Open type TBM tunnel long distance advanced geological prediction method and device

By setting up working sections at the rear of the TBM's support shoe and the front of the L1 zone, integrating horizontal directional drilling and directional control modules, the problem of space limitation at the TBM head in existing technologies was solved, enabling long-distance advanced geological prediction and grouting reinforcement, thus improving the safety and accuracy of tunnel construction.

CN117662172BActive Publication Date: 2026-11-24CCCC SECOND HIGHWAY CONSULTANTS CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202311462187.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-02
Publication Date
2026-11-24
Estimated Expiration
2043-11-02

AI Technical Summary

Technical Problem

Existing TBM heads are insufficient to meet the space and volume requirements of horizontal directional drilling and are difficult to integrate well with existing construction methods, resulting in poor long-distance advanced geological prediction for tunnels.

Method used

Working sections are set up at the rear of the TBM's support shoe and the front of the L1 area, integrating long-distance advanced geological prediction devices, including horizontal directional drilling. The drill bit trajectory is planned using the directional control module, and geological prediction is carried out during the TBM tunneling process. Grouting reinforcement mechanisms are also equipped to reinforce unfavorable geological conditions.

Benefits of technology

It enables long-distance advanced geological forecasting, reaching an operating distance of 1200 meters or more, reducing construction risks without affecting the normal construction of the TBM. It also has grouting reinforcement function, improving the accuracy and safety of geological forecasting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117662172B_ABST
    Figure CN117662172B_ABST
Patent Text Reader

Abstract

This invention provides a method and apparatus for long-distance advanced geological prediction in open-type TBM tunnels, comprising: setting up a working section for geological prediction operations at the rear of the support shoe and the front of the L1 zone on the TBM; deploying a long-distance advanced geological prediction device, including a horizontal directional drill, within the working section; while the TBM is excavating the tunnel, the drill bit of the horizontal directional drill extends from the long-distance advanced geological prediction device and reaches a designated area in front of the TBM to complete the advanced geological prediction of the designated area. During the process of the horizontal directional drill bit advancing to the designated area in front of the TBM, the TBM continues excavating, and the working section as a whole advances with the TBM, while the long-distance horizontal directional drill advanced geological prediction device remains in a fixed position and does not advance with the TBM. This invention integrates a miniaturized horizontal drilling rig at the front end of the TBM to achieve long-distance advanced geological prediction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of tunnel construction technology, specifically to a method and apparatus for long-distance advanced geological prediction of open-type TBM tunnels. Background Technology

[0002] In recent years, my country's tunnel construction technology has made continuous progress, and some complex tunnel designs have been put into construction. These tunnels often have complex geological characteristics, which bring unpredictable risks to the construction. Full-face rock tunnel boring machines (TBMs) are widely used in the construction of tunnels with complex geological conditions both domestically and internationally due to their advantages such as safety and efficiency.

[0003] Traditional TBM models are mainly divided into open-face TBMs and shield TBMs. Open-face TBMs use anchor, mesh, and shotcrete initial support technology, followed by cast-in-place concrete secondary lining. They do not use full-ring segment lining, and propulsion reaction force is provided by support shoes. Regardless of the type of TBM, in order to avoid construction risks caused by geological conditions, it is essential to have a thorough understanding and accurate grasp of the geological conditions of the tunnel under construction. Advanced geological prediction technology for tunnels can meet these requirements.

[0004] Currently, numerous long-distance advanced geological prediction technologies for tunnels have emerged in research. These technologies can determine the geological conditions of the surrounding rock within a certain range ahead of tunnel construction. Based on the long-distance advanced geological prediction, a basis can be provided for adjusting and optimizing tunnel design parameters, optimizing tunnel construction organization, and formulating construction safety emergency plans. Therefore, long-distance advanced geological prediction can reduce the probability of geological disasters and avoid geological disasters such as water inrush, gas outburst, rock burst, and large deformation during construction and operation.

[0005] However, in existing technologies, such as the invention application with publication number CN111140242A, a TBM head with a forward prediction function of over 1,000 meters is disclosed. This patent describes the ability to simultaneously perform TBM tunneling construction and forward geological prediction. However, it sets up a horizontal directional drilling rig in the head, and in practical applications, it is difficult for the TBM head to meet the space and volume requirements for setting up a horizontal directional drill, and this device is difficult to integrate well with existing construction methods.

[0006] Therefore, there is an urgent need to provide a long-distance advanced geological prediction technology for TBM tunnels that can be well integrated with construction methods and has practical application value. Summary of the Invention

[0007] To address the shortcomings of existing technologies, the purpose of this invention is to provide a method and apparatus for long-distance advanced geological prediction of open-type TBM tunnels.

[0008] A first aspect of the present invention provides a method for long-distance advanced geological prediction of open-type TBM tunnels, comprising:

[0009] A working section for geological prediction operations is set up at the rear of the support shoe and the front of the L1 area on the TBM. A long-distance advanced geological prediction device is set up in the working section, and the long-distance advanced geological prediction device includes a horizontal directional drill.

[0010] While the TBM is excavating the tunnel, the drill bit of the horizontal directional drill extends from the long-distance advanced geological prediction device and reaches the designated area in front of the TBM, completing the advanced geological prediction of the designated area.

[0011] Optionally, the long-distance advanced geological prediction device has a first housing, on which one or more reserved boreholes are provided. The drill bit of the horizontal directional drill extends out from one of the reserved boreholes and advances to a designated area in front of the TBM excavation to perform forward geological prediction.

[0012] As the drill bit of the horizontal directional drill advances to the designated area in front of the TBM, the TBM continues to advance, and the entire working section advances with the TBM. The long-distance advanced geological prediction device remains in a fixed position and does not advance with the TBM.

[0013] Optionally, the length of the working section is determined based on the tunneling speed of the TBM and the distance that the long-distance advanced geological prediction device needs to predict in advance. Taking the forward direction of the TBM as the leading edge, the length of the working section must at least meet the following requirements:

[0014] As the TBM advances at the set tunneling speed, the drill bit of the horizontal directional drill extends from the pre-drilled hole from the front end of the working section to the rear end of the working section, and completes the collection of geological data before reaching the rear end of the working section.

[0015] Optionally, the working section is provided with a second outer shell, and the second outer shell has an opening. The position of the opening corresponds to the position of the reserved drilling hole on the first outer shell. After the drill bit of the horizontal directional drill passes through the reserved drilling hole of the first outer shell, it extends out of the second outer shell from the opening.

[0016] The opening extends from the front end of the second housing to the rear end of the second housing. As the TBM and the working section advance, the portion of the opening from the front end to the rear end gradually passes the position of the horizontal directional drill, while the horizontal directional drill remains in a fixed position.

[0017] Optionally, the horizontal directional drill is equipped with a guiding control module, which is used to plan the trajectory curve of the drill bit of the horizontal directional drill from the position of the reserved borehole to the designated area, and control the drill bit of the horizontal directional drill to travel according to the trajectory curve.

[0018] Optionally, the long-distance advanced geological prediction device further includes a grouting reinforcement mechanism. After the horizontal directional drilling completes the advanced geological prediction, the grouting reinforcement mechanism is used to grout and reinforce the geology that needs to be reinforced.

[0019] Optionally, the long-distance advanced geological prediction device also includes a slag discharge mechanism, the output end of which can be directly connected to the slag discharge belt of the TBM.

[0020] A second aspect of the present invention provides a long-distance advanced geological prediction device for open-type TBM tunnels, comprising:

[0021] A first housing, wherein one or more pre-drilled holes are provided on the first housing;

[0022] A horizontal directional drill, located inside the first housing, wherein the drill bit of the horizontal directional drill extends from the reserved borehole and advances to the designated area of ​​the advanced geological prediction;

[0023] The working section is used for geological prediction operations. The working section is located between the rear of the support shoe on the TBM and the front of the L1 area. The working section is equipped with a second outer shell with an opening. The position of the opening corresponds to the position of the reserved drill hole on the first outer shell. After the drill bit of the horizontal directional drill passes through the reserved drill hole of the first outer shell, it extends out of the second outer shell from the opening.

[0024] The opening extends from the front end of the second housing to the rear end of the second housing. As the TBM and the working section advance, the portion of the opening from the front end to the rear end gradually passes the position of the horizontal directional drill, while the horizontal directional drill remains in a fixed position.

[0025] Optionally, the horizontal directional drill is equipped with a guiding control module, which is used to plan the trajectory curve of the drill bit of the horizontal directional drill from the position of the reserved borehole to the designated area, and control the drill bit of the horizontal directional drill to travel according to the trajectory curve.

[0026] Optionally, the length of the working section is determined based on the tunneling speed of the TBM and the distance requiring advance geological prediction. Taking the forward direction of the TBM as the front end, the length of the working section shall at least meet the following requirements: as the TBM advances at the set tunneling speed, the position where the drill bit of the horizontal directional drill extends out of the reserved borehole gradually moves from the front end of the working section to the rear end of the working section, and geological data collection is completed before reaching the rear end of the working section.

[0027] Compared with the prior art, the embodiments of the present invention have at least one of the following beneficial effects:

[0028] The open-type TBM tunnel long-distance advanced geological prediction method and device provided by this invention has minimal impact on tunnel construction. By integrating the horizontal directional drilling system at the front end of the TBM (behind the TBM support shoe and in front of the L1 zone), it is not limited by the space constraints of the TBM cutterhead. Simultaneously, in conjunction with the working sections set on the TBM, it can effectively achieve long-distance advanced geological prediction without affecting normal TBM construction; for example, it can achieve working distances of 1200 meters and above. This requires minimal modification to existing TBM functional modules, overcoming the problems of short drilling distances and shield shell interference in existing technologies.

[0029] The present invention provides a method and device for long-distance advanced geological prediction of open-type TBM tunnels. The horizontal directional drill can travel along a planned trajectory through the guidance and direction control function, so as to realize advanced geological prediction of a designated area in front of the tunnel.

[0030] The method and device for long-distance advanced geological prediction of open TBM tunnels provided by the present invention have grouting reinforcement function. When adverse geological conditions are found in the advanced geological prediction, the adverse geological conditions can be reinforced to reduce construction risks. Attached Figure Description

[0031] Other features, objects, and advantages of the present invention will become more apparent from the following detailed description of non-limiting embodiments with reference to the accompanying drawings:

[0032] Figure 1 This is a flowchart of a long-distance advanced geological prediction method in one embodiment of the present invention;

[0033] Figure 2 This is a schematic diagram of the layout of a long-distance advanced geological prediction device in one embodiment of the present invention;

[0034] Figure 3 This is a schematic diagram of the working section of a long-distance advanced geological prediction device in one embodiment of the present invention;

[0035] Figure 4 This is a top view of a long-distance advanced geological prediction device according to an embodiment of the present invention;

[0036] Figure 5 This is a schematic diagram of the side position of a long-distance advanced geological prediction device in one embodiment of the present invention;

[0037] Figure 6 This is a schematic cross-sectional view of a long-distance advanced geological prediction device in one embodiment of the present invention;

[0038] In the diagram: 1. Horizontal directional drilling rig; 2. Working section; 3. Sand removal machine; 4. Storage pool; 5. TBM transport track; 6. Slag discharge belt; 7. Mixing pool; 8. Cab; 9. Drill rod; 10. Support shoe; 11. L1 area; 12. First outer shell; 13. Reserved drill hole. Detailed Implementation

[0039] The present invention will now be described in detail with reference to specific embodiments. These embodiments will help those skilled in the art to further understand the present invention, but do not limit the invention in any way. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of the present invention. These all fall within the scope of protection of the present invention.

[0040] In the description of this invention, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0041] Currently, TBM (Tunnel Boring Machine) construction technology is widely used in various tunnel construction projects both domestically and internationally, significantly improving tunnel construction efficiency and the level of integration and automation. In specific TBM tunnel excavation construction, to understand the geological conditions of the surrounding rock within a certain range ahead of the tunnel and avoid risks arising from these geological conditions, this invention provides a long-distance advanced geological prediction technology for open-face TBM tunnels.

[0042] Generally, an open-face TBM consists of a main excavator, a support system, and auxiliary equipment connected sequentially. The main excavator primarily comprises a cutterhead, headframe, shield, drive system, main beam, propulsion system, and rear support, responsible for tunnel excavation and support. The support system includes the L1 and L2 support systems, mainly providing initial support and lining to the rock face after the main excavator has completed its work. The auxiliary equipment includes a hydraulic power station, transformer, distribution cabinet, cable and water pipe reels, dust removal and ventilation equipment, etc., providing power, ventilation, water, electricity, and gas support for the main excavator's operation.

[0043] Figure 1This is a flowchart of a long-distance advanced geological prediction method according to an embodiment of the present invention. (Refer to...) Figure 1 As shown, the long-range advanced geological prediction method in this embodiment includes two main steps:

[0044] S100, a working section 2 for geological prediction operations is set up at the rear of the support shoe 10 and the front of the L1 area 11 on the TBM. A long-distance advanced geological prediction device is set up in the working section 2. The long-distance advanced geological prediction device includes a horizontal directional drill 1.

[0045] This step mainly involves arranging the long-distance advanced geological prediction device and working section 2. Working section 2 is located at the rear of the support shoe 10 and the front of the L1 area 11 on the TBM. The corresponding long-distance advanced geological prediction device is located within working section 2, that is, between the rear of the support shoe 10 and the front of the L1 area 11 on the TBM. In this embodiment, the arrangement of working section 2 is mainly to ensure that the long-distance advanced geological prediction device can successfully complete the long-distance advanced geological prediction operation, that is, to ensure that the horizontal directional drill 1 remains stable during drilling.

[0046] S200: While the TBM is excavating the tunnel, the drill bit of the horizontal directional drill 1 extends from the long-distance advanced geological prediction device and reaches the designated area in front of the TBM to complete the advanced geological prediction of the designated area.

[0047] After setting up the long-distance advanced geological prediction device and working section 2, the TBM is started for tunnel excavation. During the excavation process, the support shoe 10 and other equipment operate normally. Unlike existing methods, in this embodiment, if advanced geological prediction is required during the tunnel excavation process, the horizontal directional drill 1 in the long-distance advanced geological prediction device is activated. The drill bit of the horizontal directional drill 1 reaches the designated area (the area requiring advanced geological prediction) to obtain the corresponding geological data for geological prediction. After further processing, the prediction result is formed, and the advanced geological prediction is completed.

[0048] In this embodiment, the horizontal directional drilling rig 1 is integrated into the front end of the TBM (the rear of the TBM's support shoe 10 and the front of the L1 area 11). This eliminates the spatial limitations imposed by the TBM cutterhead and avoids any damage or major adjustments to the original mechanisms such as the cutterhead, headstock, and shield, making it highly feasible. Furthermore, within the working section 2 set up on the TBM, the horizontal directional drilling rig 1 performs relatively stable forecasting work only in this section, without affecting the normal construction of the TBM, and can achieve a working distance of 1200 meters or more.

[0049] Specifically, Figure 2 This is a schematic diagram of the layout of a long-distance advanced geological prediction device in one embodiment of the present invention. (Refer to...) Figure 2As shown, the advanced geological prediction device is located between the rear of the support boot 10 and the front of the L1 area 11 on the TBM, corresponding to the location of the working section 2 used for geological prediction operations.

[0050] Figure 3 This is a schematic diagram of the working section 2 of a long-distance advanced geological prediction device in one embodiment of the present invention. (Refer to...) Figure 3 As shown, before the advanced geological prediction device is put into operation, it can be located near the front end of the working section 2 (adjacent to the support shoe 10). In addition to the advanced geological prediction device, a length of space is left at the subsequent position of the working section 2. This space can be used to allow sufficient time for the horizontal directional drill 1 of the advanced geological prediction device to carry out prediction work, so as to ensure its stability.

[0051] Specifically, in one possible implementation, the long-distance advanced geological prediction device has a first housing 12, inside which a horizontal directional drill 1 is located. The first housing 12 has a pre-drilled hole 13. The drill bit of the horizontal directional drill 1 can extend from the pre-drilled hole 13 and advance to a designated area ahead of the TBM excavation, i.e., the area requiring advanced geological prediction, to perform forward geological prediction. During the process of the drill bit of the horizontal directional drill 1 advancing to the designated area ahead of the TBM excavation, the TBM continues excavating, and the entire working section 2 advances with the TBM excavation. The long-distance advanced geological prediction device remains in a fixed position and does not advance with the TBM excavation.

[0052] The long-distance advanced geological prediction device can be fixed to a support structure, such as the support structure fixed to one end of the support shoe 10, or it can be a base for the device, fixed to the base. The support shoe 10 serves as a support and step-changing structure for the open-type TBM, and can also be used as a guide for the open-type TBM. During TBM tunneling, the position and attitude of the TBM can be continuously monitored based on the prediction results of the long-distance advanced geological prediction device. Under the premise of conforming to the engineering design, it can be determined whether to adjust the orientation of the TBM based on its attitude during tunneling.

[0053] As mentioned above, a certain length of space is left at the subsequent position of working section 2. In order to complete the advanced geological prediction work, the length of the entire working section 2 is determined according to the tunneling speed of the TBM and the distance that the long-distance advanced geological prediction device needs to predict. Taking the forward direction of the TBM as the front end, the length of working section 2 must at least meet the following requirements: as the TBM advances at the set tunneling speed, the position of the drill bit of the horizontal directional drill 1 extending from the reserved borehole 13 gradually moves from the front end of working section 2 to the rear end of working section 2, and the geological data acquisition is completed before reaching the rear end of working section 2. Specifically, when the TBM is tunneling forward, the horizontal directional drill 1 works simultaneously. However, because the TBM is constantly moving forward, if the horizontal directional drill 1 also moves forward with the entire TBM, it will cause instability in the operation of the drill bit of the horizontal directional drill 1 and its connected drill rod 9, which may lead to unnecessary accidents, causing the advanced geological prediction work to fail to be completed normally or the results to be inaccurate. To avoid this situation, in this embodiment of the invention, a working section 2 is set up, which moves along with the TBM, while the horizontal directional drill 1 remains fixed. After completing the advanced geological prediction, the horizontal directional drill 1 is withdrawn, awaiting the next advanced geological prediction to begin.

[0054] In one possible implementation, the working section 2 is provided with a second outer shell, and the long-distance advanced geological prediction device is located inside the second outer shell. The second outer shell has an opening, the position of which corresponds to the position of the reserved drill hole 13 on the first outer shell 12, so that the drill bit of the horizontal directional drill 1 extends out of the second outer shell through the reserved drill hole 13 of the first outer shell 12. At the same time, the opening extends from the front end of the second outer shell to the rear end of the second outer shell. That is, along the direction of the TBM and the working section 2, an elongated opening is provided on the upper surface of the second outer shell. The elongated opening extends from one end of the upper surface of the entire second outer shell to the other end of the upper surface of the second outer shell. The part between the front end and the rear end of the opening gradually passes the position of the horizontal directional drill 1, while the horizontal directional drill 1 remains in a fixed position. This ensures that the operation of the horizontal directional drill 1 in the long-distance advanced geological prediction device does not affect the normal operation of the TBM. At the same time, it also ensures the stability of the advanced geological prediction work and the accuracy of the results.

[0055] Reference Figure 2As shown, in some embodiments, to better and more accurately complete the advanced geological prediction work without affecting the normal tunneling of the TBM, the horizontal directional drilling rig 1 is also equipped with a guiding and control module. This module plans the trajectory curve of the drill bit from the pre-reserved borehole 13 to the designated area and controls the drill bit to travel along the trajectory curve. Specifically, the guiding and control module is installed on the horizontal directional drilling rig 1, for example, on the drill bit, and uses a pre-set control module to guide and control the drill bit. This guiding and control function enables the advanced geological prediction device to accurately and safely reach the designated area along the planned route.

[0056] Reference Figure 3 , Figure 4 , Figure 5 and Figure 6 As shown, to better facilitate tunnel excavation using a TBM, in some embodiments, the long-distance advanced geological prediction device also includes a grouting reinforcement mechanism. After the horizontal directional drilling rig 1 completes the advanced geological prediction, the grouting reinforcement mechanism is used to reinforce the geology requiring reinforcement. Specifically, the grouting reinforcement mechanism is connected to the drill bit of the horizontal directional drilling rig 1. During the advanced geological prediction process, if unfavorable geology is found ahead of the tunnel construction, a solidification material (such as concrete) is injected into the borehole through grouting equipment to fill and solidify the soil in the designated area, thereby improving the bearing capacity of the soil in the designated area. The grouting reinforcement mechanism may include a grouting material storage tank 4 and grouting equipment (such as a grouting pump). It may also further include a grouting material mixing tank 7. The required proportion of grouting material is mixed and input into the grouting material storage tank 4, and then injected into the borehole by the grouting equipment to complete the reinforcement. This embodiment, by setting up a grouting reinforcement function, can achieve the reinforcement of unfavorable geology and reduce construction risks.

[0057] Continue, refer to Figure 3 , Figure 4 , Figure 5 and Figure 6As shown, the long-distance advanced geological prediction device also includes a muck removal mechanism. The output end of this mechanism can be directly connected to the muck removal belt 6 of the TBM to transport the slag and other materials formed in the borehole of the horizontal directional drill 1. Generally, during open-face TBM tunnel excavation, the cutterhead presses against the tunnel face under the action of thrust and torque. The rollers on the disc cutterhead penetrate the rock, and the tunnel face is crushed by the rollers. As the cracks on the rock surface deepen and widen, the rock peels off in pieces to form slag. The rotating cutterhead scrapes the slag into the chute through the scraper, and it falls into the slag collection hopper and the receiving port of the muck removal belt 6. It is then transported to the tail of the TBM equipment by the muck removal belt 6, and finally transported to the outside of the tunnel by the TBM transport track 5. In this embodiment, the long-distance advanced geological prediction device is also equipped with a muck removal mechanism to transport the slag and other materials formed in the borehole of the horizontal directional drill 1 to the muck removal belt 6 of the TBM, thereby using the TBM's transport track to complete the corresponding transportation of slag and other materials, forming an organically operating whole.

[0058] Based on the same technical concept, in another embodiment of the present invention, a long-distance advanced geological prediction device for open-type TBM tunnels is also provided, comprising:

[0059] A first outer casing 12, wherein one or more pre-drilled holes 13 are provided on the first outer casing 12;

[0060] Horizontal directional drill 1, located inside the first housing 12, the drill bit of horizontal directional drill 1 extends out from the reserved drill hole 13 and advances to the designated area of ​​advanced geological prediction;

[0061] Working section 2 is used for geological forecasting operations. Working section 2 is located between the rear of the support shoe 10 on the TBM and the front of the L1 area 11. Working section 2 is provided with a second outer shell with an opening. The position of the opening corresponds to the position of the reserved drill hole 13 on the first outer shell 12. After the drill bit of the horizontal directional drill 1 passes through the reserved drill hole 13 of the first outer shell 12, it extends out of the second outer shell through the opening.

[0062] The opening extends from the front end of the second housing to the rear end of the second housing. As the TBM and working section 2 advance, the part from the front end of the opening to the rear end gradually passes the position of the horizontal directional drill 1, while the horizontal directional drill 1 remains in a fixed position.

[0063] In one possible implementation, the horizontal directional drill 1 is provided with a guiding control module, which is used to plan the trajectory curve of the drill bit of the horizontal directional drill 1 from the position of the reserved borehole 13 to the designated area, and control the drill bit of the horizontal directional drill 1 to travel according to the trajectory curve.

[0064] In one possible implementation, the length of working section 2 is determined based on the tunneling speed of the TBM and the distance for advance geological prediction. Taking the direction of TBM advance as the front end, the length of working section 2 shall at least meet the following conditions: as the TBM advances at the set tunneling speed, the position of the drill bit of the horizontal directional drill 1 extending out of the reserved borehole 13 gradually moves from the front end of working section 2 to the rear end of working section 2, and geological data collection is completed before reaching the rear end of working section 2.

[0065] The above-mentioned long-distance advanced geological prediction device for open-type TBM tunnels can be used to realize the long-distance advanced geological prediction method for open-type TBM tunnels. The specific operation process can be referred to the above-mentioned embodiment of the long-distance advanced geological prediction method for open-type TBM tunnels, and will not be repeated here.

[0066] The long-distance advanced geological prediction method and apparatus for open-face TBM tunnels provided in the above embodiments of the present invention adds a miniaturized horizontal directional drilling rig 1 to the rear of the TBM support shoe 10 and the front of the L1 zone 11 to perform advanced geological prediction of long-distance areas in front of the tunnel face, enabling operations of 1200 meters and above. Furthermore, the horizontal directional drilling rig 1 has a guiding and direction control function, enabling advanced geological prediction in front of the tunnel; the horizontal directional drilling rig 1 also has a grouting reinforcement function, enabling reinforcement of unfavorable geological conditions and reducing construction risks; the entire method has minimal impact on TBM tunnel construction.

[0067] All the accompanying drawings in the above embodiments are merely for the purpose of explaining the technical content of the present invention; the numbers, positions of components, interrelationships between components, and dimensions of components used in the optimal implementation do not constitute a limitation on the technical solution itself, but should be extended to the entire field covered by this technical field.

[0068] Specific embodiments of the present invention have been described above. It should be understood that the present invention is not limited to the specific embodiments described above, and those skilled in the art can make various modifications or variations within the scope of the claims, which do not affect the essence of the present invention. The above preferred features can be used in any combination without conflict.

Claims

1. A method for long-distance advanced geological prediction of open-type TBM tunnels, characterized in that, include: A working section for geological prediction operations is set up at the rear of the support shoe and the front of the L1 area on the TBM. A long-distance advanced geological prediction device is set up in the working section, and the long-distance advanced geological prediction device includes a horizontal directional drill. While the TBM is excavating the tunnel, the drill bit of the horizontal directional drill extends from the long-distance advanced geological prediction device and reaches the designated area in front of the TBM to complete the advanced geological prediction of the designated area. The long-distance advanced geological prediction device has a first outer shell, on which one or more reserved drill holes are provided. The drill bit of the horizontal directional drill extends out from one of the reserved drill holes and advances to a designated area in front of the TBM tunneling to perform forward geological prediction. During the process of the horizontal directional drilling bit advancing to the designated area in front of the TBM, the TBM continues to advance, the working section as a whole advances with the TBM, and the long-distance advanced geological prediction device remains in a fixed position and does not advance with the TBM. The working section is provided with a second outer shell, and the second outer shell has an opening. The position of the opening corresponds to the position of the reserved drilling hole on the first outer shell. After the drill bit of the horizontal directional drill passes through the reserved drilling hole of the first outer shell, it extends out of the second outer shell from the opening. The opening extends from the front end of the second housing to the rear end of the second housing. As the TBM and the working section advance, the portion of the opening from the front end to the rear end gradually passes the position of the horizontal directional drill, while the horizontal directional drill remains in a fixed position.

2. The method for long-distance advanced geological prediction of open-type TBM tunnels according to claim 1, characterized in that, The length of the working section is determined based on the tunneling speed of the TBM and the distance that the long-distance advanced geological prediction device needs to predict in advance. Taking the forward direction of the TBM as the leading edge, the length of the working section must at least meet the following requirements: As the TBM advances at the set tunneling speed, the drill bit of the horizontal directional drill extends from the pre-drilled hole from the front end of the working section to the rear end of the working section, and completes the collection of geological data before reaching the rear end of the working section.

3. The method for long-distance advanced geological prediction of open-type TBM tunnels according to claim 1, characterized in that, The horizontal directional drill is equipped with a guiding control module, which is used to plan the trajectory curve of the drill bit of the horizontal directional drill from the position of the reserved borehole to the designated area, and control the drill bit of the horizontal directional drill to travel according to the trajectory curve.

4. The method for long-distance advanced geological prediction of open-type TBM tunnels according to claim 1, characterized in that, The long-distance advanced geological prediction device also includes a grouting reinforcement mechanism. After the horizontal directional drilling completes the advanced geological prediction, the grouting reinforcement mechanism is used to grout and reinforce the geology that needs to be reinforced.

5. The method for long-distance advanced geological prediction of open-type TBM tunnels according to claim 1, characterized in that, The long-distance advanced geological prediction device also includes a slag discharge mechanism, the output end of which can be directly connected to the slag discharge belt of the TBM.

6. A long-distance advanced geological prediction device for open-type TBM tunnels, characterized in that, include: A first housing, wherein one or more pre-drilled holes are provided on the first housing; A horizontal directional drill, located inside the first housing, wherein the drill bit of the horizontal directional drill extends from the reserved borehole and advances to the designated area of ​​the advanced geological prediction; The working section is used for geological prediction operations. The working section is located between the rear of the support shoe on the TBM and the front of the L1 area. The working section is equipped with a second outer shell with an opening. The position of the opening corresponds to the position of the reserved drill hole on the first outer shell. After the drill bit of the horizontal directional drill passes through the reserved drill hole of the first outer shell, it extends out of the second outer shell from the opening. The opening extends from the front end of the second housing to the rear end of the second housing. As the TBM and the working section advance, the portion between the front end and the rear end of the opening gradually passes the position of the horizontal directional drill, while the horizontal directional drill remains in a fixed position.

7. The open-type TBM tunnel long-distance advanced geological prediction device according to claim 6, characterized in that, The horizontal directional drill is equipped with a guiding control module, which is used to plan the trajectory curve of the drill bit of the horizontal directional drill from the position of the reserved borehole to the designated area, and control the drill bit of the horizontal directional drill to travel according to the trajectory curve.

8. The open-type TBM tunnel long-distance advanced geological prediction device according to claim 6, characterized in that, The length of the working section is determined based on the TBM's tunneling speed and the distance requiring advance geological prediction. Taking the TBM's forward direction as the leading edge, the length of the working section must at least meet the following requirements: As the TBM advances at the set tunneling speed, the drill bit of the horizontal directional drill extends from the pre-drilled hole from the front end of the working section to the rear end of the working section, and completes the collection of geological data before reaching the rear end of the working section.

Citation Information

Patent Citations

  • TBM head with function of over-one-kilometer advance prediction

    CN111140242A

  • Tunneling device

    CN115992711A

  • Forward searching device for tunnel boring machine

    JP1996177380A