Liquefied natural gas cold box and its refrigeration process operating method
By introducing temperature monitoring, refrigeration, heating, and regulation mechanisms into the liquefied natural gas (LNG) cold box, the refrigerant flow and temperature are optimized, solving the problems of poor cooling performance in summer and high energy consumption in winter, thus achieving efficient and reliable LNG production.
Patent Information
- Application Number
- CN202311464359.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-07
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2043-11-07
AI Technical Summary
Liquefied natural gas (LNG) cold boxes have poor cooling performance in summer and high energy consumption in winter, which affects production reliability and energy-saving and environmental protection performance.
It employs a temperature monitoring mechanism, a refrigeration mechanism, a heating mechanism, and a regulating mechanism to precisely control the refrigerant flow and temperature, combined with U-shaped heat conduction pipes and electric heating pipes, to optimize the temperature and pressure conditions inside the cold box.
It improves the cooling effect and reliability of liquefied natural gas (LNG) cold boxes, reduces energy consumption, and ensures the production quality and energy-saving and environmentally friendly performance of LNG.
Smart Images

Figure CN117606192B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the technical field of liquefied natural gas production equipment, and in particular relates to a liquefied natural gas cold box and its refrigeration process operation method. Background Technology
[0002] A liquefied natural gas (LNG) cold box is used for LNG production. The liquefaction unit within the cold box is an independent, closed system. The mixed refrigerant is compressed in stages by a refrigerant compressor, cooled by air, and then enters a heat exchanger (cold box). There, it is pre-cooled and liquefied by the refrigerant's cooling capacity. The refrigerant is then separated at different temperatures, liquefied, and subcooled before exiting the heat exchanger. After further throttling, it enters the corresponding temperature range of the heat exchanger, providing cooling to the raw natural gas and the hot refrigerant. Subcooling liquefaction yields a -160°C liquefied natural gas product.
[0003] Currently, during summer use, liquefied natural gas (LNG) cold boxes experience several challenges. High temperatures reduce the condenser's heat exchange rate, leading to lower refrigerant liquefaction rates within the refrigeration unit. This results in excessively high temperatures for the refrigerant entering the cold box, and the amount of refrigerant entering the heat exchanger is also reduced due to the presence of gaseous refrigerant, further impacting refrigerant pressure within the heat exchanger. This severely affects the cold box's cooling performance and the reliability and quality of LNG production. In winter, when outside temperatures are low, high-power temperature-raising equipment is typically used to heat the connection between the discharge valve and pipeline during LNG discharge from the bottom of the cold box to prevent freezing. However, this heating method is energy-intensive, impacting the energy-saving and environmentally friendly performance of LNG production during winter.
[0004] To address these issues, we propose a liquefied natural gas cold box and its refrigeration process operation method. Summary of the Invention
[0005] The purpose of this invention is to address the above-mentioned problems by providing a liquefied natural gas cold box and its refrigeration process operation method.
[0006] To achieve the above objectives, the present invention adopts the following technical solution: a liquefied natural gas cold box and its refrigeration process operation method, comprising a cold box body, wherein the inner wall of the cold box body is provided with a precooling heat exchanger, a liquefaction heat exchanger and a subcooling heat exchanger, and a temperature monitoring mechanism is fixedly connected to the outer wall of the precooling heat exchanger, the liquefaction heat exchanger and the subcooling heat exchanger, an L-shaped plate is fixedly connected to the outer wall of the cold box body, a refrigeration mechanism is fixedly connected to the upper surface of the L-shaped plate, a control box is fixedly connected to the upper surface of the L-shaped plate, a U-shaped heat conduction pipe is fixedly connected to the outer wall of the control box, a delivery pipe is fixedly connected to the top of the control box, a heating mechanism is fixedly connected to the bottom of the control box, and an adjustment mechanism is connected to the inner wall of the control box.
[0007] In the aforementioned liquefied natural gas cold box, the temperature monitoring mechanism includes a circular hollow plate, an insulation box, and a first heat-conducting plate. The side wall of the circular hollow plate is fixedly connected to the inner wall of the cold box body. A conductive pipe is fixedly connected to the top of the circular hollow plate. An installation hole that matches the bottom of the heat exchanger is opened at the top of the circular hollow plate. A second heat-conducting plate is fixedly embedded in the outer wall of the top of the circular hollow plate. A first temperature detection component is fixedly connected to the lower surface of the second heat-conducting plate. A heat insulation cover is fixedly connected to the upper surface of the first heat-conducting plate. A second temperature detection component is fixedly connected to the upper surface of the first heat-conducting plate. A third temperature detection component is fixedly embedded in the outer wall of the insulation box.
[0008] In the aforementioned liquefied natural gas (LNG) cold box, the refrigeration mechanism includes a bracket fixedly connected to the upper surface of an L-shaped plate. Three support plates are fixedly connected to the inner wall of the bracket. Compressor and condenser assemblies, cooperating with a pre-cooling heat exchanger, a liquefaction heat exchanger, and a subcooling heat exchanger, are respectively fixedly connected to the upper surfaces of the three support plates. A first pipeline is fixedly connected to the condenser end of the compressor and condenser assembly. The side ends of multiple first pipelines pass through the inner walls of the cold box body and adjacent heat insulation covers, and are fixedly connected to expansion valves. The bottom ends of multiple expansion valves are fixedly connected to the input ends of the pre-cooling heat exchanger, the liquefaction heat exchanger, and the subcooling heat exchanger, respectively. The bottom ends of the heat exchanger, liquefaction heat exchanger, and subcooling heat exchanger are all fixedly connected to a second pipeline. The side end of the second pipeline passes through the outer wall of the circular hollow plate and the main body of the cold box, and is fixedly connected to the compressor input end of the adjacent compressor and condenser assembly. The outer walls of the three second pipelines are respectively fixedly connected to refrigerant compensation valve assemblies. The upper surfaces of the three support plates are all fixedly connected to U-shaped hollow plates. The inner wall of the U-shaped hollow plate is fixedly embedded with a vortex tube. The refrigeration end of the vortex tube is close to the outer side of the compressor and condenser assembly. The three U-shaped hollow plates are connected by two fixed pipes. The outer wall of the bottom U-shaped hollow plate is fixedly connected to the top end of the delivery pipe.
[0009] In the aforementioned liquefied natural gas cold box, the heating mechanism includes a ventilation pipe fixedly connected to the inner wall of the control box. The output end of the ventilation pipe is fixedly connected to a hollow ring. The hollow ring is located outside the liquefied natural gas discharge valve at the bottom of the cold box body. The upper surface of the hollow ring is fixedly connected to the lower surface of the cold box body. The inner wall of the hollow ring is provided with multiple exhaust holes. An electric heating tube is fixedly embedded in the outer wall of the control box.
[0010] In the aforementioned liquefied natural gas cold box, the adjusting mechanism includes a first sealing strip and a second sealing strip. The side wall of the second sealing strip has a through hole that cooperates with an electric heating tube. The outer walls of the first and second sealing strips are jointly fixedly connected to an L-shaped insulating mesh plate. An L-shaped heat-conducting box is fixedly embedded in the outer wall of the control box. The outer wall of the L-shaped heat-conducting box is fixedly connected to the inner wall of the L-shaped plate. A kerosene layer is connected to the inner wall of the L-shaped heat-conducting box. A sealing piston is movably connected to the inner wall of the top of the L-shaped heat-conducting box. An insulating rod is fixedly connected to the side wall of the sealing piston. The side end of the insulating rod passes through the outer wall of the L-shaped heat-conducting box and is fixedly connected to the outer wall of the L-shaped insulating mesh plate. A conductive strip is fixedly embedded in the bottom end of the insulating rod. An energizing strip that cooperates with the conductive strip is fixedly connected to the inner wall of the control box.
[0011] In the aforementioned liquefied natural gas cold box, multiple metal heat-conducting blocks are fixedly embedded in the outer wall of the U-shaped heat-conducting pipe.
[0012] In the aforementioned liquefied natural gas cold box, a climbing frame is fixedly connected to the outer wall of the cold box body, and a tool storage box is fixedly connected to both the outer wall of the climbing frame and the outer wall of the cold box body.
[0013] A refrigeration process operation method for a liquefied natural gas (LNG) cold box, comprising any one of the LNG cold boxes described above, and further comprising the following steps: S1. In the process of producing liquefied natural gas in the cold box body in conjunction with the precooling heat exchanger, liquefaction heat exchanger and subcooling heat exchanger under high summer temperatures, the air inlet end of the U-shaped heat pipe is first connected to the factory air duct valve, and the air duct valve is opened to allow air to enter the U-shaped heat pipe. The U-shaped heat pipe uses its bottom end to cool the ground air underground. The cooled air is then cooled again through the vortex tube of the refrigeration mechanism. Finally, the cold air is blown to the compressor and condenser components in the refrigeration mechanism. S2. Then, the compressor and condenser assembly can efficiently and reliably process the refrigerant in the refrigeration pipeline, so that the refrigerant in the refrigeration pipeline can meet the flow rate, liquefaction amount and refrigerant pressure required by the heat exchanger in the cold box. S3. Moreover, during the refrigeration process of the precooling heat exchanger, liquefaction heat exchanger and subcooling heat exchanger in the main body of the cold box, the refrigerant dosage in the refrigeration pipeline of the heat exchanger can be timely adjusted through feedback from the adjacent temperature monitoring mechanism, and the refrigerant flow rate in the precooling heat exchanger, liquefaction heat exchanger and subcooling heat exchanger can be reliably controlled. S4. In step S3, if the temperature at the precooling heat exchanger is higher than -45℃, the precooling heat exchanger refrigeration pipeline is supplemented with propane and ethylene refrigerant through the corresponding refrigerant compensation valve assembly. At the same time, if the temperature of the liquefaction heat exchanger is lower than -120℃, propane refrigerant is supplemented in the corresponding refrigerant compensation valve assembly in the liquefaction heat exchanger refrigeration pipeline. If the temperature at the liquefaction heat exchanger is higher than -120℃, ethylene refrigerant is supplemented in the refrigeration pipeline, and the temperature of the precooling heat exchanger (2) is controlled to be maintained between -45℃ and -55℃. S5. In step S3, when the temperature monitoring mechanism at the liquefied heat exchanger detects a temperature below -120°C, methane refrigerant is added to the corresponding refrigerant compensation valve assembly in the refrigeration pipeline of the liquefied heat exchanger. If the temperature at the liquefied heat exchanger is above -120°C, ethylene refrigerant is added to the refrigeration pipeline to control the temperature of the liquefied heat exchanger between -122°C and -126°C. S6. In step S3, when the temperature monitoring mechanism at the subcooled heat exchanger reports a temperature higher than -158°C, methane refrigerant is added to the refrigeration pipeline at the subcooled heat exchanger. If the temperature at the subcooled heat exchanger is lower than -158°C, nitrogen refrigerant is added to maintain the temperature of the subcooled heat exchanger between -158°C and -162°C.
[0014] Compared with existing technologies, the advantages of a liquefied natural gas cold box and its refrigeration process operation method are as follows: 1. Through the established temperature monitoring and refrigeration mechanisms, when the liquefied natural gas (LNG) cold box is in operation, the temperature monitoring mechanism in the precooling heat exchanger detects an abnormal temperature and feeds the temperature data back to the control unit of the cold box. Then, it controls the refrigeration mechanism to replenish refrigerant in the refrigeration pipelines of the precooling heat exchanger and the liquefaction heat exchanger. When the temperature monitoring mechanism at the liquefaction heat exchanger detects an abnormal temperature, it replenishes refrigerant in the refrigeration pipeline of the liquefaction heat exchanger. When the temperature monitoring mechanism at the subcooling heat exchanger reports an abnormal temperature, it replenishes refrigerant in the refrigeration pipeline of the subcooling heat exchanger. By increasing the refrigerant flow rate in the precooling heat exchanger, the liquefaction heat exchanger, and the subcooling heat exchanger, the cooling capacity of the heat exchangers is increased, ensuring the cooling effect of the LNG cold box. Moreover, the precise control of the refrigeration of the precooling heat exchanger, the liquefaction heat exchanger, and the subcooling heat exchanger in the cold box can improve the reliability of LNG production.
[0015] 2. Through the set adjustment mechanism and U-shaped heat conduction pipe, when the liquefied natural gas cold box is working in summer, the U-shaped heat conduction pipe introduces air into the factory's air duct. The U-shaped heat conduction pipe cools the ground air at its bottom end underground. The cooled air then enters the control box, and then is transported through the delivery pipe to the U-shaped hollow plate of the refrigeration mechanism. The pre-cooled air then enters the vortex tube, and after being cooled again by the vortex tube, it is sprayed near the condenser of the compressor and condenser assembly. The cold air efficiently cools the condenser, avoiding incomplete liquefaction of the refrigerant in the compressor and condenser assembly, increasing the amount of refrigerant liquefaction in the refrigeration pipeline, reducing the temperature of the mixed refrigerant entering the cold box, and ensuring the refrigerant pressure in the cold box heat exchanger. This effectively improves the refrigeration effect of the cold box and enhances the reliability and quality of liquefied natural gas production.
[0016] 3. Through the heating and control mechanisms, when the outdoor temperature of liquefied natural gas is low in winter, the control mechanism first activates the ventilation pipe, then closes the bottom of the delivery pipe to stop ventilation. Simultaneously, the electric heating element operates to raise the air temperature. At this time, the U-shaped heat pipe utilizes the higher underground temperature environment to raise the cold air entering the U-shaped heat pipe. The heated air is then delivered to the control box, where the electric heating element continues to heat the air inside. Finally, the hot air is injected through the hollow ring and exhaust hole to the connection between the exhaust valve and the pipeline at the bottom of the cold box body. This high temperature prevents freezing at the connection point. Furthermore, the electric heating element, combined with the underground thermal environment, effectively reduces energy consumption, thereby improving the energy-saving and environmentally friendly performance of liquefied natural gas production. Attached Figure Description
[0017] Figure 1 This is a schematic diagram of the structure of a liquefied natural gas cold box and its refrigeration process operation method provided by the present invention; Figure 2 This is a schematic diagram of the temperature monitoring mechanism in a liquefied natural gas cold box and its refrigeration process operation method provided by the present invention; Figure 3 This is a partial structural diagram of the refrigeration mechanism in a liquefied natural gas cold box and its refrigeration process operation method provided by the present invention; Figure 4 This is a schematic diagram of the control mechanism in a liquefied natural gas cold box and its refrigeration process operation method provided by the present invention; Figure 5 yes Figure 4 A schematic diagram of the structure of part A; Figure 6 This is a schematic diagram of the heating mechanism in a liquefied natural gas cold box and its refrigeration process operation method provided by the present invention.
[0018] In the diagram: 1. Cold box body; 2. Precooling heat exchanger; 3. Liquefaction heat exchanger; 4. Subcooling heat exchanger; 5. Temperature monitoring mechanism; 51. Circular hollow plate; 52. Insulation box; 53. First heat conduction plate; 54. Conducting pipe; 55. Second heat conduction plate; 56. First temperature detection component; 57. Heat insulation cover; 58. Second temperature detection component; 59. Third temperature detection component; 6. Refrigeration mechanism; 61. Bracket; 62. Support plate; 63. Compressor and condenser assembly; 64. First pipeline; 65. Expansion valve; 66. Second pipeline; 67. Refrigerant compensation valve assembly; 68. U-shaped hollow plate; 69. Vortex tube; 7. Heating mechanism; 71. Ventilation pipe; 72. Hollow ring; 73. Exhaust hole; 74. Electric heating tube; 8. Adjustment mechanism; 81. First sealing strip; 82. Second sealing strip; 83. 84 L-shaped insulating mesh, 85 L-shaped heat conduction box, 86 kerosene layer, 87 sealed piston, 88 insulating rod, 89 conductive strip, 9 metal heat conduction block, 10 L-shaped plate, 11 climbing frame, 12 control box, 13 U-shaped heat conduction pipe, 14 tool storage box, 15 conveying pipe. Detailed Implementation
[0019] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0020] like Figures 1-6 As shown, a liquefied natural gas (LNG) cold box and its refrigeration process operation method include a cold box body 1. A climbing frame 11 is fixedly connected to the outer wall of the cold box body 1. A tool storage box 14 is fixedly connected to the outer wall of the climbing frame 11 and the outer wall of the cold box body 1. The climbing frame 11 facilitates maintenance of the top of the cold box body 1, and the tool storage box 14 facilitates the placement of tools. The inner wall of the cold box body 1 is provided with a precooling heat exchanger 2, a liquefaction heat exchanger 3, and a subcooling heat exchanger 4. Temperature monitoring mechanisms 5 are fixedly connected to the outer walls of the precooling heat exchanger 2, the liquefaction heat exchanger 3, and the subcooling heat exchanger 4. The temperature monitoring mechanism 5 includes a circular hollow plate 51 and an insulation box. 52 and the first heat-conducting plate 53, the side wall of the circular hollow plate 51 is fixedly connected to the inner wall of the cold box body 1, the top of the circular hollow plate 51 is fixedly connected to the conductive pipe 54, the top of the circular hollow plate 51 is provided with an installation hole that matches the bottom of the heat exchanger, the outer wall of the top of the circular hollow plate 51 is fixedly embedded with the second heat-conducting plate 55, the lower surface of the second heat-conducting plate 55 is fixedly connected with the first temperature detection component 56, the upper surface of the first heat-conducting plate 53 is fixedly connected with the heat insulation cover 57, the upper surface of the first heat-conducting plate 53 is fixedly connected with the second temperature detection component 58, and the outer wall of the heat insulation box 52 is fixedly embedded with the third temperature detection component 59.
[0021] An L-shaped plate 10 is fixedly connected to the outer wall of the cold box body 1. A refrigeration mechanism 6 is fixedly connected to the upper surface of the L-shaped plate 10. The refrigeration mechanism 6 includes a bracket 61 fixedly connected to the upper surface of the L-shaped plate 10. Three support plates 62 are fixedly connected to the inner wall of the bracket 61. A compressor and condenser assembly 63 that cooperates with the precooling heat exchanger 2, the liquefaction heat exchanger 3, and the subcooling heat exchanger 4 is fixedly connected to the upper surface of the three support plates 62, respectively. A first pipe 64 is fixedly connected to the condenser end of the compressor and condenser assembly 63. The side ends of multiple first pipes 64 pass through the inner wall of the cold box body 1 and the adjacent heat insulation cover 57, and are fixedly connected to expansion valves 65. The bottom ends of multiple expansion valves 65 are fixedly connected to the input ends of the precooling heat exchanger 2, the liquefaction heat exchanger 3, and the subcooling heat exchanger 4, respectively. The bottom ends of the heat exchanger 3 and the subcooling heat exchanger 4 are both fixedly connected to a second pipe 66. The side end of the second pipe 66 passes through the circular hollow plate 51 and the outer wall of the cold box body 1, and is fixedly connected to the compressor input end of the adjacent compressor and condenser assembly 63. The outer walls of the three second pipes 66 are respectively fixedly connected to a refrigerant compensation valve assembly 67. The upper surfaces of the three support plates 62 are all fixedly connected to a U-shaped hollow plate 68. The inner wall of the U-shaped hollow plate 68 is fixedly embedded with a vortex tube 69. The refrigeration end of the vortex tube 69 is close to the outer side of the compressor and condenser assembly 63. The three U-shaped hollow plates 68 are connected by two fixed pipes. The outer wall of the bottom U-shaped hollow plate 68 is fixedly connected to the top end of the delivery pipe 15. This mechanism can effectively improve the refrigeration effect of the cold box, and at the same time improve the reliability and quality of the cold box in producing liquefied natural gas.
[0022] A control box 12 is fixedly connected to the upper surface of the L-shaped plate 10. A U-shaped heat-conducting pipe 13 is fixedly connected to the outer wall of the control box 12. A conveying pipe 15 is fixedly connected to the top of the control box 12. A heating mechanism 7 is fixedly connected to the bottom of the control box 12. The heating mechanism 7 includes a ventilation pipe 71 fixedly connected to the inner wall of the control box 12. A hollow ring 72 is fixedly connected to the output end of the ventilation pipe 71. The hollow ring 72 is located outside the liquefied natural gas discharge valve at the bottom of the cold box body 1. The upper surface of the hollow ring 72 is fixedly connected to the lower surface of the cold box body 1. Multiple exhaust holes 73 are opened on the inner wall of the hollow ring 72. An electric heating pipe 74 is fixedly embedded in the outer wall of the control box 12.
[0023] An adjustment mechanism 8 is connected to the inner wall of the control box 12. The adjustment mechanism 8 includes a first sealing strip 81 and a second sealing strip 82. The side wall of the second sealing strip 82 has a through hole that mates with the electric heating tube 74. An L-shaped insulating mesh plate 83 is fixedly connected to the outer walls of the first sealing strip 81 and the second sealing strip 82. An L-shaped heat conduction box 84 is fixedly embedded in the outer wall of the control box 12. The outer wall of the L-shaped heat conduction box 84 is fixedly connected to the inner wall of the L-shaped plate 10. A kerosene layer 85 is connected to the inner wall of the L-shaped heat conduction box 84. A sealing layer is movably connected to the inner wall of the top of the L-shaped heat conduction box 84. A sealing piston 86 is fixedly connected to an insulating rod 87 on its side wall. The side end of the insulating rod 87 passes through the outer wall of the L-shaped heat conduction box 84 and is fixedly connected to the outer wall of the L-shaped insulating mesh plate 83. A conductive strip 88 is fixedly embedded at the bottom end of the insulating rod 87. A power-conducting strip 89 that cooperates with the conductive strip 88 is fixedly connected to the inner wall of the control box 12. This mechanism uses high temperature to avoid freezing at the connection point. Moreover, the electric heating tube 74, in conjunction with the underground thermal environment, can effectively reduce energy consumption by raising the air temperature, thereby improving the energy-saving and environmental protection performance of liquefied natural gas production.
[0024] A refrigeration process operation method for a liquefied natural gas (LNG) cold box, comprising any one of the above-mentioned LNG cold boxes, further comprising the following steps: S1. In the process of producing liquefied natural gas in the cold box body 1 with the precooling heat exchanger 2, liquefaction heat exchanger 3 and subcooling heat exchanger 4 under high summer temperature, the air inlet end of the U-shaped heat pipe 13 is first connected to the factory air duct valve, and the air duct valve is opened to allow air to enter the U-shaped heat pipe 13. The U-shaped heat pipe 13 uses its bottom end to cool the ground air underground. The cooled air is then cooled again through the vortex tube 69 of the refrigeration mechanism 6. Finally, the cold air is blown to the compressor and condenser assembly 63 in the refrigeration mechanism 6. S2. Then, the compressor and condenser assembly 63 can efficiently and reliably process the refrigerant in the refrigeration pipeline, so that the refrigerant in the refrigeration pipeline can meet the flow rate, liquefaction amount and refrigerant pressure required by the heat exchanger in the cold box. S3. Moreover, during the refrigeration process of the precooling heat exchanger 2, liquefaction heat exchanger 3 and subcooling heat exchanger 4 in the main body of the cold box 1, the refrigerant dosage in the refrigeration pipeline of the heat exchanger can be timely adjusted through the feedback of the adjacent temperature monitoring mechanism 5, and the flow rate of refrigerant in the precooling heat exchanger 2, liquefaction heat exchanger 3 and subcooling heat exchanger 4 can be reliably controlled. S4. In step S3, if the temperature at the precooling heat exchanger 2 is higher than -45℃, the refrigeration pipeline of the precooling heat exchanger 2 is supplemented with propane and ethylene refrigerant through the corresponding refrigerant compensation valve assembly 67. At the same time, if the temperature of the liquefaction heat exchanger 3 is lower than -120℃, propane refrigerant is supplemented in the corresponding refrigerant compensation valve assembly 67 in the refrigeration pipeline of the liquefaction heat exchanger 3. If the temperature at the liquefaction heat exchanger 3 is higher than -120℃, ethylene refrigerant is supplemented in the refrigeration pipeline, and the temperature of the precooling heat exchanger (2) is controlled to be maintained between -45℃ and -55℃. S5. In step S3, when the temperature monitored by the temperature monitoring mechanism 5 at the liquefied heat exchanger 3 is lower than -120°C, methane refrigerant is added to the corresponding refrigerant compensation valve assembly 67 in the refrigeration pipeline of the liquefied heat exchanger 3. If the temperature at the liquefied heat exchanger 3 is higher than -120°C, ethylene refrigerant is added to the refrigeration pipeline to control the temperature of the liquefied heat exchanger 3 between -122°C and -126°C. S6. In step S3, when the temperature monitoring mechanism 5 at the subcooled heat exchanger 4 reports a temperature higher than -158°C, methane refrigerant is added to the refrigeration pipeline at the subcooled heat exchanger 4. If the temperature at the subcooled heat exchanger 4 is lower than -158°C, nitrogen refrigerant is added to maintain the temperature of the subcooled heat exchanger 4 between -158°C and -162°C.
[0025] The operating principle of this invention is described as follows: When the liquefied natural gas cold box is working, after the temperature monitoring mechanism 5 at the precooling heat exchanger 2 detects an abnormal temperature, the temperature data is fed back to the control part of the cold box body 1. Then, the refrigeration mechanism 6 is controlled to replenish refrigerant in the refrigeration pipelines of the precooling heat exchanger 2 and the liquefaction heat exchanger 3. If the temperature at the precooling heat exchanger 2 is higher than -45°C, the refrigeration pipeline of the precooling heat exchanger 2 is replenished with propane and ethylene refrigerant through the corresponding refrigerant compensation valve assembly 67. At the same time, if the temperature at the liquefaction heat exchanger 3 is lower than -120°C, propane refrigerant is replenished in the refrigeration pipeline of the liquefaction heat exchanger 3 through the corresponding refrigerant compensation valve assembly 67. If the temperature at the liquefaction heat exchanger 3 is higher than -120°C, ethylene refrigerant is replenished in the refrigeration pipeline, and the temperature of the precooling heat exchanger 2 is controlled to be maintained between -45°C and -55°C. When the temperature at the liquefaction heat exchanger 3 is lower than -120°C, propane refrigerant is replenished in the refrigeration pipeline. If the temperature monitored by the temperature monitoring mechanism 5 is below -120℃, methane refrigerant is added to the corresponding refrigerant compensation valve assembly 67 in the refrigeration pipeline of the liquefied heat exchanger 3. If the temperature at the liquefied heat exchanger 3 is above -120℃, ethylene refrigerant is added to the refrigeration pipeline to keep the temperature of the liquefied heat exchanger 3 between -122℃ and -126℃. When the temperature monitored by the temperature monitoring mechanism 5 at the subcooled heat exchanger 4 is above -158℃, methane refrigerant is added to the refrigeration pipeline of the subcooled heat exchanger 4. If the temperature at the subcooled heat exchanger 4 is below -158℃, nitrogen refrigerant is added to keep the temperature of the subcooled heat exchanger 4 between -158℃ and -162℃. Moreover, the temperature monitoring in the temperature monitoring mechanism 5 is accurately measured by multiple monitoring by the first temperature detection assembly 56, the second temperature detection assembly 58, and the third temperature detection assembly 59. Nitrogen increases the cold-end temperature difference of the subcooling heat exchanger 4 and also increases the refrigerant vaporization rate, thus increasing the refrigerant flow rate to the low-temperature zone to meet the cooling requirements of the low-temperature zone. Methane increases the refrigerant vaporization rate and also increases the low-boiling-point components in the liquid refrigerant. Ethylene meets the cooling requirements of the cold ends of the precooling heat exchanger 2 and the liquefaction heat exchanger, and also increases the refrigerant liquefaction rate. Propane meets the cooling requirements of the hot end of the precooling heat exchanger 2 and also increases the refrigerant liquefaction rate. This cold box increases the cooling capacity of the heat exchangers by increasing the refrigerant flow rate in the precooling heat exchanger 2, the liquefaction heat exchanger 3, and the subcooling heat exchanger 4, ensuring the cooling effect of the liquefied natural gas cold box. Moreover, the precise control of the cooling of the precooling heat exchanger 2, the liquefaction heat exchanger 3, and the subcooling heat exchanger 4 in the main body of the cold box 1 can improve the reliability of liquefied natural gas production.
[0026] When the liquefied natural gas (LNG) cold box is operating in summer, air is introduced into the factory's air duct through the U-shaped heat pipe 13. The U-shaped heat pipe 13 cools the ground air at its bottom end underground. The cooled air then enters the control box 12, and is then transported through the delivery pipe 15 to the U-shaped hollow plate 68 of the refrigeration mechanism 6. The pre-cooled air then enters the vortex tube 69. At this time, one end of the vortex tube 69 generates cold air with a minimum temperature of -46°C, and the other end generates hot air with a maximum temperature of 127°C. After being cooled again by the vortex tube 69, the air is sprayed from the cold end to the vicinity of the condenser of the compressor and condenser assembly 63. The cold air efficiently cools the condenser, preventing incomplete liquefaction of the refrigerant in the compressor and condenser assembly 63, increasing the amount of refrigerant liquefied in the refrigeration pipeline, reducing the temperature of the mixed refrigerant entering the cold box, and ensuring the refrigerant pressure in the cold box heat exchanger. This effectively improves the refrigeration effect of the cold box and enhances the reliability and quality of LNG production.
[0027] When the outdoor temperature of liquefied natural gas is low in winter, the kerosene layer 85 of the control mechanism first contracts due to the low temperature, which drives the sealing piston 86 to move. The sealing piston 86 drives the insulating rod 87 to move. The insulating rod 87 causes the first sealing strip 81 to seal the bottom of the delivery pipe 15, and the second sealing strip 82 to move away from the opening of the ventilation pipe 71. At this time, the U-shaped heat conduction pipe 13 uses the higher underground temperature environment to raise the cold air entering the U-shaped heat conduction pipe 13. Then, the heated air is delivered to the control box 12. Moreover, the conductive strip 88 is driven by the insulating rod 87 to contact the energized strip 89 and start the electric heating tube 74. The electric heating tube 74 continues to heat the air in the control box 12. Finally, the hot air is sprayed through the hollow ring 72 and the exhaust hole 73 to the bottom of the cold box body 1 to the connection between the exhaust valve and the pipeline. The high temperature is used to avoid freezing at the connection. Moreover, the electric heating tube 74, in conjunction with the underground thermal environment, can effectively reduce energy consumption by raising the air temperature, thereby improving the energy-saving and environmental protection performance of liquefied natural gas production.
[0028] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A liquefied natural gas cold box, comprising a cold box body (1), characterized in that, The inner wall of the cold box body (1) is provided with a precooling heat exchanger (2), a liquefaction heat exchanger (3) and a subcooling heat exchanger (4). The outer walls of the precooling heat exchanger (2), the liquefaction heat exchanger (3) and the subcooling heat exchanger (4) are all fixedly connected with a temperature monitoring mechanism (5). The outer wall of the cold box body (1) is fixedly connected with an L-shaped plate (10). The upper surface of the L-shaped plate (10) is fixedly connected with a refrigeration mechanism (6). The upper surface of the L-shaped plate (10) is fixedly connected with a control box (12). The outer wall of the control box (12) is fixedly connected with a U-shaped heat pipe (13). The top of the control box (12) is fixedly connected with a conveying pipe (15). The bottom of the control box (12) is fixedly connected with a heating mechanism (7). The inner wall of the control box (12) is connected with an adjustment mechanism (8). The temperature monitoring mechanism (5) includes a circular hollow plate (51) and a first heat-conducting plate (53), and a heat insulation cover (57) is fixedly connected to the upper surface of the first heat-conducting plate (53). An electric heating tube (74) is fixedly embedded in the outer wall of the control box (12); The refrigeration mechanism (6) includes a bracket (61) fixedly connected to the upper surface of an L-shaped plate (10). Three support plates (62) are fixedly connected to the inner wall of the bracket (61). The upper surfaces of the three support plates (62) are respectively fixedly connected to a compressor and condenser assembly (63) that cooperates with the precooling heat exchanger (2), the liquefaction heat exchanger (3), and the subcooling heat exchanger (4). The condenser end of the compressor and condenser assembly (63) is fixedly connected to a first pipe (64). The side ends of multiple first pipes (64) pass through the inner walls of the cold box body (1) and the adjacent heat insulation cover (57) and are fixedly connected to expansion valves (65). The bottom ends of multiple expansion valves (65) are respectively fixedly connected to the input ends of the precooling heat exchanger (2), the liquefaction heat exchanger (3), and the subcooling heat exchanger (4). The bottom ends of the heat exchanger (3) and the subcooling heat exchanger (4) are fixedly connected to a second pipe (66). The side end of the second pipe (66) passes through the outer wall of the circular hollow plate (51) and the cold box body (1), and is fixedly connected to the compressor input end of the adjacent compressor and condenser assembly (63). The outer walls of the three second pipes (66) are respectively fixedly connected to a refrigerant compensation valve assembly (67). The upper surfaces of the three support plates (62) are fixedly connected to a U-shaped hollow plate (68). The inner wall of the U-shaped hollow plate (68) is fixedly embedded with a vortex tube (69). The refrigeration end of the vortex tube (69) is close to the outside of the compressor and condenser assembly (63). The three U-shaped hollow plates (68) are connected by two fixed pipes. The outer wall of the bottom U-shaped hollow plate (68) is fixedly connected to the top end of the conveying pipe (15). The adjusting mechanism (8) includes a first sealing strip (81) and a second sealing strip (82). The side wall of the second sealing strip (82) has a through hole that cooperates with the electric heating tube (74). The outer walls of the first sealing strip (81) and the second sealing strip (82) are fixedly connected to an L-shaped insulating mesh plate (83). An L-shaped heat conduction box (84) is fixedly embedded in the outer wall of the control box (12). The outer wall of the L-shaped heat conduction box (84) is fixedly connected to the inner wall of the L-shaped plate (10). The inner wall of the L-shaped heat conduction box (84) is... The wall is connected with a kerosene layer (85). The top inner wall of the L-shaped heat conduction box (84) is movably connected with a sealing piston (86). The side wall of the sealing piston (86) is fixedly connected with an insulating rod (87). The side end of the insulating rod (87) passes through the outer wall of the L-shaped heat conduction box (84) and is fixedly connected to the outer wall of the L-shaped insulating mesh plate (83). The bottom end of the insulating rod (87) is fixedly embedded with a conductive strip (88). The inner wall of the control box (12) is fixedly connected with a power-conducting strip (89) that cooperates with the conductive strip (88).
2. A liquefied natural gas cold box according to claim 1, characterized in that, The temperature monitoring mechanism (5) also includes a heat insulation box (52). The side wall of the circular hollow plate (51) is fixedly connected to the inner wall of the cold box body (1). The top of the circular hollow plate (51) is fixedly connected to a conductive pipe (54). The top of the circular hollow plate (51) is provided with an installation hole that matches the bottom of the heat exchanger. The outer wall of the top of the circular hollow plate (51) is fixedly embedded with a second heat-conducting plate (55). The lower surface of the second heat-conducting plate (55) is fixedly connected with a first temperature detection component (56). The upper surface of the first heat-conducting plate (53) is fixedly connected with a second temperature detection component (58). The outer wall of the heat insulation box (52) is fixedly embedded with a third temperature detection component (59).
3. A liquefied natural gas cold box according to claim 1, characterized in that, The heating mechanism (7) includes a ventilation pipe (71) that is fixedly connected to the inner wall of the control box (12). The output end of the ventilation pipe (71) is fixedly connected to a hollow ring (72). The hollow ring (72) is located outside the liquefied natural gas discharge valve at the bottom of the cold box body (1). The upper surface of the hollow ring (72) is fixedly connected to the lower surface of the cold box body (1). The inner wall of the hollow ring (72) is provided with multiple exhaust holes (73).
4. A liquefied natural gas cold box according to claim 1, characterized in that, Multiple metal heat-conducting blocks (9) are fixedly embedded on the outer wall of the U-shaped heat-conducting pipe (13).
5. A liquefied natural gas cold box according to claim 1, characterized in that, A climbing frame (11) is fixedly connected to the outer wall of the cold box body (1), and a tool storage box (14) is fixedly connected to the outer wall of the climbing frame (11) and the outer wall of the cold box body (1).
Citation Information
Patent Citations
A novel horizontal cold box for natural gas liquefaction
CN206469585U
Liquefied natural gas precooling unit
CN218269812U
Pipeline anti-blocking filtering and separating device for liquefied natural gas
CN219933365U