A field-level and single-machine cooperative low-efficiency wind turbine identification method and system
By using a farm-level and single-unit collaborative method to identify inefficient wind turbines, this method analyzes parameters such as power generation and wind resources of each wind turbine using historical operating data of the wind farm. It accurately identifies inefficient turbines and provides optimization solutions, solving the problem of inaccurate identification of inefficient turbines in existing technologies. This improves identification efficiency and accuracy and reduces the cost of upgrading and retrofitting.
Patent Information
- Application Number
- CN202311484141.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-07
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-11-07
AI Technical Summary
Existing technologies make it difficult to accurately identify inefficient turbines in wind farms and their causes, resulting in a lack of targeted upgrades and renovations of wind farms and a waste of human, material, and financial resources.
An inefficient wind turbine identification method combining farm-level and single-unit collaboration is adopted. By acquiring historical operating data of the wind farm, the power generation, wind resources, operating time, power curve, wind energy capture system, transmission system and generator system parameters of each wind turbine are analyzed to determine whether the unit is inefficient and to provide targeted optimization prompts.
It improves the efficiency and accuracy of identifying inefficient wind turbine units, reduces technical upgrade costs, and rapidly increases wind farm revenue.
Smart Images

Figure CN117662398B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of wind power generation technology, and more specifically, to a method and system for identifying inefficient wind turbine generators that combine field-level and single-unit coordination. Background Technology
[0002] Currently, how to fully utilize high-quality wind energy resources, enhance the power generation capacity of wind farms, and promote the high-quality development of the wind power industry is a widely concerned issue in the development of new energy. Improving the utilization rate of wind energy resources requires upgrading and transforming wind farms. The first step in this process is to identify the inefficient turbines and implement targeted technological upgrades to save manpower, material resources, and financial resources, thereby rapidly improving the efficiency of wind farms. Some researchers have proposed a calculation process for the availability of individual turbines, which can identify problems with the wind turbine system or specific equipment. However, this method lacks a comprehensive energy efficiency system, lacks a wind farm-level assessment, and uses a simplistic standard, focusing solely on energy utilization. Furthermore, it does not define inefficient turbines; it can only analyze the energy efficiency level of turbines, not determine whether they are inefficient. While some researchers have proposed methods to identify inefficient turbines based on power generation, economic indicators, wind energy resources, power curves, and availability, this approach is not perfect. However, these indicators are all geared towards wind farms and turbines, making it difficult to further analyze the reasons for turbine inefficiency. Using such evaluation indicators makes it challenging to propose effective technical improvement solutions. Therefore, a solution is needed to improve the efficiency and accuracy of identifying inefficient wind turbines. Summary of the Invention
[0003] The purpose of this invention is to provide a method and system for identifying inefficient wind turbine units and the causes of inefficiency, so as to improve the technical effect of improving the identification efficiency and accuracy of inefficient wind turbine units and point the way for the power-up and efficiency-enhancing transformation of wind turbine units.
[0004] The technical means employed in this invention are as follows: In a first aspect, the present invention provides a method for identifying inefficient wind turbine generators through a combination of farm-level and single-unit collaboration. This method utilizes wind farm operation and monitoring data to identify the inefficiency and causes of inefficiency in wind turbine generators, including: S1: Obtain historical operating data of the wind farm under test; S2: Analyze whether the wind farm under test has a field-level inefficiency problem based on the historical annual power generation and guaranteed annual power generation of each wind turbine in the historical operation data obtained in S1; if the wind farm under test does not have a field-level inefficiency problem, proceed directly to S3; otherwise, send a field structure optimization prompt to the wind farm maintenance personnel and continue to execute S3. S3: Analyze whether the power generation of each unit in the wind farm is normal based on the annual power generation measured by the SCADA system of each unit and the guaranteed annual power generation; if the power generation of the wind farm unit is abnormal, it is determined to be an inefficient unit and S4 is executed directly; otherwise, a normal unit capacity expansion prompt message is sent to the wind farm maintenance personnel and S4 is executed. S4: Analyze the wind resources of the above units based on their operating data; if the wind resources of the above units are normal, proceed directly to S5; otherwise, send a unit structure optimization prompt to the wind farm maintenance personnel and continue to execute S5. S5: Analyze whether the operating time of the above units is normal; if the operating time of the above units is normal, proceed directly to S6; otherwise, send a maintenance time optimization prompt message to the wind farm maintenance personnel and continue to execute S6. S6: Analyze whether the power curves of the above units are normal; if the power curves of the above units are normal, end the process; otherwise, continue to execute S7. S7: Analyze whether the wind energy capture system of the above units is normal; if the wind energy capture system of the above units is normal, proceed directly to S8; otherwise, send the main control system optimization prompt message to the wind farm maintenance personnel and continue to execute S8. S8: Analyze whether the transmission system of the above-mentioned unit is normal; if the transmission system of the above-mentioned unit is normal, proceed directly to S9; otherwise, send a maintenance prompt message to the wind farm maintenance personnel and continue to execute S9. S9: Analyze whether the generator system of the above units is normal; if the generator system of the above units is normal, end the process; otherwise, send an abnormality prompt message to the wind farm maintenance personnel and end the process.
[0005] Furthermore, the method for analyzing whether the wind farm has a field-level inefficiency problem in S2 is as follows: Analyze whether the proportion of units in the wind farm whose measured annual power generation is lower than the guaranteed annual power generation is greater than a first preset value; If the proportion of units whose measured annual power generation is lower than the guaranteed annual power generation is greater than a first preset value, the wind farm is considered to be inefficient at the farm level. After sending a whole-farm structure optimization prompt message to the wind farm maintenance personnel, S3 is executed. Otherwise, the wind farm is considered not to have a farm-level inefficiency problem, and S3 is executed directly.
[0006] Furthermore, the method for analyzing whether the power generation of each unit in the wind farm is normal in S3 is as follows: Analyze whether the proportion of the annual power generation measured by the SCADA system of the wind farm unit that is lower than the guaranteed annual power generation exceeds the second preset value; If the annual power generation measured by the SCADA system of the wind farm unit is lower than the ratio of the guaranteed annual power generation to the guaranteed annual power generation exceeding the second preset value, it is identified as an inefficient unit and S4 is executed directly; otherwise, it is identified as a normal unit, and a normal unit capacity increase prompt message is sent to the wind farm maintenance personnel before continuing to execute S4.
[0007] Furthermore, the method for analyzing whether the wind resources of the above-mentioned units are normal in S4 is as follows: Obtain the annual average wind speed and guaranteed annual average wind speed measured by the SCADA system of the above-mentioned units; Analyze whether the proportion of the annual average wind speed measured by the SCADA system that is lower than the guaranteed annual average wind speed exceeds a third preset value; If the annual average wind speed measured by the SCADA system is lower than the guaranteed annual average wind speed, but the proportion of the guaranteed annual average wind speed to the guaranteed annual average wind speed does not exceed the third preset value, then the wind resources of the above-mentioned units are normal, and S5 is executed directly; otherwise, after sending the unit structure optimization prompt information to the wind farm maintenance personnel, S5 is executed again.
[0008] Furthermore, the method for analyzing whether the operating time of the above-mentioned units is normal in S5 is as follows: Obtain the normal operating time and failure time from the operation reports of the above-mentioned units; Analyze whether the proportion of normal operating time in the operation reports of the above-mentioned units exceeds the fourth preset value; If the proportion of normal operating time in the operation report of the above-mentioned units exceeds the fourth preset value, then the operating time of the above-mentioned units is normal, and S6 is executed directly; otherwise, after sending a maintenance time optimization prompt message to the wind farm maintenance personnel, S6 is executed again.
[0009] Furthermore, the method for analyzing whether the power curves of the aforementioned units are normal in S6 is as follows: Obtain the actual power and design power of the above-mentioned units in each wind speed range; Analyze whether the average value of the ratio of actual power to design power in each wind speed range is lower than the fifth preset value; If the average value of the ratio of actual power to design power in each wind speed range of the above units is lower than the fifth preset value, then execute S7 directly; otherwise, end the process.
[0010] Furthermore, the method for analyzing whether the wind energy capture system of the above-mentioned units is normal in S7 is as follows: Obtain the structural and aerodynamic performance parameters of the above-mentioned units and calculate the wind energy utilization coefficient; Analyze whether the proportion of the wind energy utilization coefficient of the above-mentioned units deviating from the normal value is lower than the sixth preset value; If the wind energy utilization coefficient of the above-mentioned units deviates from the normal value by a proportion lower than the sixth preset value, then S8 is executed directly; otherwise, after sending the main control system optimization prompt information to the wind farm maintenance personnel, S8 is executed again.
[0011] Furthermore, the method for analyzing whether the transmission system of the above-mentioned unit is normal in S8 is as follows: Obtain the transmission system parameters of the above-mentioned units and calculate the transmission chain efficiency; Analyze whether the proportion of the transmission chain efficiency of the above-mentioned units deviating from the normal value is lower than the seventh preset value; If the transmission chain efficiency of the above-mentioned unit deviates from the normal value by a proportion lower than the seventh preset value, then S9 is executed directly; otherwise, after sending a maintenance prompt message to the wind farm maintenance personnel, S9 is executed again.
[0012] Furthermore, the method for analyzing whether the generator system of the above-mentioned unit is normal in S9 is as follows: Obtain the generator system parameters of the above units and calculate the generator efficiency; Analyze whether the proportion of the generator efficiency of the above-mentioned units deviating from the normal value is lower than the eighth preset value; If the generator efficiency of the above-mentioned units deviates from the normal value by a proportion lower than the eighth preset value, the process ends; otherwise, the process ends after sending an abnormality prompt message to the wind farm maintenance personnel.
[0013] Secondly, the present invention provides a system for identifying inefficient wind turbine generators that combines field-level and single-unit collaboration, the system comprising: The acquisition module is used to acquire historical operating data of the wind farm under test; The field-level inefficiency analysis module is used to analyze whether the wind farm under test has a field-level inefficiency problem based on the historical annual power generation of each wind turbine in the historical operation data obtained by the acquisition module; if the wind farm under test does not have a field-level inefficiency problem, it is directly processed by the inefficient unit confirmation module; otherwise, after sending the whole field structure optimization prompt information to the wind farm maintenance personnel, it is processed by the inefficient unit confirmation module. The inefficient unit confirmation module is used to compare and analyze the annual power generation measured by the SCADA system of the wind farm units with the guaranteed annual power generation to identify inefficient units. The wind resource analysis module is used to analyze whether the wind resources of the above-mentioned units are normal based on their operating data. If the wind resources of the above-mentioned units are normal, the processing is carried out directly through the unit operation time analysis module; otherwise, the unit structure optimization prompt information is sent to the wind farm maintenance personnel and then processed through the unit operation time analysis module. The unit operating time analysis module is used to analyze whether the operating time of the above units is normal. If the operating time of the above units is normal, it is directly processed through the unit power curve analysis module; otherwise, a maintenance time optimization prompt message is sent to the wind farm maintenance personnel and then processed through the unit power curve analysis module. The unit power curve analysis module is used to analyze whether the power curves of the above units are normal; if the power curves of the above units are normal, the analysis ends; otherwise, the analysis continues through the wind energy capture system analysis module. The wind energy capture system analysis module is used to analyze whether the wind energy capture system of the above-mentioned units is normal. If the wind energy capture system of the above-mentioned units is normal, it is directly processed through the transmission system analysis module; otherwise, after sending the main control system optimization prompt information to the wind farm maintenance personnel, it is processed through the transmission system analysis module. The transmission system analysis module is used to analyze whether the transmission system of the above-mentioned unit is normal. If the transmission system of the above-mentioned unit is normal, it is directly processed through the generator system analysis module; otherwise, a maintenance prompt message is sent to the wind farm maintenance personnel and then processed through the generator system analysis module. The generator system analysis module is used to analyze whether the generator system of the above-mentioned units is normal. If the generator system of the above-mentioned units is normal, the analysis ends; otherwise, the analysis ends after sending an abnormality prompt message to the wind farm maintenance personnel.
[0014] The beneficial effects that this invention can achieve are: the identification method for inefficient wind turbine units provided by this invention can accurately identify the inefficient units in the wind farm under test and further analyze the reasons for the inefficiency of the units, thereby improving the identification efficiency and accuracy of inefficient wind turbine units, facilitating targeted technical upgrades to the wind farm units, reducing technical upgrade costs, and rapidly increasing the profitability of the wind farm. Attached Figure Description
[0015] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the embodiments of the present invention will be briefly introduced below. It should be understood that the following drawings only show some embodiments of the present invention and should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.
[0016] Figure 1 A flowchart illustrating a method for identifying inefficient wind turbine generators through field-level and single-unit collaboration, provided in an embodiment of the present invention; Figure 2 This is a schematic diagram of the topology of an inefficient wind turbine identification system that combines field-level and single-unit collaboration, provided as an embodiment of the present invention.
[0017] Icons: 10 - Identification System; 100 - Acquisition Module; 200 - Field-level Inefficiency Analysis Module; 300 - Inefficient Unit Confirmation Module; 400 - Wind Resource Analysis Module; 500 - Unit Operating Time Analysis Module; 600 - Unit Power Curve Analysis Module; 700 - Wind Energy Capture System Analysis Module; 800 - Transmission System Analysis Module; 900 - Generator System Analysis Module. Detailed Implementation
[0018] The technical solutions of the present invention will now be described with reference to the accompanying drawings in the embodiments of the present invention.
[0019] Please refer to Figure 1 , Figure 1 This is a flowchart illustrating a method for identifying inefficient wind turbine generators that combines field-level and single-unit collaboration, as provided in an embodiment of the present invention.
[0020] In one embodiment, this invention provides a method for identifying inefficient wind turbine generators that combines field-level and single-unit collaboration, the details of which are as follows.
[0021] S1. Obtain historical operating data of the wind farm to be tested.
[0022] In one implementation, the historical operating data of the wind farm under test can be calculated from the data measured by the SCADA system installed on each wind turbine; or it can be obtained from the memory of the wind farm monitoring station.
[0023] S2. Analyze whether the wind farm under test has a field-level inefficiency problem based on the historical annual power generation and guaranteed annual power generation of each wind turbine in the historical operation data; if the wind farm under test does not have a field-level inefficiency problem, proceed directly to S3; otherwise, send a field structure optimization prompt to the wind farm maintenance personnel and continue to execute S3.
[0024] In one implementation, the specific execution process of S2 can be carried out in the following manner: S21. Analyze whether the proportion of units in the wind farm whose measured annual power generation is lower than the guaranteed annual power generation is greater than a first preset value; S22. If the proportion of units whose measured annual power generation of the wind farm is lower than the guaranteed annual power generation is greater than the first preset value, the wind farm is considered to be inefficient at the farm level. After sending a whole-farm structure optimization prompt message to the wind farm maintenance personnel, S3 is executed. Otherwise, the wind farm is considered not to have a farm-level inefficiency problem, and S3 is executed directly.
[0025] Specifically, it can be analyzed whether the number of units in the wind farm whose annual power generation measured by SCADA is lower than the guaranteed annual power generation is greater than 80%. If the number of units in the wind farm whose annual power generation measured by SCADA is lower than the guaranteed annual power generation is greater than 80%, the wind farm is considered to be inefficient at the farm level. After sending a whole-farm structure optimization prompt message to the wind farm maintenance personnel, S3 is executed. Otherwise, it is considered that the wind farm does not have a farm-level inefficiency problem, and S3 is executed directly.
[0026] S3. Analyze whether the power generation of each unit in the wind farm is normal based on the SCADA measurement of the annual power generation of each unit and the guaranteed annual power generation; if the power generation of the wind farm units is abnormal, proceed directly to S4; otherwise, send a normal unit capacity expansion prompt message to the wind farm maintenance personnel and continue to execute S4.
[0027] In one implementation, the specific execution process of S3 includes: S31. Analyze whether the proportion of the annual power generation measured by the SCADA system of the wind farm unit that is lower than the guaranteed annual power generation exceeds the second preset value; S32. If the annual power generation measured by the SCADA system of the wind farm unit is lower than the ratio of the guaranteed annual power generation to the guaranteed annual power generation exceeding the second preset value, it is identified as an inefficient unit and S4 is executed directly. Otherwise, it is identified as a normal unit, and a normal unit capacity increase prompt message is sent to the wind farm maintenance personnel before continuing to execute S4.
[0028] Specifically, it can be analyzed whether the annual power generation measured by the SCADA system of the wind farm unit is more than 10% lower than the guaranteed annual power generation. If the annual power generation measured by the SCADA system of the wind farm unit is more than 10% lower than the guaranteed annual power generation, it is identified as an inefficient unit and S4 is executed directly. Otherwise, it is identified as a normal unit, and a normal unit capacity increase prompt message is sent to the wind farm maintenance personnel before continuing to execute S4.
[0029] S4. Analyze the wind resources of the above units based on their operating data to determine if they are normal. If the wind resources of the above units are normal, proceed directly to S5. Otherwise, send a unit structure optimization prompt to the wind farm maintenance personnel and continue to execute S5.
[0030] In one implementation, the execution process of S4 specifically includes: S41. Obtain the annual average wind speed measured by the SCADA system of the above-mentioned units and the guaranteed annual average wind speed; S42. Analyze whether the proportion of the annual average wind speed measured by the SCADA system that is lower than the guaranteed annual average wind speed exceeds the third preset value; S43. If the annual average wind speed measured by the SCADA system is lower than the guaranteed annual average wind speed, but the proportion of the guaranteed annual average wind speed to the guaranteed annual average wind speed does not exceed the third preset value, then the wind resources of the above-mentioned units are normal, and S5 is executed directly; otherwise, after sending the unit structure optimization prompt information to the wind farm maintenance personnel, S5 is executed.
[0031] Specifically, it can be analyzed whether the proportion of the annual average wind speed measured by the SCADA system that is lower than the guaranteed annual average wind speed exceeds 10% of the guaranteed annual average wind speed; if the proportion of the annual average wind speed measured by the SCADA system that is lower than the guaranteed annual average wind speed does not exceed 10% of the guaranteed annual average wind speed, then the wind resources of the above-mentioned units are normal, and S5 is executed directly; otherwise, after sending the unit structure optimization prompt information to the wind farm maintenance personnel, S5 is executed again.
[0032] S5. Analyze whether the operating time of the above units is normal; if the operating time of the above units is normal, proceed directly to S6; otherwise, send a maintenance time optimization prompt message to the wind farm maintenance personnel and continue to execute S6.
[0033] In one implementation, the execution process of S5 specifically includes: S51. Obtain the normal operating time and failure time from the operation report of the above-mentioned units; S52. Analyze whether the proportion of normal operating time in the above unit's operation report exceeds the fourth preset value; S53. If the proportion of normal operating time in the operation report of the above-mentioned unit exceeds the fourth preset value, then the operating time of the above-mentioned unit is normal, and S6 is executed directly; otherwise, after sending a maintenance time optimization prompt message to the wind farm maintenance personnel, S6 is executed.
[0034] Specifically, it can be analyzed whether the uptime of inefficient units exceeds 80%. If the uptime of inefficient units exceeds 80%, the unit's uptime is normal, and S6 should continue. Otherwise, it is very likely that the unit's power generation has decreased due to excessively long fault repair time. In this case, a repair time optimization prompt should be sent to the wind farm maintenance personnel before continuing to execute S6.
[0035] S6. Analyze whether the power curves of the above units are normal; if the power curves of the above units are normal, end the process; otherwise, continue to execute S7.
[0036] In one implementation, the power curve can well reflect the unit's own performance, fault status, etc. Therefore, in order to further analyze the location of the faulty unit components, this application also compares the measured power curve and the guaranteed power curve.
[0037] S61. Obtain the actual power and design power of the above-mentioned units in each wind speed range; S62. Analyze whether the average value of the ratio of actual power to design power in each wind speed range is lower than the fifth preset value; S63. If the average value of the ratio of actual power to design power in each wind speed range of the above units is lower than the fifth preset value, then execute S7 directly; otherwise, end the process.
[0038] Specifically, the fifth preset value can be set to 10%; if the average value of the ratio of actual power to design power in each wind speed range of the above units is less than 10%, then S7 is executed directly; otherwise, the process ends.
[0039] S7. Analyze whether the wind energy capture system of the above units is normal; if the wind energy capture system of the above units is normal, proceed directly to S8; otherwise, send the main control system optimization prompt information to the wind farm maintenance personnel and continue to execute S8.
[0040] The wind energy utilization factor directly determines whether the wind turbine's wind energy capture system is functioning properly. Therefore, if the calculated wind energy utilization factor is within the normal range, it indicates that the wind energy capture system is working correctly. The calculation method for the wind energy utilization factor can use the currently conventional calculation method.
[0041] S71. Obtain the structural and aerodynamic performance parameters of the above-mentioned units and calculate the wind energy utilization coefficient; S72. Analyze whether the proportion of the wind energy utilization coefficient of the above units deviating from the normal value is lower than the sixth preset value; S73. If the wind energy utilization coefficient of the above-mentioned units deviates from the normal value by a proportion lower than the sixth preset value, then execute S8 directly; otherwise, send the main control system optimization prompt information to the wind farm maintenance personnel and continue to execute S8.
[0042] Specifically, the sixth preset value can be set to 5%; if the wind energy utilization coefficient of the above units deviates from the normal value by less than 5%, then S8 is executed directly; otherwise, after sending the main control system optimization prompt information to the wind farm maintenance personnel, S8 is executed again.
[0043] S8. Analyze whether the transmission system of the above-mentioned unit is normal; if the transmission system of the above-mentioned unit is normal, proceed directly to S9; otherwise, send a maintenance prompt message to the wind farm maintenance personnel and continue to execute S9.
[0044] The efficiency of the transmission chain directly determines whether the transmission system of a wind turbine is functioning properly. Therefore, if the calculated transmission chain efficiency is within the normal range, it indicates that the transmission system is normal. The transmission chain efficiency can be calculated using the method disclosed in Chinese invention patent CN104296990A, "A Test Device and Test Method for Transmission Chain Efficiency of Wind Turbine Generator Set," or other existing calculation methods.
[0045] S81. Obtain the transmission system parameters of the above-mentioned unit and calculate the transmission chain efficiency; S82. Analyze whether the proportion of the transmission chain efficiency of the above-mentioned unit that deviates from the normal value is lower than the seventh preset value; S83. If the ratio of the transmission chain efficiency of the above-mentioned unit to the normal value is lower than the seventh preset value, then execute S9 directly; otherwise, send a maintenance prompt message to the wind farm maintenance personnel and continue to execute S9.
[0046] Specifically, the sixth preset value can be set to 5%; if the transmission chain efficiency of the above-mentioned unit deviates from the normal value by less than 5%, then S9 is executed directly; otherwise, after sending a maintenance reminder message to the wind farm maintenance personnel, S9 is executed again.
[0047] S9. Analyze whether the generator system of the above units is normal; if the generator system of the above units is normal, end the process; otherwise, send an abnormality prompt message to the wind farm maintenance personnel and end the process.
[0048] Generator efficiency directly determines whether the generator system in a wind turbine is functioning properly; therefore, if the calculated generator efficiency is within the normal range, it indicates that the generator system is normal. Generator efficiency can be calculated using existing methods.
[0049] S91. Obtain the generator system parameters of the above-mentioned units and calculate the generator efficiency; S92. Analyze whether the proportion of the generator efficiency of the above-mentioned units deviating from the normal value is lower than the eighth preset value; S93. If the generator efficiency of the above-mentioned units deviates from the normal value by a proportion lower than the eighth preset value, the process ends; otherwise, the process ends after sending an abnormality prompt message to the wind farm maintenance personnel.
[0050] Specifically, the sixth preset value can be set to 5%; if the generator efficiency of the above-mentioned units deviates from the normal value by less than 5%, the process ends; otherwise, the process ends after sending an abnormality prompt message to the wind farm maintenance personnel.
[0051] Please refer to Figure 2 , Figure 2 This is a schematic diagram of the topology of an inefficient wind turbine identification system that combines field-level and single-unit collaboration, provided as an embodiment of the present invention.
[0052] In one embodiment, the present invention also provides a field-level and single-unit coordinated inefficient wind turbine identification system 10, the identification system 10 comprising: The acquisition module 100 is used to acquire historical operating data of the wind farm under test. The field-level inefficiency analysis module 200 is used to analyze whether the wind farm under test has a field-level inefficiency problem based on the historical annual power generation of each wind turbine in the historical operation data. If the wind farm under test does not have a field-level inefficiency problem, it is directly processed by the inefficient unit confirmation module. Otherwise, after sending the whole field structure optimization prompt information to the wind farm maintenance personnel, it is processed by the inefficient unit confirmation module. The inefficient unit confirmation module 300 is used to obtain the SCADA annual power generation and the guaranteed annual power generation of the wind farm units, and to compare and analyze the SCADA annual power generation and the guaranteed annual power generation of the wind farm units to determine the inefficient units. The wind resource analysis module 400 is used to analyze whether the wind resources of the above-mentioned units are normal based on the operating data of the above-mentioned units. If the wind resources of the above-mentioned units are normal, the processing is carried out directly through the unit operation time analysis module; otherwise, the unit structure optimization prompt information is sent to the wind farm maintenance personnel and then processed through the unit operation time analysis module. The unit operating time analysis module 500 is used to analyze whether the operating time of the above-mentioned units is normal. If the operating time of the above-mentioned units is normal, it is directly processed through the unit power curve analysis module; otherwise, a maintenance time optimization prompt message is sent to the wind farm maintenance personnel and then processed through the unit power curve analysis module. The unit power curve analysis module 600 is used to analyze whether the power curve of the above unit is normal; if the power curve of the above unit is normal, the analysis ends; otherwise, it continues to be processed through the wind energy capture system analysis module. The wind energy capture system analysis module 700 is used to analyze whether the wind energy capture system of the above-mentioned units is normal. If the wind energy capture system of the above-mentioned units is normal, it is directly processed through the transmission system analysis module; otherwise, it sends the main control system optimization prompt information to the wind farm maintenance personnel and then processes it through the transmission system analysis module. The transmission system analysis module 800 is used to analyze whether the transmission system of the above-mentioned unit is normal. If the transmission system of the above-mentioned unit is normal, it is directly processed through the generator system analysis module; otherwise, a maintenance prompt message is sent to the wind farm maintenance personnel and then processed through the generator system analysis module. The generator system analysis module 900 is used to analyze whether the generator system of the above-mentioned units is normal. If the generator system of the above-mentioned units is normal, the analysis ends; otherwise, the analysis ends after sending an abnormality prompt message to the wind farm maintenance personnel.
[0053] In summary, the embodiments of the present invention provide a method and system for identifying inefficient wind turbine units through farm-level and single-unit collaboration. This method can accurately identify inefficient units in a wind farm under test and further analyze the reasons for the inefficiency of the units, thereby improving the identification efficiency and accuracy of inefficient wind turbine units. This facilitates targeted technical upgrades to wind farm units, reduces upgrade costs, and rapidly increases the profitability of wind farms.
Claims
1. A method for identifying inefficient wind turbine generators through a combination of field-level and single-unit collaboration, characterized in that... The inefficiency and causes of wind turbine units are identified using wind farm operation and monitoring data, including: S1: Obtain historical operating data of the wind farm under test; S2: Analyze whether the wind farm under test has a field-level inefficiency problem based on the historical annual power generation and guaranteed annual power generation of each wind turbine in the historical operation data obtained in S1; if the wind farm under test does not have a field-level inefficiency problem, proceed directly to S3; otherwise, send a field structure optimization prompt to the wind farm maintenance personnel and continue to execute S3. S3: Analyze whether the power generation of each unit in the wind farm is normal based on the annual power generation measured by the SCADA system of each unit and the guaranteed annual power generation; if the power generation of the wind farm units is abnormal, proceed directly to S4; otherwise, send a normal unit capacity expansion prompt message to the wind farm maintenance personnel and continue to execute S4. S4: Analyze the wind resources of the above-mentioned units based on their operating data; if the wind resources of the above-mentioned units are normal, proceed directly to S5; otherwise, send a unit structure optimization prompt to the wind farm maintenance personnel and continue to execute S5. S5: Analyze whether the operating time of the above-mentioned units is normal; if the operating time of the above-mentioned units is normal, proceed directly to S6; otherwise, send a maintenance time optimization prompt message to the wind farm maintenance personnel and continue to execute S6. S6: Analyze whether the power curves of the above units are normal; if the power curves of the above units are normal, end the process; otherwise, continue to execute S7. S7: Analyze whether the wind energy capture system of the above units is normal; if the wind energy capture system of the above units is normal, proceed directly to S8; otherwise, send the main control system optimization prompt message to the wind farm maintenance personnel and continue to execute S8. S8: Analyze whether the transmission system of the above-mentioned unit is normal; if the transmission system of the above-mentioned unit is normal, proceed directly to S9; otherwise, send a maintenance prompt message to the wind farm maintenance personnel and continue to execute S9. S9: Analyze whether the generator system of the above units is normal; if the generator system of the above units is normal, end the process; otherwise, send an abnormality prompt message to the wind farm maintenance personnel and end the process.
2. The method for identifying inefficient wind turbine generators using a field-level and single-unit collaborative approach as described in claim 1, characterized in that, The method used in S2 to analyze whether the wind farm has a field-level inefficiency problem is as follows: Analyze whether the proportion of units in the wind farm whose measured annual power generation is lower than the guaranteed annual power generation is greater than a first preset value; If the proportion of units whose measured annual power generation is lower than the guaranteed annual power generation is greater than a first preset value, the wind farm is considered to be inefficient at the farm level. After sending a whole-farm structure optimization prompt message to the wind farm maintenance personnel, S3 is executed. Otherwise, the wind farm is considered not to have a farm-level inefficiency problem, and S3 is executed directly.
3. The method for identifying inefficient wind turbine generators using a field-level and single-unit collaborative approach as described in claim 1, characterized in that, The method used in S3 to analyze whether the power generation of each unit in the wind farm is normal is as follows: Analyze whether the proportion of the annual power generation measured by the SCADA system of the wind farm unit that is lower than the guaranteed annual power generation exceeds the second preset value; If the annual power generation measured by the SCADA system of the wind farm unit is lower than the ratio of the guaranteed annual power generation to the guaranteed annual power generation exceeding the second preset value, it is identified as an inefficient unit and S4 is executed directly; otherwise, it is identified as a normal unit, and a normal unit capacity increase prompt message is sent to the wind farm maintenance personnel before continuing to execute S4.
4. The method for identifying inefficient wind turbine generators in a field-level and single-unit coordinated manner according to claim 1, characterized in that, The method for analyzing whether the wind resources of the above-mentioned units are normal in S4 is as follows: Obtain the annual average wind speed and guaranteed annual average wind speed measured by the SCADA system of the above-mentioned units; Analyze whether the proportion of the annual average wind speed measured by the SCADA system that is lower than the guaranteed annual average wind speed exceeds a third preset value; If the annual average wind speed measured by the SCADA system is lower than the guaranteed annual average wind speed, but the proportion of the guaranteed annual average wind speed to the guaranteed annual average wind speed does not exceed the third preset value, then the wind resources of the above-mentioned units are normal, and S5 is executed directly; otherwise, after sending the unit structure optimization prompt information to the wind farm maintenance personnel, S5 is executed again.
5. The method for identifying inefficient wind turbine generators in a field-level and single-unit coordinated manner according to claim 1, characterized in that, The method used in S5 to analyze whether the operating time of the above-mentioned units is normal is as follows: Obtain the normal operating time and failure time from the operation reports of the above-mentioned units; Analyze whether the proportion of normal operating time in the operation reports of the above-mentioned units exceeds the fourth preset value; If the proportion of normal operating time in the operation report of the above-mentioned units exceeds the fourth preset value, then the operating time of the above-mentioned units is normal, and S6 is executed directly; otherwise, after sending a maintenance time optimization prompt message to the wind farm maintenance personnel, S6 is executed again.
6. The method for identifying inefficient wind turbine generators in a field-level and single-unit coordinated manner according to claim 1, characterized in that, The method for analyzing whether the power curves of the above-mentioned units are normal in S6 is as follows: Obtain the actual power and design power of the above-mentioned units in each wind speed range; Analyze whether the average value of the ratio of actual power to design power in each wind speed range is lower than the fifth preset value; If the average value of the ratio of actual power to design power in each wind speed range of the above units is lower than the fifth preset value, then execute S7 directly; otherwise, end the process.
7. The method for identifying inefficient wind turbine generators in a field-level and single-unit coordinated manner according to claim 1, characterized in that, The method for analyzing whether the wind energy capture system of the above-mentioned units is normal in S7 is as follows: Obtain the structural and aerodynamic performance parameters of the above-mentioned units and calculate the wind energy utilization coefficient; Analyze whether the proportion of the wind energy utilization coefficient of the above-mentioned units deviating from the normal value is lower than the sixth preset value; If the wind energy utilization coefficient of the above-mentioned units deviates from the normal value by a proportion lower than the sixth preset value, then S8 is executed directly; otherwise, after sending the main control system optimization prompt information to the wind farm maintenance personnel, S8 is executed again.
8. The method for identifying inefficient wind turbine generators in a field-level and single-unit coordinated manner according to claim 1, characterized in that, The method for analyzing whether the transmission system of the above-mentioned unit is normal in S8 is as follows: Obtain the transmission system parameters of the above-mentioned units and calculate the transmission chain efficiency; Analyze whether the proportion of the transmission chain efficiency of the above-mentioned units deviating from the normal value is lower than the seventh preset value; If the transmission chain efficiency of the above-mentioned unit deviates from the normal value by a proportion lower than the seventh preset value, then S9 is executed directly; otherwise, after sending a maintenance prompt message to the wind farm maintenance personnel, S9 is executed again.
9. The method for identifying inefficient wind turbine generators in a field-level and single-unit coordinated manner according to claim 1, characterized in that, The method for analyzing whether the generator system of the above-mentioned units is normal in S9 is as follows: Obtain the generator system parameters of the above units and calculate the generator efficiency; Analyze whether the proportion of the generator efficiency of the above-mentioned units deviating from the normal value is lower than the eighth preset value; If the generator efficiency of the above-mentioned units deviates from the normal value by a proportion lower than the eighth preset value, the process ends; otherwise, the process ends after sending an abnormality prompt message to the wind farm maintenance personnel.
10. A system for identifying inefficient wind turbine generators that combines field-level and single-unit collaboration, characterized in that, include: The acquisition module is used to acquire historical operating data of the wind farm under test; The field-level inefficiency analysis module is used to analyze whether the wind farm under test has a field-level inefficiency problem based on the historical annual power generation of each wind turbine in the historical operation data obtained by the acquisition module; if the wind farm under test does not have a field-level inefficiency problem, it is directly processed by the inefficient unit confirmation module. Otherwise, after sending a whole-farm structure optimization prompt to the wind farm maintenance personnel, it is processed through the inefficient unit confirmation module; The inefficient unit confirmation module is used to compare and analyze the annual power generation measured by the SCADA system of the wind farm units with the guaranteed annual power generation to identify inefficient units. The wind resource analysis module is used to analyze whether the wind resources of the above-mentioned units are normal based on their operating data. If the wind resources of the above-mentioned units are normal, the processing is carried out directly through the unit operation time analysis module; otherwise, the unit structure optimization prompt information is sent to the wind farm maintenance personnel and then processed through the unit operation time analysis module. The unit operating time analysis module is used to analyze whether the operating time of the above units is normal. If the operating time of the above units is normal, it is directly processed through the unit power curve analysis module; otherwise, a maintenance time optimization prompt message is sent to the wind farm maintenance personnel and then processed through the unit power curve analysis module. The unit power curve analysis module is used to analyze whether the power curves of the above units are normal; if the power curves of the above units are normal, the analysis ends; otherwise, the analysis continues through the wind energy capture system analysis module. The wind energy capture system analysis module is used to analyze whether the wind energy capture system of the above-mentioned units is normal. If the wind energy capture system of the above-mentioned units is normal, it is directly processed through the transmission system analysis module; otherwise, after sending the main control system optimization prompt information to the wind farm maintenance personnel, it is processed through the transmission system analysis module. The transmission system analysis module is used to analyze whether the transmission system of the above-mentioned unit is normal. If the transmission system of the above-mentioned unit is normal, it is directly processed through the generator system analysis module; otherwise, a maintenance prompt message is sent to the wind farm maintenance personnel and then processed through the generator system analysis module. The generator system analysis module is used to analyze whether the generator system of the above-mentioned units is normal. If the generator system of the above-mentioned units is normal, the analysis ends; otherwise, the analysis ends after sending an abnormality prompt message to the wind farm maintenance personnel.
Citation Information
Patent Citations
Device and method for testing transmission chain efficiency of wind generating set
CN104296990A
Multi-dimensional intelligent evaluation system for in-service wind power plant
CN113565702A
Wind power plant post-evaluation method based on wind resource and unit generating capacity analysis
CN116611714A