Railway marshalling yard traffic estimation method

By introducing train flow codes, assembly codes, group codes, and special operation codes, the problem that existing technologies cannot adapt to the suspension of loaded train transportation, detour transportation, and empty train transportation has been solved, and flexible, accurate, and automated train flow calculation at railway marshalling yards has been realized.

CN117681931BActive Publication Date: 2026-11-24SIGNAL & COMM RES INST OF CHINA ACAD OF RAILWAY SCI +3
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410015726.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-04
Publication Date
2026-11-24
Estimated Expiration
2044-01-04

AI Technical Summary

Technical Problem

Existing technologies are insufficient to flexibly handle situations such as suspended transport of loaded vehicles, detour transport, and empty transport, resulting in inaccurate traffic flow prediction.

Method used

By introducing four attributes—train flow code, assembly code, group code, and special operation code—which respectively represent the direction of the freight car, assembly point, car type, and whether shunting operation is required, and combining them with the train operation type, the train flow can be automatically calculated and estimated.

Benefits of technology

It enables flexible determination of freight train routes, improves the accuracy and automation of traffic flow calculation, and supports the rapid and accurate preparation of station operation plans.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117681931B_ABST
    Figure CN117681931B_ABST
Patent Text Reader

Abstract

This invention discloses a method for calculating train flow at railway marshalling yards. This method allows for more flexible calculation of train flow at marshalling yards. Specifically, by using train attributes, this method can solve the problem of single-group numbering. Through a hierarchical system of group codes, assembly codes, train flow codes, and special operation codes, the system can determine the departure time, departure direction, number of trains departing, and marshalling content of the train flow. This provides station dispatchers with a convenient and fast processing method, optimizes train marshalling, and improves the efficiency of station marshalling and demarcation operations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of railway transportation technology, and in particular to a method for estimating train flow at railway marshalling yards. Background Technology

[0002] Traffic flow prediction is the most important issue for all marshalling yard dispatchers and commanders. It is the basis for formulating phase plans and shunting operation plans. Accurate prediction of traffic flow requires strong computing power and rich operational experience. Achieving automation of traffic flow prediction has always been the goal pursued by marshalling yards.

[0003] Railway traffic flow refers to the total number and destination of vehicles (traffic volume) within a certain period, in a certain direction, section, or station. In other words, traffic flow is the collection of vehicles transported by rail with a specific destination. The train is the basic unit of railway transportation production, and railway train flow is a collection of the same type of trains with a specific destination.

[0004] Marshalling yards organize and direct daily production activities by formulating station operation plans. Station operation plans include shift plans, phase plans, and shunting operation plans. Phase plans are the detailed arrangements for each phase of work within a shift, ensuring the completion of the shift plan, and are prepared by the station dispatcher based on the specific circumstances before the start of that phase of work.

[0005] Traffic flow prediction refers to the process of calculating the departure trains that can be operated, as well as the specific details of axle reduction, axle replenishment, car retrieval, and car delivery operations, given the known destination codes of freight cars awaiting formation and those not yet arriving at the station within a certain period of time. This process determines the train numbers, departure times, formation contents, and traffic sources of the departing trains, and the operation times, formation contents, and traffic sources of the car delivery, car retrieval, axle reduction, and axle replenishment operations, providing a basis for the subsequent preparation of station operation plans.

[0006] Most current methods for estimating train flow are based on train destination codes. The train destination code is an attribute of freight cars. For loaded cars, the train destination code is the set of stations to which its final destination belongs. The final destinations included in each station set are specified and fixed by the "Freight Train Formation Plan." Since the railway is a network, multiple paths generally exist from the originating station to the final destination given the train destination code. Although the "Freight Train Formation Plan" specifies the basic train flow paths, when these basic paths encounter section congestion, construction closures, insufficient capacity, or disasters and accidents, dispatch orders can be issued to suspend or reroute transport. For empty cars, the train destination code is the car type and does not include information about the final destination. The final destination of an empty car is related to the day's loading needs and depends on its final inclusion in a train heading in a certain direction, making it more flexible and less fixed. The freight cars arriving at the marshalling yard must be incorporated into specific trains departing in a particular direction, which is closely related to the freight car's transport route. This makes the current train flow estimation method based on train destination codes difficult to adapt to issues such as suspended transport of loaded cars, detour transport, and empty car transport. Therefore, the fundamental issue in improving the accuracy of train flow estimation is how to determine the freight car transport route on demand so as to quickly match the direction of departing trains.

[0007] In view of this, the present invention is hereby proposed. Summary of the Invention

[0008] The purpose of this invention is to provide a method for estimating train flow at railway marshalling yards, which can more flexibly realize the estimation of train flow at marshalling yards.

[0009] The objective of this invention is achieved through the following technical solution:

[0010] A method for estimating train flow at railway marshalling yards includes:

[0011] Step 1: Determine the train flow code, assembly code, group code, and special operation code attributes of various freight cars within the marshalling yard. Among them, the train flow code indicates the direction of the train flow, the assembly code indicates the direction of assembly, the destination station, the type of car, the location of maintenance operations, or the location of loading and unloading operations, the group code identifies the cars that can be coupled into a car group, and the special operation code indicates whether additional shunting operations are required.

[0012] Step 2: Combine the relevant information of the arriving trains to obtain the train flow code, assembly code, group code, and special operation code attributes of the freight cars en route, and determine the train operation type.

[0013] Step 3: Based on the train operation type, deduct the freight cars in transit corresponding to the set train operation type, retain the freight cars in transit, and use the various freight cars in the marshalling yard for subsequent steps;

[0014] Step 4: Divide the departure time of the station-commissioned trains into three time periods. Combine the various freight cars and related code attributes determined in Step 3, calculate the delivery and retrieval information of the station-commissioned trains, freight yards, dedicated lines and depot pipelines in the first, second and third time periods respectively, and add them to the departure trains and delivery and retrieval operation sets of the corresponding departure time periods.

[0015] Step 5: Calculate the planned departure time of the trains originating from the intermediate station for each of the three time periods, as well as the start and end times of the train delivery and retrieval operations.

[0016] Step 6: Calculate the planned departure times of the freight cars in transit that were deducted in Step 3, and add them to the departure trains and pick-up and delivery operation sets for the corresponding departure times.

[0017] Step 7: Based on the calculated planned departure time, delivery start time, and pick-up start time, reorder the departure trains and pick-up / delivery sets for the corresponding departure time period in ascending order to generate the overall sequence number of the departure trains and pick-up / delivery sets.

[0018] As can be seen from the technical solution provided by the present invention, by adding four modifiable attributes to freight cars—train flow code, assembly code, group code, and special operation code—these attributes respectively indicate the direction of the freight car's train flow, the direction of its assembly, its destination station, car type, and the location of maintenance or loading / unloading operations. They also indicate whether a freight car can be grouped with other freight cars and whether additional shunting operations are required. This solves the problem that the original train flow calculation based on the train flow destination code attribute is difficult to adapt to situations involving suspended transport of loaded cars, detour transport, and empty car transport. This lays the foundation for the rapid, accurate, and automatic preparation of station operation plans. Attached Figure Description

[0019] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the following description of the embodiments will be briefly introduced. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0020] Figure 1 A flowchart illustrating a method for estimating train flow at railway marshalling yards, provided as an embodiment of the present invention. Detailed Implementation

[0021] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of the present invention.

[0022] First, the following explanations are provided for the terms that may be used in this article:

[0023] The terms “including,” “comprising,” “containing,” “having,” or other similar semantic descriptions should be interpreted as non-exclusive inclusion. For example, “including a technical feature element (such as raw material, component, ingredient, carrier, dosage form, material, size, part, component, mechanism, device, step, process, method, reaction conditions, processing conditions, parameter, algorithm, signal, data, product or article of manufacture, etc.)” should be interpreted as including not only the expressly listed technical feature element, but also other technical feature elements that are not expressly listed and are well-known in the art.

[0024] The following is a detailed description of a railway marshalling yard traffic estimation method provided by this invention. Contents not described in detail in the embodiments of this invention are prior art known to those skilled in the art. Where specific conditions are not specified in the embodiments of this invention, they should be performed according to conventional conditions in the art or conditions recommended by the manufacturer.

[0025] To address the shortcomings of existing technologies, this invention aims to provide a method for calculating train flow at railway marshalling yards. This invention proposes four attributes: train flow code, assembly code, group code, and special trainset code. By defining and utilizing these four attributes for trains, freight cars, and classification lines at marshalling yards, rapid and accurate automated train flow calculation is achieved. Specifically, the train flow code enables rapid association between departing trains and freight cars awaiting marshalling, freight cars awaiting decoupling, and freight cars en route at the marshalling yard; the assembly code enables rapid association between classification lines and freight cars awaiting decoupling and freight cars en route; the group code enables rapid association between trainsets within departing trains and classification lines and freight cars awaiting marshalling; and the special trainset code enables rapid identification of whether additional shunting operations are required for the trainsets.

[0026] To facilitate understanding, the technical terms involved in the following text will be explained first: (1) Train flow refers to a set of trains with the same originating station, driving route and destination station. Trains belonging to the same train flow only differ in train number and timetable. (2) Car flow refers to a set of railway freight cars with the same destination. Freight cars whose destination station belongs to the same station set have the same car flow destination. The station set is specified by the "Freight Train Formation Plan". By convention, freight cars with a determined car flow destination are also called car flow. (3) The freight train formation plan specifies which trains can be operated from the originating station, and also includes the originating station name, driving route, destination station name, train number, formation content, formation method, etc. (4) Formation content refers to the information of each freight car from beginning to end in the train, including freight car ID (freight car identifier), sequence number, car type, car number, commodity name, car flow destination code, originating station, destination station, shipper, consignee, tare weight, gross weight, length change, notes, etc.

[0027] like Figure 1 As shown in the figure, this embodiment of the invention provides a method for estimating train flow at railway marshalling yards, which mainly includes the following steps:

[0028] Step 1: Determine the train flow code, assembly code, grouping code, and special operation code attributes for various types of freight cars within the marshalling yard. Modify these attributes according to the shift plan and dispatching orders.

[0029] In this embodiment of the invention, the types of trucks included are: trucks to be unloaded, trucks to be organized, trucks to be delivered, and trucks to be picked up.

[0030] In this step, the first step is to determine the various code attribute information based on the fixed information of the truck, and then modify the various code attribute information according to the adjustments and changes in the transportation organization.

[0031] The preferred implementation method for this step is as follows:

[0032] 1) The system automatically checks whether the train flow code, assembly code, and grouping code attributes of all freight cars awaiting release, marshalling, delivery, and pickup within the current station are empty. If empty, for loaded cars, the default value is filled in with the train flow destination code + the corresponding freight train type; for empty cars, the default value is filled in with the main emptying direction of that car type + the emptying freight train type. Loaded cars refer to freight cars loaded with goods and with a clear destination, while empty cars refer to freight cars without goods and with an undetermined destination. Freight train types include: baggage trains, mail trains, direct trains, through trains, section trains, coupling / uncoupling trains, and short-distance trains.

[0033] 2) The system automatically checks the notes attributes of all freight cars currently in the station. If there are markings indicating shunting operation precautions in the notes, such as "No shunting," "No crossing the hump," or "No crossing the parking device," the special operation code will be automatically filled with "No-Hump Car," "No Shunting Car," or "No Parking Device Car." If there are markings indicating the number of cars to be coupled and the required coupling positions, such as "Closed Door Car," "G1," "G2," "G3," "G4," "G5," "G6," "G7," "G8," "GW," or "140 Product," the marking will be automatically filled with the special operation code. The special operation code is filled in as "Shunting Operation Precautions + Number of Cars to be Coupled and Requirements for Coupling Position." If there are no shunting operation precautions or no requirements for the number of cars to be coupled and the required coupling positions, the corresponding position will be empty.

[0034] The above method automatically fills in the train flow code, assembly code, group code, and special operation code attributes for various freight cars. However, it is still necessary to check whether the corresponding code attributes need to be modified.

[0035] 1) For loaded and empty cars that need to be suspended from transport according to the shift plan and dispatching order, as well as loaded cars that are rerouted within the station and empty cars that do not run in the main emptying direction, modify their train flow code attributes: For loaded and empty cars that are suspended from transport, modify their train flow code to the train flow destination code + station retention; For loaded and empty cars going to freight yards, dedicated lines, or depots, modify their train flow code to the name of the freight yard, dedicated line, or depot + station shunting; For loaded cars that are rerouted, modify their train flow code to the train flow code of the rerouted direction + the freight train type of the rerouted direction; For empty cars that do not run in the main emptying direction, modify their train flow code to the train flow code of the actual emptying direction + the freight train type of the actual emptying direction.

[0036] 4) For freight cars that are not scheduled to assemble according to the traffic flow direction code as specified in the shift plan and dispatch order, such as assembling according to the traffic flow detour direction, assembling according to the long-distance direct marshalling yard, assembling according to the freight yard and dedicated line, assembling according to the maintenance car, assembling according to the standby car, etc., modify their assembly code attribute according to their actual assembly needs (i.e., the actual assembly direction, destination station, car type, location of maintenance operation or location of loading and unloading operation).

[0037] 5) For freight cars that are not grouped according to the destination code as specified in the shift plan and dispatching order, such as grouping them according to the detour direction of the traffic flow, grouping them according to the up or down direction of the marshalling yard, selecting one or several stations from the set of stations with the same destination code to form a group, or mixing empty cars with loaded cars going to a certain destination to form a group, modify the corresponding grouping code attribute according to their actual grouping requirements.

[0038] 6) Inspect freight cars with the "Special Operation Code" attribute. Modify the "Special Operation Code" attribute of freight cars that can be shunted after protective measures are taken, and freight cars that are not shunted according to the dispatch order according to the required number of groups and the required coupling positions.

[0039] Step 2: Combine the relevant information of the arriving trains to obtain the train flow code, assembly code, group code, and special operation code attributes of the freight cars en route, and determine the train operation type.

[0040] In this step, the first step is to determine the various code attribute information based on the fixed information of the trucks in transit. Then, the various code attribute information is modified according to the adjustments and changes in the transportation organization.

[0041] The preferred implementation method for this step is as follows:

[0042] 1) Receive train operation adjustment plans, arrival train numbers and planned arrival times issued by the dispatching center, as well as arrival train confirmation reports (or electronic operation statistics 1) forwarded by the dispatching center.

[0043] 2) Based on the arriving train number and scheduled arrival time, search for the latest arriving train confirmation report (or electronic transport statistics 1) with the same train number within a set time (e.g., within 24 hours) from all arriving train confirmation reports (or electronic transport statistics 1). Obtain the marshalling content from the corresponding arriving train confirmation report message, and obtain the relevant freight car flow destination code and notes column attributes from the marshalling content.

[0044] 3) Determine whether the train operation type is a transfer train based on whether the destination attribute of the arriving train in the train operation adjustment plan is empty: if the destination attribute is not empty, it is a transfer train; if the destination attribute is empty, it is a terminal dismantling train.

[0045] Furthermore, for transfer trains, it is determined whether there are axle reduction or axle replenishment markings. If there is an axle reduction marking, it is an axle replenishment train; if there is an axle replenishment marking, it is an axle replenishment train; if there is neither axle reduction nor axle replenishment markings, it is a transfer train without adjustment. Among these, transfer trains without adjustment, axle reduction transfer trains, and axle replenishment transfer trains all represent different types of train operations.

[0046] 4) Automatically fill in the default values ​​of train flow code, assembly code, and group code of freight cars in transit based on the traffic flow destination code, automatically fill in the special group code of freight cars in transit based on the notes column, and then confirm and modify the train flow code, assembly code, group code, and special group code of freight cars in transit based on the shift plan and dispatch order.

[0047] For loaded cars within the station that require suspension or detour transportation as stipulated in the shift plan and dispatching orders, as well as empty cars that do not run in the main emptying direction, their train flow code attributes are modified as follows: For loaded and empty cars that are suspended, their train flow code is modified to the train flow destination code + station retention; for loaded and empty cars going to freight yards, dedicated lines, or depots, their train flow code is modified to the name of the freight yard, dedicated line, or depot + station shunting; for loaded cars that are detour transportation, their train flow code is modified to the train flow code of the detour direction + the freight train type of the detour direction; for empty cars that do not run in the main emptying direction, their train flow code is modified to the train flow code of the actual emptying direction + the freight train type of the actual emptying direction.

[0048] For freight cars that are not scheduled to assemble according to the traffic flow direction code as specified in the shift plan and dispatch order, such as assembling according to the traffic flow detour direction, assembling according to the long-distance direct marshalling yard, assembling according to the freight yard and dedicated line, assembling according to the maintenance car, assembling according to the standby car, etc., their assembly code attributes shall be modified according to their actual assembly needs (i.e., the actual assembly direction, destination station, car type, location of maintenance operation or location of loading and unloading operation).

[0049] For freight cars that are not grouped according to the destination code as specified in the shift plan and dispatching order, such as grouping them according to the detour direction of the traffic flow, grouping them according to the up or down direction of the marshalling yard, selecting one or several stations from the set of stations with the same destination code to form a group, or mixing empty cars with loaded cars to a certain destination to form a group, the corresponding grouping code attribute should be modified according to their actual grouping requirements.

[0050] For freight cars with the "special operation code" attribute, modify the "special operation code" attribute of freight cars that can be shunted after protective measures are taken, and freight cars that are not shunted according to the dispatch order according to the required number of groups and the required coupling positions.

[0051] 5) Determine whether the train operation type needs to be modified based on the modified train flow codes of the freight cars en route. For trains with no-adjustment transfers, axle reduction transfers, and axle supplement transfers, if the freight cars they are attached to have two or more train flow codes, modify them to terminal dismantling trains; for terminal dismantling trains, if the freight cars they are attached to have only one train flow code, modify them to no-adjustment transfer trains.

[0052] Step 3: Based on the train operation type, deduct the freight cars in transit corresponding to the set train operation type, retain the freight cars in transit, and use the various freight cars in the marshalling yard for subsequent step 4.

[0053] In this embodiment of the invention, freight cars of trains with no adjustment transfer, trains with reduced axles transfer, and trains with supplemented axles transfer are excluded to ensure that these freight cars will not be selected by the station for originating trains when step 4 is performed.

[0054] The preferred implementation method for this step is as follows:

[0055] 1) For train operations of type 'no-decoupling transfer train', all freight cars on 'no-decoupling transfer train' are set as 'already-arranged freight cars' and automatically bound to the train ID and the 'already-arranged freight car ID.

[0056] 2) For train operations of the axle reduction transfer train type, the freight cars removed from the axle reduction transfer train and the remaining freight cars are all set as booked freight cars in this step, and the train ID and booked freight car ID are automatically bound.

[0057] 3) For train operations of the type of axle replacement train, all freight cars on the axle replacement train are set as pre-arranged freight cars, and the train ID and pre-arranged freight car ID are automatically bound. In this step, axle replacement freight cars are not assigned.

[0058] Step 4: Divide the departure time of the station-commissioned trains into three time periods. Combine the various freight cars and related code attributes determined in Step 3, calculate the station-commissioned trains, as well as the delivery and retrieval operations of freight yards, dedicated lines and depot pipelines in the first, second and third time periods, and add them to the departure trains and delivery / retrieval operation sets of the corresponding departure time periods.

[0059] For ease of description in subsequent steps, the departure times of trains originating from different stations are divided into three time periods based on the different sources of traffic:

[0060] For the first phase of station-based train departures, the train traffic originates from the classified lines, and the train formation and assembly process takes the shortest time, so they are given priority for departure.

[0061] For the second phase of station-based train formation, the train flow originates from the marshalling yard, but is not entirely within the sorting line. Some trains need to be disassembled and moved to the sorting line before they can be assembled. The assembly and train formation operation time is longer than that of the first phase, and the trains are organized to depart after the first phase of station-based train formation.

[0062] The trains originating from the station in the third phase do not all originate from the marshalling yard. Some of them come from trains that are being dismantled en route. They need to wait for the trains to arrive at the station and for the freight cars to be dismantled and moved to the sorting line before they can be marshalled. The marshalling operation time is longer than that of the second phase, and the trains are organized to depart after the trains originating from the station in the second phase.

[0063] The preferred implementation method for this step is as follows:

[0064] 1) Calculate the train flow codes, assembly codes, and grouping codes that the station needs to meet for originating trains, delivering trains, and retrieving trains. Details are as follows:

[0065] Obtain the planned train number, planned departure time, full axle conditions, assembly requirements, and grouping requirements for each station's originating trains from the schedule plan and dispatching orders. Generate the train flow code for all station-originating trains. For each station-originating train, calculate the assembly code of the freight cars that can be incorporated into the corresponding station's originating train, and calculate the grouping code and coupling position of the freight cars that can be incorporated into the station's originating train. The freight cars that can be incorporated into the corresponding station's originating train include: various types of freight cars in the marshalling yard mentioned in step 1, and the freight cars in transit retained in step 3.

[0066] The system obtains the delivery location, vehicle type, vehicle number, number of vehicles, and delivery time requirements specified in the shift plan, generates a train flow code for each delivery operation, calculates the freight car assembly code that can be assigned to the corresponding delivery operation, calculates the group code that can be assigned to the corresponding delivery operation, and the coupling position in the train.

[0067] The system obtains the vehicle pick-up location, vehicle type, vehicle number, number of vehicles, and pick-up time requirements specified in the shift plan, generates a train flow code for each pick-up operation, calculates the freight car assembly code that can be assigned to the corresponding pick-up operation, calculates the group code that can be assigned to the corresponding pick-up operation, and the mounting position in the train.

[0068] 2) Calculate the station-based departure trains, train delivery and retrieval operations, and the corresponding train formation content and traffic sources for the first time period.

[0069] Those skilled in the art will understand that "traffic source" is a technical term. In this invention, it mainly refers to freight cars bound to station-organized originating trains, delivery operations, and pick-up operations. The binding ID (identifier) ​​process mentioned later is the process of determining the traffic source.

[0070] Obtain the freight car ID, line name, stopping order, car number, total weight, and transfer length of all freight cars to be assembled and delivered in the marshalling yard, as well as all freight cars to be picked up in the freight yard, dedicated lines, and depot pipelines.

[0071] According to the dispatching order, shift plan, and "Freight Train Formation Plan" stipulating the full axle weight, full axle length change conditions, assembly requirements, and grouping requirements of the departing train, for each station-departing train number, it is determined whether the accumulated freight cars with the same train flow code as the corresponding station-departing train on each shunting yard classification line meet the conditions for full axle weight and full axle length change of the departing train. It is also determined whether the assembly code of these freight cars matches the assembly code required by the train, and whether the grouping code matches the grouping code required by the train. If all three judgments are yes, the requirements are met; otherwise, the requirements are not met. If the requirements are met, a station-arranged originating train object is generated and assigned a train ID. It is then added to the departure trains and pick-up / delivery operation set of the first time period, generating the departure sequence number for the station-arranged originating trains in the first time period. The corresponding freight cars to be arranged are set as arranged freight cars, and the departure train ID is automatically bound to the freight car ID of the corresponding freight car to be arranged. If the requirements are not met, a search is conducted on other category lines for freight cars with the same train flow code that meet the requirements for aggregation and grouping codes. If at most two freight cars from the same category line within the same shunting operation area need to be accumulated, it is considered to meet the requirements; otherwise, it is considered not to meet the requirements. For station-arranged originating trains for which no freight cars or freight cars meeting the requirements are found, they fall into the second time period for recalculation.

[0072] The main purposes of binding IDs are as follows: 1) to provide binding relationships for subsequent dispatching and utilization plans; 2) to ensure that already bound trucks will not be selected as traffic sources again during the next traffic flow calculation. Of course, these binding relationships can be released as needed.

[0073] Synchronously, for each delivery operation, the system calculates the number of wagons with the same train flow code as the delivery operation on each shunting yard classification line, and determines whether the accumulation of the corresponding wagons satisfies the requirements for both assembly and group codes. If the requirements are met, a wagon delivery operation object (assigned a wagon delivery operation ID) is generated for the freight yard, dedicated line, and depot pipeline, and then added to the departure trains and pick-up / delivery operation sets of the first time period. A pick-up / delivery operation sequence number for the first time period is generated, and the corresponding wagon is marked as a delivered wagon, automatically binding the delivery operation ID with the corresponding wagon's freight car ID. If the requirements are not met, the system searches other classification lines for wagons with the same train flow code that also meet the requirements for assembly and group codes. If accumulating wagons from at most two classification lines within the same shunting operation area is sufficient, the operation is considered to meet the requirements; otherwise, it is considered to not meet the requirements. Delivery operations that do not find wagons meeting the requirements are recalculated in the second time period.

[0074] Synchronously, for each freight car retrieval operation, the system calculates the number of freight cars with the same train flow code as that operation on the freight yard, dedicated line, and depot pipeline. It then checks whether the accumulated freight cars simultaneously meet the requirements for both the aggregation code and the grouping code. If the requirements are met, a freight yard, dedicated line, and depot pipeline freight car retrieval operation object is generated (assigned a freight car retrieval operation ID), and added to the departure trains and retrieval / delivery operation sets of the first time period. This generates a retrieval / delivery operation sequence number for the first time period, automatically assigns the corresponding freight cars to be assigned as waiting freight cars, and binds the freight car ID to the corresponding freight car ID. Freight car retrieval operations that do not find a freight car meeting the requirements are recalculated in the second time period.

[0075] The above calculation results constitute the grouping content for the first time period.

[0076] 3) Calculate the originating trains, delivery and retrieval operations, and their composition and traffic sources for the second time period.

[0077] After completing the calculations for the first time period, obtain the remaining freight cars to be assembled and the freight cars to be delivered in the marshalling yard of the marshalling yard, as well as the freight car ID, line name, stopping order, car number, total weight and length change of all freight cars to be unloaded at the arrival yard.

[0078] After deducting the trains that meet the requirements for departure in the first time period, the following steps are taken in sequence according to the dispatching order, shift plan, and the full axle weight and full axle length change conditions, assembly requirements, and grouping requirements of the departing trains as stipulated in the "Freight Train Formation Plan": For each remaining train that meets the requirements for departure, calculate the number of freight cars with the same train flow code on each shunting yard classification line. Determine whether the calculated freight cars to be assembled and the freight cars to be unloaded at the arrival yard with the same train flow code meet the requirements for departure full axle weight and full axle length change conditions. Determine whether the assembly code of these freight cars matches the assembly code required by the train, and whether the grouping code matches the grouping code required by the train. If all three determinations are yes, the requirements are met; otherwise, the requirements are not met. If the requirements are met, a station-arranged originating train object is generated and assigned a train ID. This object is then added to the departure train and pick-up / drop-off operation set for the second time period. Its departure sequence number for the station-arranged originating train in the second time period is generated, and the corresponding freight car to be arranged is set as an arranged freight car, automatically binding the departure train ID with the corresponding freight car ID. If the requirements are not met, a search is conducted on other category lines for freight cars with the same train flow code that meet the requirements for aggregation and grouping codes. If it is sufficient to accumulate freight cars on at most two category lines within the same shunting operation area, it is considered to meet the requirements; otherwise, it is considered not to meet the requirements. For station-arranged originating train numbers for which no freight cars meeting the requirements are found, they fall into the third time period for recalculation.

[0079] Synchronously, delivery operations that did not meet the conditions in the first time period are included in the delivery operations of this time period. For each delivery operation in this time period, the number of cars to be delivered with the same train flow code as the delivery operation on each shunting yard classification line is calculated. It is then determined whether the calculated cars to be delivered and the cars to be unloaded at the arrival yard with the same train flow code simultaneously meet the requirements of the assembly code and group code. If the requirements are met, a delivery operation object (assigned delivery operation ID) for the freight yard, dedicated line, and depot pipeline is generated and added to the departure train and pick-up and delivery operation set of the second time period. Its pick-up and delivery operation sequence number in the second time period is generated, and the corresponding cars to be delivered are marked as delivered cars, automatically binding the delivery operation ID with the corresponding car ID of the cars to be delivered. If the requirements are not met, other classification lines are searched for cars to be delivered with the same train flow code and meet the requirements of the assembly code and group code. If it is only necessary to accumulate cars to be delivered on two classification lines within the same shunting operation area, it is also considered to meet the requirements; otherwise, it is considered to not meet the requirements. If no delivery operation that meets the requirements is found, the operation will be recalculated in the third time period.

[0080] Synchronously, retrieval operations that did not meet the conditions in the first time period are included in the retrieval operations of the current time period. For each retrieval operation in the current time period, the number of waiting freight cars with the same train flow code as the retrieval operation on the freight yard, dedicated line, and depot are calculated. It is then determined whether the calculated waiting freight cars and the waiting freight cars at the arrival yard with the same train flow code simultaneously meet the requirements of the aggregation code and group code. If the requirements are met, a freight yard, dedicated line, and depot retrieval operation object (assigned a retrieval operation ID) is generated, and it is added to the departure train and retrieval operation set of the second time period. Its retrieval operation sequence number in the second time period is generated, and the corresponding waiting freight car is marked as a retrieved freight car, automatically binding the retrieval operation ID with the corresponding freight car ID of the waiting freight car. Retrieval operations that do not find a waiting freight car that meets the requirements fall into the third time period and are calculated again.

[0081] The above calculation results constitute the grouping content for the second time period.

[0082] 4) Calculate the originating trains, delivery and retrieval operations, train composition, and train flow sources for the third time period.

[0083] After completing the calculations for the second time period, obtain the remaining freight cars to be assembled and delivered in the marshalling yard, the remaining freight cars to be unloaded in the arrival yard, and the freight car ID, line name, stopping order, car number, total weight, and length change information for all freight cars in transit.

[0084] After deducting the trains that meet the requirements for departure in the second time period, the following steps are taken in sequence according to the dispatching order, shift plan, and the full axle weight and full axle length conversion conditions, assembly requirements, and grouping requirements of the departing trains as stipulated in the "Freight Train Formation Plan": For each remaining train that is a station-based departure, the number of freight cars with the same train flow code as that train on each shunting yard classification line is calculated. It is then determined whether the calculated freight cars to be assembled, the freight cars to be unloaded at the arrival yard with the same train flow code, and the freight cars en route meet the conditions for full axle weight and full axle length conversion of the departing train. It is also determined whether the assembly code of these freight cars to be assembled matches the assembly code required by the train, and whether the grouping code matches the grouping code required by the train. If all three determinations are yes, the requirements are met; otherwise, the requirements are not met. If the requirements are met, a station-arranged originating train object is generated and assigned a train ID. This train is then added to the departure train and pickup / delivery operation set for the third time period. Its departure sequence number for the station-arranged originating train in the third time period is generated, and the corresponding freight car to be arranged is set as an arranged freight car, automatically binding the departure train ID with the corresponding freight car ID. If the requirements are not met, a search is conducted on other category lines for freight cars with the same train flow code that meet the requirements for aggregation and grouping codes. If it is sufficient to accumulate freight cars on at most two category lines within the same shunting operation area, it is considered to meet the requirements; otherwise, it is considered not to meet the requirements. For station-arranged originating train numbers that do not find freight cars or delivery cars that meet the requirements, the calculation is repeated in the next train flow estimation.

[0085] Synchronously, delivery operations that did not meet the conditions in the second time period are included in the delivery operations of this time period. For each delivery operation in this time period, the number of cars to be delivered with the same train flow code as the delivery operation on each shunting yard classification line is calculated. It is then determined whether the calculated cars to be delivered, along with the cars to be unloaded and cars in transit with the same train flow code at the arrival yard, simultaneously meet the requirements of the assembly code and group code. If the requirements are met, a delivery operation object for the freight yard, dedicated line, and depot pipeline is generated (assigned delivery operation ID), and it is added to the departure train and pick-up and delivery operation set of the third time period. Its pick-up and delivery operation sequence number in the third time period is generated, and the corresponding cars to be delivered are set as delivered cars, automatically binding the delivery operation ID with the corresponding car ID of the cars to be delivered. If the requirements are not met, the system searches other category lines for delivery vehicles with the same column flow code that also meet the requirements for aggregation and grouping codes. If it is possible to accumulate delivery vehicles from at most two category lines within the same dispatching operation area, the system is considered to meet the requirements; otherwise, it is considered not to meet the requirements. If no delivery operation with a vehicle meeting the requirements is found, the system will recalculate the flow in the next traffic flow calculation.

[0086] Synchronously, retrieval operations that did not meet the conditions in the second time period are included in the retrieval operations of this time period. For each retrieval operation in this time period, the number of waiting freight cars with the same train flow code as the retrieval operation in the freight yard, dedicated line, and depot is calculated. It is then determined whether the calculated waiting freight cars and the waiting freight cars in the arrival yard with the same train flow code simultaneously meet the requirements of the assembly code and group code. If the requirements are met, a freight yard, dedicated line, and depot retrieval operation object (assigned a retrieval operation ID) is generated, added to the departure train and retrieval operation set of the second time period, its retrieval operation sequence number in the second time period is generated, the corresponding waiting freight car is marked as a retrieved freight car, and the retrieval operation ID is automatically bound to the corresponding freight car ID of the waiting freight car. If no retrieval operation with a waiting freight car that meets the requirements is found, it will be recalculated in the next train flow estimation.

[0087] The above calculation results constitute the grouping content for the third time period.

[0088] Step 5: Calculate the planned departure time of the trains originating from the intermediate station for each of the three time periods, as well as the start and end times of the train delivery and retrieval operations.

[0089] The preferred implementation method for this step is as follows:

[0090] 1) According to the "Station Operation Rules", obtain the average time for marshalling operations, average time for dismantling operations, average time for assembly, average time for sending cars, average time for picking up cars, train tracking interval, technical operation time for arrival and departure lines of trains arriving at the station and dismantling stations, and technical operation time for arrival and departure lines of trains originating from the station.

[0091] 2) Combine the various time periods mentioned in 1) above to calculate the additional time for assembly, additional time for grouping, additional time for special operations, additional time for the departure sequence of station-organized originating trains, and additional time for the order of pick-up and delivery operations.

[0092] In this embodiment of the invention, the additional time for assembly, the additional time for grouping, and the additional time for special operation are set according to the number of assembly codes, the number of group codes, and the number of special operation codes. The additional time for departure sequence of station-based originating trains is set according to the departure sequence number of the station-based originating trains. The additional time for retrieval and delivery operation sequence is set according to the operation sequence number of the retrieval and delivery operation.

[0093] Based on the originating trains, delivery operations, and retrieval operations determined in step 4, each freight car has only one train flow code. There may be one or more assembly and grouping codes, and one or more special operation codes. For every additional m1 assembly codes, an additional n1 minutes of assembly time is required; for every additional m2 grouping codes, an additional n2 minutes of grouping time is required; and for every additional m3 special operation codes, an additional n3 minutes of special operation time is required. The additional time for the departure sequence of originating trains at each station = the departure sequence number of the originating trains in this time period * p minutes. This additional time is the same for all three time periods.

[0094] Additional time for pickup and delivery operations = pickup and delivery sequence number in this time period * q minutes.

[0095] The values ​​of m1, m2, m3, n1, n2, n3, p, and q can be set according to the actual situation.

[0096] 3) Calculate the planned departure time of the first time period, the delivery time of the train dispatch operation, and the retrieval time of the train retrieval operation; calculate the start time and end time of the first time period.

[0097] The planned departure time of each station's originating train in the first time period = max{(current time + average marshalling operation time + additional grouping time + technical operation time of arrival and departure lines for station-based originating trains + additional departure sequence time for station-based originating trains), (planned departure time of the previous station-based originating train in the same direction + train tracking interval time)}.

[0098] The start time of each delivery operation in the first time period = current time + additional time for the order of pickup and delivery operations.

[0099] The end time of each vehicle delivery operation in the first time period = current time + additional time for the order of pickup and delivery operations + average time of vehicle delivery operations.

[0100] The start time of each vehicle retrieval operation within the first time period = current time + additional time for the retrieval and delivery operation sequence.

[0101] The end time of each vehicle retrieval operation within the first time period = current time + additional time for retrieval and delivery sequence + average time for vehicle retrieval operation.

[0102] The start time of the first time period = min{the planned departure time of the station-based train with departure sequence number 1 in the first time period, and the start time of the delivery or pick-up operation with delivery operation sequence number 1 in the first time period}.

[0103] The end time of the first time period = max{the planned departure time of the train with the largest departure sequence number in the first time period, and the end time of the delivery or pick-up operation with the largest pick-up / pick-up sequence number in the first time period}.

[0104] 4) Calculate the planned departure time of the first train departing from the station in the second time period, the delivery time of the train delivery operation, and the retrieval time of the train retrieval operation; calculate the start time and end time of the second time period.

[0105] The planned departure time of each station's originating train in the second time period = max{(end time of the first time period + average dismantling operation time + average assembly time + average marshalling operation time + additional grouping time + technical operation time of the station's originating train arrival and departure lines + additional departure sequence time of the station's originating train), (planned departure time of the previous station's originating train in the same direction + train tracking interval time)}.

[0106] The start time of each vehicle delivery operation in the second period = the end time of the first period + the average duration of dismantling operations + the average assembly time + the additional time for the order of pick-up and delivery operations.

[0107] The end time of each vehicle delivery operation in the second period = the end time of the first period + the average duration of dismantling operations + the average assembly time + the additional time for the order of pick-up and delivery operations + the average duration of vehicle delivery operations.

[0108] The start time of each vehicle retrieval operation in the second time period = the end time of the first time period + the average duration of dismantling operations + the average assembly time + the additional time for the retrieval and delivery sequence + the average duration of vehicle retrieval operations.

[0109] The end time of each vehicle retrieval operation in the second time period = the end time of the first time period + the average duration of dismantling operations + the average assembly time + the additional time for the retrieval and delivery sequence + the average duration of vehicle retrieval operations.

[0110] The start time of the second time period = min{the planned departure time of the station-based train with departure sequence number 1 in the second time period, and the start time of the delivery operation with delivery operation sequence number 1 in the second time period}.

[0111] The end time of the second time period = max{the planned departure time of the train with the largest departure sequence number in the second time period, and the end time of the delivery operation with the largest pickup and delivery sequence number in the second time period}.

[0112] 5) Calculate the planned departure time of the trains originating from the station in the third time period and the delivery time of the train delivery operation; calculate the start time and end time of the second time period.

[0113] The planned departure time of each station's originating train in the third time period = max{(max{end time of the second time period + planned arrival time of the train with the latest arriving freight car in transit} + technical operation time of the arrival and departure line of the final dismantling train + average dismantling operation time + average assembly time + average marshalling operation time + additional grouping time + technical operation time of the arrival and departure line of the station's originating train + additional time for the departure sequence of the station's originating train), (planned departure time of the previous station's originating train in the same direction + train tracking interval time)}.

[0114] The start time of each delivery operation in the third time period = max{end time of the second time period + planned arrival time of the train to which the latest freight car in transit is bound} + technical operation time of the arrival and departure line of the final dismantling train + average dismantling operation time + average assembly time + additional time for the order of pick-up and delivery operations.

[0115] The end time of each delivery operation in the third time period = max{end time of the second time period + planned arrival time of the train with the latest arriving freight car in transit} + technical operation time of the arrival and departure line of the final dismantling train + average dismantling operation time + average assembly time + additional time for the order of pick-up and delivery operations + average delivery operation time.

[0116] The start time of each car retrieval operation in the third time period = max{end time of the second time period + planned arrival time of the train to which the latest freight car in transit is bound} + technical operation time of the arrival and departure line of the final dismantling train + average dismantling operation time + average assembly time + additional time for the order of retrieval and delivery operations.

[0117] The end time of each car retrieval operation in the third time period = max{end time of the second time period + planned arrival time of the train to which the latest freight car in transit is bound} + technical operation time of the arrival and departure line of the final dismantling train + average dismantling operation time + average assembly time + additional time for the order of retrieval and delivery operations + average car retrieval operation time.

[0118] The start time of the third time period = min{the planned departure time of the station-based train with departure sequence number 1 in the third time period, and the start time of the delivery operation with delivery operation sequence number 1 in the third time period}.

[0119] The end time of the third time period = max{the planned departure time of the train with the largest departure sequence number in the third time period, and the end time of the delivery operation with the largest pickup and delivery sequence number in the second time period}.

[0120] The times calculated in this step will be marked in the shunting operation plan. In addition, the planned departure time, the start time of the delivery operation, and the start time of the retrieval operation will also be used for subsequent sorting work, which will be introduced in detail in step 7.

[0121] Step 6: Calculate the planned departure times of the freight cars in transit (i.e., trains without axle transfer, trains with axle reduction, and trains with axle replenishment) deducted in Step 3, add them to the departure train and pick-up / delivery operation sets for the corresponding departure time slots, and determine the destination of the axle-reducing freight cars and the source of the axle-replenishing freight cars.

[0122] The preferred implementation method for this step is as follows:

[0123] 1) According to the "Station Operation Rules", obtain the technical operation time of the arrival and departure lines of the transfer trains without final adjustment, the technical operation time of the arrival and departure lines of the transfer trains with axle reduction, the technical operation time of the arrival and departure lines of the transfer trains with axle replenishment, the average time of axle reduction operation, and the average time of axle replenishment operation.

[0124] 2) Set the waiting time for reducing shafts and the waiting time for replenishing shafts.

[0125] 3) For train operations that are non-adjustment transfer trains, the planned departure time is the sum of the planned arrival time and the technical operation time of the non-adjustment transfer train arrival and departure lines. The train is then added to the set of departing trains and pick-up and delivery operations for the corresponding departure time period.

[0126] 4) For train operations involving axle reduction transfers, the planned departure time is set to "planned arrival time + axle reduction transfer train arrival / departure track technical operation duration," the axle reduction start time is set to "planned arrival time + axle reduction operation standby time," and the axle reduction end time is set to "planned arrival time + axle reduction operation standby time + axle reduction operation average time." This train object is then added to the corresponding departure train and pick-up / delivery operation set for the corresponding departure period. The freight cars removed from the axle reduction transfer train are designated as waiting freight cars in the corresponding marshalling yard for that period, and the binding between the freight car ID and the train ID is removed.

[0127] 5) For train operations involving axle replenishment and transfer, the planned departure time is set to "planned arrival time + axle replenishment and transfer train arrival / departure track technical operation time," the axle reduction start time is set to "planned arrival time + axle replenishment operation standby time," and the axle reduction end time is set to "planned arrival time + axle replenishment operation standby time + axle replenishment operation average time." The train is then added to the corresponding departure train and pick-up / delivery operation set for the corresponding departure period. All freight cars on axle replenishment and transfer trains are set as pre-arranged freight cars. Freight cars selected from the waiting-to-be-arranged train flow in the marshalling yard for the corresponding time period are automatically bound to the train ID and the freight car ID for axle replenishment.

[0128] Step 7: Based on the calculated planned departure times, delivery start times, and retrieval start times, reorder the departing trains and retrieval / delivery sets in ascending order to generate a total sequence number for the departing trains and retrieval / delivery sets. These sets form the basis for subsequent shunting operation planning.

[0129] In this embodiment of the invention, the numbering of each step is only used to indicate different steps and does not necessarily represent the execution order of the steps. In fact, some steps can be executed in parallel or sequentially as needed. For example, steps 1 and 2 can be executed synchronously or one after the other. In short, the specific execution order can be determined by those skilled in the art in combination with the specific steps.

[0130] Through the above description of the embodiments, those skilled in the art can clearly understand that the above embodiments can be implemented by software, or by using software plus necessary general-purpose hardware platforms. Based on this understanding, the technical solutions of the above embodiments can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (such as a CD-ROM, USB flash drive, external hard drive, etc.), including several instructions to cause a computer device (such as a personal computer, server, or network device, etc.) to execute the methods described in the various embodiments of the present invention.

[0131] The above description is merely a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in the present invention should be included within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.

Claims

1. A method for estimating train flow at railway marshalling yards, characterized in that, include: Step 1: Determine the train flow code, assembly code, group code, and special operation code attributes of various freight cars within the marshalling yard. Among them, the train flow code indicates the direction of the train flow, the assembly code indicates the direction of assembly, the destination station, the type of car, the location of maintenance operations, or the location of loading and unloading operations, the group code identifies the cars that can be coupled into a car group, and the special operation code indicates whether additional shunting operations are required. Step 2: Combine the relevant information of the arriving trains to obtain the train flow code, assembly code, group code, and special operation code attributes of the freight cars en route, and determine the train operation type. Step 3: Based on the train operation type, deduct the freight cars in transit corresponding to the set train operation type, retain the freight cars in transit, and use the various freight cars in the marshalling yard for subsequent steps; Step 4: Divide the departure time of the station-commissioned trains into three time periods. Combine the various freight cars and related code attributes determined in Step 3, calculate the delivery and retrieval information of the station-commissioned trains, freight yards, dedicated lines and depot pipelines in the first, second and third time periods respectively, and add them to the departure trains and delivery and retrieval operation sets of the corresponding departure time periods. Step 5: Calculate the planned departure time of the trains originating from the intermediate station for each of the three time periods, as well as the start and end times of the train delivery and retrieval operations. Step 6: Calculate the planned departure times of the freight cars in transit that were deducted in Step 3, and add them to the departure trains and pick-up and delivery operation sets for the corresponding departure times. Step 7: Based on the calculated planned departure time, delivery start time and pick-up start time, reorder the departure trains and pick-up / delivery sets for the corresponding departure time period in ascending order to generate the overall sequence number of the departure trains and pick-up / delivery sets. The calculation process for the first time period is as follows: Obtain the freight car ID, line name, stopping order, car number, total weight and transfer length of all freight cars to be assembled and delivered in the marshalling yard of the marshalling yard, as well as all freight cars to be picked up in the freight yard, dedicated line and section pipeline; According to the prescribed conditions for full axle weight, full axle length change, assembly requirements, and grouping requirements of departing trains, for each station-commissioned train number, it is determined whether the accumulated freight cars with the same train flow code as the corresponding station-commissioned train on each shunting yard classification line meet the conditions for full axle weight and full axle length change of departing trains; whether the assembly code of the freight cars matches the assembly code required by the train; and whether the grouping code matches the grouping code required by the train. If all three judgments are correct, the requirements are met; otherwise, they are not met. If the requirements are met, a station-commissioned train object is generated and assigned a train ID, and then added to the first... The system generates the departure train and pick-up / delivery operation set for each time period, and generates the departure sequence number of the station-arranged originating trains in the first time period. The corresponding freight cars to be arranged are set as arranged freight cars, and the departure train ID is automatically bound to the freight car ID of the corresponding freight car to be arranged. If the requirements are not met, the system searches other classification lines for freight cars to be delivered that have the same train flow code and meet the requirements of the assembly code and group code. If it is necessary to accumulate freight cars to be delivered on at most two classification lines in the same shunting operation area, it is also determined that the requirements are met; otherwise, it is determined that the requirements are not met. For station-arranged originating train numbers for freight cars or freight cars to be delivered that do not meet the requirements, they fall into the second time period and are calculated again. For each delivery operation, calculate the number of cars to be delivered on each shunting yard classification line that have the same train flow code as the delivery operation, and determine whether the requirements for assembly code and group code are met after accumulating the corresponding cars to be delivered. If the requirements are met, generate a delivery operation object for freight yard, dedicated line, and depot pipeline, and add it to the departure train and pick-up and delivery operation set of the first time period to generate the pick-up and delivery operation sequence number of the first time period. Set the corresponding cars to be delivered as delivered cars and automatically bind the delivery operation ID and the freight car ID of the corresponding cars to be delivered. If the requirements are not met, search other classification lines for cars to be delivered that have the same train flow code and meet the requirements for assembly code and group code. If it is only necessary to accumulate the cars to be delivered on two classification lines in the same shunting operation area, it is also determined to meet the requirements. Otherwise, it is determined to not meet the requirements. Delivery operations that do not find cars to be delivered that meet the requirements fall into the second time period and are calculated again. For each retrieval operation, calculate the freight cars waiting to be retrieved that have the same train flow code as the retrieval operation on the freight yard, dedicated line, and depot pipeline, and determine whether the accumulated freight cars waiting to be retrieved simultaneously meet the requirements of the aggregation code and group code. If the requirements are met, generate a freight yard, dedicated line, and depot pipeline retrieval operation object, and add it to the departing trains and retrieval operation set of the first time period to generate the retrieval operation sequence number of the first time period. Automatically set the corresponding freight cars waiting to be retrieved as freight cars to be organized, and bind the retrieval operation ID with the freight car ID of the corresponding freight car waiting to be retrieved. If no freight cars waiting to be retrieved that meet the requirements are found, the retrieval operation falls into the second time period and is calculated again.

2. The method for estimating train flow at railway marshalling yards according to claim 1, characterized in that, The attributes for determining the train flow code, assembly code, grouping code, and special operation code for various types of freight cars within the marshalling yard include: Check if the train flow code, assembly code, and grouping code attributes of all types of freight cars in the current station are empty. If the train flow code is empty, for loaded cars, fill in the train flow code with the train destination and freight train type as the default value; for empty cars, fill in the train flow code with the train destination in the direction of car type emptying as the default value. Among them, all types of freight cars include: all freight cars waiting to be released, freight cars waiting to be assembled, freight cars waiting to be delivered, freight cars waiting to be picked up, and freight cars in transit in the station. Loaded cars refer to freight cars loaded with goods and with a clear destination, and empty cars refer to freight cars without goods and with an undetermined destination. If the assembly code and grouping code are empty, fill in the assembly code and grouping code with the freight car flow destination code as the default value. Check the notes column attributes of various freight cars. If there is a mark for shunting operation precautions in the notes column and the corresponding special operation code attribute value is empty, then automatically fill the corresponding mark into the special operation code.

3. The method for estimating train flow at railway marshalling yards according to claim 2, characterized in that, Also includes: For loaded and empty cars that have suspended operations, the train flow code will be changed to indicate that the train flow destination and station are retained. For loaded and empty cars heading to freight yards, dedicated lines, or depots, the train flow code is modified to the name of the freight yard, dedicated line, or depot and the shunting operation at this station; for loaded cars on detours, the train flow code is modified to the train flow code of the detour direction and the freight train type of the detour direction; for empty cars not running in the main emptying direction, their train flow code is modified to the train flow code of the actual emptying direction and the freight train type of the actual emptying direction. For trucks that do not assemble according to their traffic flow direction codes, their assembly code attributes will be modified according to their actual assembly needs. For trucks that are not grouped according to traffic flow direction codes, modify the corresponding grouping code attributes according to the actual grouping requirements. Inspect freight cars with special operation codes. Modify the special operation code attributes of freight cars that can be released after protective measures are taken, as well as freight cars that are not grouped according to the requirements of the number of trains and the position of the trains according to the dispatching order.

4. The method for estimating train flow at railway marshalling yards according to claim 1, characterized in that, The process of combining information about arriving trains to obtain the train flow code, assembly code, group code, and special operation code attributes of freight cars en route includes: Obtain the destination code and notes attributes of the trucks on the road from the grouped content; The system automatically fills in the default values ​​of train flow codes, assembly codes, and group codes for freight cars en route based on the traffic flow destination codes, and automatically fills in the special group codes for freight cars en route based on the notes column; then, based on the shift plan and dispatch orders, it confirms and modifies the train flow codes, assembly codes, group codes, and special group codes for freight cars en route.

5. The method for estimating train flow at railway marshalling yards according to claim 1, characterized in that, The train operation type is determined as follows: Based on whether the destination attribute of the arriving train in the train operation adjustment plan is empty, it is determined whether the train operation type is a transfer train: if the destination attribute is not empty, it is a transfer train; if the destination attribute is empty, it is a terminal dismantling train. For transfer trains, it is determined whether there is an axle reduction or axle replenishment mark. If there is an axle reduction mark, it is an axle reduction train; if there is an axle replenishment mark, it is an axle replenishment train; if there is neither axle reduction nor axle replenishment mark, it is an unadjusted transfer train. Among them, the transfer trains without adjustment, the transfer trains with reduced axles, and the transfer trains with supplemented axles all represent different types of train operations. They are all set types of train operations and will be deducted in step 3.

6. The method for estimating train flow at railway marshalling yards according to claim 1, characterized in that, The calculation of the planned departure times of trains originating from intermediate stations in the three time periods, as well as the start and end times of train delivery and retrieval operations, includes: The average time for marshalling operations, dismantling operations, assembly operations, car delivery operations, car retrieval operations, train tracking intervals, technical operation times for arrival and departure lines of trains arriving at and departing from stations, and technical operation times for arrival and departure lines of trains originating from stations are obtained. Based on the various durations obtained, calculate the additional duration for assembly, additional duration for grouping, additional duration for special operations, additional duration for the departure sequence of station-based originating trains, and additional duration for the sequence of pick-up and delivery operations. By combining the additional time for assembly, additional time for grouping, additional time for special operations, additional time for the departure sequence of station-based originating trains, and additional time for the sequence of pick-up and delivery operations, the planned departure time of the station-based originating trains, as well as the start and end times of the delivery and pick-up operations, are calculated for the three time periods.

7. The method for estimating train flow at railway marshalling yards according to claim 1, characterized in that, The planned departure times of freight cars in transit, deducted in calculation step 3, are added to the set of departing trains and pick-up / delivery operations for the corresponding departure time period, including: The deducted freight cars in transit include: trains without adjustment transfers, trains with axle reduction transfers, and trains with axle replenishment transfers; Obtain the technical operation time of the arrival and departure lines for trains with no axle reduction, the technical operation time of the arrival and departure lines for trains with axle replenishment, the average time of axle reduction operation, and the average time of axle replenishment operation; Set the standby time for axle reduction operation and the standby time for axle replenishment operation; For trains without transfers, the planned arrival time plus the technical operation time of the train arrival and departure lines without transfers is used as the planned departure time, and it is added to the set of departing trains and pick-up and delivery operations for the corresponding departure time. For axle reduction transfer trains, the planned arrival time plus the technical operation time of the axle reduction transfer train arrival and departure line is used as its planned departure time, the planned arrival time plus the axle reduction operation standby time is used as its axle reduction start time, and the planned arrival time plus the axle reduction operation standby time plus the average axle reduction operation time is used as its axle reduction end time. These are then added to the departure trains and pick-up and delivery operation sets for the corresponding departure time period. For axle replacement trains, the planned arrival time plus the technical operation time of the axle replacement train arrival and departure line is used as its planned departure time, the planned arrival time plus the axle replacement operation standby time is used as its axle reduction start time, and the planned arrival time plus the axle replacement operation standby time plus the average axle replacement operation time is used as its axle reduction end time. These are then added to the departure trains and pick-up and delivery operation sets for the corresponding departure time period.

Citation Information

Patent Citations

  • Railway real-time traffic flow calculation method and device

    CN107554560A

  • Marshalling yard dispatching automation system

    CN109532960A