一种卸船机海运装卸系统及装卸方法

By setting up roll-on/roll-off tracks and traction mechanisms in the marine loading and unloading system of the ship unloader, the vertical transportation of the ship unloader on the barge is realized, which solves the problem of facility dismantling during ship unloading and improves the port's production and transportation efficiency.

CN117657829BActive Publication Date: 2026-07-17SHANGHAI ZHENHUA HEAVY IND

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
SHANGHAI ZHENHUA HEAVY IND
Filing Date
2024-01-23
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

When existing ship unloaders unload ships at trestle-type wharves, it is necessary to dismantle facilities such as corridors, which disrupts the wharf's production rhythm. Furthermore, special-shaped wharves cannot use the ship's side for berthing and unloading, increasing workload and costs.

Method used

The ship unloader maritime loading and unloading system adopts roll-on/roll-off tracks at the loading dock and barges, and uses traction mechanisms and temporary ground anchors to achieve vertical transportation of the ship unloader on the barges and docking at the dock, avoiding the need for facility dismantling.

Benefits of technology

It improved the efficiency of the dock, reduced the dismantling and restoration of facilities, enhanced transportation efficiency, and adapted to the unloading needs of different dock types.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117657829B_ABST
    Figure CN117657829B_ABST
Patent Text Reader

Abstract

本发明提供一种卸船机海运装卸系统及装卸方法。其中,系统包括:装船码头,装船码头上设置有第一滚装轨道,第一滚装轨道沿第一方向设置,用于承载卸船机,卸船机的长度方向平行于第一方向;驳船,包括:船体;第二滚装轨道,设置在船体上并沿第一方向设置,用于与第一滚装轨道对接并承载卸船机;第三滚装轨道,沿第二方向设置并与第二滚装轨道相交;靠泊码头,靠泊码头上设置有第四滚装轨道,第四滚装轨道用于与第三滚装轨道对接,并承载卸船机;牵引机构,设置在靠泊码头上,用于将卸船机由第三滚装轨道牵引至第四滚装轨道。本发明实施例的装卸系统,可以适用于短岸线、低水深、窄航道的码头,减少了码头上的结构拆除和恢复工作。
Need to check novelty before this filing date? Find Prior Art