A method for optimizing the evaluation of linear steel-concrete composite continuous beam pull-out reinforcement
By combining high-definition cameras and intelligent reinforcement equipment with total station monitoring, the deflection deviation of steel-concrete composite beam bridges can be accurately assessed and controlled, solving the problems of cumbersome and low-precision reinforcement methods in existing technologies, and achieving efficient and accurate reinforcement results.
Patent Information
- Application Number
- CN202311445571.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-01
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-11-01
AI Technical Summary
Existing technologies for steel-concrete composite beam bridges suffer from excessive deflection, cumbersome reinforcement methods, large measurement errors, and an inability to guarantee reinforcement accuracy during construction and operation. Furthermore, they are time-consuming and costly to implement.
High-definition cameras are used to scan the deflection line of the main beam. Combined with the theoretical pre-camber cosine curve equation, the line shape is accurately evaluated and reinforced by intelligent reinforcement lifting equipment and total station monitoring. Steel strands and reflective crosshairs are used for real-time correction to achieve precise control.
This improved the precision and efficiency of steel-concrete composite beam bridge reinforcement construction, reduced construction costs and time, and ensured the accuracy and safety of the reinforcement.
Smart Images

Figure CN117684483B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of steel-concrete composite continuous beam construction technology, specifically relating to a method for optimizing the evaluation of the alignment of steel-concrete composite continuous beams by lifting and reinforcing them. Background Technology
[0002] Steel-concrete composite beams are a new type of structure developed based on steel and concrete structures. They primarily utilize shear connectors (studs, channel steel, bent bars, etc.) between the steel beams and concrete flanges to resist uplift and relative slippage at the interface, allowing them to function as a unified whole. This rational combination of steel and concrete fully leverages the advantages of steel's high tensile strength and good plasticity, and concrete's good compressive strength. They complement each other's weaknesses, representing an improvement over traditional concrete web box girders and fully utilizing the strengths of both materials.
[0003] During construction, steel-concrete composite beam bridges may experience significant deformation and deflection under conditions such as secondary paving or load testing due to insufficient bolt tightening. For steel-concrete composite beam bridges with lower initial design load levels, severe overloading, coupled with long-term exposure to humid air and rain, can easily cause connecting bolts or rivets to loosen or break, resulting in partial failure of the tightening force, leading to a decrease in structural stiffness and an increase in steel beam deflection. For steel-concrete composite beam bridges located in cold regions, the extensive use of de-icing salt can severely damage expansion joints and other ancillary facilities. Coupled with a lack of regular maintenance, the bridge condition deteriorates further, making it prone to fatigue failure under vehicle loads, leading to further severe structural damage.
[0004] To address the issue of excessive deflection in steel-concrete composite beam structures during construction and operation, existing solutions involve directly measuring the deflection profile of the beam segments using a level, then erecting temporary piers or supports at the excessively deflected areas and using jacks to lift them back to their original positions. However, this method is cumbersome in practice, relies on traditional alignment assessment methods leading to significant measurement errors and compromising reinforcement accuracy. Furthermore, the jacking process can be challenging due to asynchronous support forces, making it difficult to control the lifting height and beam alignment, and can cause localized stress concentrations and excessive deformation. Moreover, the reinforcement construction is time-consuming and costly. Therefore, a more efficient reinforcement construction method that meets the structural stress characteristics of steel-concrete composite beam bridges is urgently needed. Summary of the Invention
[0005] To address the shortcomings of existing technologies, this invention provides a method for optimizing the evaluation of the alignment of steel-concrete composite continuous beams by lifting and reinforcing them. By accurately evaluating the alignment and adopting a reasonable lifting and reinforcing scheme, the method effectively solves the problem of excessive deflection during the construction and subsequent operation of steel-concrete composite beams, and greatly improves the quality and efficiency of steel-concrete composite beam bridge reinforcement construction.
[0006] To achieve the above objectives, the present invention adopts the following technical solution: a method for optimizing the evaluation of the linearity of a steel-concrete composite continuous beam for lifting and reinforcement, comprising the following steps:
[0007] S1. A high-definition camera is used to scan the main beam to obtain the actual deflection profile. This profile is compared with the profile of the theoretical pre-camber cosine curve equation to determine the beam segment to be reinforced. Key sections are selected, and the actual deflection height D at the key section locations is measured. z The theoretical pre-camber height D at the key section location is obtained by using the theoretical pre-camber cosine curve equation. z Calculate the lifting height ΔD:
[0008] ΔD=(D Z -D' Z )+Δd
[0009] In the formula: Δd is the additional height based on the theoretical pre-arch, and Δd is 10-20cm;
[0010] S2. Move the lifting device to the position of the beam segment to be reinforced, and then fix the steel strand of the lifting device to the hook pre-embedded in the beam segment to be reinforced.
[0011] S3. The transverse wet joint of the beam segment to be reinforced is cleaned by cutting and chiseling away the wet joint concrete. Then, the high-strength bolts on the front and rear ends of the beam segment to be reinforced are loosened.
[0012] S4. Affix reflective cross markers to the side wall of the beam segment to be reinforced;
[0013] S5. The beam segment to be reinforced is lifted using the steel strand of the lifting device, and the reflective crosshairs are monitored using a total station during the lifting process.
[0014] S6. After lifting, retighten the high-strength bolts and pour concrete at the wet joint.
[0015] As a preferred embodiment, the following steps are also included:
[0016] S7. After the reinforcement work of the span is completed, the lifting device is slid to the next span to complete the hole crossing operation, and then the reinforcement work of the next span is repeated according to steps S1-S6.
[0017] Preferably, in step S3, the transverse wet joint of the beam segment to be reinforced is cleaned by removing the wet joint concrete using a "high-pressure water jet" cutting process.
[0018] Preferably, in step S4, reflective cross markers are affixed to the four corners of the side wall of the beam segment to be reinforced.
[0019] Preferably, in step S4, reflective cross markers are affixed to the midpoints of both sides of the sidewall of the beam segment to be reinforced.
[0020] Preferably, in step S5, the beam segment to be reinforced is simultaneously and gradedly lifted using the steel strands of the lifting device. After each lift to a certain height, the reflective crosshairs are monitored by a total station. When abnormalities such as horizontal axial deviation or vertical plane deflection occur in the beam segment to be reinforced, the deviation is corrected in a timely manner.
[0021] Preferably, in step S6, after the lifting is completed, the coordinates are remeasured using a total station to ensure that the beam segment to be reinforced is lifted to the designated position. Then, the high-strength bolts are retightened, and the wet joint is poured.
[0022] Preferably, the lifting device is an intelligent reinforcement lifting device, which includes a device distribution beam, a bottom rail of the distribution beam, a rear support leg, and a front support leg. The bottom ends of the front support leg and the rear support leg are detachably installed on the front and rear side beam segments of the beam segment to be reinforced, respectively. The top ends of the rear support leg and the front support leg are fixed with upper rails of the beam segment. The bottom rail of the distribution beam simultaneously slides with two sets of upper rails of the beam segment. The device distribution beam slides with the bottom rail of the distribution beam. The sliding direction of the upper rail of the beam segment is perpendicular to the sliding direction of the bottom rail of the distribution beam. The device distribution beam is equipped with a device for lifting the steel strand.
[0023] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0024] 1. The present invention provides a method for lifting and reinforcing steel-concrete composite continuous beams with optimized evaluation line shape. By scanning the deflection line shape of the main beam with a high-definition camera, the actual deflection line shape can be obtained quickly and accurately. The actual deflection line shape can be compared with the line shape calculated and analyzed by the theoretical pre-camber cosine curve equation to obtain a reasonable lifting height, which can significantly improve the accuracy of the deflection evaluation line shape of steel-concrete composite beams.
[0025] 2. The present invention provides a method for lifting and reinforcing steel-concrete composite continuous beams with optimized evaluation of the beam profile. Reflective cross markers are set on the side wall of the beam segment to be reinforced. Then, the lifting, axial deviation and rotation of the beam segment are monitored in real time by a total station. Once an abnormality occurs, it can be corrected in time, which effectively improves the lifting accuracy and efficiency.
[0026] 3. The present invention provides an optimized evaluation method for lifting and reinforcing steel-concrete composite continuous beams. The intelligent reinforcement and lifting equipment is easy and quick to operate. By distributing the bottom track of the beam and the upper track of the beam segment, the equipment can distribute the longitudinal and lateral movement of the beam, so that the equipment can be quickly moved to the position of the beam segment to be reinforced. That is, the lifting steel strand can quickly reach the designated position and complete the lifting operation. Attached Figure Description
[0027] Figure 1 A flowchart of a method for optimizing and evaluating the linearity of a steel-concrete composite continuous beam for lifting and strengthening is provided in an embodiment of the present invention;
[0028] Figure 2 A schematic diagram of the theoretical precamber cosine curve of a method for lifting and strengthening a steel-concrete composite continuous beam with optimized evaluation line provided in an embodiment of the present invention;
[0029] Figure 3 A schematic diagram of the pre-arched alignment and the on-site deflection alignment of a steel-concrete composite continuous beam lifting and reinforcement method for optimizing the evaluation alignment provided in an embodiment of the present invention;
[0030] Figure 4 A top view of the transverse wet joint of the beam segment to be reinforced in a method for lifting and reinforcing a steel-concrete composite continuous beam with optimized evaluation line provided in an embodiment of the present invention.
[0031] Figure 5 A side view of the beam segment to be reinforced, provided in an embodiment of the present invention, for a method of lifting and reinforcing a steel-concrete composite continuous beam with optimized evaluation profile;
[0032] Figure 6 A schematic diagram of the front structure of a reflective cross marker pasted on the side wall of the beam segment to be reinforced, which is provided in an embodiment of the present invention for a method of lifting and reinforcing a steel-concrete composite continuous beam with optimized evaluation line.
[0033] Figure 7 A schematic diagram of the front structure of the beam segment to be reinforced after deflection, provided in an embodiment of the present invention, for a method of lifting and reinforcing a steel-concrete composite continuous beam with optimized evaluation line.
[0034] Figure 8 A front structural schematic diagram of an intelligent reinforcement lifting device for an optimized evaluation method of lifting and reinforcing a steel-concrete composite continuous beam, provided in an embodiment of the present invention;
[0035] Figure 9 A front structural diagram of the steel strand and related parts of a method for lifting and strengthening a steel-concrete composite continuous beam with optimized evaluation line shape, provided in an embodiment of the present invention;
[0036] Figure 10A top view of the track and related parts on the beam segment of a steel-concrete composite continuous beam lifting and reinforcement method for optimizing the evaluation line provided in an embodiment of the present invention;
[0037] Figure 11 This is a front structural diagram of an intelligent reinforcement lifting device used during a through-hole operation, as provided in an embodiment of the present invention, for a method of lifting and reinforcing a steel-concrete composite continuous beam with optimized evaluation line shape.
[0038] The attached diagram lists the components represented by each number as follows:
[0039] 1. Beam segment to be reinforced; 2. Equipment distribution beam; 3. Bottom track of distribution beam; 4. Coordinate layout points; 5. Bottom track of outriggers; 6. Steel strand; 7. Hook; 8. Upper track of beam segment; 9. Bridge deck; 12. Rear outrigger; 13. Front outrigger; 14. Middle outrigger; 15. Mid-span alignment; 16. Side-span alignment; 17. Pre-arch alignment; 18. On-site deflection alignment; 19. Milled area. Detailed Implementation
[0040] The present invention will now be described in further detail with reference to specific embodiments, so that those skilled in the art can more clearly understand the present invention.
[0041] It should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "joining" should be interpreted broadly. For example, they can refer to fixed connections, detachable connections, or integrally formed structures. Those skilled in the art can understand the specific meaning of these terms in this patent based on the specific circumstances.
[0042] Example 1
[0043] like Figure 1 As shown in the figure, this embodiment provides a method for optimizing the evaluation line of a steel-concrete composite continuous beam by lifting and strengthening, which includes the following steps:
[0044] S1. According to existing technology, the cosine curve equation of the theoretical pre-camber of a mid-span bridge is as follows:
[0045]
[0046] Where: L - span; M z - Pre-camber of the completed bridge at mid-span; x is the distance of the key section from the origin; Y is the pre-camber of the completed bridge at the key section.
[0047] Based on the above equations, the mid-span shape 15 of the theoretical pre-camber cosine curve can be derived, such as... Figure 2 As shown. The theoretical precamber of the completed side span can also be calculated using the above curve equation. After calculation, the side span shape 16 of the theoretical precamber cosine curve can be obtained, as shown. Figure 2As shown, combining the mid-span line 15 and the side-span line 16 yields the pre-arch line 17.
[0048] A high-definition camera was used to scan the main beam, resulting in the on-site deflection profile 18. This profile was then compared with the pre-camber profile 17 derived from the theoretical pre-camber cosine curve equation. Figure 3 As shown, the beam segment where the deflection occurred is identified as beam segment 1 to be reinforced. The mid-span is selected as the critical section, and the elevation of the deflection location is measured using a total station and other surveying equipment. That is, the actual deflection height D at the critical section location is measured. z The theoretical pre-camber height D at the key section location is obtained by using the theoretical pre-camber cosine curve equation. z Calculate the lifting height ΔD:
[0049] ΔD=(D Z -D' Z )+Δd
[0050] In the formula: Δd is the additional height based on the theoretical pre-arch, and Δd is 10-20cm.
[0051] S2. Move the lifting device to the position of the beam segment 1 to be reinforced, and then fix the steel strand 6 of the lifting device to the hook 7 pre-embedded in the beam segment 1 to be reinforced. The lifting device is existing technology, and its principle is similar to the existing bridge erecting machine equipment. The lifting of the beam segment 1 to be reinforced can be achieved by raising and lowering the steel strand 6.
[0052] S3. The transverse wet joint of the beam segment 1 to be reinforced is cleaned and removed using a "high-pressure water jet" (water milling) method, such as... Figure 4-5 As shown, the dimensions of the milling area 19 can follow the following rules:
[0053] Milling length = bridge deck width;
[0054] Milling depth = thickness of bridge deck 9;
[0055] The milling width is 10-20cm.
[0056] After milling is completed, loosen the high-strength bolts on the front and rear ends of the beam segment 1 to be reinforced, and complete the preparation work before lifting.
[0057] S4. To monitor the elevation displacement of the beam segment 1 to be reinforced in real time during the lifting process, reflective cross markers can be affixed to the side wall of the beam segment 1 to be reinforced. For example, reflective cross markers can be affixed to the four corners and the midpoints of both sides of the side wall of the beam segment 1 to be reinforced. Figure 6As shown, a total of six coordinate points 4 are arranged. A total station is then used to observe the reflective crosshairs of these six coordinate points 4. During the lifting process, by judging whether the line connecting the six coordinate points 4 deflects, it can be quickly determined whether the beam segment 1 to be reinforced has deflected. Figure 7 As shown, if the beam segment 1 to be reinforced deflects, the posture of the beam segment 1 to be reinforced can be adjusted by controlling the position and lifting speed of the steel strand 6, so that the beam segment 1 to be reinforced can be restored to the initial angle.
[0058] S5. The beam segment 1 to be reinforced is lifted using the steel strand 6 of the lifting device. During the lifting process, the lifting force and displacement are controlled simultaneously, with displacement as the primary control and lifting force as the secondary control. Furthermore, the reflective crosshairs are monitored by a total station every certain height. When abnormalities such as horizontal axial deviation or vertical plane deflection occur in the beam segment 1 to be reinforced, the deviation is corrected in a timely manner.
[0059] S6. After the lifting is completed, use a total station to remeasure the coordinates to ensure that the beam segment to be reinforced 1 is lifted to the designated position. Then, re-tighten the high-strength bolts and ensure that the bolt tightening force meets the requirements. Finally, use higher grade concrete to pour the wet joint to complete the reinforcement work of the beam segment.
[0060] The steel-concrete composite continuous beam lifting and reinforcement method provided in this embodiment also includes the following steps:
[0061] S7. After the reinforcement work on the current span is completed, slide the lifting device to the next span. Specifically, the lifting device can be moved as a whole to the next span, and then the corresponding support legs can be installed to complete the transfer of the lifting device between spans. Then repeat the reinforcement work on the next span according to steps S1-S6.
[0062] In summary, the steel-concrete composite continuous beam lifting and reinforcement method provided in this embodiment can quickly and accurately obtain the actual deflection line by scanning the main beam deflection line with a high-definition camera. This line is then compared with the line obtained through calculation and analysis using the theoretical pre-camber cosine curve equation to determine a reasonable lifting height, significantly improving the accuracy of the deflection assessment line for the steel-concrete composite beam. Reflective crosshairs are placed on the sidewall of the beam segment to be reinforced, and the lifting, axial deviation, and rotation of the beam segment are monitored in real time using a total station. Any abnormalities can be corrected promptly, effectively improving the lifting accuracy and efficiency.
[0063] Example 2
[0064] Based on Example 1, in this example, the lifting device can be an intelligent reinforcement lifting device, such as... Figure 8-10As shown, the intelligent reinforcement and lifting device includes a distribution beam 2, a bottom rail 3 of the distribution beam, a rear support leg 12, and a front support leg 13. The bottom ends of the front support leg 13 and the rear support leg 12 are detachably installed on the front and rear side beam segments of the beam segment 1 to be reinforced. The top ends of the rear support leg 12 and the front support leg 13 are each fixed with a beam segment upper rail 8. The bottom rail 3 of the distribution beam slides in cooperation with two sets of beam segment upper rails 8. The distribution beam 2 slides in cooperation with the bottom rail 3 of the distribution beam. The sliding direction of the upper rail 8 of the beam segment is perpendicular to the sliding direction of the bottom rail 3 of the distribution beam. The distribution beam 2 is equipped with a device for lifting the steel strand 6. The bottom rail 3 of the distribution beam is arranged along the length direction of the beam segment 1 to be reinforced.
[0065] The intelligent reinforcement and lifting device includes at least two rear support legs 12, which together support the upper track 8 of the beam segment. Similarly, the intelligent reinforcement and lifting device includes at least two front support legs 13, which together support the upper track 8 of the beam segment. That is, one set of upper track 8 is fixedly mounted on each of the two rear support legs 12 and the other on each of the two front support legs 13. This allows the bottom track 3 of the distribution beam to slide in conjunction with both sets of upper track 8, effectively improving the stability of the bottom track 3. Based on this structure, the longitudinal and lateral movement of the distribution beam 2 can be achieved through the bottom track 3 and the upper track 8, enabling the device to quickly move to the location of the beam segment 1 to be reinforced. This allows the steel strand 6 to quickly reach the designated position and complete the lifting operation, effectively improving construction efficiency and operational flexibility.
[0066] The equipment distribution beam 2 can slide freely and be locked on the bottom track 3 of the distribution beam. For example, the bottom track 3 of the distribution beam has multiple limiting screw holes evenly spaced along its length on its side wall, and the equipment distribution beam 2 has locking screw holes that match the limiting screw holes on its side wall. When the equipment distribution beam 2 slides to a designated position on the bottom track 3 of the distribution beam, the locking screw hole aligns with one of the limiting screw holes. Then, the limiting screw is simultaneously inserted into both the locking screw hole and the limiting screw hole, thereby locking and fixing the equipment distribution beam 2 to the bottom track 3 of the distribution beam. For example, during operation, the equipment distribution beam 2 can be driven to slide on the bottom track 3 of the distribution beam by a hydraulic drive mechanism or a pulley drive mechanism. When the equipment distribution beam 2 slides to a designated position on the bottom track 3 of the distribution beam, the hydraulic drive mechanism or the pulley drive mechanism is stopped, thereby keeping the equipment distribution beam 2 fixed and locking and fixing it to the bottom track 3 of the distribution beam.
[0067] Similarly, the bottom track 3 of the distribution beam can slide freely and be locked on the upper track 8 of the beam segment, and its principle is the same as the above structure.
[0068] To facilitate the vias, in this embodiment, as follows: Figure 11 As shown, the intelligent reinforcement lifting device also includes a bottom track 5 for the support legs and a middle support leg 14. The bottom end of the rear support leg 12 is adapted to the bottom track 5 for the support legs, that is, the rear support leg 12 can slide on the bottom track 5 for the support legs. The bottom track 5 for the support legs is arranged along the length direction of the beam segment 1 to be reinforced. The top end of the middle support leg 14 is slidably connected to the bottom track 3 of the distribution beam. The bottom end of the middle support leg 14 is detachably installed on the beam segment 1 to be reinforced. The middle support leg 14 is located between the rear support leg 12 and the front support leg 13.
[0069] When a hole is needed, the bottom rail 5 of the support leg is installed on the beam segment behind the beam segment 1 to be reinforced. At this time, three support legs provide support. The bottom end of the rear support leg 12 is detached from the beam segment, and the bottom end of the rear support leg 12 is slidably engaged with the bottom rail 5 of the support leg. At this time, the rear support leg 12 can still provide support. Then, the bottom end of the front support leg 13 is detached from the beam segment, so that the bottom end of the front support leg 13 is in a suspended state. Then, the rear support leg 12 is slid along the bottom rail 5 of the support leg, which drives the bottom rail 3 of the distribution beam. Synchronous movement: Since the top of the middle support leg 14 slides into contact with the bottom track 3 of the distribution beam, the top of the middle support leg 14 will not move with the bottom track 3 of the distribution beam. That is, the middle support leg 14 plays the role of sliding support. When the bottom track 3 of the distribution beam slides to the next span position, the bottom end of the front support leg 13 is installed on the beam segment that does not need to be lifted and reinforced. Then the bottom track 5 of the support leg is removed, and the rear support leg 12 is installed on the beam segment that does not need to be lifted and reinforced to complete the hole-passing operation. Subsequently, the reinforcement operation of the next span beam segment can be carried out.
[0070] The mechanisms, components, and parts not specifically described in this invention are all existing structures in the prior art and can be purchased directly from the market.
[0071] In the description of this invention, it should be understood that the terms "upper," "lower," "left," and "right," etc., indicating orientation or positional relationships based on the orientation or positional relationships shown in the accompanying drawings, are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or a specific orientational structure and operation. Therefore, they should not be construed as limitations on the invention. Furthermore, "first" and "second" are only for descriptive purposes and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Therefore, a feature defined with "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this invention, unless otherwise stated, "multiple" means two or more.
[0072] The above are merely preferred embodiments of the present invention and are not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.
Claims
1. A method for optimizing the evaluation line of a steel-concrete composite continuous beam by lifting and strengthening, characterized in that, Includes the following steps: S1. The main beam is scanned with a high-definition camera to obtain the actual deflection line of the main beam. The line is compared with the line of the theoretical pre-camber cosine curve equation to determine the beam segment to be reinforced (1). The key section is selected and the actual deflection height at the key section position is measured. The theoretical pre-camber height at key section locations was obtained using the cosine curve equation of the theoretical pre-camber. Calculate the lifting height : In the formula: This is the additional height added based on the theoretical pre-arch. It is 10-20cm; S2. Move the lifting device to the position of the beam segment (1) to be reinforced, and then fix the steel strand (6) of the lifting device to the hook (7) pre-embedded in the beam segment (1) to be reinforced. S3. The transverse wet joint of the beam segment (1) to be reinforced is cleaned by cutting process, and then the high-strength bolts on the front and rear ends of the beam segment (1) to be reinforced are loosened. S4. Affix reflective cross markers to the side wall of the beam segment (1) to be reinforced; S5. The beam segment (1) to be reinforced is lifted by the steel strand (6) of the lifting device, and the reflective crosshairs are monitored by a total station during the lifting process. S6. After the lifting is completed, retighten the high-strength bolts and pour concrete at the wet joint. The lifting device is an intelligent reinforcement lifting device. The intelligent reinforcement lifting device includes a device distribution beam (2), a distribution beam bottom rail (3), a rear support leg (12), and a front support leg (13). The bottom ends of the front support leg (13) and the rear support leg (12) are respectively detachably installed on the front and rear side beam sections of the beam section to be reinforced (1). The top ends of the rear support leg (12) and the front support leg (13) are fixed with upper rails (8) of the beam section. The distribution beam bottom rail (3) simultaneously slides with two sets of upper rails (8) of the beam section. The device distribution beam (2) slides with the distribution beam bottom rail (3). The sliding direction of the upper rail (8) of the beam section is perpendicular to the sliding direction of the distribution beam bottom rail (3). The device distribution beam (2) is equipped with a device for lifting the steel strand (6). The intelligent reinforcement lifting device also includes a bottom track (5) for the support legs and a middle support leg (14). The bottom end of the rear support leg (12) is adapted to the bottom track (5) for the support legs. The bottom track (5) for the support legs is arranged along the length of the beam segment (1) to be reinforced. The top end of the middle support leg (14) is slidably connected to the bottom track (3) of the distribution beam. The bottom end of the middle support leg (14) is detachably installed on the beam segment (1) to be reinforced. The middle support leg (14) is located between the rear support leg (12) and the front support leg (13).
2. The method for optimizing the evaluation line of a steel-concrete composite continuous beam by lifting and strengthening, as described in claim 1, is characterized in that... It also includes the following steps: S7. After the reinforcement work of the beam segment to be reinforced (1) is completed, the lifting device is slid to the next span to complete the hole crossing operation, and then the reinforcement work of the next span beam segment is repeated according to steps S1-S6.
3. The method for optimizing the evaluation line of a steel-concrete composite continuous beam by lifting and strengthening, as described in claim 1, is characterized in that... In step S3, the transverse wet joint of the beam segment (1) to be reinforced is cleaned by removing the wet joint concrete using a "high-pressure water jet" cutting process.
4. The method for optimizing the evaluation line of a steel-concrete composite continuous beam by lifting and strengthening, as described in claim 1, is characterized in that... In step S4, reflective cross markers are affixed to the four corners of the side wall of the beam segment (1) to be reinforced.
5. The method for optimizing the evaluation line of a steel-concrete composite continuous beam by lifting and strengthening, as described in claim 4, is characterized in that... In step S4, reflective cross markers are pasted at the midpoints of both sides of the sidewall of the beam segment (1) to be reinforced.
6. The method for optimizing the evaluation line of a steel-concrete composite continuous beam by lifting and strengthening, as described in claim 1, is characterized in that... In step S5, the beam segment (1) to be reinforced is synchronously and gradedly lifted using the steel strand (6) of the lifting device. The reflective crosshairs are monitored by a total station after each lift to a certain height. When the beam segment (1) to be reinforced shows abnormal horizontal axial deviation or vertical plane deflection, the deviation is corrected in time.
7. The method for optimizing the evaluation line of a steel-concrete composite continuous beam by lifting and strengthening, as described in claim 1, is characterized in that... In step S6, after the lifting is completed, the coordinates are remeasured using a total station to ensure that the beam segment (1) to be reinforced is lifted to the designated position. Then, the high-strength bolts are tightened again, and the wet joint is poured.
Citation Information
Patent Citations
Reverse jacking reinforcing method and jacking structure of concrete box girder bridge
CN110952463A
Total station reflector plate type steel beam deflection measuring method
CN113358087A
Complete bridge linear control method for steel-concrete composite beam construction
CN114169050A