Self-repairable energy-dissipation pile-slab support system and construction and repair method thereof
The self-healing energy-dissipating pile-slab support system, composed of irregular piles, precast arch slabs and rubber seats, solves the problem of insufficient seismic resistance of traditional pile-slab walls in mountainous areas, and achieves efficient damage self-repair and improved economy.
Patent Information
- Application Number
- CN202311812780.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-12-26
AI Technical Summary
Traditional pile-slab walls have insufficient seismic resistance and recovery capacity in earthquake and landslide support in mountainous areas, resulting in uneven construction quality, high costs, and great difficulty in post-earthquake repair.
The self-healing energy-dissipating pile-slab support system, composed of irregularly shaped piles, precast arch slabs, rubber seats, and support columns, utilizes a combination of high-ductility concrete, friction particles, and polymeric binders to enhance seismic performance and damage recovery capabilities.
It improves the seismic performance and self-healing ability of the pile-slab support system, reduces the difficulty and cost of post-earthquake repair, and enhances its economy and applicability.
Smart Images

Figure CN117684546B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of geotechnical engineering technology, and in particular to a self-healing energy-dissipating pile-slab support system and its construction and repair methods. Background Technology
[0002] Pile-slab walls, as a common slope protection structure, are widely used due to their good load-bearing performance and cost-effectiveness, especially suitable for earthquake-induced landslides in mountainous areas. However, traditional pile-slab walls also exhibit several shortcomings in practical applications. Firstly, construction conditions in mountainous areas are often harsh, and the thin-walled slabs, when cast on-site, are prone to uneven thickness, affecting the quality of the slabs and consequently the safety performance of the entire pile-slab structure. Secondly, the seismic resistance of traditional pile-slab walls is significantly insufficient. As the design magnitude increases, the construction and maintenance costs of this structure rise rapidly, and strong earthquakes can cause severe damage to the pile-slab structure, requiring substantial post-earthquake repair costs, thus diminishing its initial economic advantages. To improve the applicability of pile-slab walls in mountainous landslides, it is essential to enhance their seismic resistance and self-recovery capabilities, reduce earthquake damage to the structure, and lower the difficulty and cost of post-earthquake repairs. Only in this way can the widespread and long-term application of pile-slab walls be truly realized in various regions. Summary of the Invention
[0003] This invention provides a self-healing energy-dissipating pile-slab support system and its construction and repair method, which solves the problem of insufficient seismic resistance and recovery capacity of existing pile-slab walls in landslide support.
[0004] A self-healing energy-dissipating pile-slab support system includes: irregular piles, precast arch slabs, and rubber seats. The rubber seats are fixed to the irregular piles by connecting steel plates, and the two sides of the precast arch slabs are connected to two adjacent irregular piles.
[0005] The rubber seat has multiple support columns inside, with the two ends of the support columns abutting against the connecting steel plate;
[0006] The support column is made of friction particles and polymeric binder. The polymeric binder has strong adhesion and high strength after solidification. The friction particles are evenly distributed in the polymeric binder.
[0007] The beneficial effects of adopting the above technical solution are as follows: The support system of the present invention replaces the traditional flat retaining wall with an arch plate. Due to its curved structure, the arch plate has better seismic resistance and damage recovery ability. Secondly, the two sides of the precast arch plate are installed on rubber seats. When the rubber seats fail in shear, they can dissipate some seismic energy and reduce damage to the structure. Moreover, support columns are set inside the rubber seats. Before the support columns are damaged, they can not only provide support, but also consume seismic energy. After they are damaged, the friction particles inside rub against the polymer binder and consume a large amount of seismic energy, thereby improving the seismic resistance of the overall support system.
[0008] Furthermore, the aforementioned irregular piles are formed by pouring high-strength concrete in conjunction with a steel reinforcement cage, with their bottom extending into stable rock strata.
[0009] Furthermore, the aforementioned precast arch slabs are cast from high-ductility concrete, and their radial cross-sectional shapes include circular arc, trapezoidal, and U-shaped.
[0010] The beneficial effects of adopting the above technical solution are: the precast arch slabs cast with high ductility concrete have higher deformation energy dissipation capacity, which can reduce damage to the overall system and facilitate self-repair during earthquakes.
[0011] Furthermore, the aforementioned connecting steel plate is fixed to the wall of the irregular pile by positioning nails.
[0012] Furthermore, the aforementioned positioning pin can be any one of a double-ended bolt, an anchor cable, or an anchor rod.
[0013] Furthermore, the aforementioned friction particles are made of high-strength wear-resistant metal, and their surface is processed to be rough.
[0014] The beneficial effects of adopting the above technical solution are: the friction particles made of metal with rough surfaces consume a large amount of energy through mutual friction between the particles during an earthquake, thus reducing damage to the structure.
[0015] Furthermore, the aforementioned polymeric binder includes high-strength heat-shrinkable polymers and natural polymers with strong anti-aging properties.
[0016] Furthermore, the aforementioned polymer binder contains high-strength and high-toughness fiber filaments.
[0017] A construction method for a self-healing energy-dissipating pile-slab support system, based on the aforementioned pile-slab support system, includes the following steps:
[0018] Step 1: Before construction, conduct a geological survey and formulate a suitable specific pile-slab support plan based on the soil quality and rock mass distribution;
[0019] Step 2: Clear obstacles from the site and prepare the necessary equipment and materials for construction;
[0020] Step 3: Drill holes at the designated locations, pile the piles according to the designed depth and diameter, and install the reinforcing cage and cast-in-place concrete to construct the irregular piles. When constructing the irregular piles, the positioning nails and connecting steel plates need to be integrated into one piece.
[0021] Step 4: Precast arch panels are manufactured in the factory according to the design quality standards and dimensions, and transported to the construction site after curing to meet the standards;
[0022] Step 5: Install rubber seats on the irregularly shaped piles and securely install the rubber seats onto the connecting steel plate;
[0023] Step Six: Use hoisting equipment to hoist the precast arch slab into place and fix it to the rubber seat by connecting steel plates to ensure the accuracy of the position and angle of the precast arch slab;
[0024] Step 7: Perform construction joint correction to ensure a tight connection between the precast arch slab and the rubber seat; conduct a detailed inspection of all structural connections to ensure they are secure, and immediately repair and adjust any installation defects.
[0025] Step 8: After construction is completed, conduct stability and safety tests on the support system and carry out necessary maintenance until the support system is fully stable and safe to use.
[0026] Step 9: Regularly inspect and maintain the support system to ensure long-term stability and safety.
[0027] To increase the service life of pile-slab support systems, a repair method for a self-healing energy-dissipating pile-slab support system is proposed. Based on the aforementioned pile-slab support system, the method includes the following steps:
[0028] S1: Regular inspection and evaluation: Regularly conduct visual inspections of the entire support system, focusing on parts such as rubber seats, precast arches, and connecting steel plates; use professional equipment (such as ultrasonic flaw detectors) to detect internal damage and defects, record the inspection results, and compare them with historical data to evaluate the trend of changes in the condition of each component of the support system.
[0029] S2: Repair of rubber seat: If the rubber seat has small cracks or slight deformation, observe whether it can repair itself. If self-repair does not occur but the damage is minor, temporary support can be set at the damaged part to reduce its load and avoid further damage. If the rubber seat is found to be severely damaged or cannot repair itself, replace it with a rubber seat of the same model.
[0030] S3: Repair of precast arch panels: For minor damage, such as cracks or fragments, use appropriate adhesive materials for bonding and repair; for large-area damage or structural damage, replacement should be performed.
[0031] S4: Repair of connecting steel plates: After inspecting the appearance and internal damage of the connecting steel plates, if the damage is minor, local reinforcement can be carried out. Reinforcement methods include adding supports, using reinforcement plates, and strengthening the connection. If the damage is severe, the plates should be replaced immediately.
[0032] S5: Check the stability of bolts and other connectors, and after ensuring that there are no errors, conduct a comprehensive safety and functional test;
[0033] S6: Record repair work information and continuously monitor the support system.
[0034] The present invention has the following beneficial effects:
[0035] (1) The energy-dissipating pile-slab support system of the present invention uses high-performance precast concrete arch slabs, self-healing rubber seats and energy-dissipating support columns. Compared with the traditional pile-slab wall structure, the support system of the present invention has higher seismic performance and damage self-healing ability, while improving the applicability and economy of the support system in mountainous areas and avoiding large-scale repairs after earthquakes.
[0036] (2) The energy dissipation type pile-slab support system of the present invention is conducive to improving the service life and support effect of the overall support structure, and reducing repair costs and workload. Attached Figure Description
[0037] Figure 1 This is a front isometric view of the pile-slab support system of the present invention;
[0038] Figure 2 This is a rear isometric view of the pile-slab support system of the present invention;
[0039] Figure 3 This is a top view schematic diagram of the pile-slab support system of the present invention;
[0040] Figure 4 This is a schematic diagram of the supporting column in this invention;
[0041] Figure 5 This is a schematic diagram of the arrangement of the rubber seat and the connecting steel plate in this invention. Figure 1 ;
[0042] Figure 6 This is a schematic diagram of the arrangement of the rubber seat and the connecting steel plate in this invention. Figure 2 .
[0043] In the diagram: 1-Irregular pile; 2-Precast arch slab; 3-Connecting steel plate; 4-Rubber seat; 5-Support column; 6-Friction particles; 7-Polymerized binder. Detailed Implementation
[0044] The principles and features of the present invention are described below with reference to the accompanying drawings. The examples given are only for explaining the present invention and are not intended to limit the scope of the present invention.
[0045] Example 1
[0046] refer to Figure 1 and Figure 2This invention provides a self-healing energy-dissipating pile-slab support system, comprising irregular piles 1, precast arch plates 2, connecting steel plates 3, and rubber seats 4. The two sides of the precast arch plates 2 are connected to two adjacent irregular piles 1. The rubber seats 4 are fixed to the irregular piles 1 by the connecting steel plates 3. The connecting steel plates 3 are fixed to the wall of the irregular piles 1 by positioning nails, which can be any one of double-ended bolts, anchor cables, or anchor rods. Multiple support columns 5 are arranged inside the rubber seats 4, and the two ends of the support columns 5 are pressed against the connecting steel plates 3.
[0047] The irregular pile 1 is formed by pouring high-strength concrete in conjunction with a steel cage. Its bottom extends into the stable rock layer, providing a load-bearing foundation for the support and also providing support for the installation of the precast arch slab 2.
[0048] The precast arch slab 2 is cast from high-ductility concrete. Due to the excellent deformation capacity of this material, the slab can effectively prevent cracking under seismic loads, improving the overall seismic performance of the system and possessing self-healing properties, facilitating post-earthquake maintenance. The radial cross-sectional shape of the precast arch slab 2 includes various shapes such as arc, trapezoid, and U-shape. In this embodiment, the precast arch slab 2 is arc-shaped. Its curved structure can withstand greater pressure and is less prone to damage, absorbing and dissipating more seismic energy during earthquakes, ensuring structural safety. The precast arch slab 2 is prefabricated in a factory, ensuring its quality.
[0049] refer to Figure 3 The connecting steel plate 3 includes two pieces, which are fixed on both sides of the rubber seat 4 respectively. Each connecting steel plate 3 is provided with threaded holes. One of the connecting steel plates 3 is fixed to the irregular pile 1 by installing positioning nails on the threaded holes. The other connecting steel plate 3 has a U-shaped groove structure and is fixed to the rubber seat 4 by bolts. At the same time, the precast arch plate 2 is installed through its groove cavity.
[0050] refer to Figures 4 to 6 The rubber seat 4 has multiple support columns 5 inside. The support columns 5 are made of friction particles 6 and polymer binder 7. The friction particles 6 are distributed in the polymer binder 7.
[0051] The friction particles 6 are preferably made of high-strength wear-resistant metal, and their surfaces are processed into rough surfaces such as uneven or serrated surfaces to increase the surface roughness of the particles, which is beneficial to enhance the frictional damping between particles and increase the energy dissipation capacity. At the same time, their rough surfaces can enhance the adhesion of the polymer binder 7 and improve the bonding strength.
[0052] The polymeric binder 7 is a high-molecular material with strong adhesion at a certain temperature and high strength after solidification. It forms a solid support column 5 by adhering to the friction particles 6. When the pressure reaches a certain threshold, it quickly breaks and falls off within a short time, ensuring that the friction particles 6 quickly enter the friction state after the support column 5 is damaged. This ensures that the support column 5 has sufficient support strength under normal use and also provides excellent energy dissipation capacity under seismic action. Depending on the application scenario, the polymeric binder 7 can be made of a high-strength heat-shrinkable polymer, which is suitable for heavy-load projects such as roads. For mountainous areas, natural polymers with strong anti-aging properties can be considered. Of course, recombinant polymers or biopolymers can also be used to achieve self-healing functions and reduce the difficulty of later maintenance.
[0053] Under normal operating conditions, the rubber seat 4 and the support column 5 are firmly bonded together by the polymeric binder 7 in the support column 5, which is responsible for bearing the applied stress and transmitting it to the support. At this time, the rubber seat 4 does not undergo shearing, and the displacement of the precast arch slab 2 is strictly limited. When a strong earthquake occurs, if the applied stress exceeds the bearing limit of the polymeric binder 7, it will quickly break or fall off. The precast arch slab 2 will lose its movement range restriction, causing the rubber seat 4 to enter a shearing state and participate in energy dissipation. At the same time, the friction particles 6 will break free from their restraints and slide and collide relative to each other inside the rubber seat 4. The friction and collision process consumes a large amount of seismic energy, reduces the amplitude of the precast arch slab 2, and thus achieves the purpose of structural energy dissipation and vibration reduction.
[0054] To increase the strength of the support column 5, high-strength and high-toughness fiber filaments are added to the polymer binder 7 to act as connecting ribs.
[0055] The support system of the present invention effectively improves the seismic resistance of the pile-slab support system, making it safer. At the same time, the rubber seat 4 enhances the energy dissipation capacity of the entire system, eliminates irreparable damage to the support system under strong earthquakes, reduces the difficulty of later repairs, and further enhances the economy and practicality of the entire system.
[0056] Example 2
[0057] A construction method for a self-healing energy-dissipating pile-slab support system, based on the pile-slab support system described in Example 1, includes the following steps:
[0058] Step 1: Before construction, conduct a detailed geological survey to understand the geological conditions such as soil and rock, and formulate a suitable specific pile-slab support plan based on the geological conditions;
[0059] Step 2: Clean up the construction site, remove obstacles, ensure the safety and unobstructed access of the construction area, and prepare the materials and equipment needed for construction, including steel bars, concrete, precast arch slabs 2, rubber seats 4, etc.
[0060] Step 3: Drill holes at the designated locations, pile the piles according to the designed depth and diameter, and install the reinforcing cage and cast-in-place concrete to construct the irregular pile 1. When constructing the irregular pile 1, the positioning nails and connecting steel plates 3 need to be integrated as one unit.
[0061] Step 4: According to the design quality standards and dimensions, precast arch panels 2 are manufactured in the factory, cured to meet the standards, and then transported to the construction site;
[0062] Step 5: Install rubber seat 4 on irregular pile 1, and securely install rubber seat 4 on connecting steel plate 3;
[0063] Step 6: Use hoisting equipment to hoist the precast arch slab 2 into place and fix it to the rubber seat 4 by connecting steel plate 3 to ensure that the position and angle of the precast arch slab 2 are accurate;
[0064] Step 7: Perform construction joint correction to ensure a tight connection between the precast arch slab 2 and the rubber seat 4; conduct a detailed inspection of all structural connections to ensure they are secure, and immediately repair and adjust any installation defects.
[0065] Step 8: After construction is completed, conduct stability and safety tests on the support system and carry out necessary maintenance until the support system is fully stable and safe to use.
[0066] Step 9: Regularly inspect and maintain the support system to ensure long-term stability and safety.
[0067] Example 3
[0068] A repair method for a self-healing energy-dissipating pile-slab support system, based on the pile-slab support system described in Example 1, includes the following steps:
[0069] S1: Regular inspection and evaluation: Regularly conduct visual inspections of the entire support system, focusing on parts such as rubber seat 4, precast arch slab 2, and connecting steel plate 3; use professional equipment (such as ultrasonic flaw detector) to detect internal damage and defects, record the inspection results, and compare them with historical data to evaluate the trend of changes in the condition of each component of the support system.
[0070] S2: Repair of rubber seat 4: If the rubber seat 4 has small cracks or slight deformation, observe whether it can repair itself. If self-repair does not occur but the damage is minor, temporary support can be set at the damaged part to reduce its load and avoid further damage. If the rubber seat 4 is found to be severely damaged or cannot repair itself, replace it with a rubber seat 4 of the same model.
[0071] S3: Repair of precast arch slab 2: For minor damage, such as cracks or fragmentation, use appropriate adhesive materials for bonding and repair; for large-area damage or structural damage, replacement should be performed.
[0072] S4: Repair of connecting steel plate 3: After inspecting the appearance and internal damage of connecting steel plate 3, if the damage is minor, local reinforcement should be carried out. Reinforcement methods include adding supports, using reinforcement plates, and strengthening the connection; if the damage is serious, it should be replaced immediately.
[0073] S5: Check the stability of bolts and other connectors, and after ensuring that there are no errors, conduct a comprehensive safety and functional test;
[0074] S6: Record detailed information on all repair work, including damage, repair methods, and materials used. Regularly compile maintenance and repair reports to provide a reference for future maintenance and continuously monitor the support system.
[0075] Example 4
[0076] Multiple landslides occurred along a provincial highway and were treated using a pile-slab support structure. The pile-slab structure consisted of self-healing precast arch slabs 2, support columns 5, and rubber seats 4. Monitoring over a year and a half revealed that the polymeric binder 7 on several support columns 5 had partially cracked. Temporary supports were installed on this section of the structure, temporarily removing it from operation. After a period of rest, it was found that the connection in this section had reconstituted and recovered. The temporary supports were then removed, and the structure returned to normal operation.
[0077] The above description is merely a preferred embodiment of the present invention, and does not represent all possible forms of the present invention. The scope of protection of the present invention is not limited to such specific statements and embodiments. Various other modifications and improvements can be made based on the technical teachings disclosed in the present invention without departing from the essence of the present invention, and these modifications and improvements are still within the scope of protection of the present invention.
Claims
1. A self-repairable energy-dissipating pile-slab support system, characterized in that, include: The irregular pile (1), the precast arch plate (2) and the rubber seat (4) are fixed on the irregular pile (1) by connecting steel plate (3), and the two sides of the precast arch plate (2) are connected to two adjacent irregular piles (1). The rubber seat (4) has multiple support columns (5) arranged inside, and the two ends of the support columns (5) abut against the connecting steel plate (3). The support column (5) is made of friction particles (6) and polymeric binder (7). The polymeric binder (7) has strong adhesion and high strength after solidification. The friction particles (6) are uniformly distributed in the polymeric binder (7). High-strength and high-toughness fiber filaments are added to the polymeric binder (7). The polymeric binder (7) includes a high-strength heat-shrinkable polymer and a natural polymer with strong anti-aging ability. The friction particles (6) are made of high-strength wear-resistant metal and have a rough surface.
2. The self-repairable energy-dissipating pile-slab shoring system according to claim 1, wherein, The irregular pile (1) is formed by pouring high-strength concrete in conjunction with a steel cage, and its bottom extends into the stable rock layer.
3. The self-repairable energy-dissipating pile-slab shoring system according to claim 1, wherein, The precast arch slab (2) is made of high ductility concrete and its radial cross-sectional shape includes arc, trapezoid and U.
4. The self-repairable buckling-restrained bracing system of claim 1, wherein, The connecting steel plate (3) is fixed to the wall of the irregular pile (1) by positioning nails.
5. The self-repairable energy-dissipating pile-slab shoring system according to claim 4, wherein, The positioning pin can be any one of a double-ended bolt, an anchor cable, or an anchor rod.
6. A construction method for a self-healing energy-dissipating pile-slab support system, based on the pile-slab support system of claim 1, comprising the following steps: Step 1: Before construction, conduct a geological survey and formulate a suitable specific pile-slab support plan based on the soil quality and rock mass distribution; Step 2: Clear obstacles from the site and prepare the necessary equipment and materials for construction; Step 3: Drill holes at the designated locations, pile the piles according to the designed depth and diameter, and install the steel cage and cast-in-place concrete to construct the irregular pile (1). When constructing the irregular pile (1), the positioning nails and connecting steel plates (3) need to be set as one piece at the same time. Step 4: Precast arch panels (2) are manufactured in the factory according to the design quality standards and dimensions, and transported to the construction site after curing to meet the standards; Step 5: Install the rubber seat (4) on the irregular pile (1) and securely install the rubber seat (4) on the connecting steel plate (3); Step 6: Use hoisting equipment to hoist the precast arch slab (2) into place and fix it to the rubber seat (4) through the connecting steel plate (3) to ensure that the position and angle of the precast arch slab (2) are accurate; Step 7: Perform construction joint correction to ensure a tight connection between the precast arch slab (2) and the rubber seat (4); conduct a detailed inspection of all structural connections to ensure they are secure, and immediately repair and adjust any installation defects. Step 8: After construction is completed, conduct stability and safety tests on the support system and carry out curing until the support system is fully stable and safe to use; Step 9: Regularly inspect and maintain the support system to ensure long-term stability and safety.
7. A repair method for a self-healing energy-dissipating pile-slab support system, based on the pile-slab support system of claim 1, comprising the following steps: S1: Ultrasonic flaw detector) detects internal damage and defects, records the inspection results, compares them with historical data, and assesses the trend of condition changes of each component of the support system; S2: Repair of rubber seat (4): If there are small cracks or slight deformation damage in the rubber seat (4), observe whether it can repair itself. If self-repair does not occur but the damage is slight, set up temporary support at the damaged part to reduce its load and avoid further damage. If the rubber seat (4) is found to be severely damaged or cannot be repaired by itself, replace it with a rubber seat (4) of the same model; S3: Repair of precast arch slabs (2): For small-area damage, such as cracks, use adhesive materials for bonding and repair; for large-area damage or structural damage, replace them. S4: Repair of connecting steel plate (3): After inspecting the appearance and internal damage of connecting steel plate (3), if the damage is minor, local reinforcement shall be carried out. Reinforcement methods include adding support and using reinforcement plates; if the damage is serious, it shall be replaced immediately. S5: Check the stability of the bolted connections and, after ensuring they are correct, conduct comprehensive safety and functional tests; S6: Record repair work information and continuously monitor the support system.
Citation Information
Patent Citations
Assembly type pile and arch combined retaining wall and construction method thereof
CN108385715A
Composite self-resetting lead-core rubber damper
CN108708471A
Seamless formula bridge expansion joint structure
CN204608598U