A method of cable laying

By incorporating insulation checks, mechanical control, and vibration damping systems in the cable laying method, the problems of cable collisions with mechanical pipelines and heat from thermal pipelines were solved, ensuring the safety and reliability of cable laying and guaranteeing the normal operation of thermal power plants.

CN117650467BActive Publication Date: 2026-11-24THE SIXTH CONSTR CO LTD OF CHINA NAT CHEM ENG
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202311430156.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-10-27
Publication Date
2026-11-24
Estimated Expiration
2043-10-27

AI Technical Summary

Technical Problem

During the cable laying process in thermal power plants, collisions between cable supports and mechanical pipelines can cause wear on the insulation sheath, potentially leading to short circuits and affecting the normal operation of the units. Furthermore, the high temperature of the thermal pipelines can also affect the cables.

Method used

The cable laying method includes insulation inspection, mechanical laying speed control, conversion cable tray design and vibration reduction system. The arc-shaped conversion cable tray is used to bypass the mechanical pipeline. The vibration reduction system is set up to buffer the vibration and heat insulation of the thermal pipeline. The impact force is reduced by movable plates and buffer bodies. The hot airflow is regulated by temperature probes and blowers.

Benefits of technology

This effectively avoids collisions between cables and machinery pipelines, reduces insulation damage, minimizes the impact of heat from thermal pipelines on cables, improves construction safety, and ensures the normal operation of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117650467B_ABST
    Figure CN117650467B_ABST
Patent Text Reader

Abstract

This invention discloses a cable laying method, comprising the following steps: performing an insulation inspection before cable laying, installing cable trays, and removing stones, iron filings, and mud from the cable trays; using mechanical methods to lay the cable, with a laying speed not exceeding 15 m / min and a traction strength not exceeding 7 N / mm². 2 In this invention, when the cable laying path perpendicularly conflicts with the maintenance pipeline, the cable trays at the conflicting locations are connected by a conversion cable tray. The conversion cable tray is installed below the maintenance pipeline, allowing the cable to bypass the pipeline. The conversion cable tray has an arc-shaped structure, and the connection between the conversion cable tray and the cable tray is a rounded transition. This invention improves the safety factor during construction and ensures the normal operation of the unit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of cable laying. More specifically, this invention relates to a method for laying cables. Background Technology

[0002] In recent years, with the continuous strengthening of urbanization and the continuous improvement of people's living standards, the demand for electricity has become increasingly strong. To better ensure the normal operation of thermal power plants, the work of cable line construction is particularly important. In the construction of thermal power plant installation projects, cable laying is directly related to the safe operation of the power grid later. Currently, with the continuous expansion of the scale of thermal power plants, the amount of cable line installation work is also increasing. To better ensure the quality of cable line construction, it is necessary to strengthen the research on its technology, master the technology of power cable laying, ensure laying quality and efficiency, and thus improve the overall construction quality of power projects, providing a guarantee for the normal operation of the power grid. In the current cable laying process, problems such as collisions between cable supports and mechanical pipelines, and distance issues between cable channels and mechanical heating pipelines, must be given sufficient attention. Because the pipeline is subjected to the impact of the medium inside the pipe during operation, the impact force of the medium will cause the pipeline to vibrate. When the pipeline uses spring supports, the spring supports will shake accordingly, which will wear down the insulation of the cable. Over time, this will damage the cable insulation and cause short circuit accidents, affecting the normal operation of the unit. In severe cases, it may even cause shutdown accidents and huge economic losses. Summary of the Invention

[0003] The purpose of this invention is to provide a cable laying method that improves the safety factor during construction and ensures the normal operation of the unit.

[0004] The technical solution adopted by this invention to solve this technical problem is: a cable laying method, comprising the following steps: Before laying cables, perform insulation checks, install cable trays, and remove stones, iron filings, mud, and sand from the cable trays; when using mechanical cable laying, the laying speed should not exceed 15m / min, and the traction strength should not exceed 7N / mm2. When the cable laying path conflicts perpendicularly with the maintenance pipeline, the cable trays at the conflicting locations are connected by a conversion cable tray. The conversion cable tray is installed below the maintenance pipeline so that the cable can bypass the maintenance pipeline. The conversion cable tray has an arc-shaped structure, and the connection between the conversion cable tray and the cable tray is an arc transition.

[0005] Preferably, the bending radius of the cable should not be less than 10 times the outer diameter of the cable.

[0006] Preferably, when the mechanical pipeline is a heating pipeline and the heating pipeline uses spring supports, the distance between the heating pipeline and the intersection point of the cable below it shall not be less than 0.5 meters.

[0007] Preferably, when the mechanical pipeline is a thermal pipeline and the thermal pipeline uses spring supports, the cable tray is equipped with a vibration damping system directly below the thermal pipeline, and the distance between the intersection of the thermal pipeline and the cable below it is not less than 0.25 meters.

[0008] Preferably, the vibration damping system is disposed between the space where the thermal pipes and cables cross, and the vibration damping system includes: a movable plate, a composite plate, a support rod, and a first buffer body; The upper ends of a pair of support rods are fixed, and the opposite sides of the composite plate are fixed by the support rods. The movable plate is set above the composite plate and passes through the support rods. The first buffer body includes a foamed polyurethane layer, a bottom plate layer and a spring connector from top to bottom. The spring connector is fixed to the movable plate. The foamed polyurethane layer is located directly below the heat pipe corresponding to the intersection point. The height of the foamed polyurethane layer is set to contact the bottom of the spring support or have a certain gap.

[0009] Preferably, it also includes a pair of parallel tracks, which are installed on the top of the power plant wall, the length direction of the tracks being parallel to the axial direction of the heat pipe; the tracks are electrically operated linear tracks, and the support rod is slidably mounted on the tracks; The controller controls the switching of the track.

[0010] Preferably, the composite plate is composed of a rubber plate and a heat insulation plate from top to bottom.

[0011] Preferably, the length and width of the composite plate are at least twice the diameter of the heating pipe; the foamed polyurethane layer and the base plate layer have the same dimensions, and their length and width are greater than the diameter of the heating pipe.

[0012] Preferably, air passages are provided on both sides inside the movable plate, and air holes are provided on the surface of the movable plate. The air holes are connected to the air passages, and the air passages are connected to a blower through a pipe. A temperature probe is installed on the support rod to detect the temperature of the thermal pipeline. The controller is connected to the temperature probe and the blower. When the temperature detected by the temperature probe is greater than the set value, the controller controls the blower to turn on.

[0013] The present invention has at least the following beneficial effects: compared with traditional construction methods, it can effectively avoid the unit pipelines and at the same time avoid the impact of the high temperature heat of the heating pipelines on the cables.

[0014] Other advantages, objectives and features of the present invention will become apparent in part from the following description, and in part from those skilled in the art through study and practice of the invention. Attached Figure Description

[0015] Figure 1 This is a schematic diagram showing the arrangement of the vibration reduction system, heating pipes, and cables of the present invention.

[0016] Explanation of reference numerals in the attached drawings: 1. Cable tray, 2. Cable, 3. Heating pipe, 4. Spring support, 5. Movable plate, 6. Support rod, 7. Polyurethane foam layer, 8. Base plate layer, 9. Spring connector, 10. Track, 11. Rubber plate, 12. Insulation board, 13. Air duct, 14. Temperature probe. Detailed Implementation

[0017] The present invention will now be described in detail and completely with reference to the accompanying drawings. Those skilled in the art will be able to implement the present invention based on these descriptions. Before describing the present invention with reference to the accompanying drawings, it should be particularly noted that the technical solutions and features provided in various parts of the present invention, including the following description, can be combined with each other without conflict.

[0018] Furthermore, the embodiments of the present invention described below are generally only some, not all, of the embodiments of the present invention. Therefore, all other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort should fall within the scope of protection of the present invention.

[0019] The present invention will be further described in detail below with reference to the accompanying drawings and embodiments. The specific implementation process is as follows: like Figure 1 As shown, the present invention provides a cable laying method, comprising the following steps: Before laying cable 2, an insulation test shall be conducted, and laying shall only proceed if the test is passed; cable tray 1 shall be installed, and stones, iron filings, mud and sand shall be removed from cable tray 1; cable 2 shall be laid mechanically, and the traction machine and guiding mechanism shall be properly adjusted, and measures shall be taken to prevent mechanical damage to cable 2. The laying speed shall not exceed 15m / min, and the traction strength shall not exceed 7N / mm2. When the cable 2 laying path conflicts perpendicularly with the maintenance pipeline, the cable tray 1 at the conflicting position is connected by a conversion cable tray. The conversion cable tray is installed below the maintenance pipeline so that the cable 2 can bypass the maintenance pipeline. The conversion cable tray has an arc-shaped structure, and the connection between the conversion cable tray and the cable tray 1 is an arc transition.

[0020] This technical solution may also include the following technical details to better achieve the technical effect: the bending radius of cable 2 should not be less than 10 times the outer diameter of cable 2.

[0021] This technical solution may also include the following technical details to better achieve the technical effect: when the mechanical pipeline is a heat pipeline 3 and the heat pipeline 3 adopts a spring support hanger 4, the distance between the intersection of the heat pipeline 3 and the cable 2 below it shall not be less than 0.5 meters.

[0022] This technical solution may also include the following technical details to better achieve the technical effect: when the mechanical pipeline is a heat pipeline 3 and the heat pipeline 3 adopts a spring support hanger 4, the cable tray 1 is provided with a vibration damping system directly below the heat pipeline 3, and the distance between the intersection point of the heat pipeline 3 and the cable 2 below it is not less than 0.25 meters. After the vibration damping system is set up, the net distance between the intersection point of the heat pipeline 3 and the cable 2 can be reduced.

[0023] This technical solution may also include the following technical details to better achieve the technical effect: the shock absorption system is set between the intersection space of the heat pipe 3 and the cable 2, and the shock absorption system includes: a movable plate 5, a composite plate, a support rod 6 and a first buffer body; The upper ends of a pair of support rods 6 are fixed and can be fixed to the wall, similar to the fixing method of the cable tray 1. The opposite sides of the composite plate are fixed by the support rods 6. The movable plate 5 is set above the composite plate and passes through the support rods 6, and can move on the support rods 6. The first buffer body includes a foamed polyurethane layer 7, a bottom plate layer 8 and a spring connector 9 from top to bottom. The spring connector 9 is fixed to the movable plate 5. The foamed polyurethane layer 7 is located directly below the heat pipe 3 corresponding to the intersection point. The height of the foamed polyurethane layer 7 is set to contact the bottom of the spring support 4 or have a certain gap.

[0024] In the above technical solution, when the pipeline is in operation, it will be impacted by the medium inside the pipe. The impact force of the medium will cause the pipeline to vibrate. The first buffer body reduces the local vibration of the thermal pipeline 3. The first buffer body collides with the movable plate 5 under the action of the spring connector 9 to achieve the effect of slowing down. The vibration reduction system reduces the local vibration of the thermal pipeline 3 and also plays a role in heat insulation.

[0025] This technical solution may also include the following technical details to better achieve the technical effect: it also includes a pair of parallel tracks 10, which are set on the top of the power plant wall, and the length direction of the tracks 10 is parallel to the axial direction of the heat pipe 3; the tracks 10 are electric linear tracks 10, and the support rod 6 is slidably set on the tracks 10; The controller controls the switch of the track 10; when the heating pipe 3 or cable 2 needs to be repaired, the control track 10 is opened, so that the shock absorption system moves away from the intersection of the heating pipe 3 and cable 2, making it convenient for personnel to carry out maintenance.

[0026] This technical solution may also include the following technical details to better achieve the technical effect: the composite plate is composed of a rubber plate 11 and a heat insulation plate 12 from top to bottom.

[0027] This technical solution may also include the following technical details to better achieve the technical effect: the length and width of the composite plate are at least twice the diameter of the heat pipe 3; the foamed polyurethane layer 7 and the base plate layer 8 have the same dimensions, and their length and width are greater than the diameter of the heat pipe 3.

[0028] This technical solution may also include the following technical details to better achieve the technical effect: air passages 13 are provided on both sides inside the movable plate 5, and air holes are provided on the surface of the movable plate 5. The air holes are connected to the air passages 13, and the air passages 13 are connected to the blower through pipes; the air holes are located on both sides of the orthogonal projection of the bottom plate layer 8, so that the air outlet of the air holes is directly facing the spring support 4 / thermal pipe 3, which accelerates the upward movement of hot air and reduces the impact on the cable 2; A temperature probe 14 is installed on the support rod 6. The temperature probe 14 is used to detect the temperature of the heat pipe 3. The controller is connected to the temperature probe 14 and the blower. When the temperature detected by the temperature probe 14 is greater than the set value, the controller controls the blower to turn on.

[0029] Although embodiments of the present invention have been disclosed above, they are not limited to the applications listed in the specification and embodiments. They can be applied to various fields suitable for the present invention. For those skilled in the art, other modifications can be easily made. Therefore, without departing from the general concept defined by the claims and their equivalents, the present invention is not limited to the specific details and embodiments shown and described herein.

Claims

1. A cable laying method, characterized in that, Includes the following steps: Before laying cables, perform insulation checks, install cable trays, and remove stones, iron filings, and mud from the cable trays. When using mechanical cable laying, the laying speed should not exceed 15 m / min, and the traction strength should not exceed 7 N / mm². 2 ; When the cable laying path conflicts perpendicularly with the maintenance pipeline, the cable trays at the conflicting locations are connected by a conversion cable tray. The conversion cable tray is installed below the maintenance pipeline so that the cable can bypass the maintenance pipeline. The conversion cable tray has an arc structure, and the connection between the conversion cable tray and the cable tray is an arc transition. When the pipeline is a thermal pipeline and the thermal pipeline uses spring supports, the cable tray is equipped with a vibration damping system directly below the thermal pipeline, and the distance between the intersection of the thermal pipeline and the cable below it is not less than 0.25 meters. The vibration damping system is installed between the space where the thermal pipes and cables cross, and the vibration damping system includes: a movable plate, a composite plate, a support rod, and a first buffer body; The upper ends of a pair of support rods are fixed, and the opposite sides of the composite plate are fixed by the support rods. The movable plate is set above the composite plate and passes through the support rods. The first buffer body includes a foamed polyurethane layer, a bottom plate layer and a spring connector from top to bottom. The spring connector is fixed to the movable plate. The foamed polyurethane layer is located directly below the heat pipe corresponding to the intersection point. The height of the foamed polyurethane layer is set to contact the bottom of the spring support or have a certain gap.

2. The cable laying method as described in claim 1, characterized in that, The bending radius of the cable should not be less than 10 times the outer diameter of the cable.

3. The cable laying method as described in claim 1, characterized in that, The vibration damping system also includes a pair of parallel tracks installed on the top of the power plant wall, with the length direction of the tracks parallel to the axis of the heat pipe; the tracks are electrically operated linear tracks, and the support rods are slidably mounted on the tracks; The controller controls the switching of the track.

4. The cable laying method as described in claim 3, characterized in that, The composite panel is composed of a rubber sheet and a heat insulation board from top to bottom.

5. The cable laying method as described in claim 4, characterized in that, The length and width of the composite plate are at least twice the diameter of the heating pipe; the foamed polyurethane layer and the base plate layer have the same dimensions, and their length and width are greater than the diameter of the heating pipe.

6. The cable laying method as described in claim 5, characterized in that, Air passages are provided on both sides inside the movable plate, and air holes are provided on the surface of the movable plate. The air holes are connected to the air passages, and the air passages are connected to the blower through pipes. A temperature probe is installed on the support rod to detect the temperature of the thermal pipeline. The controller is connected to the temperature probe and the blower. When the temperature detected by the temperature probe is greater than the set value, the controller controls the blower to turn on.