This not only facilitates comparison and improves comparison efficiency, but also improves the accuracy of comparison results and more accurately determines the changing trends of load currents and ground currents.
[0083] In practical applications, while acquiring the load current and grounding current of the cable, the current detection time node can be recorded. In this way, each detection time node can correspond to a set of load current and grounding current, which facilitates rapid comparison and accurate comparison results during the execution of steps S231 and S232.
[0084] Figure 5 A flowchart illustrating a cable operation status monitoring method provided as another exemplary embodiment of this application. Figure 5 As shown, step S240 may include:
[0085] S241: If the trend indicates that the load current and the grounding current are positively correlated, it indicates that the output cable is operating normally.
[0086] S242: If the trend indicates that the load current and the grounding current are not positively correlated, it indicates that the output cable is in an abnormal operating state.
[0087] Specifically, the load current of a cable changes with the load, and during this process, the grounding current of the cable also changes accordingly. The grounding circuit and the load current are positively correlated.
[0088] Therefore, if the load current and the grounding current are positively correlated, the cable can be considered to be operating normally; if the load current and the grounding current are not positively correlated, the cable can be considered to be operating abnormally.
[0089] It should be noted that situations where load current and grounding current are not positively correlated can include situations where grounding current changes abruptly, or situations where load current and grounding current are negatively correlated.
[0090] Figure 6 A flowchart illustrating a cable operation status monitoring method provided as another exemplary embodiment of this application. Figure 6 As shown, after step S240, the cable operating status monitoring method further includes:
[0091] S270: The control information viewing device displays information indicating whether the cable's operating status is normal or abnormal.
[0092] Specifically, after the information viewing device displays information indicating whether the cable is operating normally or abnormally, it allows staff to monitor the cable's operating status in real time. This enables staff to take timely emergency measures when abnormalities occur in the cable's operating status, reducing the likelihood of safety accidents.
[0093] Figure 7 A structural block diagram of a cable operation status monitoring device provided as another exemplary embodiment of this application. (See diagram below.) Figure 7As shown, the cable operation status monitoring device 400 provided in this application embodiment includes: a first acquisition module 410, configured to acquire the load current and grounding current of the cable; an allocation module 420, configured to allocate the load current of the cable to different current ranges; a first comparison module 430, configured to compare the changing trends of the load current and grounding current in each current range; and a first output module 440, configured to output information on whether the cable operation status is normal or abnormal based on the changing trends.
[0094] The cable operation status monitoring device provided in this application first acquires the load current and grounding current of the cable, then distributes the load current of the cable into different current ranges, and then compares the changing trends of the load current and grounding current in each current range. Based on the changing trends, it outputs information on whether the cable operation status is normal or abnormal. In this way, the cable operation status can be determined in real time based on the changing trends of the load current and grounding current without the aid of manual maintenance, and cables with abnormal operation status can be detected in a timely manner, which can effectively reduce the workload of staff.
[0095] Figure 8 A structural block diagram of a cable operation status monitoring device provided as another exemplary embodiment of this application. (See diagram below.) Figure 8 As shown, in one embodiment, the cable operation status monitoring device 400 includes a second acquisition module 450 configured to acquire the maximum load current that the cable can withstand; and a division module 460 configured to divide the range from zero to the maximum load current into multiple current intervals with preset spacing.
[0096] like Figure 8 As shown, in one embodiment, the second acquisition module 450 includes a third acquisition module 451, configured to acquire the voltage level information, cross-sectional area information, and core material information of the cable. The fourth acquisition module 452 is configured to obtain the maximum load current that the cable can withstand based on the voltage level information, cross-sectional area information, and core material information.
[0097] like Figure 8 As shown, in one embodiment, the first comparison module 430 includes an arrangement module 431, configured to arrange the load currents sequentially according to the detection time within each current region; the second comparison module 432 is configured to compare the ground current with the corresponding load current sequentially according to the detection time to obtain the changing trends of the load current and the ground current.
[0098] like Figure 8As shown, in one embodiment, the first output module 440 includes a second output module 441, configured to output information indicating that the cable is operating normally if the trend indicates that the load current and the ground current are positively correlated; and a third output module 442, configured to output information indicating that the cable is operating abnormally if the trend indicates that the load current and the ground current are not positively correlated.
[0099] like Figure 8 As shown, in one embodiment, the cable operation status monitoring device 400 includes a display module 470, configured to display information on whether the cable operation status is normal or abnormal.
[0100] Figure 9 This is a structural block diagram of a cable operation status monitoring system provided as an exemplary embodiment of this application. Figure 9 As shown, the cable operation status monitoring system 600 provided in this application embodiment includes: a current acquisition device 610 for acquiring the load current and grounding current of the cable; and the cable operation status monitoring device 400 as described above, which is communicatively connected to the current acquisition device 610.
[0101] In one embodiment, the current acquisition device 610 may include a first current sensor and a second current sensor, the first current sensor being used to acquire the load current of the cable and the second current sensor being used to acquire the grounding current of the cable.
[0102] The cable operation status monitoring system provided in this application first acquires the load current and grounding current of the cable, then distributes the load current of the cable into different current ranges, and then compares the changing trends of the load current and grounding current in each current range. Based on the changing trends, it outputs information on whether the cable operation status is normal or abnormal. In this way, the cable operation status can be determined in real time based on the changing trends of the load current and grounding current without the aid of manual maintenance, and cables with abnormal operation status can be detected in a timely manner, which can effectively reduce the workload of staff.
[0103] Figure 10 A structural block diagram of a cable operation status monitoring system provided as another exemplary embodiment of this application. (See diagram below.) Figure 10 As shown, the cable operation status monitoring system 600 also includes an information viewing device 620, which is communicatively connected to the cable operation status monitoring device 400.
[0104] Specifically, in practical applications, information viewing devices can be used to display information on whether the cable is operating normally or abnormally. This allows staff to monitor the cable's operating status in real time and enables them to take timely emergency measures when abnormalities occur, thereby reducing the likelihood of safety accidents.
[0105] Figure 11 This is a structural block diagram of an electronic device provided as an exemplary embodiment of this application. (See diagram below.) Figure 11 As shown, the electronic device 800 provided in this application embodiment can be any one or both of the first device and the second device, or a standalone device independent of them. The standalone device can communicate with the first device and the second device to receive the collected input signals from them.
[0106] like Figure 11 As shown, the electronic device 800 includes one or more processors 810 and a memory 820. The memory 820 is used to store executable instructions of the processor 810, which is used to execute the cable operation status monitoring method as described above.
[0107] The processor 810 may be a central processing unit (CPU) or other form of processing unit with data processing and / or instruction execution capabilities, and may control other components in the electronic device 800 to perform desired functions.
[0108] The memory 820 may include one or more computer program products, which may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. The volatile memory may, for example, include random access memory (RAM) and / or cache memory.
[0109] The non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc. One or more computer program instructions may be stored on the computer-readable storage medium, and the processor 810 may execute the program instructions to implement the control methods and / or other desired functions of the various embodiments of this application described above. Various contents such as input signals, signal components, and noise components may also be stored in the computer-readable storage medium.
[0110] In one example, the electronic device 800 may also include an input device 830 and an output device 840, which are interconnected via a bus system and / or other forms of connection mechanism (not shown).
[0111] When the controller is a standalone device, the input device 830 can be a communication network connector for receiving the acquired input signals from the first device and the second device.
[0112] In addition, the input device 830 may also include, for example, a keyboard, a mouse, etc.
[0113] The output device 840 can output various information to the outside, including determined distance information, direction information, etc. The output device 840 may include, for example, a display, a speaker, a printer, and a communication network and its connected remote output devices, etc.
[0114] Of course, for the sake of simplicity, Figure 11 Only some of the components of the electronic device 800 relevant to this application are shown in this illustration; components such as buses, input / output interfaces, etc., are omitted. In addition, the electronic device 800 may include any other suitable components depending on the specific application.
[0115] The computer program product can be written in any combination of one or more programming languages to perform the operations of the embodiments of this application. The programming languages include object-oriented programming languages such as Java and C++, as well as conventional procedural programming languages such as C or similar languages. The program code can be executed entirely on the user's computing device, partially on the user's computing device, as a standalone software package, partially on the user's computing device and partially on a remote computing device, or entirely on a remote computing device or server.
[0116] The computer-readable storage medium may be any combination of one or more readable media. The readable medium may be a readable signal medium or a readable storage medium. The readable storage medium may, for example, include, but is not limited to, electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, apparatuses, or devices, or any combination thereof.
[0117] More specific examples of readable storage media (a non-exhaustive list) include: electrical connections having one or more wires, portable disks, hard disks, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), optical fiber, portable compact disk read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination of the foregoing.
[0118] The basic principles of this application have been described above with reference to specific embodiments. However, it should be noted that the advantages, benefits, and effects mentioned in this application are merely examples and not limitations, and should not be considered as essential features of each embodiment of this application. Furthermore, the specific details disclosed above are for illustrative and facilitative purposes only, and are not limitations. These details do not limit the application to the necessity of employing the aforementioned specific details for implementation.
[0119] The block diagrams of devices, apparatuses, devices, and systems involved in this application are merely illustrative examples and are not intended to require or imply that they must be connected, arranged, or configured in the manner shown in the block diagrams. As those skilled in the art will recognize, these devices, apparatuses, devices, and systems can be connected, arranged, and configured in any manner.
[0120] Words such as “including,” “contains,” and “has” are open-ended terms meaning “including but not limited to,” and are used interchangeably with them. The words “or” and “and” as used here refer to the words “and / or,” and are used interchangeably with them unless the context explicitly indicates otherwise. The word “such as” as used here refers to the phrase “such as but not limited to,” and is used interchangeably with it.
[0121] It should also be noted that in the apparatus, equipment, and methods of this application, the components or steps can be disassembled and / or recombined. These disassemblies and / or recombinations should be considered as equivalent solutions of this application.
[0122] The above description of the disclosed aspects is provided to enable any person skilled in the art to make or use this application. Various modifications to these aspects will be readily apparent to those skilled in the art, and the general principles defined herein can be applied to other aspects without departing from the scope of this application. Therefore, this application is not intended to be limited to the aspects shown herein, but rather to be accorded the widest scope consistent with the principles and novel features disclosed herein.
[0123] The above description has been given for purposes of illustration and description. Furthermore, this description is not intended to limit the embodiments of this application to the forms disclosed herein. Although numerous exemplary aspects and embodiments have been discussed above, those skilled in the art will recognize certain variations, modifications, alterations, additions, and sub-combinations thereof.
Claims
1. A method of cable operational state monitoring, characterized by, The method comprises: obtaining load current and ground current of a cable; allocating the load current of the cable to different current intervals; comparing the change trend of the load current and the ground current in each current interval; and outputting information about the normal or abnormal operation state of the cable according to the change trend. The comparing the change trend of the load current and the ground current in each current interval comprises: arranging the load current in each current interval in order of detection time; comparing the ground current with the corresponding load current in order of detection time to obtain the change trend of the load current and the ground current. The outputting information about the normal or abnormal operation state of the cable according to the change trend comprises: if the change trend indicates that the load current and the ground current are positively correlated, outputting information about the normal operation state of the cable; and if the change trend indicates that the load current and the ground current are not positively correlated, outputting information about the abnormal operation state of the cable. Before allocating the load current of each phase of the cable to different current intervals, the method further comprises:
2. The cable operating condition monitoring method according to claim 1, characterized by, obtaining the maximum load current that the cable can withstand; dividing a plurality of current intervals in the range from zero to the maximum load current at a preset interval. The obtaining the maximum load current that the cable can withstand comprises:
3. The cable routing condition monitoring method according to claim 2, characterized in that, obtaining voltage grade information, cross-sectional area information, and wire core material information of the cable; obtaining the maximum load current that the cable can withstand according to the voltage grade information, the cross-sectional area information, and the wire core material information. After the outputting information about the normal or abnormal operation state of the cable according to the change trend, the method further comprises:
4. The cable operational status monitoring method of claim 1, wherein, controlling an information viewing device to display the information about the normal or abnormal operation state of the cable. The method comprises:
5. A cable operating condition monitoring device, characterized by, a first obtaining module configured to obtain load current and ground current of a cable; an allocating module configured to allocate the load current of the cable to different current intervals; a first comparing module configured to compare the change trend of the load current and the ground current in each current interval; and a first outputting module configured to output information about the normal or abnormal operation state of the cable according to the change trend. The first comparing module comprises: an arranging module configured to arrange the load current in each current interval in order of detection time; a second comparing module configured to compare the ground current with the corresponding load current in order of detection time to obtain the change trend of the load current and the ground current. The first outputting module comprises: a second outputting module configured to output information about the normal operation state of the cable if the change trend indicates that the load current and the ground current are positively correlated; and a third outputting module configured to output information about the abnormal operation state of the cable if the change trend indicates that the load current and the ground current are not positively correlated. The third output module is configured to output information that the cable operation state is abnormal if the change trend indicates that the load current and the ground current are not positively correlated.
6. A cable operating condition monitoring system characterized by, The cable operation state monitoring device comprises: a current collection device configured to collect a load current and a ground current of the cable; The cable operation state monitoring device of claim 5 is in communication connection with the current collection device.
7. A cable routing condition monitoring system according to claim 6, characterised in that, The cable operation state monitoring system further comprises: an information viewing device in communication connection with the cable operation state monitoring device, the information viewing device being configured to display information that the cable operation state is normal or abnormal.
8. An electronic device, comprising: The cable operation state monitoring device comprises: a processor; and a memory for storing instructions executable by the processor; wherein the processor is configured to execute the cable operation state monitoring method according to any one of claims 1 to 4.
Citation Information
Patent Citations
High-voltage cable health state on-line monitoring system and monitoring method thereof
CN113805007A
High-voltage cable on-line monitoring method and device based on operation current and grounding ring current
CN116381379A
