Method and device for operating a double rotor wind turbine and electronic device

CN117536775BActive Publication Date: 2026-10-09HUANENG CLEAN ENERGY RES INST
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311685080.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-08
Publication Date
2026-10-09
Estimated Expiration
2043-12-08

AI Technical Summary

Technical Problem

[0003]然而,相关技术中,尚没有完善的针对双风轮风电机组的控制策略

Benefits of technology

[0011] This application provides an operation control method for a dual-rotor wind turbine, which comprehensively considers power feedback control compensation and speed feedback control compensation, and modifies the power feedback control compensation to reduce the load during the switching of the dual-rotor wind turbine and ensure the stable operation of the dual-rotor wind turbine.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117536775B_ABST
    Figure CN117536775B_ABST
Patent Text Reader

Abstract

The application provides a method and device for operating control of a double-rotor wind turbine and an electronic device. The method comprises: obtaining a first electromagnetic torque compensation value of a front-rotor generator and a second electromagnetic torque compensation value of a rear-rotor generator, correcting the first electromagnetic torque compensation value and the second electromagnetic torque compensation value to obtain a first target electromagnetic torque correction compensation value and a second target electromagnetic torque correction compensation value, obtaining a first basic electromagnetic torque of the front-rotor generator and a second basic electromagnetic torque of the rear-rotor generator, obtaining a third electromagnetic torque compensation value of the rear-rotor generator, and operating the wind turbine according to a front-rotor electromagnetic torque instruction and a rear-rotor electromagnetic torque instruction. Thus, the application comprehensively considers power feedback control compensation and speed feedback control compensation, and corrects the power feedback control compensation, thereby reducing the load during switching of the double-rotor wind turbine and ensuring stable operation of the double-rotor wind turbine.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power generation technology, and in particular to the operation control method, device and electronic equipment of dual-rotor wind turbine units. Background Technology

[0002] Currently, wind turbines are widely used in power generation. In particular, for dual-rotor wind turbines, accurate and reliable control methods can ensure their stable operation. Among these methods, the reliability of the electromagnetic torque control method for the wind turbine generator is often one of the main factors affecting the operational stability of dual-rotor wind turbines.

[0003] However, there is currently no comprehensive control strategy for dual-rotor wind turbines. Therefore, improving the accuracy and reliability of dual-rotor wind turbine control to ensure their stable operation has become an urgent problem to be solved. Summary of the Invention

[0004] This application provides an operation control method for dual-rotor wind turbine units, which comprehensively considers power feedback control compensation and speed feedback control compensation, and modifies the power feedback control compensation to reduce the load during the switching of dual-rotor wind turbine units and ensure the stable operation of dual-rotor wind turbine units.

[0005] According to a first aspect of this application, a method for operating control of a dual-rotor wind turbine generator is provided, comprising: acquiring a power deviation of the wind turbine generator; acquiring a first electromagnetic torque compensation value of the front wind turbine generator and a second electromagnetic torque compensation value of the rear wind turbine generator based on the power deviation; correcting the first electromagnetic torque compensation value to obtain a first target electromagnetic torque correction compensation value, and correcting the second electromagnetic torque compensation value to obtain a second target electromagnetic torque correction compensation value; acquiring a first basic electromagnetic torque of the front wind turbine generator and a second basic electromagnetic torque of the rear wind turbine generator; acquiring a speed deviation of the rear wind turbine generator, and acquiring a third electromagnetic torque compensation value of the rear wind turbine generator based on the speed deviation; generating a front wind turbine electromagnetic torque command based on the first basic electromagnetic torque and the first target electromagnetic torque correction compensation value, and generating a rear wind turbine electromagnetic torque command based on the second basic electromagnetic torque, the second target electromagnetic torque correction compensation value, and the third electromagnetic torque compensation value; and performing operation control of the wind turbine generator based on the front wind turbine electromagnetic torque command and the rear wind turbine electromagnetic torque command.

[0006] According to a second aspect of this application, an operation control device for a dual-rotor wind turbine generator is provided, comprising: a first acquisition module, configured to acquire the power deviation of the wind turbine generator, and acquire a first electromagnetic torque compensation value of the front wind turbine generator and a second electromagnetic torque compensation value of the rear wind turbine generator based on the power deviation; a correction module, configured to correct the first electromagnetic torque compensation value to obtain a first target electromagnetic torque correction compensation value, and correct the second electromagnetic torque compensation value to obtain a second target electromagnetic torque correction compensation value; a second acquisition module, configured to acquire a first basic electromagnetic torque of the front wind turbine generator and a second basic electromagnetic torque of the rear wind turbine generator; a third acquisition module, configured to acquire the speed deviation of the rear wind turbine generator, and acquire a third electromagnetic torque compensation value of the rear wind turbine generator based on the speed deviation; and a control module, configured to generate a front wind turbine electromagnetic torque command based on the first basic electromagnetic torque and the first target electromagnetic torque correction compensation value, and generate a rear wind turbine electromagnetic torque command based on the second basic electromagnetic torque, the second target electromagnetic torque correction compensation value, and the third electromagnetic torque compensation value, and perform operation control of the wind turbine generator based on the front wind turbine electromagnetic torque command and the rear wind turbine electromagnetic torque command.

[0007] To achieve the above objectives, a third aspect of this application provides an electronic device, characterized in that it includes: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, it implements the operation control method for a dual-rotor wind turbine as described in the first aspect.

[0008] To achieve the above objectives, a fourth aspect of this application provides a non-transitory computer-readable storage medium storing computer instructions, wherein the computer instructions are used to cause the computer to execute the operation control method for the dual-rotor wind turbine generator described in the first aspect.

[0009] To achieve the above objectives, the fifth aspect of this application proposes a computer program product, including a computer program that, when executed by a processor, implements the operation control method for a dual-rotor wind turbine generator according to the first aspect.

[0010] The technical solutions provided in this application have at least the following beneficial effects:

[0011] This application provides an operation control method for a dual-rotor wind turbine, which comprehensively considers power feedback control compensation and speed feedback control compensation, and modifies the power feedback control compensation to reduce the load during the switching of the dual-rotor wind turbine and ensure the stable operation of the dual-rotor wind turbine.

[0012] It should be understood that the description in this section is not intended to identify key or essential features of the embodiments of this application, nor is it intended to limit the scope of this application. Other features of this application will become readily apparent from the following description. Attached Figure Description

[0013] The accompanying drawings are provided for a better understanding of this solution and do not constitute a limitation of this application. Wherein:

[0014] Figure 1 A flowchart illustrating an operation control method for a dual-rotor wind turbine provided in this application embodiment;

[0015] Figure 2 A flowchart illustrating another operation control method for a dual-rotor wind turbine provided in this application embodiment;

[0016] Figure 3 A flowchart illustrating another operation control method for a dual-rotor wind turbine provided in this application embodiment;

[0017] Figure 4 A flowchart illustrating another operation control method for a dual-rotor wind turbine provided in this application embodiment;

[0018] Figure 5 A flowchart illustrating another operation control method for a dual-rotor wind turbine provided in this application embodiment;

[0019] Figure 6 A flowchart illustrating another operation control method for a dual-rotor wind turbine provided in this application embodiment;

[0020] Figure 7 A flowchart illustrating another operation control method for a dual-rotor wind turbine provided in this application embodiment;

[0021] Figure 8 A flowchart illustrating another operation control method for a dual-rotor wind turbine provided in this application embodiment;

[0022] Figure 9 A schematic diagram of the operation control device for a dual-rotor wind turbine provided in this application embodiment;

[0023] Figure 10 This is a schematic diagram of the structure of an electronic device provided in an embodiment of this application. Detailed Implementation

[0024] The following description, in conjunction with the accompanying drawings, illustrates exemplary embodiments of this application, including various details to aid understanding. These should be considered merely exemplary. Therefore, those skilled in the art will recognize that various changes and modifications can be made to the embodiments described herein without departing from the scope and spirit of this application. Similarly, for clarity and brevity, descriptions of well-known functions and structures are omitted in the following description.

[0025] The following describes in detail the operation control method of the dual-rotor wind turbine of this application using an embodiment.

[0026] Figure 1 A flowchart illustrating the operation control method for a dual-rotor wind turbine provided in this application embodiment.

[0027] like Figure 1 As shown, the operation control method for a dual-rotor wind turbine proposed in this embodiment specifically includes the following steps:

[0028] S101. Obtain the power deviation of the wind turbine generator set, and based on the power deviation, obtain the first electromagnetic torque compensation value of the front wind turbine generator and the second electromagnetic torque compensation value of the rear wind turbine generator.

[0029] It should be noted that the first power deviation of the front wind turbine generator and the second power deviation of the rear wind turbine generator can be obtained. Based on the first power deviation, the first electromagnetic torque compensation value of the front wind turbine generator can be obtained, and based on the second power deviation, the second electromagnetic torque compensation value of the rear wind turbine generator can be obtained.

[0030] It should be noted that in the relevant technologies, the main control strategy of wind turbines relies solely on the generator speed as the control variable of the unit. However, in actual operation, the rear rotor of a dual-rotor wind turbine is subject to many constraints. Therefore, relying solely on the generator speed as the control variable cannot accurately track changes in wind speed and the speed of the front rotor.

[0031] Therefore, this application proposes an operation control method for a dual-rotor wind turbine, which uses the rotational speed and output power of the front and rear rotors as calculation variables for the control of the front and rear rotor generators. A power feedback control command is added on top of the basic torque. Furthermore, the compensation value corresponding to the power feedback control command is further modified, and then the front and rear rotors are controlled according to the final generated command.

[0032] The first power deviation refers to the deviation of the output power of the front wind turbine generator from the target power of the front wind turbine generator.

[0033] It should be noted that the target power of the front wind turbine generator can be obtained based on the attributes of the wind turbine unit.

[0034] In this embodiment of the application, after obtaining the first power deviation, that is, after obtaining the power feedback control basis for the front wind turbine generator, the first electromagnetic torque compensation value for electromagnetic torque compensation of the front wind turbine generator can be obtained based on the first power deviation.

[0035] It should be noted that this application does not limit the specific method for obtaining the first electromagnetic torque compensation value of the front wind turbine generator based on the first power deviation, and it can be selected according to the actual situation.

[0036] Optionally, after obtaining the first power deviation, the control parameters of the controller corresponding to the wind turbine can be combined to obtain the first electromagnetic torque compensation value of the front wind turbine generator.

[0037] The second power deviation refers to the deviation of the output power of the rear wind turbine generator from the target power of the rear wind turbine generator.

[0038] In this embodiment of the application, after obtaining the second power deviation, that is, after obtaining the power feedback control basis for the rear wind turbine generator, the second electromagnetic torque compensation value for electromagnetic torque compensation of the rear wind turbine generator can be obtained based on the second power deviation.

[0039] It should be noted that, since there is a power deviation between the rear wind turbine generator and the front wind turbine generator, in this application, a power feedback control compensation command for the rear wind turbine speed can be further added on the basis of the basic electromagnetic torque, that is, the power deviation between the rear wind turbine generator and the front wind turbine generator, in order to obtain the second electromagnetic torque compensation value of the rear wind turbine generator.

[0040] It should be noted that this application does not limit the specific method for obtaining the second electromagnetic torque compensation value of the rear wind turbine generator based on the second power deviation, and it can be selected according to the actual situation.

[0041] Optionally, after obtaining the second power deviation, the control parameters of the controller corresponding to the wind turbine can be combined to obtain the second electromagnetic torque compensation value of the front wind turbine generator.

[0042] S102. Correct the first electromagnetic torque compensation value to obtain the first target electromagnetic torque correction compensation value, and correct the second electromagnetic torque compensation value to obtain the second target electromagnetic torque correction compensation value.

[0043] In this embodiment, after obtaining the first electromagnetic torque compensation value and the second electromagnetic torque compensation value, the first electromagnetic torque compensation value and the second electromagnetic torque compensation value can be corrected to obtain the first target electromagnetic torque compensation value ΔT. e1* Second target electromagnetic torque compensation value ΔT e2* .

[0044] It should be noted that the specific method of modifying the first electromagnetic torque compensation value to obtain the first target electromagnetic torque compensation value and modifying the second electromagnetic torque compensation value to obtain the second target electromagnetic torque compensation value is not limited and can be selected according to the actual situation.

[0045] Optionally, an electromagnetic torque correction model can be used to obtain a first target electromagnetic torque compensation value and a second electromagnetic target electromagnetic torque compensation value.

[0046] S103. Obtain the first basic electromagnetic torque of the front wind turbine generator and the second basic electromagnetic torque of the rear wind turbine generator.

[0047] Among them, the first basic electromagnetic torque refers to the basic electromagnetic torque corresponding to the front wind turbine generator. Electromagnetic torque refers to the rotational torque formed on the rotor by the interaction of the magnetic flux of each pole of the generator's rotating magnetic field and the rotor current.

[0048] The second basic electromagnetic torque refers to the basic electromagnetic torque corresponding to the rear wind turbine generator. Electromagnetic torque refers to the rotational torque formed on the rotor by the interaction of the magnetic flux of each pole of the generator's rotating magnetic field and the rotor current.

[0049] It should be noted that this application does not limit the specific method for obtaining the first foundation electromagnetic torque compensation value of the front wind turbine generator and the second foundation electromagnetic torque compensation value of the rear wind turbine generator, and the method can be selected according to the actual situation.

[0050] Optionally, the attribute parameters of the dual wind turbine generator set can be obtained, and the first basic electromagnetic torque compensation value of the front wind turbine generator and the second basic electromagnetic torque compensation value of the rear wind turbine generator can be obtained based on the attribute parameters.

[0051] S104. Obtain the speed deviation of the rear wind turbine generator, and based on the speed deviation, obtain the third electromagnetic torque compensation value of the rear wind turbine generator.

[0052] Among them, the speed deviation refers to the speed deviation of the rear wind turbine generator relative to the front wind turbine generator.

[0053] It should be noted that, since the incoming wind speed passes through the front and rear wind turbine generators at different times, that is, there is a certain time interval between the incoming wind speed passing through the front and rear wind turbine generators, there is a speed deviation between the rear wind turbine generator and the front wind turbine generator. Therefore, in this application, a feedback control compensation command for the front wind turbine generator can be further added on the basis of the basic electromagnetic torque, that is, the speed deviation between the rear wind turbine generator and the front wind turbine generator, so as to obtain the third electromagnetic torque compensation value of the rear wind turbine generator.

[0054] It should be noted that this application does not limit the specific method for obtaining the third electromagnetic torque compensation value of the rear wind turbine generator based on the speed deviation, and it can be selected according to the actual situation.

[0055] Optionally, after obtaining the speed deviation, the control parameters of the controller corresponding to the wind turbine can be combined to obtain the third electromagnetic torque compensation value of the rear wind turbine generator.

[0056] S105. Based on the first basic electromagnetic torque and the first target electromagnetic torque correction compensation value, generate the front wind turbine electromagnetic torque command, and based on the second basic electromagnetic torque, the second target electromagnetic torque correction compensation value and the third electromagnetic torque compensation value, generate the rear wind turbine electromagnetic torque command, so as to control the operation of the wind turbine unit according to the front wind turbine electromagnetic torque command and the rear wind turbine electromagnetic torque command.

[0057] Therefore, according to steps S101 to S104, for the front wind turbine generator, a first target electromagnetic torque compensation value based on power feedback and a first basic electromagnetic torque compensation value based on the basic torque command are obtained; for the rear wind turbine generator, a second target electromagnetic torque compensation value based on power feedback, a second basic electromagnetic torque compensation value based on the basic torque command, and a third electromagnetic torque compensation value based on speed feedback are obtained. Thus, in this embodiment of the application, a front wind turbine electromagnetic torque command can be generated based on the basic electromagnetic torque compensation value and the first target electromagnetic torque compensation value, and a rear wind turbine electromagnetic torque command can be generated based on the second basic electromagnetic torque compensation value, the second target electromagnetic torque compensation value, and the third electromagnetic torque compensation value.

[0058] Furthermore, after generating the electromagnetic torque commands for the front and rear wind turbines, the wind turbine generator can be controlled based on these commands.

[0059] The operation control method for a dual-rotor wind turbine provided in this application obtains the power deviation of the wind turbine, and based on the power deviation, obtains a first electromagnetic torque compensation value for the front wind turbine generator and a second electromagnetic torque compensation value for the rear wind turbine generator. The first electromagnetic torque compensation value is corrected to obtain a first target electromagnetic torque correction compensation value, and the second electromagnetic torque compensation value is corrected to obtain a second target electromagnetic torque correction compensation value. The method also obtains a first basic electromagnetic torque for the front wind turbine generator and a second basic electromagnetic torque for the rear wind turbine generator, obtains the speed deviation of the rear wind turbine generator, and based on the speed deviation, obtains a third electromagnetic torque compensation value for the rear wind turbine generator. Based on the first basic electromagnetic torque and the first target electromagnetic torque correction compensation value, a front wind turbine electromagnetic torque command is generated, and based on the second basic electromagnetic torque, the second target electromagnetic torque correction compensation value, and the third electromagnetic torque compensation value, a rear wind turbine electromagnetic torque command is generated. The wind turbine is then operated and controlled according to the front and rear wind turbine electromagnetic torque commands. Therefore, this application comprehensively considers power feedback control compensation and speed feedback control compensation, and modifies the power feedback control compensation to reduce the load when switching the dual-rotor wind turbine. At the same time, it considers the interval time of the incoming wind speed passing through the front and rear rotors to improve the accuracy of the torque command of the rear rotor and ensure the stable operation of the dual-rotor wind turbine.

[0060] As one possible implementation, such as Figure 2 As shown, based on the above steps, the specific process of obtaining the first electromagnetic torque compensation value of the front wind turbine generator and the second electromagnetic torque compensation value of the rear wind turbine generator according to the power deviation in step S101 is explained, including the following steps:

[0061] S201. Obtain the first control parameters of the front rotor controller of the wind turbine, and obtain the first electromagnetic torque compensation value based on the first control parameters and the power deviation.

[0062] It should be noted that the controller corresponding to the wind turbine's front rotor can be a PID controller (proportional-integral-derivative controller), consisting of a proportional unit (P), an integral unit (I), and a derivative unit (D). Correspondingly, the first control parameter of the front rotor controller can be the first proportional coefficient K. p1 First integration time T I1 First differential time T D1 .

[0063] It should be noted that this application does not limit the specific method for obtaining the first control parameters of the wind turbine's front rotor controller, and the method can be selected according to the actual situation.

[0064] Optionally, pre-stored controller parameter information can be read to obtain the first control parameters of the wind turbine's front rotor controller.

[0065] It should be noted that after obtaining the first control parameters and power deviation, the first electromagnetic torque compensation value can be obtained according to the following formula:

[0066]

[0067] Where ΔTe1 is the first electromagnetic torque compensation value, K p1 The first proportionality coefficient, T I1 For the first integration time, T D1 ΔP represents the first differential time and ΔP represents the power deviation.

[0068] S202. Obtain the second control parameters of the rear rotor controller of the wind turbine, and obtain the second electromagnetic torque compensation value based on the second control parameters and the power deviation.

[0069] It should be noted that the controller corresponding to the rear rotor of the wind turbine can be a PID controller (proportional-integral-derivative controller), consisting of a proportional unit (P), an integral unit (I), and a derivative unit (D). Correspondingly, the second control parameter of the rear rotor controller can be the second proportional coefficient K. p2 Second integration time T I2 Second differential time T D2 .

[0070] It should be noted that this application does not limit the specific method for obtaining the second control parameters of the rear rotor controller of the wind turbine, and can be selected according to the actual situation.

[0071] Optionally, pre-stored controller parameter information can be read to obtain the second control parameters of the wind turbine's rotor controller.

[0072] It should be noted that after obtaining the second control parameter and power deviation, the second electromagnetic torque compensation value can be obtained according to the following formula:

[0073]

[0074] Where ΔTe2 is the second electromagnetic torque compensation value, K p2 The second proportionality coefficient, T I2 For the second integration time, T D2 The second differential time is ΔP, and the power deviation is ΔP.

[0075] As one possible implementation, such as Figure 3As shown, based on the above steps, the process of correcting the first electromagnetic torque compensation value in step S102 to obtain the first target electromagnetic torque correction compensation value, and correcting the second electromagnetic torque compensation value to obtain the second target electromagnetic torque correction compensation value, is explained, including the following steps:

[0076] S301. Obtain the first starting speed, first low speed threshold, first high speed threshold and first rated speed corresponding to the front wind turbine generator, and the second starting speed, second low speed threshold, second high speed threshold and second rated speed corresponding to the rear wind turbine generator.

[0077] It should be noted that, in this application, when attempting to obtain the first target electromagnetic torque correction compensation value and the second target electromagnetic torque correction compensation value, at least two intervals, such as three intervals, can be pre-divided using the first starting speed, the first low speed threshold, the first high speed threshold, the first rated speed, and the second starting speed, the second low speed threshold, the second high speed threshold, and the second rated speed as interval thresholds. Then, the first target electromagnetic torque correction compensation value is obtained according to the interval in which the first speed is located, and the second target electromagnetic torque correction compensation value is obtained according to the interval in which the second speed is located.

[0078] The first low speed threshold refers to the speed of the front wind turbine generator at a lower power, and the second low speed threshold refers to the speed of the rear wind turbine generator at a lower power.

[0079] Optionally, based on the attribute information of the wind turbine, the lower power of the front wind turbine generator and the lower power of the rear wind turbine generator can be obtained to obtain the first low speed threshold ω_(1_a) and the second low speed threshold ω_(2_a).

[0080] The first high speed threshold refers to the speed of the front wind turbine generator at a higher power, and the second high speed threshold refers to the speed of the rear wind turbine generator at a higher power.

[0081] Optionally, based on the attribute information of the wind turbine generator, the higher power of the front wind turbine generator and the higher power of the rear wind turbine generator can be obtained to obtain the first high speed threshold ω. 1_b Second highest speed threshold ω 2_b .

[0082] The first rated speed refers to the speed of the front wind turbine generator at the first rated power, and the second rated speed refers to the speed of the rear wind turbine generator at the second rated power.

[0083] Optionally, the first speed of the front wind turbine generator and the second speed of the rear wind turbine generator can be obtained based on the attribute information of the wind turbine generator. The first rated speed ω can be obtained by obtaining the rated power of the front wind turbine generator and the rated power of the rear wind turbine generator. 1_n Second rated speed ω 2_n .

[0084] The first starting speed refers to the speed of the front wind turbine generator when it starts generating electricity from the grid, and the second starting speed refers to the speed of the rear wind turbine generator when it starts generating electricity from the grid.

[0085] S802. Based on the first rotational speed, the first starting rotational speed value, the first low rotational speed threshold, the first high rotational speed threshold, and the first rated rotational speed, obtain the first target electromagnetic torque correction compensation value, and based on the second rotational speed, the second starting rotational speed value, the second low rotational speed threshold, the second high rotational speed threshold, and the second rated rotational speed, obtain the second target electromagnetic torque correction compensation value.

[0086] Optionally, in response to a first rotational speed greater than a first low rotational speed threshold and less than or equal to a first high rotational speed threshold, the first electromagnetic torque compensation value is used as the first target electromagnetic torque correction compensation value, that is: when ω 1_a <ω1≤ω 1_b At that time, the first electromagnetic torque compensation value ΔT e1 The first target electromagnetic torque correction compensation value ΔT e1* .

[0087] Optionally, in response to a first rotational speed being greater than a first starting rotational speed value and less than or equal to a first low rotational speed threshold, or a first rotational speed being greater than a first high rotational speed threshold and less than or equal to a first rated rotational speed, 0 is taken as the first target electromagnetic torque correction compensation value, i.e., ΔT. e1* =0.

[0088] Optionally, in response to the second rotational speed being greater than the second low rotational speed threshold and less than or equal to the second high rotational speed threshold, the second electromagnetic torque compensation value is used as the second target electromagnetic torque correction compensation value, that is: when ω 2_a <ω2≤ω 2_b At that time, the second electromagnetic torque compensation value ΔT e2 The second target electromagnetic torque correction compensation value ΔT e2* .

[0089] Optionally, in response to a second speed value being greater than a second starting speed value and less than or equal to a second low speed threshold, or a second speed value being greater than a second high speed threshold and less than or equal to a second rated speed, 0 is taken as the second target electromagnetic torque correction compensation value, i.e.: ΔT e2* =0.

[0090] It should be noted that the load of a dual-rotor wind turbine varies significantly at low speed thresholds and near rated speed. Therefore, in order to reduce the load during switching of the dual-rotor wind turbine, the electromagnetic torque compensation value needs to be set to zero.

[0091] In summary, based on the first rotational speed, the first starting rotational speed, the first low rotational speed threshold, the first high rotational speed threshold, and the first rated rotational speed, the first target electromagnetic torque correction compensation value ΔT is determined. e1* And based on the second speed value, the second starting speed value, the second low speed threshold, the second high speed threshold, and the second rated speed, the second target electromagnetic torque ΔT is determined. e2* At that time, the following relationship exists:

[0092]

[0093] Where ω1 is the first rotational speed, ω 1_in The first starting speed, ω 1_a For the first low speed threshold, ω 1_b For the first high speed threshold, ω 1_n For the first rated speed, ΔT e1 The second electromagnetic torque compensation value, ΔT e1* This is the correction and compensation value for the first target electromagnetic torque.

[0094]

[0095] Where ω2 is the second rotational speed, ω 2_in For the second starting speed, ω 2_a For the second low speed threshold, ω 2_b The second highest speed threshold, ω 2_n For the second rated speed, ΔT e2 The second electromagnetic torque compensation value, ΔT e2* This is the correction and compensation value for the second target electromagnetic torque.

[0096] As one possible implementation, such as Figure 4 As shown, based on the above steps, the specific process of obtaining the first basic electromagnetic torque of the front wind turbine generator and the second basic electromagnetic torque of the rear wind turbine generator in step S103 is explained, including the following steps:

[0097] S401. Obtain the design parameters corresponding to the wind turbine, and based on the design parameters, obtain the torque control coefficient of the front wind turbine and the torque control coefficient of the rear wind turbine.

[0098] It should be noted that this application does not limit the specific method for obtaining the front and rear wind turbine torque control coefficients, and the method can be selected according to the actual situation.

[0099] Optionally, the front rotor torque control coefficient can be obtained by querying the mapping relationship between the design parameters of the wind turbine and the front rotor torque control coefficient; the rear rotor torque control coefficient can be obtained by querying the mapping relationship between the design parameters of the wind turbine and the rear rotor torque control coefficient.

[0100] S402. Obtain the first basic electromagnetic torque based on the front impeller torque control coefficient, and obtain the second basic electromagnetic torque based on the rear impeller torque control coefficient.

[0101] In this embodiment of the application, after obtaining the front wind turbine torque control coefficient, the first basic electromagnetic torque can be obtained according to the following formula:

[0102]

[0103] Among them, K opt1 For the front wind turbine torque control coefficient, T e1 ω1[n] represents the first basic electromagnetic torque, and ω1[n] represents the speed of the wind turbine at time n.

[0104] In this embodiment of the application, after obtaining the rear wind turbine torque control coefficient, the second basic electromagnetic torque can be obtained according to the following formula:

[0105]

[0106] Among them, K opt2 For the rear wind turbine torque control coefficient, T e2 ω2[n] represents the second basic electromagnetic torque, and ω2[n] represents the wind turbine speed after time n.

[0107] It should be noted that, since the load of a dual (front and rear) wind turbine generator set often changes significantly at low speeds and near rated speeds, in order to reduce the load during unit switching, in this embodiment of the application, the first electromagnetic torque compensation value can be corrected to obtain a first target electromagnetic torque correction compensation value, and the second electromagnetic torque compensation value can be corrected to obtain a second target electromagnetic torque correction compensation value.

[0108] As one possible implementation, such as Figure 5 As shown, based on the above steps, the specific process of obtaining the speed deviation of the rear wind turbine generator in step S104 is explained, including the following steps:

[0109] S501, Obtain the distance between the front and rear wind turbines.

[0110] It should be noted that this application does not limit the specific method for obtaining the distance between the front and rear wind turbines, and the method can be selected according to the actual situation.

[0111] Optionally, the distance between the front and rear rotors can be obtained based on the attribute information of the wind turbine.

[0112] S502. Obtain the first rotational speed of the front wind turbine generator at time n, and based on the first rotational speed and distance, obtain the first relative delayed rotational speed of the front wind turbine generator at time ni, and obtain the second rotational speed of the rear wind turbine generator at time n, where i is a positive integer less than n and n is a positive integer greater than 1.

[0113] It should be noted that this application does not limit the specific method for obtaining the first rotational speed of the front wind turbine generator at time n, and it can be selected according to the actual situation.

[0114] Alternatively, a speed measuring instrument can be used to obtain the first speed of the front wind turbine generator at time n.

[0115] Furthermore, after obtaining the first rotational speed and distance, the first relative delay rotational speed can be obtained based on the first rotational speed and distance.

[0116] S503. Obtain the second target speed of the rear wind turbine generator when the speed of the front wind turbine generator is the first relative delay speed.

[0117] It should be noted that when attempting to obtain the second target speed of the rear wind turbine generator, the second target speed of the rear wind turbine generator when the front wind turbine speed is the first relative delay speed can be calculated using the following formula:

[0118] ω2[n]_Cmd=f(ω1[ni])

[0119] Where ω2[n]_cmd is the second target speed of the rear wind turbine generator, and ω1[ni] is the first relative delay speed of the front wind turbine generator.

[0120] It should be noted that time i is related to the front impeller speed and the incoming air velocity, and the incoming air velocity and the front impeller speed are dynamically adjusted. The higher the incoming air velocity, the smaller i is, and the lower the incoming air velocity, the larger i is.

[0121] In this embodiment of the application, after obtaining the incoming wind speed and the distance between the front and rear impellers, i can be obtained according to the following formula:

[0122] i = D / v

[0123] Where i is the time, D is the distance between the front and rear wind turbines, and v is the incoming wind speed.

[0124] The incoming wind speed v can be obtained by measuring with an anemometer or by estimating the front impeller speed.

[0125] v=f(ω1[n])

[0126] Where ω1[n] is the rotational speed of the front wind turbine generator.

[0127] S504. Based on the second rotational speed and the second target rotational speed, obtain the relative delay target rotational speed deviation, and use the relative delay target rotational speed deviation as the rotational speed deviation.

[0128] In this embodiment of the application, after obtaining the second target rotational speed, the difference between the second rotational speed and the second target rotational speed can be obtained using the following formula to obtain the relative delay target rotational speed deviation:

[0129] Δω2[n]=f(ω1[ni])-ω2[n]

[0130] Where Δω2[n] is the relative delay target speed deviation, ω2[n]_cmd is the second target speed of the rear wind turbine generator, and ω2[n] is the second speed.

[0131] As one possible implementation, such as Figure 6 As shown, based on the above steps, the specific process of obtaining the third electromagnetic torque compensation value of the rear wind turbine generator according to the speed deviation in step S104 includes the following steps:

[0132] S601. Obtain the third control parameter of the rear rotor controller corresponding to the wind turbine.

[0133] It should be noted that the controller corresponding to the rear rotor of the wind turbine can be a PID controller. Accordingly, the third control parameter of the controller corresponding to the wind turbine can be the third proportional coefficient Kp*, the third integral time TI*, and the third derivative time TD*.

[0134] It should be noted that this application does not limit the specific method for obtaining the third control parameters of the rear rotor controller corresponding to the wind turbine, and the method can be selected according to the actual situation.

[0135] Optionally, pre-stored controller parameter information can be read to obtain the third control parameters of the controller corresponding to the wind turbine.

[0136] S602. Obtain the third electromagnetic torque compensation value based on the speed deviation and the third control parameter.

[0137] It should be noted that after obtaining the third control parameter and the speed deviation (relative to the target speed deviation with delay), the third electromagnetic torque compensation value can be obtained according to the following formula:

[0138]

[0139] Where ΔTe* is the third electromagnetic torque compensation value, Kp* is the third proportional coefficient, TI* is the third integral time, TD* is the third differential time, and Δω 2[n] This refers to the rotational speed deviation (relative to the target rotational speed deviation over time).

[0140] As one possible implementation, such as Figure 7 As shown, based on the above steps, the specific process of generating the front wind turbine electromagnetic torque command based on the first basic electromagnetic torque and the first target electromagnetic torque correction compensation value in step S105, and generating the rear wind turbine electromagnetic torque command based on the second basic electromagnetic torque, the second target electromagnetic torque correction compensation value, and the third electromagnetic torque compensation value, is explained, including the following steps:

[0141] S701. Add the first basic electromagnetic torque and the first target electromagnetic torque correction compensation value to obtain the first target electromagnetic torque corresponding to the front wind turbine generator.

[0142] In this embodiment of the application, after obtaining the first basic electromagnetic torque and the first target electromagnetic torque correction compensation value, the first basic electromagnetic torque and the first target electromagnetic torque correction compensation value can be added together to obtain the first target electromagnetic torque corresponding to the front wind turbine generator, that is: T 1_ T e =T e1 +ΔT e1* Among them, T e1 For the first fundamental electromagnetic torque, ΔT e1* This is the correction and compensation value for the first target electromagnetic torque.

[0143] S702. Generate the electromagnetic torque command for the front wind turbine based on the first target electromagnetic torque.

[0144] In this embodiment of the application, after obtaining the first target electromagnetic torque, a front wind turbine electromagnetic torque command T can be generated. 1_ T e This is to control the front wind turbine generator to operate according to the first target electromagnetic torque.

[0145] S703. Add the second basic electromagnetic torque, the second target electromagnetic torque correction compensation value, and the third electromagnetic torque compensation value to obtain the second target electromagnetic torque corresponding to the rear wind turbine generator.

[0146] In this embodiment of the application, after obtaining the second basic electromagnetic torque, the second target electromagnetic torque correction compensation value, and the third electromagnetic torque compensation value, the second basic electromagnetic torque, the second electromagnetic torque compensation value, and the third electromagnetic torque compensation value can be added together to obtain the second target electromagnetic torque corresponding to the rear wind turbine generator, i.e., T. 2_ T e =T e2+ΔT e2* +ΔT e* Among them, T 2_ T e For the second target electromagnetic torque, T e2 For the second fundamental electromagnetic torque, ΔT e2* The second target electromagnetic torque correction compensation value, ΔT e* This is the third electromagnetic torque compensation value.

[0147] S704. Generate the rear wind turbine electromagnetic torque command based on the second target electromagnetic torque.

[0148] In this embodiment of the application, after obtaining the second target electromagnetic torque, a rear wind turbine electromagnetic torque command T can be generated. 2_ T e This is to control the rear wind turbine generator to operate according to the second target electromagnetic torque.

[0149] It should be noted that, in the embodiments of this application, the incoming wind speed of the wind turbine, the wind turbine rotor start-up determination threshold set, and the wind turbine rotor shutdown determination threshold set can be obtained, so as to generate matching control commands based on the incoming wind speed, the first rotational speed, the second rotational speed, the front rotor start-up determination threshold set, and the rear rotor start-up determination threshold set, so as to control the wind turbine to start and stop according to the control commands.

[0150] As one possible implementation, such as Figure 8 As shown, based on the above steps, the specific process of controlling the wind turbine's start-up and shutdown according to control commands includes the following steps:

[0151] S801, Obtain the incoming wind speed of the wind turbine.

[0152] It should be noted that start-stop control strategies are often only applicable to single-rotor wind turbines. Furthermore, for dual-rotor wind turbines, the start-stop control strategy relies solely on generator speed and incoming wind speed as the conditions for starting and stopping the wind turbine. However, in actual operation, the rear rotor of a dual-rotor wind turbine is subject to many factors, and the incoming wind speed does not directly affect the rear rotor. Therefore, relying solely on generator speed and incoming wind speed cannot be used as the conditions for starting and stopping the unit.

[0153] Incoming air velocity refers to the distance a fluid (wind) travels per unit time.

[0154] Alternatively, an anemometer can be used to obtain the incoming wind speed of the wind turbine.

[0155] S802. Obtain the wind turbine start-up determination threshold set and the wind turbine shutdown determination threshold set for the wind turbine unit.

[0156] It should be noted that the wind turbine start-up determination threshold set includes the front wind turbine start-up determination threshold set and the rear wind turbine start-up determination threshold set, and the wind turbine shutdown determination threshold set includes the front wind turbine shutdown determination threshold set and the rear wind turbine shutdown determination threshold set.

[0157] It should be noted that this application does not limit the specific methods for obtaining the wind turbine start-up and wind turbine shutdown threshold sets, and the methods can be selected according to the actual situation.

[0158] Optionally, the mapping relationship between the front and rear rotors of the wind turbine can be queried during operation, and the rotor start-up and rotor shutdown judgment threshold sets of the wind turbine can be obtained based on the mapping relationship.

[0159] S803 generates matching control commands based on the incoming wind speed, first rotational speed, second rotational speed, front impeller start-up determination threshold set, and rear impeller start-up determination threshold set, so as to control the impeller to start and stop according to the control commands.

[0160] In this embodiment of the application, after obtaining the wind turbine start-up determination threshold set and the wind turbine shutdown determination threshold set, a matching start-up and shutdown control command can be generated based on the incoming wind speed, the first rotational speed, and the second rotational speed.

[0161] Furthermore, after generating matching control commands, the wind turbine can be started and stopped according to the control commands.

[0162] In summary, the control method for dual-rotor wind turbines provided in this application addresses the issue of numerous constraints during operation. For the front rotor, the output power is used as the calculation variable for front rotor generator control, and a power feedback control command is added on top of the basic torque. For the rear rotor, the front rotor speed, rear rotor speed, front rotor power, and rear rotor power are used as the calculation variables for rear rotor torque control, and a front rotor speed feedback control compensation command is added on top of the basic torque command. This improves the accuracy of the rear rotor torque command, enhances the adaptability of the dual-rotor wind turbine to wind speed fluctuations, enables the dual-rotor wind turbine to track wind speed and front rotor speed changes in real time, increases the power generation of the dual-rotor wind turbine, and ensures the stable operation of the dual-rotor wind turbine.

[0163] To achieve the above embodiments, this embodiment provides an operation control device for a dual-rotor wind turbine. Figure 9 This is a schematic diagram of a dual-rotor wind turbine control device provided in an embodiment of this application.

[0164] like Figure 9As shown, the operation control device 1000 of the dual-rotor wind turbine includes: a first acquisition module 110, a correction module 120, a second acquisition module 130, a third acquisition module 140, and a control module 150.

[0165] The first acquisition module 110 is used to acquire the power deviation of the wind turbine generator and, based on the power deviation, acquire the first electromagnetic torque compensation value of the front wind turbine generator and the second electromagnetic torque compensation value of the rear wind turbine generator.

[0166] The correction module 120 is used to correct the first electromagnetic torque compensation value to obtain a first target electromagnetic torque correction compensation value, and to correct the second electromagnetic torque compensation value to obtain a second target electromagnetic torque correction compensation value.

[0167] The second acquisition module 130 is used to acquire the first basic electromagnetic torque of the front wind turbine generator and the second basic electromagnetic torque of the rear wind turbine generator.

[0168] The third acquisition module 140 is used to acquire the speed deviation of the rear wind turbine generator and acquire the third electromagnetic torque compensation value of the rear wind turbine generator based on the speed deviation.

[0169] The control module 150 is used to generate a front wind turbine electromagnetic torque command based on the first basic electromagnetic torque and the first target electromagnetic torque correction compensation value, and to generate a rear wind turbine electromagnetic torque command based on the second basic electromagnetic torque, the second target electromagnetic torque correction compensation value and the third electromagnetic torque compensation value, and to perform operation control on the wind turbine based on the front wind turbine electromagnetic torque command and the rear wind turbine electromagnetic torque command.

[0170] According to one embodiment of this application, a first acquisition module 110 is used to acquire first control parameters of the front rotor controller of the wind turbine, so as to acquire the first electromagnetic torque compensation value based on the first control parameters and the power deviation; and to acquire second control parameters of the rear rotor controller of the wind turbine, so as to acquire the second electromagnetic torque compensation value based on the second control parameters and the power deviation.

[0171] According to one embodiment of this application, the correction module 120 is used to obtain a first starting speed value, a first low speed threshold, a first high speed threshold, and a first rated speed corresponding to the front wind turbine generator, and a second starting speed, a second low speed threshold, a second high speed threshold, and a second rated speed corresponding to the rear wind turbine generator; based on the first speed, the first starting speed value, the first low speed threshold, the first high speed threshold, and the first rated speed, it obtains a first target electromagnetic torque correction compensation value, and based on the second speed, the second starting speed value, the second low speed threshold, the second high speed threshold, and the second rated speed, it obtains a second target electromagnetic torque correction compensation value.

[0172] According to one embodiment of this application, the correction module 120 is configured to: 1) use the first electromagnetic torque compensation value as the first target electromagnetic torque correction compensation value when the first rotational speed is greater than the first low rotational speed threshold and less than or equal to the first high rotational speed threshold; or 2) use 0 as the first target electromagnetic torque correction compensation value when the first rotational speed is greater than the first starting speed value and less than or equal to the first low rotational speed threshold, or when the first rotational speed is greater than the first high rotational speed threshold and less than or equal to the first rated speed; 3) use the second electromagnetic torque compensation value as the second target electromagnetic torque correction compensation value when the second rotational speed is greater than the second starting speed value and less than or equal to the second low rotational speed threshold, or when the second rotational speed value is greater than the second high rotational speed threshold and less than or equal to the second rated speed.

[0173] According to one embodiment of this application, the second acquisition module 130 is used to acquire the design parameters corresponding to the wind turbine, and acquire the front wind turbine torque control coefficient and the rear wind turbine torque control coefficient according to the design parameters; acquire the first basic electromagnetic torque according to the front wind turbine torque control coefficient, and acquire the second basic electromagnetic torque according to the rear wind turbine torque control coefficient.

[0174] According to one embodiment of this application, the third acquisition module 140 is used to acquire the distance between the front wind turbine and the rear wind turbine; acquire the first rotational speed of the front wind turbine generator at time n, and based on the first rotational speed and the distance, acquire the first relative delayed rotational speed of the front wind turbine generator at time ni, and acquire the second rotational speed of the rear wind turbine generator at time n, where i is a positive integer less than n and n is a positive integer greater than 1; acquire the second target rotational speed of the rear wind turbine generator when the rotational speed of the front wind turbine generator is the first relative delayed rotational speed; acquire the relative delayed target rotational speed deviation based on the second rotational speed and the second target rotational speed, and use the relative delayed target rotational speed deviation as the rotational speed deviation.

[0175] According to one embodiment of this application, the third acquisition module 140 is used to acquire the third control parameters of the rear wind turbine controller corresponding to the wind turbine; and to acquire the third electromagnetic torque compensation value based on the speed deviation and the third control parameters.

[0176] According to one embodiment of this application, the control module 150 is configured to add the first basic electromagnetic torque and the first target electromagnetic torque correction compensation value to obtain the first target electromagnetic torque corresponding to the front wind turbine generator; generate the front wind turbine electromagnetic torque command based on the first target electromagnetic torque; add the second basic electromagnetic torque, the second target electromagnetic torque correction compensation value, and the third electromagnetic torque compensation value to obtain the second target electromagnetic torque corresponding to the rear wind turbine generator; and generate the rear wind turbine electromagnetic torque command based on the second target electromagnetic torque.

[0177] According to one embodiment of this application, device 1000 is used to acquire the incoming wind speed of the wind turbine; acquire the wind turbine start-up determination threshold set and the wind turbine shutdown determination threshold set of the wind turbine; and generate a matching control command based on the incoming wind speed, the first rotational speed, the second rotational speed, the front wind turbine start-up determination threshold set and the rear wind turbine start-up determination threshold set, so as to control the start-up and shutdown of the wind turbine according to the control command.

[0178] The dual-rotor wind turbine operation control device provided in this application acquires the power deviation of the wind turbine, and based on the power deviation, acquires a first electromagnetic torque compensation value for the front wind turbine generator and a second electromagnetic torque compensation value for the rear wind turbine generator. It then corrects the first electromagnetic torque compensation value to obtain a first target electromagnetic torque correction compensation value, and corrects the second electromagnetic torque compensation value to obtain a second target electromagnetic torque correction compensation value. Furthermore, it acquires the first basic electromagnetic torque of the front wind turbine generator and the second basic electromagnetic torque of the rear wind turbine generator, acquires the speed deviation of the rear wind turbine generator, and based on the speed deviation, acquires a third electromagnetic torque compensation value for the rear wind turbine generator. Based on the first basic electromagnetic torque and the first target electromagnetic torque correction compensation value, it generates a front wind turbine electromagnetic torque command, and based on the second basic electromagnetic torque, the second target electromagnetic torque correction compensation value, and the third electromagnetic torque compensation value, it generates a rear wind turbine electromagnetic torque command. This allows for operation control of the wind turbine based on the front and rear wind turbine electromagnetic torque commands. Therefore, this application comprehensively considers power feedback control compensation and speed feedback control compensation, and modifies the power feedback control compensation to reduce the load when switching the dual-rotor wind turbine. At the same time, it considers the interval time of the incoming wind speed passing through the front and rear rotors to improve the accuracy of the torque command of the rear rotor and ensure the stable operation of the dual-rotor wind turbine.

[0179] To implement the above embodiments, this application also proposes an electronic device 2000, such as... Figure 10 As shown, it includes: a memory 210, a processor 220, and a computer program stored in the memory 210 and executable on the processor 220. When the processor executes the program, it implements the operation control method of the dual-rotor wind turbine as described in the first aspect.

[0180] To implement the above embodiments, this application proposes a non-transitory computer-readable storage medium storing computer instructions, wherein the computer instructions are used to cause the computer to execute the operation control method of the dual-rotor wind turbine generator described in the first aspect.

[0181] To implement the above embodiments, this application also proposes a computer program product, including a computer program that, when executed by a processor, implements the operation control method for the dual-rotor wind turbine generator described in the first aspect.

[0182] It should be understood that the various forms of processes shown above can be used to rearrange, add, or delete steps. For example, the steps described in this application can be executed in parallel, sequentially, or in different orders, as long as the desired result of the technical solution disclosed in this application can be achieved, and this is not limited herein.

[0183] The specific embodiments described above do not constitute a limitation on the scope of protection of this application. Those skilled in the art should understand that various modifications, combinations, sub-combinations, and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this application should be included within the scope of protection of this application.

Claims

1. A method for operating and controlling a dual-rotor wind turbine generator set, characterized in that, The method includes: The power deviation of the wind turbine is obtained, and based on the power deviation, the first electromagnetic torque compensation value of the front wind turbine generator and the second electromagnetic torque compensation value of the rear wind turbine generator are obtained. Obtain the distance between the front and rear wind turbines; The first rotational speed of the front wind turbine generator at time n is obtained, and based on the first rotational speed and the distance, the first relative delay rotational speed of the front wind turbine generator at time ni is obtained, and the second rotational speed of the rear wind turbine generator at time n is obtained, where i is a positive integer less than n and n is a positive integer greater than 1; The second target speed of the rear wind turbine generator is obtained when the rotational speed of the front wind turbine generator is the first relative delay speed; Based on the second rotational speed and the second target rotational speed, the relative delay target rotational speed deviation is obtained, and the relative delay target rotational speed deviation is used as the rotational speed deviation; The first starting speed value, the first low speed threshold, the first high speed threshold, and the first rated speed corresponding to the front wind turbine generator are obtained, as well as the second starting speed value, the second low speed threshold, the second high speed threshold, and the second rated speed corresponding to the rear wind turbine generator. When the first rotational speed is greater than the first low rotational speed threshold and less than or equal to the first high rotational speed threshold, the first electromagnetic torque compensation value is used as the first target electromagnetic torque correction compensation value; or... In response to the first speed being greater than the first starting speed value and less than or equal to the first low speed threshold, or the first speed being greater than the first high speed threshold and less than or equal to the first rated speed, 0 is used as the first target electromagnetic torque correction compensation value. When the second rotational speed is greater than the second low rotational speed threshold and less than or equal to the second high rotational speed threshold, the second electromagnetic torque compensation value is used as the second target electromagnetic torque correction compensation value; or, In response to the second speed value being greater than the second starting speed value and less than or equal to the second low speed threshold, or the second speed value being greater than the second high speed threshold and less than or equal to the second rated speed, 0 is taken as the second target electromagnetic torque correction compensation value. Obtain the first basic electromagnetic torque of the front wind turbine generator and the second basic electromagnetic torque of the rear wind turbine generator; Based on the speed deviation, the third electromagnetic torque compensation value of the rear wind turbine generator is obtained; Based on the first basic electromagnetic torque and the first target electromagnetic torque correction compensation value, a front wind turbine electromagnetic torque command is generated, and based on the second basic electromagnetic torque, the second target electromagnetic torque correction compensation value, and the third electromagnetic torque compensation value, a rear wind turbine electromagnetic torque command is generated. The wind turbine is then operated and controlled based on the front wind turbine electromagnetic torque command and the rear wind turbine electromagnetic torque command.

2. The method according to claim 1, characterized in that, The step of obtaining the first electromagnetic torque compensation value of the front wind turbine generator and the second electromagnetic torque compensation value of the rear wind turbine generator based on the power deviation includes: The first control parameters of the front rotor controller of the wind turbine are obtained, and the first electromagnetic torque compensation value is obtained based on the first control parameters and the power deviation. The second control parameters of the rear rotor controller of the wind turbine are obtained, and the second electromagnetic torque compensation value is obtained based on the second control parameters and the power deviation.

3. The method according to claim 1, characterized in that, The process of obtaining the first basic electromagnetic torque of the front wind turbine generator and the second basic electromagnetic torque of the rear wind turbine generator includes: Obtain the design parameters corresponding to the wind turbine, and based on the design parameters, obtain the front rotor torque control coefficient and the rear rotor torque control coefficient; The first basic electromagnetic torque is obtained based on the front wind turbine torque control coefficient, and the second basic electromagnetic torque is obtained based on the rear wind turbine torque control coefficient.

4. The method according to claim 1, characterized in that, The step of obtaining the third electromagnetic torque compensation value of the rear wind turbine generator based on the speed deviation further includes: Obtain the third control parameters of the rear rotor controller corresponding to the wind turbine; The third electromagnetic torque compensation value is obtained based on the speed deviation and the third control parameter.

5. The method according to claim 1, characterized in that, The step of generating a front wind turbine electromagnetic torque command based on the first basic electromagnetic torque and the first target electromagnetic torque correction compensation value, and generating a rear wind turbine electromagnetic torque command based on the second basic electromagnetic torque, the second target electromagnetic torque correction compensation value, and the third electromagnetic torque compensation value, further includes: The first basic electromagnetic torque and the first target electromagnetic torque correction compensation value are added together to obtain the first target electromagnetic torque corresponding to the front wind turbine generator; Based on the first target electromagnetic torque, the electromagnetic torque command of the front wind turbine is generated; The second basic electromagnetic torque, the second target electromagnetic torque correction compensation value, and the third electromagnetic torque compensation value are added together to obtain the second target electromagnetic torque corresponding to the rear wind turbine generator. The electromagnetic torque command for the rear wind turbine is generated based on the second target electromagnetic torque.

6. The method according to claim 1, characterized in that, The method further includes: Obtain the incoming wind speed of the wind turbine; Obtain the wind turbine start-up determination threshold set and the wind turbine shutdown determination threshold set of the wind turbine unit; Based on the incoming wind speed, the first rotational speed, the second rotational speed, the wind turbine start-up determination threshold set, and the wind turbine shutdown determination threshold set, a matching control command is generated to control the wind turbine to start and stop according to the control command.

7. An operation control device for a dual-rotor wind turbine generator set, implemented based on the operation control method for a dual-rotor wind turbine generator set as described in claim 1, comprising: The first acquisition module is used to acquire the power deviation of the wind turbine generator and, based on the power deviation, acquire the first electromagnetic torque compensation value of the front wind turbine generator and the second electromagnetic torque compensation value of the rear wind turbine generator. The correction module is used to correct the first electromagnetic torque compensation value to obtain a first target electromagnetic torque correction compensation value, and to correct the second electromagnetic torque compensation value to obtain a second target electromagnetic torque correction compensation value. The second acquisition module is used to acquire the first basic electromagnetic torque of the front wind turbine generator and the second basic electromagnetic torque of the rear wind turbine generator. The third acquisition module is used to acquire the speed deviation of the rear wind turbine generator and, based on the speed deviation, acquire the third electromagnetic torque compensation value of the rear wind turbine generator. The control module is used to generate a front wind turbine electromagnetic torque command based on the first basic electromagnetic torque and the first target electromagnetic torque correction compensation value, and to generate a rear wind turbine electromagnetic torque command based on the second basic electromagnetic torque, the second target electromagnetic torque correction compensation value and the third electromagnetic torque compensation value, and to perform operation control of the wind turbine unit based on the front wind turbine electromagnetic torque command and the rear wind turbine electromagnetic torque command.

8. An electronic device, characterized in that, Including processor and memory; The processor reads executable program code stored in the memory to run a program corresponding to the executable program code, so as to implement the method as described in any one of claims 1-6.

Citation Information

Patent Citations

  • Wind turbine generator control method, controller and control system of wind turbine generator

    CN102797629A

  • Control method for compensating electromagnetic torque to realize quick and smooth tracking of maximum wind energy

    CN103485978A