A warmer, method, apparatus and medium for pre-heat scheduling

By determining the preheating time of heating equipment and adjusting the heating power during off-peak electricity hours, the problem of high electricity costs for heating equipment has been solved, and the user experience has been improved.

CN117663231BActive Publication Date: 2026-11-24GD MIDEA ENVIRONMENT APPLIANCES MFG
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211042663.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-29
Publication Date
2026-11-24
Estimated Expiration
2042-08-29

AI Technical Summary

Technical Problem

The improper use of existing heating equipment has led to high electricity costs and a poor user experience.

Method used

By obtaining the scheduled heating time parameters of the heating equipment, it is determined whether the scheduled heating time falls within the peak electricity consumption period, and the pre-heating time is determined within the off-peak electricity consumption period. The heating equipment is then controlled to start heating when the pre-heating time is reached, and the heating power is adjusted in stages to ensure that the heating temperature meets the user's needs.

Benefits of technology

It enabled off-peak heating, reduced electricity costs, and improved the user experience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117663231B_ABST
    Figure CN117663231B_ABST
Patent Text Reader

Abstract

This invention discloses a heater, a scheduled heating method, an apparatus, and a medium, comprising: acquiring scheduled heating time parameters of the heating device; determining whether the scheduled heating time falls within a peak electricity consumption period based on the time parameters; if the scheduled heating time falls within a peak electricity consumption period, determining a pre-heating time from an off-peak electricity consumption period based on the time parameters; wherein the off-peak electricity consumption period is prior to the peak electricity consumption period; and controlling the heating device to start heating when the pre-heating time is reached. The solution provided by this invention not only guarantees the user's heating needs but also ensures that the heating device starts heating within an off-peak electricity consumption period, achieving peak-shifting electricity use. This ensures that the electricity used during the heating phase is generated during off-peak hours, thereby leveraging the lower electricity prices during off-peak hours to reduce electricity costs and improve the user experience.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of smart home appliance technology, and in particular to a heater, a pre-heating method, an apparatus, and a medium. Background Technology

[0002] Heating equipment (such as heaters) is a device that converts electrical energy into heat energy. It has a relatively high heating power and consumes a lot of electricity. If heating equipment is used improperly, it will lead to high electricity bills and a poor user experience. Summary of the Invention

[0003] This application provides a heater, a scheduled heating method, an apparatus, and a medium, which solves the technical problem in the prior art where the unreasonable use of heating equipment leads to high electricity costs and a poor user experience. It achieves the technical effect of improving the rational use of heating equipment, reducing electricity costs, and improving the user experience.

[0004] Firstly, this application provides a method for scheduled heating of a heating device, the method comprising:

[0005] Obtain the scheduled heating time parameters for the heating equipment;

[0006] Based on the time parameters, determine whether the scheduled heating time falls within the peak electricity consumption period;

[0007] If the scheduled heating time falls within a peak electricity consumption period, the pre-heating time will be determined from an off-peak electricity consumption period based on the time parameters; wherein, the off-peak electricity consumption period is before the peak electricity consumption period.

[0008] The heating equipment is controlled to start heating when the preheating time is reached.

[0009] Furthermore, before determining whether the scheduled heating time falls within peak electricity consumption hours, the method also includes:

[0010] Obtain peak and valley electricity consumption data from the power grid;

[0011] Based on peak and off-peak electricity consumption data, determine the peak and off-peak electricity consumption periods.

[0012] Furthermore, if the scheduled heating time falls within a low-electricity consumption period, the method also includes:

[0013] The heating equipment is controlled to start heating when the scheduled heating time arrives.

[0014] Furthermore, if the scheduled heating time falls within a low-electricity consumption period, the method also includes:

[0015] Determine whether the heating equipment can heat to the first preset temperature before the transition time. The transition time refers to the boundary between peak electricity consumption period and off-peak electricity consumption period. The first preset temperature is less than or equal to the user-set scheduled heating temperature.

[0016] If the heating device cannot heat to the first preset temperature before the transition time, a backup time is determined during the off-peak electricity period. The backup time is before the scheduled heating time, so that the heating device can heat to the first preset temperature before the transition time after starting heating from the backup time.

[0017] The heating equipment is controlled to start heating when the pre-selected time is reached.

[0018] Furthermore, the timing of preheating is determined from off-peak electricity consumption periods, including:

[0019] The timing of preheating should be determined during the off-peak hours that are adjacent to the peak electricity consumption period.

[0020] Furthermore, if the scheduled heating time falls within a peak electricity consumption period, the pre-heating time is determined from an off-peak electricity consumption period, including:

[0021] If the scheduled heating time falls within a peak electricity consumption period, obtain the ambient temperature and the user-set scheduled heating temperature;

[0022] Determine the target lead time based on the ambient temperature and the scheduled heating temperature;

[0023] Based on the transition time and the target lead time, the lead time for heating is determined from the off-peak electricity consumption period. The transition time refers to the boundary between the peak electricity consumption period and the off-peak electricity consumption period.

[0024] Furthermore, based on the transition time and the target lead time, the lead-up heating time is determined from the off-peak electricity consumption period, including:

[0025] The time obtained by advancing the target advance time from the transition time will be used as the advance heating time.

[0026] Furthermore, after controlling the heating device to start heating when the preheating time is reached, the method also includes:

[0027] Monitor the actual heating temperature of the heating equipment;

[0028] If the actual heating temperature reaches the user-set preset heating temperature, the heating equipment will be controlled to maintain the preset heating temperature.

[0029] Furthermore, after controlling the heating device to start heating when the preheating time is reached, the method also includes:

[0030] Monitor the actual heating temperature of the heating equipment;

[0031] If the actual heating temperature reaches the second preset temperature before the transition time, the heating equipment is controlled to maintain the second preset temperature; where the transition time refers to the boundary between peak electricity consumption period and off-peak electricity consumption period; the second preset temperature is lower than the user-set scheduled heating temperature;

[0032] If the transition time is reached, control the heating equipment to heat to the preset heating temperature and maintain it at the preset heating temperature.

[0033] Furthermore, controlling the heating device to start heating when the preheating time is reached includes:

[0034] The heating equipment is controlled to start heating at the first power when the preheating time is reached;

[0035] Monitor the actual heating temperature of the heating equipment;

[0036] If the actual heating temperature reaches the second preset temperature before the transition time, the heating equipment is controlled to maintain the second preset temperature at the second power; wherein, the transition time refers to the boundary between the peak electricity consumption period and the off-peak electricity consumption period; the second preset temperature is lower than the user-set scheduled heating temperature;

[0037] If the transition time is reached, the heating equipment is controlled to heat to the predetermined heating temperature at the third power and maintained at the predetermined heating temperature; both the first power and the third power are greater than the second power.

[0038] Secondly, this application provides a pre-heating device for heating equipment, the device comprising:

[0039] The time parameter acquisition module is used to acquire the scheduled heating time parameters of the heating equipment;

[0040] The judgment module is used to determine whether the scheduled heating time falls within the peak electricity consumption period based on the time parameter.

[0041] The preheating time determination module is used to determine the preheating time from the off-peak period based on time parameters when the scheduled heating time falls within the peak electricity consumption period; wherein the off-peak period is before the peak electricity consumption period.

[0042] The heating module is used to control the heating equipment to start heating when the preheating time is reached.

[0043] Thirdly, this application provides a heater, comprising:

[0044] processor;

[0045] Memory used to store processor-executable instructions;

[0046] The processor is configured to execute a heating device scheduled heating method as provided in the first aspect.

[0047] Fourthly, this application provides a non-transitory computer-readable storage medium, which, when the instructions in the storage medium are executed by the processor of a heater, enables the heater to perform a pre-heating method for a heating device as provided in the first aspect.

[0048] One or more technical solutions provided in the embodiments of this application have at least the following technical effects or advantages:

[0049] This application embodiment determines the scheduled heating time based on the scheduled heating time parameters of the heating equipment, and determines whether the scheduled heating time falls within the peak electricity consumption period. If the scheduled heating time falls within the peak electricity consumption period, a pre-heating time is determined from the off-peak electricity consumption period, and heating begins when the pre-heating time is reached. It can be seen that the solution provided by this application embodiment not only guarantees the user's heating needs, but also ensures that the heating equipment starts heating during the off-peak electricity consumption period, achieving off-peak heating. This ensures that the electricity used during the heating phase is generated during the off-peak electricity consumption period, thereby leveraging the advantage of lower electricity prices during the off-peak electricity consumption period to reduce electricity costs and improve the user experience. Attached Figure Description

[0050] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0051] Figure 1 A flowchart illustrating a pre-heating method for a heating device provided in this application;

[0052] Figure 2 A line graph illustrating peak and valley electricity consumption data for a power grid provided in this application;

[0053] Figure 3 A flowchart illustrating a method for determining a preliminary alternative timing provided in this application;

[0054] Figure 4 A flowchart illustrating another method for determining the alternative timing provided in this application;

[0055] Figure 5 A schematic diagram of a heating process provided for this application;

[0056] Figure 6 A schematic diagram of temperature changes during a heating process is provided in this application;

[0057] Figure 7 A schematic diagram of another heating process provided for this application;

[0058] Figure 8 A flowchart illustrating a comprehensive example provided for this application;

[0059] Figure 9 A schematic diagram of the structure of a heating device provided in this application;

[0060] Figure 10 This application provides a schematic diagram of the structure of a pre-heating device for heating equipment;

[0061] Figure 11 This is a schematic diagram of the structure of a heater provided in this application. Detailed Implementation

[0062] This application provides a method for scheduling heating in a heating device, which solves the technical problem in the prior art where unreasonable use of heating devices leads to high electricity costs and a poor user experience.

[0063] The technical solution of this application embodiment is to solve the above-mentioned technical problems, and the general idea is as follows:

[0064] A method for scheduling heating of a heating device includes: obtaining scheduled heating time parameters of the heating device; determining whether the scheduled heating time falls within a peak electricity consumption period based on the time parameters; if the scheduled heating time falls within a peak electricity consumption period, determining a pre-heating time from a low electricity consumption period based on the time parameters; wherein the low electricity consumption period is before the peak electricity consumption period; and controlling the heating device to start heating when the pre-heating time is reached.

[0065] This embodiment determines the scheduled heating time based on the scheduled heating time parameters of the heating equipment and determines whether the scheduled heating time falls within the peak electricity consumption period. If the scheduled heating time falls within the peak electricity consumption period, a pre-heating time is determined from the off-peak electricity consumption period, and heating begins when the pre-heating time is reached. It can be seen that the solution provided by this embodiment not only guarantees the user's heating needs but also ensures that the heating equipment starts heating during the off-peak electricity consumption period, achieving off-peak heating. This ensures that the electricity used during the heating phase is generated during the off-peak electricity consumption period, thereby leveraging the advantage of lower electricity prices during the off-peak electricity consumption period to reduce electricity costs and improve the user experience.

[0066] To better understand the above technical solutions, the following will provide a detailed explanation of the technical solutions in conjunction with the accompanying drawings and specific implementation methods.

[0067] First, it should be clarified that the term "and / or" in this article is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, or B existing alone. Additionally, the character " / " in this article generally indicates that the preceding and following related objects have an "or" relationship.

[0068] This embodiment provides, for example Figure 1 The heating device scheduled heating method shown can be applied to devices such as controllers, processors, local servers, and cloud servers to control the heating device. The controller and processor can be integrated inside the heating device or exist independently of it; this embodiment does not impose any restrictions. The local server can communicate with the heating device via wired or wireless means; the cloud server can communicate with the heating device wirelessly.

[0069] For ease of description, the following explanation will take the example of the heating equipment directly processing data, that is, the controller being integrated into the heating equipment.

[0070] Heating equipment can be any device that converts electrical energy into heat energy, such as electric heaters and electric radiators.

[0071] Figure 1 The method shown includes steps S11-S14.

[0072] Step S11: Obtain the scheduled heating time parameters of the heating equipment;

[0073] Step S12: Based on the time parameters, determine whether the scheduled heating time falls within the peak electricity consumption period;

[0074] Step S13: If the scheduled heating time falls within the peak electricity consumption period, determine the pre-heating time from the off-peak electricity consumption period based on the time parameters; wherein, the off-peak electricity consumption period is before the peak electricity consumption period.

[0075] Step S14: Control the heating device to start heating when the preheating time is reached.

[0076] Regarding step S11, obtain the scheduled heating time parameters of the heating equipment.

[0077] The heating device receives the scheduled heating time parameter input by the user. The scheduled heating time parameter can be a single moment or a time period; this embodiment does not impose any restrictions on this.

[0078] For example, when the scheduled heating time parameter is a time, the user can specify that heating will start at 20:00 on January 1, 2010 (assuming the current time is 17:59 on January 1, 2010, and this time will be used as the current time for the following explanation); when the scheduled heating time parameter is a time period, the user can specify that heating will start 2 hours later.

[0079] Regarding step S12, based on the time parameter, it is determined whether the scheduled heating time falls within the peak electricity consumption period.

[0080] Based on the scheduled heating time parameters, the specific scheduled heating time of the heating equipment can be determined. For example, if the user specifies that heating will start at 20:00 on January 1, 2010, then the scheduled heating time is 20:00 on January 1, 2010. If the user specifies that heating will start 2 hours later, then the scheduled heating time is 17:59 on January 1, 2010 plus the time obtained two hours later, which is 19:59 on January 1, 2010.

[0081] Generally, electricity consumption periods can be divided into peak and off-peak periods based on the amount of electricity consumed. Electricity prices are higher during peak periods and lower during off-peak periods.

[0082] If users are left to determine when to start heating based on peak and off-peak electricity hours, the efficiency and accuracy are low, the operation is cumbersome, and the user experience may be poor.

[0083] To address this issue, this embodiment first obtains peak and off-peak electricity data from the power grid via the cloud before determining whether the scheduled heating time falls within the peak electricity consumption period. Based on this data, the peak and off-peak electricity consumption periods are then determined.

[0084] Based on the acquired peak and off-peak electricity consumption data, peak and off-peak periods can be defined. These periods can be relative, based on a preset electricity consumption range, or determined by specific electricity consumption values.

[0085] For example, such as Figure 2 The image shows a line graph plotted based on peak and off-peak electricity consumption data for a specific day. The horizontal axis represents the time of day. Figure 2 The graph shows times such as 8:00 and 12:00, with the vertical axis representing the electricity consumption at each time point. Figure 2 The graph shows powers P1, P2, P0, and P3, with the time endpoints corresponding to P2 denoted as a1, a2, a3, t7, t8, and a4, respectively. The numbers t1, t2, ..., t11 in the line graph represent the inflection points of the line. From... Figure 2As can be seen, the t1-t2, t5-t6, and t9-t10 periods are high-consumption periods, while the t3-t4, t5-t6, and t11 periods (specifically, the period after the t11 inflection point) are low-consumption periods. The t7-t8 period has moderate consumption. Other periods (such as before the t1 inflection point, the t2-t3 period, etc.) are transitional phases. These transitional phases can be classified as either high-consumption or low-consumption periods depending on demand, or they can be excluded from either classification.

[0086] If peak and off-peak electricity consumption periods are relative, then the periods with higher electricity consumption can be considered peak periods, and the periods with lower electricity consumption can be considered off-peak periods. Figure 2 For example, we can Figure 2 The t1-t2, t5-t6, and t9-t10 segments are designated as peak electricity consumption periods, while the t3-t4, t5-t6, t11, and t7-t8 segments are designated as off-peak electricity consumption periods. The remaining time periods can be used as transitional phases.

[0087] If peak and off-peak electricity consumption periods are defined based on preset electricity consumption ranges, then these preset ranges can be set according to actual needs, thereby achieving the division of peak and off-peak electricity consumption periods. Figure 2 For example, the time period with electricity consumption in the range of P2-P3 is divided into peak electricity consumption periods, and the time period with electricity consumption in the range of P1-P2 is divided into off-peak electricity consumption periods. Then, the a1-a2 and a3-a4 segments are respectively considered peak electricity consumption periods, and the a1 segment (specifically, the time period before point a1), the a2-a3 segment, and the a4 segment (specifically, the time period after point a4) are respectively considered off-peak electricity consumption periods. Among them, the t7-t8 segment can be considered either a peak electricity consumption period or an off-peak electricity consumption period. Of course, it can also be neither classified as a peak electricity consumption period nor an off-peak electricity consumption period. This embodiment does not impose any restrictions on this.

[0088] If peak and off-peak electricity consumption periods are defined based on specific electricity consumption values, then electricity consumption values ​​can be set according to actual needs, thereby achieving the division of peak and off-peak electricity consumption periods. Figure 2 For example, P0 can be used as the boundary between peak and off-peak electricity consumption periods. Periods with electricity consumption higher than P0 can be considered peak electricity consumption periods, and periods with electricity consumption lower than P0 can be considered off-peak electricity consumption periods.

[0089] In addition to the above methods of dividing peak and off-peak electricity consumption periods, peak and off-peak electricity consumption periods can also be divided based on electricity price per unit. Periods with higher electricity prices per unit are designated as peak electricity consumption periods, while periods with lower electricity prices per unit are designated as off-peak electricity consumption periods.

[0090] After determining the off-peak and peak electricity consumption periods, it is then determined whether the scheduled heating time falls within the peak electricity consumption period.

[0091] If the scheduled heating time falls within an off-peak electricity consumption period, i.e., outside of peak hours, the electricity cost for heating will be lower, achieving peak-shifting electricity use and saving on electricity bills. This allows the heating equipment to start heating at the scheduled time. If the scheduled heating time falls within a peak electricity consumption period, the electricity cost for heating will be higher, and step S13 continues.

[0092] In practice, when setting the scheduled heating time, users typically also set the scheduled heating temperature, which is the temperature they ultimately want the heating equipment to maintain. However, it takes time for the heating equipment to heat from room temperature to the scheduled temperature, and the power consumption is higher during the heating phase and lower during the temperature maintenance phase. Therefore, it is necessary to schedule the heating phase during off-peak electricity consumption periods to achieve peak-hour electricity usage and reduce electricity bills.

[0093] However, when the scheduled heating time falls within an off-peak electricity period, the heating process may cross the boundary between peak and off-peak electricity periods (i.e., the transition moment, which can be any moment within the transition period between peak and off-peak electricity periods). If the heating time using electricity from peak hours is too long, it can still easily lead to higher electricity bills and affect the user experience.

[0094] To address this problem, this embodiment provides the following: Figure 3 The optimization scheme shown specifically includes steps S31-S33.

[0095] Step S31: If the scheduled heating time falls within a low-electricity consumption period, determine whether the heating device can heat to the first preset temperature before the transition time. The transition time refers to the boundary between the peak electricity consumption period and the low-electricity consumption period. The first preset temperature is less than or equal to the scheduled heating temperature set by the user.

[0096] When the scheduled heating time is determined to be within a period of low electricity consumption, a prediction is made as to whether the heating equipment can heat to the first preset temperature before the transition time.

[0097] Specifically, the heating temperature of the heating device at the transition time can be calculated based on the preset heating power of the heating device and the time between the scheduled heating time and the transition time. If the heating temperature exceeds the first preset temperature, the heating device is controlled to start heating when the scheduled heating time is reached; if the heating temperature does not exceed the first preset temperature, step S32 is executed.

[0098] Of course, the time required for the heating device to heat to the first preset temperature can also be calculated based on the temperature difference between the first preset temperature and the current ambient temperature, as well as the preset heating power of the heating device, and this time can be compared with the time between the current time and the transition time. If the time is less than the time between the current time and the transition time, the heating device is controlled to start heating when the scheduled heating time is reached; if the time is more than the time between the current time and the transition time, step S32 is executed.

[0099] Step S32: If the heating device cannot heat to the first preset temperature before the transition time, a backup time is determined during the off-peak electricity period. The backup time is before the scheduled heating time, so that the heating device can heat to the first preset temperature before the transition time after starting heating from the backup time.

[0100] If the heating device cannot heat to the first preset temperature before the transition time, the actual heating time is advanced, that is, a preliminary alternative time is determined before the preset heating time, and the preliminary alternative time is in a period of low electricity consumption, so that the heating device can heat to the first preset temperature before the transition time after starting to heat from the preliminary alternative time.

[0101] Specifically, the heating temperature of the heating device at the transition time can be calculated based on the preset heating power of the heating device and the time between the scheduled heating time and the transition time. The alternative time can be determined based on the difference between the heating temperature and the first preset temperature.

[0102] Of course, the time required for the heating device to heat to the first preset temperature can also be calculated based on the temperature difference between the first preset temperature and the current ambient temperature, as well as the preset heating power of the heating device, and the alternative timing can be determined based on this time.

[0103] Step S33: Control the heating device to start heating when the pre-selected time is reached.

[0104] When the pre-selection time is reached, the heating device is controlled to start heating.

[0105] As can be seen, the solution provided in this embodiment can ensure that the electricity used in the actual heating process is as close as possible to the off-peak hours, while guaranteeing the user's heating needs, thereby achieving peak-shifting electricity use, reducing electricity costs to a lower level, saving users' expenses, and improving user experience.

[0106] Regarding step S13, if the scheduled heating time falls within the peak electricity consumption period, the pre-heating time is determined from the off-peak electricity consumption period based on the time parameters; wherein, the off-peak electricity consumption period is before the peak electricity consumption period.

[0107] When the scheduled heating time falls within the peak electricity consumption period, the actual heating time of the heating equipment needs to be moved to the off-peak electricity consumption period. That is, the pre-heating time is determined from the off-peak electricity consumption period to achieve off-peak heating.

[0108] Combination Figure 2 It is known that there may be multiple off-peak and peak electricity consumption periods within a day. In actual operation, the pre-heating time can be determined from the off-peak electricity period preceding the peak electricity consumption period of the scheduled heating time, that is, from the off-peak electricity period that is before and adjacent to the peak electricity consumption period; or the pre-heating time can be determined from any of the several off-peak electricity periods preceding the peak electricity consumption period of the scheduled heating time.

[0109] by Figure 2 For example, segments a1-a2, a3-t7, and t8-a4 are designated as peak electricity consumption periods, while other time periods are designated as off-peak periods. The user sets the scheduled heating time to 20:00 on January 1, 2010. Figure 2 It can be seen that 20:00 belongs to the t8-a4 segment, which is the peak electricity consumption period. The preheating time can be determined within the previous low electricity consumption period (i.e., the t7-t8 segment) of the t8-a4 segment, or it can be determined within the a2-a3 segment.

[0110] The specific method for determining the preheating time from the off-peak electricity consumption period includes steps S41-S43, such as... Figure 4 As shown.

[0111] Step S41: If the scheduled heating time falls within the peak electricity consumption period, obtain the ambient temperature and the scheduled heating temperature set by the user.

[0112] When the scheduled heating time falls within the peak electricity consumption period, the ambient temperature around the heating equipment is detected by sensors, and the ambient temperature and scheduled heating temperature are obtained.

[0113] Step S42: Determine the target lead time based on the ambient temperature and the scheduled heating temperature.

[0114] Factors affecting the heating equipment's ability to raise the space temperature from ambient temperature to the predetermined heating temperature include the heating equipment's predetermined heating power and the spatial characteristics of the space where the heating equipment is located (including size, shape, and materials). However, the spatial characteristics of the space where the heating equipment is located are difficult to obtain accurately; therefore, the corresponding time can only be estimated based on the above-mentioned influencing factors.

[0115] For example, based on the temperature difference between the ambient temperature and the scheduled heating temperature, the corresponding target lead time can be set according to experimental or empirical data in relevant technologies, as shown in Table 1.

[0116] Table 1

[0117] Temperature difference between ambient temperature and scheduled heating temperature Target lead time 10° < (T0 - T) < 20° 30 minutes 20°≤(T0-T)≤25° 40 minutes 25°<(T0-T) 60 minutes

[0118] In addition to the above methods, the time required for the heating equipment to heat to the scheduled heating temperature (i.e., target lead time) can also be estimated based on the ambient temperature, the scheduled heating temperature, and the preset heating power of the heating equipment.

[0119] Alternatively, based on the ambient temperature, the scheduled heating temperature, the preset heating power of the heating equipment, and the spatial characteristics of the space, estimate the time required for the heating equipment to heat to the scheduled heating temperature (i.e., the target lead time).

[0120] Step S43: Determine the preheating time from the off-peak electricity period based on the transition time and the target preheating time. The transition time refers to the boundary between the peak electricity period and the off-peak electricity period.

[0121] The time obtained by advancing the target lead time from the transition time is used as the lead time for heating, and the lead time for heating is used as the actual start time of heating equipment.

[0122] Regarding step S14, the heating device is controlled to start heating when the preheating time is reached.

[0123] Once the preheating time is determined, the heating equipment will start and begin heating when the preheating time is reached.

[0124] After the heating equipment starts heating when the preheating time is reached, the actual heating temperature of the equipment can be monitored. If the actual heating temperature reaches the user-set preset heating temperature, the heating equipment is controlled to maintain the preset heating temperature. The heating power can be determined according to the needs. Under normal circumstances, the heating power of the equipment is set to the highest level to quickly increase the temperature of the heating equipment, shorten the power consumption of the heating stage, and reduce power consumption.

[0125] As mentioned earlier, the preheating time is an estimated time. To ensure that the user's desired heating temperature is met near the preset heating time, the time difference between the preheating time and the transition time is generally set to be relatively large. Therefore, the heating device may have already heated the temperature to the desired temperature some time before the preset heating time. The longer the heating device maintains the temperature at the desired heating temperature, the higher its power consumption will be.

[0126] To minimize power consumption, this embodiment divides the heating process into multiple stages, specifically including: Figure 5 Steps S51-S53 are shown.

[0127] Step S51: Monitor the actual heating temperature of the heating equipment.

[0128] Step S52: If the actual heating temperature reaches the second preset temperature before the transition time is reached, control the heating equipment to maintain the second preset temperature; wherein, the transition time refers to the boundary between the peak electricity consumption period and the off-peak electricity consumption period; the second preset temperature is less than the scheduled heating temperature set by the user.

[0129] If the actual temperature has reached the second preset temperature before the transition time is reached, the heating equipment can be controlled to maintain the second preset temperature, which is lower than the scheduled heating temperature. Since the second preset temperature is lower than the scheduled heating temperature, the power consumption to maintain the second preset temperature is also lower than the power consumption to maintain the scheduled heating temperature, thereby reducing power consumption. Typically, the second preset temperature is two-thirds or more of the scheduled heating temperature.

[0130] Step S53: If the transition time is reached, control the heating equipment to heat to the predetermined heating temperature and maintain it at the predetermined heating temperature.

[0131] When the transition time is reached, the heating device will heat from the second preset temperature to the scheduled heating temperature and maintain it near the scheduled heating temperature.

[0132] like Figure 6 The diagram shown illustrates the temperature changes during a specific operating process of a heating device, where M3 represents the scheduled heating time and T0° represents the scheduled heating temperature. The predetermined pre-heating time is M1, and M2 is the transition time. From... Figure 6 As can be seen, the heating device starts heating from M1. After stage I, the heating device heats to T1° (i.e., the second preset temperature). At this point, the transition time has not yet been reached, so the heating device maintains the temperature around T1° (i.e., Figure 6 In stage II of the process, when the transition time is reached, the heating device begins to heat from T1° to T0° (i.e., ...). Figure 6 In stage III of the process, after reaching T0°, the heating equipment maintains the temperature around T0° (i.e., Figure 6 (Phase IV in the middle).

[0133] The heating power of the heating equipment during the heating process can be set according to the actual situation. Specifically, in Figure 5 Based on the scheme shown, this embodiment also provides, as follows: Figure 7 The optimization scheme shown includes steps S71-S74.

[0134] Step S71: Control the heating device to start heating at a first power level when the preheating time is reached. The first power level can be the highest power setting of the heating device. Figure 6 Phase I is shown in the diagram.

[0135] Step S72: Monitor the actual heating temperature of the heating equipment.

[0136] Step S73: If the actual heating temperature reaches the second preset temperature before the transition time is reached, control the heating device to maintain the second preset temperature at the second power; wherein, the transition time refers to the boundary between the peak electricity consumption period and the off-peak electricity consumption period; the second preset temperature is less than the scheduled heating temperature set by the user.

[0137] The second power can be less than the first power, and it can maintain the temperature at a second preset temperature. Specifically, it can be as follows: Figure 6 Phase II as shown.

[0138] Step S74: If the transition time is reached, control the heating device to heat to the predetermined heating temperature at the third power and maintain it at the predetermined heating temperature; both the first power and the third power are greater than the second power.

[0139] The third power setting can be the highest power setting of the heating equipment. For example... Figure 6 The stages III and IV are shown in the diagram.

[0140] In summary, this embodiment determines the scheduled heating time based on the scheduled heating time parameters of the heating equipment and determines whether the scheduled heating time falls within the peak electricity consumption period. If the scheduled heating time falls within the peak electricity consumption period, a pre-heating time is determined from the off-peak electricity consumption period, and heating begins when the pre-heating time is reached. Therefore, the solution provided in this embodiment combines peak and off-peak electricity consumption periods to achieve off-peak electricity consumption while meeting the user's heating needs. This ensures that the heating equipment starts heating during the off-peak period, maximizing the use of electricity during the heating phase. Furthermore, it leverages the lower electricity price during off-peak periods to minimize electricity costs and improve the user experience.

[0141] Now combined with such Figure 8The schematic diagram shown illustrates the above-mentioned solution provided in this embodiment.

[0142] The user inputs the scheduled heating time M1 and the scheduled heating temperature T0°. The system determines whether the scheduled heating time is a peak time (i.e., whether it is within the peak electricity consumption period). If not, it is determined to be an off-peak time. The system then continuously checks whether the scheduled heating time has arrived. If it has, heating is executed. After heating, the system continuously checks whether the temperature has reached T0°. If it has, the temperature is precisely controlled.

[0143] When the scheduled heating time is a peak time (i.e., during peak electricity consumption periods), the preheating time M1 is determined before the transition time M2 based on the ambient temperature T° and the scheduled heating temperature T0°. The system cyclically checks whether the preheating time M1 has been reached. If so, heating is performed. The system cyclically checks whether the transition time M2 has been reached. If so, secondary heating is performed. The system cyclically checks whether the temperature has reached T0°. If so, precise temperature control is achieved.

[0144] Based on the same inventive concept, this embodiment provides a heating device compatible with the aforementioned pre-heating method for heating devices, such as... Figure 9 As shown, the system includes a controller 91, a power acquisition system 92, a temperature acquisition system 93, and a heating system 94. The controller 91 includes a Wi-Fi module 95, which is used to communicate with the outside world. The controller 91 is used to execute the scheduled heating method provided in this embodiment. The power acquisition system 92 is used to collect the power consumption of the heating equipment through voltage and current transformers. The temperature acquisition system 93 is used to collect the ambient temperature and actual heating temperature near the heating equipment through a temperature probe. The heating system 94 is used to convert electrical energy into heat energy through a PTC or heating element. The cloud 96 is used to provide the controller 91 with peak and valley data of the power grid and to receive the power consumption data uploaded by the controller 91.

[0145] Based on the same inventive concept, this embodiment provides as follows: Figure 10 The heating equipment shown includes a preheating reservation device, which comprises:

[0146] The time parameter acquisition module 101 is used to acquire the scheduled heating time parameters of the heating equipment.

[0147] The judgment module 102 is used to determine whether the scheduled heating time is within the peak electricity consumption period based on the time parameter;

[0148] The preheating time determination module 103 is used to determine the preheating time from the off-peak period based on time parameters if the scheduled heating time is within the peak electricity consumption period; wherein the off-peak period is before the peak electricity consumption period.

[0149] Heating module 104 is used to control the heating device to start heating when the preheating time is reached.

[0150] Furthermore, the device also includes:

[0151] The peak and valley electricity consumption data acquisition module is used to acquire peak and valley electricity consumption data of the power grid before determining whether the scheduled heating time is within the peak electricity consumption period.

[0152] The segmentation module is used to determine the peak and off-peak electricity consumption periods based on peak and off-peak electricity consumption data.

[0153] Furthermore, the heating module 104 is also used to control the heating device to start heating when the scheduled heating time arrives if the scheduled heating time falls within a period of low electricity consumption.

[0154] Furthermore, the judgment module 102 is also used to determine whether the heating device can heat to the first preset temperature before the transition time if the scheduled heating time is within the off-peak electricity consumption period. The transition time refers to the boundary between the peak electricity consumption period and the off-peak electricity consumption period. The first preset temperature is less than or equal to the scheduled heating temperature set by the user.

[0155] The preheating time determination module 103 is also used to determine a pre-selected time during a low-electricity period if the heating device cannot heat to the first preset temperature before the transition time. The pre-selected time is before the scheduled heating time, so that the heating device can heat to the first preset temperature before the transition time after starting heating from the pre-selected time.

[0156] The heating module 104 is also used to control the heating device to start heating when the pre-selected time is reached.

[0157] Furthermore, the preheating time determination module 103 is used to determine the preheating time during the off-peak electricity consumption period that is before the peak electricity consumption period and adjacent to the peak electricity consumption period.

[0158] Furthermore, the preheating timing determination module 103 is also used for:

[0159] If the scheduled heating time falls within a peak electricity consumption period, obtain the ambient temperature and the user-set scheduled heating temperature;

[0160] Determine the target lead time based on the ambient temperature and the scheduled heating temperature;

[0161] Based on the transition time and the target lead time, the lead time for heating is determined from the off-peak electricity consumption period. The transition time refers to the boundary between the peak electricity consumption period and the off-peak electricity consumption period.

[0162] Furthermore, the preheating timing determination module 103 is also used for:

[0163] The time obtained by advancing the target advance time from the transition time will be used as the advance heating time.

[0164] Furthermore, the device also includes:

[0165] The monitoring module is used to monitor the actual heating temperature of the heating equipment after it starts heating when the preheating time is reached.

[0166] The maintenance module is used to control the heating equipment to maintain the preset heating temperature if the actual heating temperature reaches the preset heating temperature set by the user.

[0167] Furthermore, the monitoring module is also used to monitor the actual heating temperature of the heating equipment after the heating equipment starts heating when the preheating time is reached;

[0168] The maintenance module is also used to control the heating device to maintain the second preset temperature if the actual heating temperature reaches the second preset temperature before the transition time is reached; wherein, the transition time refers to the boundary between the peak electricity consumption period and the off-peak electricity consumption period; the second preset temperature is less than the user-set scheduled heating temperature;

[0169] If the transition time is reached, control the heating equipment to heat to the preset heating temperature and maintain it at the preset heating temperature.

[0170] Furthermore, the heating module 104 is also used to: control the heating device to start heating at a first power when the preheating time is reached;

[0171] The monitoring module is also used to monitor the actual heating temperature of the heating equipment;

[0172] The maintenance module is also used to control the heating device to maintain the second preset temperature at a second power if the actual heating temperature reaches the second preset temperature before the transition time is reached; wherein, the transition time refers to the boundary between the peak electricity consumption period and the off-peak electricity consumption period; the second preset temperature is less than the user-set scheduled heating temperature;

[0173] If the transition time is reached, the heating equipment is controlled to heat to the predetermined heating temperature at the third power and maintained at the predetermined heating temperature; both the first power and the third power are greater than the second power.

[0174] Based on the same inventive concept, this embodiment provides as follows: Figure 11 The heater shown includes:

[0175] Processor 111;

[0176] Memory 112 is used to store executable instructions of processor 111;

[0177] The processor 111 is configured to execute a pre-heating method for a heating device as described above.

[0178] Based on the same inventive concept, this embodiment provides a non-transitory computer-readable storage medium. When the instructions in the storage medium are executed by the processor 111 of the heater, the heater is able to execute a pre-heating method for a heating device as described above.

[0179] Since the electronic device described in this embodiment is an electronic device used to implement the information processing method in the embodiments of this application, those skilled in the art can understand the specific implementation methods and various variations of the electronic device in this embodiment based on the information processing method described in the embodiments of this application. Therefore, how the electronic device implements the method in the embodiments of this application will not be described in detail here. Any electronic device used by those skilled in the art to implement the information processing method in the embodiments of this application falls within the scope of protection of this application.

[0180] Those skilled in the art will understand that embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the present invention can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present invention can take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0181] This invention is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart illustrations and / or block diagrams. Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.

[0182] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1The function specified in one or more boxes.

[0183] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.

[0184] Although preferred embodiments of the invention have been described, those skilled in the art, upon learning the basic inventive concept, can make other changes and modifications to these embodiments. Therefore, the appended claims are intended to be interpreted as including both the preferred embodiments and all changes and modifications falling within the scope of the invention.

[0185] Obviously, those skilled in the art can make various modifications and variations to this invention without departing from its spirit and scope. Therefore, if these modifications and variations fall within the scope of the claims of this invention and their equivalents, this invention also intends to include these modifications and variations.

Claims

1. A method for pre-heating a heating device, characterized in that, The method includes: Obtain the scheduled heating time parameters for the heating equipment; Based on the time parameters, determine whether the scheduled heating time falls within a peak electricity consumption period; If the scheduled heating time falls within the peak electricity consumption period, a pre-heating time is determined from the off-peak electricity consumption period based on the time parameters; wherein the off-peak electricity consumption period is before the peak electricity consumption period; the heating equipment is controlled to start heating when the pre-heating time is reached; If the scheduled heating time falls within the off-peak electricity consumption period, it is determined whether the heating device can heat to a first preset temperature before a transition time. The transition time refers to the boundary between the peak electricity consumption period and the off-peak electricity consumption period. The first preset temperature is less than or equal to the scheduled heating temperature set by the user. If the heating device cannot heat to the first preset temperature before the transition time, a preliminary alternative time is determined within the off-peak electricity consumption period. The preliminary alternative time is before the scheduled heating time, so that the heating device can heat to the first preset temperature before the transition time after starting heating from the preliminary alternative time. The heating device is then controlled to start heating when the preliminary alternative time is reached.

2. The method as described in claim 1, characterized in that, Before determining whether the scheduled heating time falls within a peak electricity consumption period, the method further includes: Obtain peak and valley electricity consumption data from the power grid; Based on the peak and off-peak electricity consumption data, the peak electricity consumption period and the off-peak electricity consumption period are determined.

3. The method as described in claim 1, characterized in that, Determining the preheating time from off-peak electricity consumption periods includes: The preheating time is determined during the off-peak electricity consumption period that is before and adjacent to the peak electricity consumption period.

4. The method as described in claim 1, characterized in that, If the scheduled heating time falls within the peak electricity consumption period, the pre-heating time is determined from the off-peak electricity consumption period, including: If the scheduled heating time falls within the peak electricity consumption period, obtain the ambient temperature and the user-set scheduled heating temperature; The target lead time is determined based on the ambient temperature and the scheduled heating temperature; The preheating time is determined from the off-peak electricity consumption period based on the transition time and the target preheating time.

5. The method as described in claim 4, characterized in that, Determining the preheating time from the off-peak electricity consumption period based on the transition time and the target preheating time includes: The time obtained by advancing the target advance time from the transition time is taken as the advance heating time.

6. The method as described in claim 1, characterized in that, After controlling the heating device to start heating when the preheating time is reached, the method further includes: Monitor the actual heating temperature of the heating equipment; If the actual heating temperature reaches the user-set preset heating temperature, the heating device is controlled to maintain the preset heating temperature.

7. The method as described in claim 1, characterized in that, After controlling the heating device to start heating when the preheating time is reached, the method further includes: Monitor the actual heating temperature of the heating equipment; If the actual heating temperature reaches the second preset temperature before the transition time is reached, the heating device is controlled to maintain the second preset temperature; wherein the second preset temperature is less than the user-set scheduled heating temperature; If the transition time is reached, control the heating device to heat to the predetermined heating temperature and maintain it at the predetermined heating temperature.

8. The method as described in claim 1, characterized in that, The control of the heating device to start heating when the preheating time is reached includes: The heating device is controlled to start heating at a first power when the preheating time is reached; Monitor the actual heating temperature of the heating equipment; If the actual heating temperature reaches the second preset temperature before the transition time is reached, the heating device is controlled to maintain the second preset temperature at the second preset temperature with the second power; wherein the second preset temperature is less than the user-set scheduled heating temperature; If the transition time is reached, the heating device is controlled to heat to the predetermined heating temperature at a third power and maintained at the predetermined heating temperature; both the first power and the third power are greater than the second power.

9. A pre-heating device for heating equipment, characterized in that, The device includes: The time parameter acquisition module is used to acquire the scheduled heating time parameters of the heating equipment; The judgment module is used to determine whether the scheduled heating time falls within a peak electricity consumption period based on the time parameter. The preheating time determination module is used to determine the preheating time from the off-peak electricity period based on the time parameters when the scheduled heating time falls within the peak electricity consumption period; wherein the off-peak electricity period is before the peak electricity consumption period. A heating module is used to control the heating device to start heating when the preheating time is reached; The judgment module is also used to determine whether the heating equipment can heat to the first preset temperature before the transition time if the scheduled heating time is within the off-peak electricity period. The transition time refers to the boundary between the peak electricity period and the off-peak electricity period. The first preset temperature is less than or equal to the scheduled heating temperature set by the user. The preheating time determination module is also used to determine a pre-selected time during a low-power period if the heating device cannot heat to the first preset temperature before the transition time. The pre-selected time is before the scheduled heating time, so that the heating device can heat to the first preset temperature before the transition time after starting heating from the pre-selected time. The heating module is also used to control the heating equipment to start heating when the pre-selected time is reached.

10. A heater, characterized in that, include: processor; Memory used to store the processor's executable instructions; The processor is configured to execute a heating device scheduled heating method as described in any one of claims 1 to 8.

11. A non-transitory computer-readable storage medium, wherein instructions in the storage medium, when executed by a processor of a heater, enable the heater to perform a pre-heating method for a heating device as described in any one of claims 1 to 8.

Citation Information

Patent Citations

  • Heat pump type intelligent electric water boiler with staggering power consumption function