Deep foundation pit column pile floating displacement releasing device and method
By installing connecting components on the deep foundation pit column piles and cutting the lattice columns, the safe and quick release of the column piles' upward displacement was achieved, solving the problem of foundation pit instability caused by the upward displacement of the column piles and reducing safety hazards.
Patent Information
- Application Number
- CN202311853550.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-12-29
AI Technical Summary
Existing technologies cannot effectively release the upward displacement of deep foundation pit columns, causing the foundation pit supports to bend and be compressed, posing a significant safety hazard.
The system employs connecting components, including an upper movable end and a lower fixed end, which are connected to the lattice column and fixed with bolts. This allows for the release of the column pile's upward displacement by cutting the lattice column, achieving rapid and safe displacement release.
It effectively reduced the risk of foundation pit instability, ensured the stability of the foundation pit, simplified the operation process, and reduced implementation risks.
Smart Images

Figure CN117605097B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building construction technology, and in particular to a device and method for releasing the upward displacement of deep foundation pit column piles. Background Technology
[0002] With the acceleration of urban construction, column piles are becoming increasingly common in deep foundation pit support systems. However, during foundation pit excavation, soil unloading can cause foundation pit rebound, which in turn can cause the columns to float. This floating of the columns can lead to bending and compression of the foundation pit supports, and the additional bending moment caused by the rebound can easily cause foundation pit instability, posing a significant safety hazard.
[0003] Currently, there is no established solution in the industry for releasing the upward displacement of the column pile. Existing conventional control measures are all indirect control, which aim to slow down the rate of increase in displacement and thus control the total displacement, but none of them can achieve the release of the upward displacement of the column pile. Summary of the Invention
[0004] To overcome the shortcomings of existing technologies, this invention provides a device and method for releasing the floating displacement of deep foundation pit column piles, which realizes the safe and quick release of the floating displacement of column piles, greatly reduces the risk of foundation pit instability, and ensures the stability of the foundation pit.
[0005] To achieve the above objectives, the present invention provides a deep foundation pit column pile floating displacement release device, comprising:
[0006] A connecting component includes an upper movable end and a lower fixed end fixedly installed at the bottom of the upper movable end along the height direction for fixed connection with the column pile lattice column. The upper movable end includes a first part and a plurality of second parts fixedly installed on the first part. The plurality of second parts are interconnected and surround the first part. The lower fixed end includes a plurality of third parts interconnected and surround the first part. The plurality of third parts are correspondingly fixedly installed at the bottom of the plurality of second parts along the height direction.
[0007] Preferably, the first part is installed on the inner side of the lattice column, and a plurality of second parts are arranged around the outer side of the lattice column.
[0008] Preferably, both the first part and the second part are provided with a plurality of first through holes, and each first through hole is provided with a first bolt for fixing the first part and the second part together with a first nut.
[0009] Preferably, a plurality of second through holes are provided on the side where the second part and the third part are connected to each other, and a second bolt for fixing the second part and the third part together with a second nut is inserted into each second through hole.
[0010] Preferably, the connecting member is installed on the lattice column at a position close to the first concrete support of the foundation pit along the height direction.
[0011] A method for releasing the upward displacement of a deep foundation pit column pile, involving a device for releasing the upward displacement of the column pile, the method comprising the following steps:
[0012] After the construction of the column piles and the first layer of concrete support for the foundation pit is completed, a horizontal circumferential cut is made on the side of the column pile grid column close to the first layer of concrete support for the foundation pit along the height direction.
[0013] The lower fixed end of the connecting component is installed at the position of the cutting seam, and the upper movable end is installed on the lower fixed end, with the top of the lower fixed end aligned with the cutting seam;
[0014] After the column pile floats up and displaces, the upper movable end is moved to the position of the column pile's upward displacement and the part of the lattice column corresponding to the upward displacement of the column pile is exposed.
[0015] The lattice column between the upper movable end and the lower fixed end is horizontally cut off in a circumferential direction, and the two cut lattice column sections are reconnected through the upper movable end and the lower fixed end to complete the release of the column pile floating displacement.
[0016] By adopting the above technical solution, the present invention has the following beneficial effects:
[0017] 1) The connecting components are made of steel plates, angle steel and the same materials as the lattice columns. They are divided into an upper movable end and a lower fixed end. The lower fixed end is welded and the upper movable end is fixed with bolts. The two ends are then connected by bolts. The processing is simple, the operation is convenient, economical and reasonable, and safe and effective.
[0018] 2) By using the connection and fixation after the lattice column is cut, the upward displacement of the column pile is released, which is conducive to the stability of the foundation pit support structure, greatly reduces the risk of instability and reduces safety hazards.
[0019] 3) The lattice column is cut in two stages. When the foundation pit is excavated, a horizontal circumferential cut is made. When the upward displacement needs to be released, it is cut again and the cut part is removed. No other measures are required. This makes full use of the strength and weight of the lattice column itself and effectively reduces the risk during implementation. Attached Figure Description
[0020] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0021] Figure 1 This is a front view of the connecting component in this invention.
[0022] Figure 2 This is a top view of the connecting component in this invention.
[0023] Figure 3 This is a side view of the connecting component in this invention.
[0024] Figure 4 This is a three-dimensional structural diagram of the connecting component in this invention. Figure 1 .
[0025] Figure 5 This is a three-dimensional structural diagram of the connecting component in this invention. Figure 2 .
[0026] Figure 6 This is a schematic diagram of the fit and installation of the upper movable end of the connecting component in this invention.
[0027] Figure 7 This is a schematic diagram of the parts fitting and installation of the lower fixed end of the connecting component in this invention.
[0028] Figure 8 This is a schematic diagram showing the overall effect of the deep foundation pit column pile floating displacement release device in use.
[0029] Figure 9 This is a schematic diagram of step one of the floating displacement release process of the column pile in this invention.
[0030] Figure 10 This is a schematic diagram of step two in the process flow of releasing the floating displacement of the column pile in this invention.
[0031] Figure 11 This is a schematic diagram of step three in the floating displacement release process of the column pile in this invention.
[0032] Figure 12 This is a schematic diagram of step four in the process flow of releasing the floating displacement of the column pile in this invention.
[0033] The correspondence between the numbers in the attached diagram is as follows:
[0034] 1-Column pile; 2-Lattice column; 3-Connecting component; 31-Upper movable end; 311-First part; 312-Second part; 313-First through hole; 32-Lower fixed end; 321-Third part; 322-Second through hole; 41-First nut; 42-Second nut; 51-First bolt; 52-Second bolt; 6-First concrete support; 7-Horizontal circumferential cut. Detailed Implementation
[0035] The specific embodiments of the present invention will be further described below with reference to the accompanying drawings. It should be noted that these descriptions are for the purpose of aiding understanding the present invention, but do not constitute a limitation thereof. Furthermore, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0036] The technical problem to be solved by this invention is that soil unloading during foundation pit excavation can cause foundation pit rebound, which in turn causes the columns to float. Conventional control measures are all indirect control methods such as monitoring the foundation pit, rationally arranging the foundation pit excavation, and strengthening groundwater level control to slow down the rate of displacement and thus control the total displacement. However, none of these methods can release the floating displacement. Therefore, this invention provides a device and method for releasing the floating displacement of deep foundation pit columns, which can safely and quickly release the floating displacement of the columns, greatly reducing the risk of foundation pit instability.
[0037] Please see Figure 1 Hezhi Figure 8 As shown, the present invention provides a deep foundation pit column pile floating displacement release device, including a connecting member 3. The connecting member 3 includes an upper movable end 31 and a lower fixed end 32 installed at the bottom of the upper movable end along the height direction for fixed connection with the column pile lattice column 2. The upper movable end 31 includes a first part 311 and a plurality of second parts 312 fixedly installed on the first part 311. The plurality of second parts 312 are interconnected and surround the first part 311. The lower fixed end 32 includes a plurality of third parts 321 interconnected and surround the first part 311. The plurality of third parts 321 are correspondingly fixedly installed at the bottom of the plurality of second parts 312 along the height direction. Preferably, in this embodiment, the connecting member 4 is installed at the position of the lattice column 2 near the first concrete support 6 of the foundation pit along the height direction.
[0038] Furthermore, the first part 311 is installed on the inner side of the lattice column 2, and a plurality of second parts 312 are arranged around the outer side of the lattice column 2. Preferably, a plurality of first through holes 313 are correspondingly provided on the first part 311 and the second part 312, and a first bolt 51 for fixing the first part 311 and the second part 312 together with a first nut 41 is inserted into each first through hole 313.
[0039] Furthermore, on the side where the second part 312 and the third part 321 are connected to each other, a plurality of second through holes 322 are provided, and a second bolt 52 is inserted into each second through hole 322 to fix the second part 312 and the third part 321 together with the second nut 42.
[0040] It should be noted that in this embodiment, the first part 311 is welded from a 12mm thick Q235 steel plate, and the second part 312 and the third part 321 are both made of hot-rolled equilateral angle steel with specifications of L140×14. The multiple third parts 321 are fully welded by carbon dioxide shielded welding, and the flux-cored welding wire is YJ501. The first part 311 on the inner side of the lattice column 2 is fastened to the lattice column 2 by 8 first bolts 51, and the second part 312 and the third part 321 are fixedly connected by 16 second bolts 52. Both the first bolts 51 and the second bolts 52 are M16 bolts.
[0041] Please see Figures 9 to 12 As shown, the process flow for releasing the floating displacement of deep foundation pit column piles using the deep foundation pit column pile floating displacement release device of the present invention includes:
[0042] Step 1: After the construction of the foundation pit column pile 1 and the first concrete support 6 is completed, the foundation pit soil is excavated to expose part of the column pile grid column 2, and the backfill soil inside the grid column 2 is cleaned.
[0043] Step 2: Make a horizontal circumferential cut 7 on the lattice column 2 using an oxy-acetylene torch. Weld the lower fixed end 32 of the connecting component 3 to the horizontal circumferential cut 7. Then, install the upper movable end 31 on the lower fixed end 32 and fasten the upper and lower ends together with bolts. (The entire assembly is positioned near the first concrete support 6 of the foundation pit, with the top of the lower fixed end 32 aligned with the horizontal circumferential cut 7).
[0044] Step 3: As the excavation of the foundation pit progresses, when the upward displacement of column pile 1 is large, move the upper movable end 31 to the upward displacement point of column pile 1 and expose the angle steel of lattice column 2.
[0045] Step 4: Complete the horizontal circumferential cutting (i.e., cut off the part of the lattice column 2 that corresponds to the upward displacement between the upper movable end and the detailed fixed end; the cutting length is determined according to the actual displacement). Then, reset and connect the two ends of the cut lattice column 2 through the upper movable end 31 and the lower fixed end 32 to complete the release of the upward displacement of the column pile.
[0046] The embodiments of the present invention have been described in detail above with reference to the accompanying drawings, but the present invention is not limited to the described embodiments. For those skilled in the art, various changes, modifications, substitutions, and variations can be made to these embodiments without departing from the principles and spirit of the present invention, and these variations still fall within the protection scope of the present invention.
Claims
1. A device for releasing the upward displacement of a deep foundation pit column pile, characterized in that, The system includes a connecting component comprising an upper movable end and a lower fixed end fixedly installed at the bottom of the upper movable end along the height direction for fixed connection with a column pile lattice column. The upper movable end includes a first part and a plurality of second parts fixedly installed on the first part. The plurality of second parts are interconnected and surround the first part. The lower fixed end includes a plurality of third parts interconnected and surround the first part. The plurality of third parts are correspondingly fixedly installed at the bottom of the plurality of second parts along the height direction. The first part and the second parts each have a plurality of first through holes. Each first through hole has a first screw inserted into it for engaging with a first nut to fix the first part and the second part together. The side where the second part and the third part are interconnected each other has a plurality of second through holes. Each second through hole has a second bolt inserted into it for engaging with a second nut to fix the second part and the third part together.
2. The deep foundation pit column pile floating displacement release device as described in claim 1, characterized in that: The first part is installed on the inner side of the lattice column, and a plurality of the second parts are arranged around the outer side of the lattice column.
3. The deep foundation pit column pile floating displacement release device as described in claim 1, characterized in that: The connecting component is installed on the lattice column at a position close to the first concrete support of the foundation pit along the height direction.
4. A method for releasing the upward displacement of a deep foundation pit column pile, relating to the column pile upward displacement release device as described in claim 1, characterized in that, The method for releasing the upward displacement of the column pile includes the following steps: After the construction of the column piles and the first layer of concrete support for the foundation pit is completed, a horizontal circumferential cut is made on the side of the column pile grid column close to the first layer of concrete support for the foundation pit along the height direction. The lower fixed end of the connecting component is installed at the position of the cutting seam, and the upper movable end is installed on the lower fixed end, with the top of the lower fixed end aligned with the cutting seam; After the column pile floats up and displaces, the upper movable end is moved to the position of the column pile's upward displacement and the part of the lattice column corresponding to the upward displacement of the column pile is exposed. The lattice column between the upper movable end and the lower fixed end is horizontally cut off in a circumferential direction, and the two cut lattice column sections are reconnected through the upper movable end and the lower fixed end to complete the release of the column pile floating displacement.
Citation Information
Patent Citations
Stand column upheaval adjusting device and foundation pit supporting system comprising same
CN112392050A
Latticed column stress release safety device
CN209429137U