预应力锚索桩板墙施工方法
By using the prestressed anchor pile slab wall construction method, and utilizing the built-in steel rigid frame and cast-in-place hanging plate formwork system, the problems of slow construction progress and poor safety of traditional construction have been solved, achieving efficient and low-cost post-disaster slope treatment.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- ZHEJIANG ZHENGFANG TRAFFIC CONSTR CO LTD
- Filing Date
- 2023-11-28
- Publication Date
- 2026-07-17
AI Technical Summary
Traditional prestressed anchor pile slab wall construction suffers from slow construction progress and poor safety, especially since construction cannot be completed before the rainy season, and the cost is high.
The construction method of prestressed anchor pile slab wall is adopted, including anti-slide pile construction, cast-in-place hanging slab formwork system and precast hanging slab assembly structure. The construction progress is accelerated by using built-in steel stiffening frame, and the construction efficiency is improved by combining cast-in-place concrete and precast hanging slab construction.
It significantly reduces construction costs, improves construction efficiency, ensures construction safety, and meets the urgent needs of post-disaster slope restoration.
Smart Images

Figure CN117513370B_ABST