列车运行计划传输方法及装置

By periodically sending and updating planning information frames in the train operation control system, the problems of large memory requirements and unstable data transmission in traditional systems are solved, ensuring that trains can accurately obtain timetables and improving operational efficiency.

CN117601936BActive Publication Date: 2026-07-17CRSC URBAN RAIL TRANSIT TECH CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CRSC URBAN RAIL TRANSIT TECH CO LTD
Filing Date
2023-11-24
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In traditional train operation control systems, the train timetable requires a large storage space, and packet loss and packet merging are prone to occur during data transmission, which prolongs the time for the train to obtain the timetable and reduces the efficiency of train operation.

Method used

By acquiring the train's operating status, the system periodically sends planning information frames to the application operation and maintenance management platform and updates the planning information frames based on feedback information, ensuring that the train can receive the complete operation plan in real time, including accurately obtaining the timetable after the train is woken up or during operation.

Benefits of technology

This reduces the error rate of operation plan transmission and improves train operation efficiency without increasing memory space.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117601936B_ABST
    Figure CN117601936B_ABST
Patent Text Reader

Abstract

本发明提供一种列车运行计划传输方法及装置,该列车运行计划传输方法包括:获取列车的运行状态;根据列车运行状态向应用运维管理平台AOM周期性地发送第一计划信息帧,AOM用于根据不同的目标计划信息帧按包回复包序号或者周期性的发送时间戳;根据AOM发送的反馈信息更新第一计划信息帧,得到第二计划信息帧,并将第二计划信息帧周期性的发送至AOM,以供列车根据第二计划信息帧运行。本发明所述方法实现了在列车唤醒后或者运行过程中,准确获取ATS发送的该车完整列车时刻,从而支持车载后续自主办理进路以及根据运行图运行,同时降低了运行计划传输时的出错率,提高了列车运行效率。
Need to check novelty before this filing date? Find Prior Art