High-altitude large-span single-layer net shell cumulative sliding construction method
By assembling the reticulated shell structure in sections on the ground and using sliding track beams and crawlers for cumulative sliding at high altitudes, the installation difficulty and safety issues of large-span single-layer reticulated shell structures at high altitudes have been solved, achieving efficient and safe construction results.
Patent Information
- Application Number
- CN202311694129.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-11
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2043-12-11
AI Technical Summary
The installation of high-altitude, large-span single-layer reticulated shell structures is difficult, requires high precision, and has poor safety, making it a challenging aspect of construction.
The reticulated shell structure is divided into several reticulated shell units, which are assembled on the ground. The reticulated shell units are installed and slid segment by segment using a high-altitude cumulative sliding construction method, utilizing sliding track beams, crawlers, and temporary support devices. This is combined with an aerial work platform and support frame for efficient and safe construction.
It improves construction efficiency, reduces safety risks, lowers construction costs, and makes it easier to control construction quality and precision.
Smart Images

Figure CN117536334B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of steel structure space frame construction technology, specifically relating to a method for cumulative sliding construction of a high-altitude, large-span single-layer space shell. Background Technology
[0002] With the continuous development of my country's construction industry, single-layer grid shell structures have become increasingly popular for large-space, long-span, and ultra-high atrium areas to meet the requirements of building functionality and facade design. A single-layer grid shell structure typically consists of steel beams, steel columns, steel cables, cast steel components, and steel supports. The installation location is usually between the roof layers of two building structures, at a considerable height above the ground and in an arched shape. This makes installation difficult, requires high precision, and carries significant risks. The installation of high-altitude, long-span single-layer grid shells has always been a challenging aspect of grid shell construction. Summary of the Invention
[0003] The purpose of this invention is to overcome the shortcomings of the prior art and provide a method for cumulative sliding construction of high-altitude, large-span single-layer reticulated shell structures. By using the high-altitude cumulative sliding construction method, the construction efficiency of high-altitude, large-span single-layer reticulated shell structures is greatly improved, the safety risks of construction are reduced, and the economic benefits are good and the quality is easy to control.
[0004] This invention proposes a method for cumulative sliding construction of a high-altitude, large-span single-layer reticulated shell, comprising the following steps:
[0005] Step 1: Divide the reticulated shell structure into several reticulated shell units according to the location of its cast steel parts and cables, and assemble the reticulated shell structure in sections on the ground; set up an aerial work platform between the two existing buildings where the reticulated shell structure to be constructed is to be constructed.
[0006] Step 2: Install two sliding track beams onto the concrete structural beams of the roof of the two existing buildings respectively; install multiple steel columns on the two sliding track beams according to the length of each reticulated shell unit, and connect the steel columns and concrete structural beams with temporary construction support devices; install the crawler on the sliding track beams and connect the crawler to the steel columns.
[0007] Step 3: Install the aerial support frame and the cast steel parts of the first section of the reticulated shell unit on the aerial work platform. Hoist the first section of the reticulated shell unit on the ground onto the aerial support frame to form a whole, so that the two ends of the first section of the reticulated shell unit are respectively connected to the steel columns on the two sliding track beams.
[0008] Step 4: Install and tension the cables for the first section of the reticulated shell unit; remove the high-altitude support frame;
[0009] Step 5: Disconnect the temporary support device from the steel column. While the crawler crawls on the sliding track beam, it pushes the first section of the reticulated shell unit to slide on the sliding track beam to the target position. Return to step 3 to hoist and form the next section of the reticulated shell unit until the cumulative sliding of the reticulated shell structure is completed.
[0010] Step 6: Re-tension the cables, unload the mesh shell structure, and dismantle the aerial work platform.
[0011] Furthermore, the installation steps of the sliding track beam in step 2 include: laying the sliding track beam horizontally on the concrete structure beam, installing fixing plates on both sides of the sliding track beam, using the fixing plates to press and fix the sliding track beam, and fixing the fixing plates to the embedded parts embedded in the concrete structure beam.
[0012] Furthermore, the temporary support devices are distributed on both sides of the sliding track beam and are supported and connected between the steel column and the concrete structural beam.
[0013] Furthermore, the crawler includes a hydraulic cylinder and a clamping block; one end of the hydraulic cylinder is connected to the clamping block, and the other end is connected to the steel column; when the clamping block clamps the sliding track beam, the hydraulic cylinder extends and retracts to push the steel column to slide on the sliding track beam; when the clamping block releases the sliding track beam, the hydraulic cylinder retracts to pull the clamping block to crawl on the sliding track beam.
[0014] Furthermore, the side wall of the steel column is connected to a pusher plate, which is connected to the hydraulic cylinder.
[0015] Furthermore, the step 1 of dividing the reticulated shell structure into several reticulated shell units according to the positions of its cast steel parts and cables, and assembling the reticulated shell structure in sections on the ground includes: dividing the reticulated shell structure into several reticulated shell units according to the positions of its cast steel parts and cables; drawing construction drawings for the ground support frame based on the dimensions of the divided reticulated shell units and verifying its stability; constructing the ground support frame based on the construction drawings of the ground support frame; and assembling the reticulated shell structure in sections on the ground support frame.
[0016] Furthermore, the step of erecting the aerial work platform between the two existing buildings where the proposed reticulated shell structure is to be constructed in step 1 includes: determining the sliding direction of the aerial work platform and the reticulated shell structure according to the design position of the reticulated shell structure between the two existing buildings, drawing the pole layout diagram of the aerial work platform, and verifying its stability; based on the pole layout diagram, erecting the poles, crossbars and horizontal shear braces of the aerial work platform layer by layer, accurately positioning the poles of the aerial work platform using a level and a total station, and after erecting it to the design height, fully laying platform boards on top of it and fixing them.
[0017] Furthermore, a horizontal safety net is installed below each horizontal shear brace of the aerial work platform.
[0018] Furthermore, each segment of the reticulated shell unit includes multiple reticulated shell pieces; the multiple reticulated shell pieces are spliced together in the transverse and longitudinal directions to form the reticulated shell unit.
[0019] Furthermore, at least two of the multiple mesh shell pieces in each mesh shell unit have different planar dimensions.
[0020] The beneficial effects of this invention are:
[0021] 1. Low construction difficulty and high construction efficiency. The reticulated shell structure is divided into several reticulated shell units, which are assembled in sections on the ground. The operation is simple and the construction is efficient. The cumulative sliding of the reticulated shell structure is the same in each section, which requires a high level of skill.
[0022] 2. High construction safety. The aerial work platform can be erected according to the high formwork standard, and its stability and load-bearing capacity meet the requirements for high-altitude installation and operation of the reticulated shell structure. After the aerial work platform is erected, the amount of high-altitude work is reduced; the ground assembly of the reticulated shell structure is conducive to construction safety and further reduces the safety hazards of high-altitude operations.
[0023] 3. High turnover rate and low construction cost. The components of the aerial work platform are reusable materials and can serve a dual purpose: structural formwork and installation of the grid shell structure, thus saving costs. Both the ground support frame and the aerial support frame can be reused after each sliding of the grid shell unit, further reducing costs.
[0024] 4. Construction quality is easy to control. The grid shell structure is assembled and welded into sections on the ground, which facilitates the quality of welds and installation accuracy, ensuring that the deformation and camber of the grid shell structure meet the requirements. The cables and cast steel components are installed and tensioned on the high-altitude work platform, making it easy to control the elevation and cable force. Attached Figure Description
[0025] Figure 1 This is a flowchart illustrating the cumulative sliding construction method for high-altitude, large-span single-layer reticulated shells according to the present invention.
[0026] Figure 2 This is a top view of the ground support frame in the method of the present invention, which is supported by a mesh shell unit.
[0027] Figure 3 for Figure 2 Schematic diagram of section 1-1.
[0028] Figure 4 for Figure 2 Schematic diagram of section 2-2.
[0029] Figure 5 This is a top view of the high-altitude support frame in the method of the present invention.
[0030] Figure 6 for Figure 5 A side view of the high-altitude support frame.
[0031] Figure 7 This is a plan view of a mesh shell unit assembled above the aerial work platform in the method of the present invention.
[0032] Figure 8 This is a partial front view schematic diagram of the aerial work platform in the method of the present invention.
[0033] Figure 9 This is a schematic diagram of the planar arrangement of the reticulated shell structure and the sliding track beam between existing buildings in the method of the present invention.
[0034] Figure 10 This is a schematic diagram of the planar distribution of multiple mesh shell sheets in a mesh shell unit in the method of the present invention.
[0035] Figure 11 This is a partially enlarged schematic diagram of the crawler, steel column, and sliding track beam in the method of the present invention.
[0036] Figure 12 for Figure 11 A schematic diagram of the left-side view structure.
[0037] In the diagram: 1-base steel beam, 2-supporting steel beam, 3-connecting steel beam, 4-reticulated shell unit, 5-cable, 6-cast steel component, 7-aerial work platform, 8-sliding track beam, 9-embedded part, 10-temporary support device, 11-fixed clamping plate, 12-concrete structural beam, 13-steel column, 14-crawler, 15-pushing lug plate; 16-aerial support frame. Detailed Implementation
[0038] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0039] like Figure 1 The high-altitude, large-span, single-layer reticulated shell cumulative sliding construction method shown includes the following steps:
[0040] Step 1: Divide the reticulated shell structure into several reticulated shell units 4 according to the positions of its cast steel parts 6 and cables 5, and assemble the reticulated shell structure in sections on the ground; set up an aerial work platform 7 between the two existing buildings where the reticulated shell structure is to be constructed.
[0041] Step 1 specifically includes: dividing the reticulated shell structure into several reticulated shell units 4 according to the positions of its cast steel parts 6 and cables 5; drawing construction drawings for the ground support frame based on the dimensions of the divided reticulated shell units 4, and verifying its stability; constructing the ground support frame based on the ground support frame construction drawings; and assembling the reticulated shell structure in sections on the ground support frame. Based on the design position of the reticulated shell structure between the two existing buildings, determining the sliding direction of the aerial work platform 7 and the reticulated shell structure, drawing the upright layout diagram of the aerial work platform 7, and verifying its stability; such as Figures 2-4 As shown, the ground support frame includes a base steel beam 1, a support steel beam 2, and a connecting steel beam 3; the base steel beam 1, the support steel beam 2, and the connecting steel beam 3 are installed and fixed according to the design drawings of the ground support frame; after the ground support frame is installed, the first section of the reticulated shell structure 4 is installed above the ground support frame.
[0042] like Figure 8 As shown, based on the pole layout diagram, the uprights, crossbars, and horizontal shear braces of the aerial work platform 7 are erected layer by layer. A level and total station are used to accurately position the uprights of the aerial work platform 7. After reaching the designed height, platform panels are laid on top and secured. During the erection of the aerial work platform 7, a level and total station are used to accurately position the uprights. Both the uprights and crossbars of the aerial work platform 7 use a disc-lock scaffold. Wooden blocks are placed at the bottom of the uprights of the aerial work platform 7, and a horizontal safety net is installed under each horizontal shear brace of the aerial work platform 7. After reaching the designed height, platform panels are laid on top and secured.
[0043] like Figure 10As shown, each mesh shell unit 4 includes multiple mesh shell pieces; these pieces are spliced together in the transverse and longitudinal directions to form the mesh shell unit 4. At least two of the mesh shell pieces in each mesh shell unit 4 have different planar dimensions. In this embodiment, each mesh shell unit 4 includes eight mesh shell pieces, and is divided into three parts along the longitudinal direction of the mesh shell structure. The first part includes a first, second, and third mesh shell piece arranged in the transverse direction of the mesh shell structure; the second part includes a fourth, fifth, and sixth mesh shell piece arranged in the transverse direction of the mesh shell structure; and the third part includes a seventh and eighth mesh shell piece arranged in the transverse direction of the mesh shell structure. Specifically, the first and fourth mesh shell pieces are arranged in the longitudinal direction of the mesh shell structure, the second and fifth mesh shell pieces are arranged in the longitudinal direction of the mesh shell structure, and the third and sixth mesh shell pieces are arranged in the longitudinal direction of the mesh shell structure. The first and third mesh shell pieces are the same size and each weighs 8 tons. The second mesh shell piece is larger and heavier than the first and third mesh shell pieces. The fourth and sixth mesh shell pieces are the same size and each weighs 7 tons. The fifth mesh shell piece is larger and heavier than the fourth and sixth mesh shell pieces. The seventh and eighth mesh shell pieces are the same size and weigh larger than any one of the first six mesh shell pieces.
[0044] Each shell unit 4 has a cast steel component 6 located at its lower center, and the cast steel component 6 is tensioned to the four corners of the shell unit 4 by cables 5.
[0045] Step 2: Install two sliding track beams 8 onto the concrete structural beams 12 of the roof of the two existing buildings. The concrete structural beams 12 can be the existing structure of the existing buildings or the structure constructed on site. Install multiple steel columns 13 on the two sliding track beams 8 according to the length of each section of the reticulated shell unit 4 along the longitudinal direction of the reticulated shell structure. Connect the steel columns 13 and the concrete structural beams 12 with the temporary construction support device 10. Install the crawler 14 on the sliding track beams 8 and connect the crawler 14 to the steel columns 13.
[0046] like Figure 11 , Figure 12As shown, the installation steps of the sliding track beam 8 include: laying the sliding track beam 8 horizontally on the concrete structural beam 12; installing fixing plates 11 on both sides of the sliding track beam 8; using the fixing plates 11 to press and fix the sliding track beam 8; and fixing the fixing plates 11 to the embedded parts 9 pre-embedded in the concrete structural beam 12. A portion of the embedded parts 9 is pre-embedded in the concrete structural beam 12, and another portion is located at the top of the concrete structural beam 12 and distributed on both sides of the sliding track beam 8, for welding to the fixing plates 11 on both sides of the sliding track beam 8. Under the action of the fixing plates 11, the sliding track beam 8 is stably installed on the concrete structural beam 12. The length direction of the sliding track beam 8 is the same as the length direction of the concrete structural beam 12, both being the longitudinal direction of the grid shell structure.
[0047] To ensure the stability of the steel column 13 on the sliding track beam 8, temporary support devices 10 are distributed on both sides of the sliding track beam 8, supporting and connecting the steel column 13 and the concrete structural beam 12. A steel sliding shoe is installed at the lower end of the steel column 13, resting on the sliding track beam 8. The temporary support devices 10 can support the steel sliding shoe between the concrete structural beam 12. The temporary support devices 10 can be made of reinforcing steel bars or steel pipes. Alternatively, the temporary support devices 10 can employ a vertical telescopic structure, such as a hydraulic telescopic cylinder, with its upper end fixed to the steel sliding shoe and its lower end abutting against the concrete structural beam 12 to support the steel column 13.
[0048] The sliding track beam 8 is made of 43kg / m I-beams. The fixing plates 11 and embedded parts 9 are arranged on the sliding track beam 8 at 800mm intervals. In this embodiment, the cable 5 is made of PE cable, and the cast steel part 6 is made of G20Mn5 cast steel, heat-treated, and integrally cast. The cable 5 and the cast steel part 6 are located below the grid shell structure.
[0049] The crawler 14 is a TLPG-1000 self-locking hydraulic crawler 14, which includes a hydraulic cylinder and a clamping block. One end of the hydraulic cylinder is connected to the clamping block, and the other end is connected to the steel column 13. When the clamping block clamps the sliding track beam 8, the hydraulic cylinder extends and retracts to push the steel column 13 to slide on the sliding track beam 8. When the clamping block releases the sliding track beam 8, the hydraulic cylinder retracts to pull the clamping block to crawl on the sliding track beam 8. The side wall of the steel column 13 is connected to a pusher plate 15, which is connected to the hydraulic cylinder.
[0050] Step 3, as follows Figures 7-9 As shown, an aerial support frame 16 and the cast steel component 6 of the first section of the reticulated shell unit 4 are installed on the aerial work platform 7. The first section of the reticulated shell unit 4 is then hoisted onto the aerial support frame 16 and integrally formed, with both ends of the first section of the reticulated shell unit 4 connected to the steel columns 13 on the two sliding track beams 8, respectively. The aerial support frame 16 is as follows... Figure 5 , Figure 6 As shown.
[0051] Step 4: Install and tension the cables 5 of the first section of the reticulated shell unit 4; remove the high-altitude support frame 16.
[0052] Step 5: Disconnect the temporary support device 10 from the steel column 13. While the crawler 14 crawls on the sliding track beam 8, it pushes the first section of the reticulated shell unit 4 to slide on the sliding track beam 8 to the target position. Return to step 3 to hoist and form the next section of the reticulated shell unit 4 as a whole until the cumulative sliding of the reticulated shell structure is completed.
[0053] Step 6: Tension cable 5, unload the reticulated shell structure, and dismantle the aerial work platform 7. The dismantling of the aerial work platform 7 shall be carried out according to the principles of dismantling first the supports, from the outside in, and in sections.
[0054] The above are merely preferred embodiments of the present invention. The scope of protection of the present invention is not limited to the above embodiments. All technical solutions falling within the scope of the present invention's concept are within the scope of protection of the present invention. It should be noted that for those skilled in the art, any improvements and modifications made without departing from the principle of the present invention should also be considered within the scope of protection of the present invention.
Claims
1. A method for cumulative sliding construction of a high-altitude, large-span single-layer reticulated shell, characterized in that, Includes the following steps: Step 1: Divide the reticulated shell structure into several reticulated shell units according to the location of its cast steel parts and cables, and assemble the reticulated shell structure in sections on the ground; set up an aerial work platform between the two existing buildings where the reticulated shell structure to be constructed is to be constructed. Step 2: Install two sliding track beams onto the concrete structural beams of the roof of the two existing buildings respectively; install multiple steel columns on the two sliding track beams according to the length of each reticulated shell unit, and connect the steel columns and concrete structural beams with temporary construction support devices; install the crawler on the sliding track beams and connect the crawler to the steel columns. Step 3: Install the aerial support frame and the cast steel component of the first section of the reticulated shell unit on the aerial work platform. Hoist the first section of the reticulated shell unit from the ground onto the aerial support frame to form a whole, so that both ends of the first section of the reticulated shell unit are connected to the steel columns on the two sliding track beams respectively. A cast steel component is placed at the center of the bottom of each reticulated shell unit, and the cast steel component is connected to the four corners of the reticulated shell unit by cables. Step 4: Install and tension the cables for the first section of the reticulated shell unit; remove the high-altitude support frame; Step 5: Disconnect the temporary support device from the steel column. While the crawler crawls on the sliding track beam, it pushes the first section of the reticulated shell unit to slide on the sliding track beam to the target position. Return to step 3 to hoist and form the next section of the reticulated shell unit, until the cumulative sliding of the reticulated shell structure is completed; Step 6: Re-tension the cables, unload the reticulated shell structure, and dismantle the aerial work platform; Step 1, which involves dividing the reticulated shell structure into several reticulated shell units based on the positions of its cast steel components and cables, and assembling the reticulated shell structure in segments on the ground, includes the following steps: The reticulated shell structure is divided into several reticulated shell units according to the position of its cast steel parts and cables. Based on the dimensions of the divided reticulated shell units, the construction drawings of the ground support frame are drawn and its stability is verified. Based on the construction drawings of the ground support frame, the ground support frame is constructed, and the reticulated shell structure is assembled in sections on the ground support frame. The step of setting up the high-altitude work platform between the two existing buildings where the reticulated shell structure to be constructed in step 1 includes: Based on the design location of the reticulated shell structure between the two existing buildings, determine the sliding direction of the aerial work platform and the reticulated shell structure, draw the pole layout diagram of the aerial work platform, and verify its stability; based on the pole layout diagram, erect the poles, crossbars and horizontal shear braces of the aerial work platform layer by layer, accurately position the poles of the aerial work platform using a level and a total station, and after erecting it to the design height, fully lay the platform board on top and fix it.
2. The method for cumulative sliding construction of a high-altitude, large-span single-layer reticulated shell according to claim 1, characterized in that, The installation steps of the sliding track beam in step 2 include: laying the sliding track beam horizontally on the concrete structure beam, installing fixing plates on both sides of the sliding track beam, using the fixing plates to press and fix the sliding track beam, and fixing the fixing plates to the embedded parts embedded in the concrete structure beam.
3. The method for cumulative sliding construction of a high-altitude, large-span single-layer reticulated shell according to claim 2, characterized in that, The temporary support devices are distributed on both sides of the sliding track beam and are connected between the steel column and the concrete structural beam.
4. The method for cumulative sliding construction of a high-altitude, large-span single-layer reticulated shell according to claim 1, characterized in that, The crawler includes a hydraulic cylinder and a clamping block; one end of the hydraulic cylinder is connected to the clamping block, and the other end is connected to the steel column; when the clamping block clamps the sliding track beam, the hydraulic cylinder extends and retracts to push the steel column to slide on the sliding track beam; when the clamping block releases the sliding track beam, the hydraulic cylinder retracts to pull the clamping block to crawl on the sliding track beam.
5. The method for cumulative sliding construction of a high-altitude, large-span single-layer reticulated shell according to claim 4, characterized in that, The side wall of the steel column is connected to a pusher plate, which is connected to the hydraulic cylinder.
6. The method for cumulative sliding construction of a high-altitude, large-span single-layer reticulated shell according to claim 1, characterized in that, Each horizontal shear brace of the aerial work platform is equipped with a horizontal safety net underneath.
7. The method for cumulative sliding construction of a high-altitude, large-span single-layer reticulated shell according to claim 1, characterized in that, Each of the aforementioned shell units comprises multiple shell sheets; the multiple shell sheets are spliced together in the transverse and longitudinal directions to form the shell unit.
8. The method for cumulative sliding construction of a high-altitude, large-span single-layer reticulated shell according to claim 1, characterized in that, In each segment of the reticulated shell unit, at least two of the reticulated shell pieces have different planar dimensions.
Citation Information
Patent Citations
Whole high-cleanliness electronic plant steel structure slippage and detachment method
CN103806658A
Construction technology of large-span mesh shell steel structure roof
CN110130562A
Construction method for large public construction engineering beam string structure dome steel structure roof hoisting
CN111980418A
Construction method of stockyard shed engineering steel structure
CN113235926A