Double-vacuum preheater boiler coupling flue gas waste heat utilization system
By using a dual air preheater-furnace coupling system, the cold air is heated multiple times by high-temperature and low-temperature air preheaters. Combined with heat pipe heat exchangers and flue bypass high-temperature heaters, the corrosion and ash accumulation problems of condensate heaters and low-temperature heat exchangers are solved, achieving higher safety and economy.
Patent Information
- Application Number
- CN202311446062.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-01
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-11-01
AI Technical Summary
In existing flue gas waste heat recovery systems, condensate heaters and low-temperature heat exchangers are prone to corrosion, which can lead to unsafe operation of the unit. In addition, traditional solutions are subject to the risk of ash accumulation and blockage, and are not economically viable.
The system employs a dual air preheater-furnace coupling system, which heats the cold air three times through a high-temperature air preheater and a low-temperature air preheater. Combined with a heat pipe heat exchanger and a high-temperature heater in the flue bypass, it avoids low-temperature corrosion and ash accumulation blockage, thereby improving safety and economy.
It effectively solves the corrosion problem of condensate heaters and low-temperature heat exchangers, reduces the risk of ash accumulation and blockage, improves the safety and economy of the unit, and has an energy saving benefit of about 3g/(kw·h), which is better than the traditional solution.
Smart Images

Figure CN117685560B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of flue gas waste heat utilization technology, specifically to a dual air preheater-furnace coupled flue gas waste heat utilization system. Background Technology
[0002] Energy management of coal-fired power generating units is becoming increasingly sophisticated, with various forms of flue gas waste heat recovery and utilization systems already in place. Their main characteristic is the full utilization of low-temperature flue gas to heat cold air, replacing high-temperature flue gas to heat the higher-temperature feedwater and condensate of the turbine system, reducing steam extraction from the regenerator system, and achieving cascaded energy utilization. For example, a publicly disclosed boiler flue gas waste heat utilization system (ZL 2019 2 0726958.7) uses a heat exchanger located at the air preheater outlet to heat the cold primary / secondary air at the air preheater inlet, and uses a heat exchanger located on the air preheater bypass flue to heat the turbine feedwater and condensate systems from the portion of flue gas that does not pass through the air preheater. Currently, several 600MW / 1000MW class coal-fired power generating units in China have adopted this or similar schemes for deep cascaded utilization of boiler flue gas waste heat.
[0003] However, based on the practical results from power plants that have implemented this system, the actual operation has not achieved the desired effect. The main reason is that the heat exchangers used to heat condensate in the air preheater bypass flue and the heat exchangers located at the air preheater outlet are at high risk of low-temperature corrosion. They begin to leak after about 3 years of operation, and some units even experience leaks in less than 1 year. If not handled properly, a large amount of water leaks into the flue, causing unscheduled unit shutdowns and making the unit unable to operate safely. Summary of the Invention
[0004] The purpose of this invention is to provide a dual air preheater boiler coupled flue gas waste heat utilization system to solve the problem of unit inability to operate safely due to corrosion of the heating surfaces of condensate heaters and low-temperature heat exchangers.
[0005] To achieve the above objectives, embodiments of the present invention provide a dual air preheater boiler-machine coupled flue gas waste heat utilization system, comprising: a flue, the inlet end of which is connected to the boiler, and a high-temperature air preheater, a low-temperature air preheater, a first heat exchange component, and a second heat exchange component disposed on the flue, wherein the low-temperature air preheater is disposed between the high-temperature air preheater and the second heat exchange component.
[0006] A flue is used to transport flue gas discharged from a boiler.
[0007] The first heat exchange component is used to heat the feedwater delivered to the boiler using the flue gas in the flue.
[0008] The second heat exchange component is used to heat the cold air delivered to the boiler using the flue gas from the flue.
[0009] Low-temperature air preheater is used to reheat the cold air delivered to the boiler using flue gas in the flue.
[0010] A high-temperature air preheater is used to reheat the cold air delivered to the boiler three times using flue gas from the flue.
[0011] Optionally, the first heat exchange assembly includes: a flue bypass, a high-temperature heat exchanger, a high-pressure heater, a feedwater pump, a main feedwater line, a first feedwater branch line, and a second feedwater branch line;
[0012] One end of the main water supply line and one end of the first water supply branch line are respectively connected to the water supply pump. The other end of the main water supply line and the other end of the second water supply branch line are respectively connected to the boiler. The high-pressure heater is installed on the main water supply line. The other end of the first water supply branch line is connected to the input end of the high-temperature heat exchanger. The other end of the second water supply branch line is connected to the output end of the high-temperature heat exchanger. The high-temperature heat exchanger is installed in the flue bypass. The input end of the flue bypass is connected to the input end of the high-temperature air preheater. The output end of the flue bypass is connected to the input end of the low-temperature air preheater.
[0013] Optionally, the first heat exchange assembly further includes: a flue gas damper and a first valve;
[0014] The flue gas damper is installed inside the flue bypass, the high-temperature heat exchanger is installed at one end near the input end of the flue bypass, and the flue gas damper is installed at one end near the output end of the flue bypass; the first valve is installed on the second water supply branch.
[0015] Optionally, the ratio of the diameter of the flue to the diameter of the flue bypass is 3:1.
[0016] Optionally, the second heat exchange component includes: a first low-temperature heat exchanger, a primary air heater, a secondary air heater, a primary fan, a secondary fan, a first circulating water main line, a second circulating water main line, a first circulating water branch line, a second circulating water branch line, a first air supply duct, and a second air supply duct.
[0017] The first low-temperature heat exchanger is installed on the flue. The input end of the first air supply duct is connected to the primary air fan, the input end of the second air supply duct is connected to the secondary air fan, and the output ends of the first and second air supply ducts are connected to the boiler. The primary air heater is installed on the first air supply duct, and the secondary air heater is installed on the second air supply duct. The input ends of the first main circulating water line and the first branch circulating water line are connected to the input end of the first low-temperature heat exchanger. The output end of the first main circulating water line is connected to the input end of the primary air heater, the output end of the first branch circulating water line is connected to the input end of the secondary air heater, the input end of the second main circulating water line is connected to the output end of the primary air heater, the input end of the second branch circulating water line is connected to the output end of the secondary air heater, and the output ends of the second main circulating water line and the second branch circulating water line are connected to the output end of the first low-temperature heat exchanger.
[0018] Optionally, the second heat exchange assembly further includes: a second cryogenic heat exchanger and a third circulating water main;
[0019] The output end of the second circulating water main line and the output end of the second circulating water branch line are connected to the input end of the second low-temperature heat exchanger. The output end of the second low-temperature heat exchanger is connected to the input end of the third circulating water main line. The output end of the third circulating water main line is connected to the output end of the first low-temperature heat exchanger.
[0020] Optionally, the second heat exchange assembly also includes: a circulating water pump, a second valve, and a third valve;
[0021] A circulating water pump and a second valve are sequentially installed along the direction of circulating water delivery on the first circulating water main line, and a third valve is installed on the first circulating water branch line.
[0022] Optionally, the flue outlet is connected to the desulfurization tower, and a denitrification system is also installed on the flue. The denitrification system is located before the high-temperature air preheater, and an electrostatic precipitator and an induced draft fan are installed sequentially between the first low-temperature heat exchanger and the second low-temperature heat exchanger.
[0023] Optionally, the high-temperature air preheater and the low-temperature air preheater are rotary air preheaters.
[0024] Optionally, the first and second low-temperature heat exchangers are heat pipe heat exchangers.
[0025] In this embodiment of the invention, the dual air preheater-boiler coupled flue gas waste heat utilization system includes: a flue, the inlet of which is connected to the boiler; a high-temperature air preheater, a low-temperature air preheater, a first heat exchange component, and a second heat exchange component installed on the flue; the low-temperature air preheater being located between the high-temperature air preheater and the second heat exchange component; the flue for conveying flue gas discharged from the boiler; the first heat exchange component for heating feedwater supplied to the boiler using the flue gas in the flue; the second heat exchange component for primary heating of cold air supplied to the boiler using the flue gas in the flue; the low-temperature air preheater for secondary heating of cold air supplied to the boiler using the flue gas in the flue; and the high-temperature air preheater for tertiary heating of cold air supplied to the boiler using the flue gas in the flue.
[0026] The beneficial effects of this invention are as follows:
[0027] 1. Existing flue gas waste heat recovery systems with bypasses have high-temperature heaters (for heating feedwater) and condensate heaters (for heating condensate) installed on the bypass. The temperature of the condensate heater is precisely within the zone of highest corrosion rate for the steel, making corrosion unavoidable. Besides upgrading the pipe material, there is no effective solution, but upgrading the pipe material would increase the cost several times over. This invention, by setting up a dual air preheater, bypasses the flue gas only at the high-temperature air preheater. The cooled flue gas continues to enter the low-temperature air preheater, effectively solving the low-temperature corrosion problem of the condensate heater and ensuring the safety of the unit.
[0028] 2. The first and second low-temperature heat exchangers of the present invention adopt the form of heat pipes. Through the physical isolation between flue gas and circulating water, the low-temperature corrosion problem of the low-temperature heat exchanger at the air preheater outlet is effectively solved, which helps to ensure the safety of the unit.
[0029] 3. Currently, the rotary air preheaters used in power units generally employ two-stage heat exchange elements, meaning they use two different waveforms. This poses a significant risk of ash accumulation and bridging blockage in the transition zone. This invention adopts a dual air preheater scheme: the high-temperature air preheater can use a waveform suitable for the high-temperature section, and the low-temperature air preheater can use a waveform suitable for the low-temperature section. This ensures that the heat exchange elements in both air preheaters have the same waveform, avoiding the risk of ash accumulation and bridging blockage in the transition zone, and thus effectively ensuring the safety of the power unit.
[0030] 4. This invention, by arranging a high-temperature heat exchanger (for heating feedwater) only on the flue bypass, compared with the traditional arrangement of a high-temperature heater (for heating feedwater) and a condensate heater (for heating condensate) on the flue bypass, can displace the steam extracted from the high-pressure heater section. The steam extracted by the heater has a higher overall quality, stronger work capacity of the flue gas heat in the flue bypass, and better economy.
[0031] Other features and advantages of the embodiments of the present invention will be described in detail in the following detailed description section. Attached Figure Description
[0032] The accompanying drawings are provided to further illustrate embodiments of the present invention and form part of the specification. They are used together with the following detailed description to explain the embodiments of the present invention, but do not constitute a limitation thereof. In the drawings:
[0033] Figure 1 This is a schematic diagram of the structure of a dual air preheater furnace coupled flue gas waste heat utilization system provided in one embodiment of the present invention;
[0034] Figure 2 This is a schematic diagram of the structure of a dual air preheater furnace coupled flue gas waste heat utilization system provided in another embodiment of the present invention;
[0035] Figure 3This is a schematic diagram of the medium flow direction in the dual air preheater-furnace coupled flue gas waste heat utilization system provided in an embodiment of the present invention.
[0036] Explanation of reference numerals in the attached figures
[0037] 1. Flue gas duct; 2. Denitrification system; 3. High-temperature air preheater;
[0038] 4. Low-temperature air preheater; 5. Flue gas bypass; 6. High-temperature heat exchanger;
[0039] 7. High-pressure heater; 8. Feed water pump; 9. Flue gas damper;
[0040] 10. First valve; 11. First low-temperature heat exchanger; 12. Primary air heater;
[0041] 13. Secondary air heater; 14. Primary air fan; 15. Secondary air fan;
[0042] 16. Second valve; 17. Third valve; 18. Circulating water pump;
[0043] 19. Electrostatic precipitator; 20. Exhaust fan; 21. Second cryogenic heat exchanger;
[0044] P1, main water supply line; P2, first water supply branch line; P3, second water supply branch line;
[0045] P4, First circulating water main line; P5, Second circulating water main line;
[0046] P6, First circulating water branch; P7, Second circulating water branch;
[0047] P8, First air supply duct; P9, Second air supply duct;
[0048] P10, Third circulating water main line. Detailed Implementation
[0049] The specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are for illustration and explanation only and are not intended to limit the scope of the present invention.
[0050] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs; the terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit this application.
[0051] In the description of the embodiments of this application, technical terms such as "first" and "second" are used only to distinguish different objects and should not be construed as indicating or implying relative importance or implicitly specifying the number, specific order, or primary and secondary relationship of the indicated technical features. In the description of the embodiments of this application, "multiple" means two or more, unless otherwise explicitly defined.
[0052] Please refer to Figure 1 , Figure 1 This is a schematic diagram of a dual air preheater-boiler coupled flue gas waste heat utilization system according to an embodiment of the present invention. The system includes: a flue 1, the input end of which is connected to the boiler; a high-temperature air preheater 3, a low-temperature air preheater 4, a first heat exchange component, and a second heat exchange component disposed on the flue 1; the low-temperature air preheater 4 being disposed between the high-temperature air preheater 3 and the second heat exchange component; the flue 1 for conveying flue gas discharged from the boiler; the first heat exchange component for heating feedwater supplied to the boiler using the flue gas in the flue 1; the second heat exchange component for primary heating of cold air supplied to the boiler using the flue gas in the flue 1; the low-temperature air preheater 4 for secondary heating of cold air supplied to the boiler using the flue gas in the flue 1; and the high-temperature air preheater 3 for tertiary heating of cold air supplied to the boiler using the flue gas in the flue 1.
[0053] Understandably, the present invention adopts a dual air preheater scheme. The high-temperature air preheater 3 can adopt a waveform suitable for the high-temperature section, and the low-temperature air preheater 4 can adopt a waveform suitable for the low-temperature section. In this way, the heat exchange elements in each air preheater have the same waveform, avoiding the risk of ash accumulation and "bridging" blockage in the transition zone, thereby ensuring the safe operation of the unit.
[0054] In one embodiment, reference is made to Figure 1 The first heat exchange assembly includes: a flue bypass 5, a high-temperature heat exchanger 6, a high-pressure heater 7, a feedwater pump 8, a main feedwater line P1, a first feedwater branch line P2, and a second feedwater branch line P3. One end of the main feedwater line P1 and one end of the first feedwater branch line P2 are respectively connected to the feedwater pump 8, and the other end of the main feedwater line P1 and the other end of the second feedwater branch line P3 are respectively connected to the boiler. The high-pressure heater 7 is installed on the main feedwater line P1. The other end of the first feedwater branch line P2 is connected to the input end of the high-temperature heat exchanger 6, and the other end of the second feedwater branch line P3 is connected to the output end of the high-temperature heat exchanger 6. The high-temperature heat exchanger 6 is installed in the flue bypass 5. The input end of the flue bypass 5 is connected to the input end of the high-temperature air preheater 3, and the output end of the flue bypass 5 is connected to the input end of the low-temperature air preheater 4.
[0055] In this embodiment, by arranging a high-temperature heat exchanger (for heating feedwater) only on the flue bypass, compared to the traditional method of arranging a high-temperature heater (for heating feedwater) and a condensate heater (for heating condensate) on the flue bypass, the extracted steam from the high-pressure heater section can be displaced. The overall quality of the extracted steam is higher, the work-capacity of the flue gas heat in the flue bypass is stronger, and the economy is better. Calculations show that the energy-saving benefit of this embodiment is approximately 3g / (kW·h), while the traditional deep utilization scheme of waste heat from coupled boiler and turbine flue gas is generally 2.5g / (kW·h), making this scheme more economical.
[0056] As a further optimization of the above embodiments, refer to Figure 1 The first heat exchange component also includes: a flue gas baffle 9 and a first valve 10; the flue gas baffle 9 is disposed in the flue bypass 5, the high-temperature heat exchanger 6 is disposed at one end near the input end of the flue bypass 5, and the flue gas baffle 9 is disposed at one end near the output end of the flue bypass 5; the first valve 10 is disposed on the second water supply branch P3.
[0057] Specifically, the first valve 10 is used to control the flow rate of the feed water from the feed water pump 8 to the high-temperature heat exchanger 6, and the flow rate can be calculated in the following way:
[0058] Among them, Q 水 This indicates the flow rate of feed water from the feed pump to the high-temperature heat exchanger; Q 烟 t1 represents the flue gas flow rate in the flue gas bypass; t1 represents the flue gas temperature at the inlet of the flue gas bypass; t2 represents the flue gas temperature at the outlet of the flue gas bypass; c p,烟 T1 represents the average isobaric specific heat capacity of the flue gas in the flue gas bypass; T2 represents the feedwater temperature in the first feedwater branch, and T1 represents the feedwater temperature in the second feedwater branch; c p,水 This represents the average constant pressure specific heat capacity of the first water supply branch.
[0059] The following specific examples illustrate this: Under the heat rate acceptance condition (THA), Q 烟 =243.3kg / s; t1=358℃, t2=216℃; c p,烟 =1.02kJ / (kg·℃); T1=325.4℃, T2=186℃; c p,水 = 4.66 kJ / (kg·℃); Q is calculated. 水 =53.46 kg / s.
[0060] In one embodiment, the first valve 10 includes one or more regulating valves, preferably an electrically regulating valve and an electrically isolating valve.
[0061] As a further optimization of the above embodiment, the ratio of the diameter of flue 1 to the diameter of flue bypass 5 is 3:1.
[0062] Specifically, the ratio of the diameter of flue 1 to the diameter of flue bypass 5 is set to 3:1, which ensures that the ratio of the flue gas flow rate entering flue bypass 5 to the flue gas flow rate at the outlet of denitrification system 2 is 3:1.
[0063] In one embodiment, reference is made to Figure 1 The second heat exchange assembly includes: a first low-temperature heat exchanger 11, a primary air heater 12, a secondary air heater 13, a primary air fan 14, a secondary air fan 15, a first main circulating water line P4, a second main circulating water line P5, a first branch circulating water line P6, a second branch circulating water line P7, a first air supply duct P8, and a second air supply duct P9. The first low-temperature heat exchanger 11 is mounted on the flue 1. The input end of the first air supply duct P8 is connected to the primary air fan 14, the input end of the second air supply duct P9 is connected to the secondary air fan 15, and the output ends of the first air supply duct P8 and the second air supply duct P9 are connected to the boiler. The primary air heater 12 is mounted on the first air supply duct P8. The secondary air heater 13 is installed on the second air supply duct P9. The input end of the first circulating water main duct P4 and the input end of the first circulating water branch duct P6 are connected to the input end of the first low-temperature heat exchanger 11. The output end of the first circulating water main duct P4 is connected to the input end of the primary air heater 12. The output end of the first circulating water branch duct P6 is connected to the input end of the secondary air heater 13. The input end of the second circulating water main duct P5 is connected to the output end of the primary air heater 12. The input end of the second circulating water branch duct P7 is connected to the output end of the secondary air heater 13. The output ends of the second circulating water main duct P5 and the second circulating water branch duct P7 are connected to the output end of the first low-temperature heat exchanger 11.
[0064] In one embodiment, under the heat rate acceptance condition (THA), the outlet air temperature of the primary air heater 12 and the secondary air heater 13 is 60°C.
[0065] Understandably, the first low-temperature heat exchanger 11 adopts the form of heat pipes, which effectively solves the low-temperature corrosion problem of the air preheater outlet heat exchanger through physical isolation between flue gas and circulating water, thereby ensuring the safe operation of the unit.
[0066] As a further optimization of the above embodiments, refer to Figure 2 The second heat exchange assembly also includes: a second low-temperature heat exchanger 21 and a third circulating water main line P10; the output end of the second circulating water main line P5 and the output end of the second circulating water branch line P7 are connected to the input end of the second low-temperature heat exchanger 21, the output end of the second low-temperature heat exchanger 21 is connected to the input end of the third circulating water main line P10, and the output end of the third circulating water main line P10 is connected to the output end of the first low-temperature heat exchanger 11.
[0067] As a further optimization of the above embodiment, the second heat exchange component further includes: a circulating water pump 18, a second valve 16, and a third valve 17; the circulating water pump 18 and the second valve 16 are sequentially arranged along the direction of circulating water delivery on the first circulating water main P4, and the third valve 17 is arranged on the first circulating water branch P6. In this embodiment, by setting the circulating water pump 18, the second valve 16, and the third valve 17, the flow rate of circulating water entering the primary air heater 12 and the secondary air heater 13 can be controlled, thereby controlling the temperature rise of the cold air discharged from the primary fan 14 and the secondary fan 15.
[0068] As a further optimization of the above embodiments, refer to Figure 1 and Figure 2 The output end of flue 1 is connected to the desulfurization tower. A denitrification system 2 is also installed on the flue. The denitrification system 2 is located before the high-temperature air preheater 3. An electrostatic precipitator 19 and an induced draft fan 20 are also installed between the first low-temperature heat exchanger 11 and the second low-temperature heat exchanger 21.
[0069] In one or more of the above embodiments, the high-temperature air preheater 3 and the low-temperature air preheater 4 are rotary air preheaters.
[0070] Specifically, the high-temperature air preheater 3 is equipped with hot-end heat exchange elements, and the low-temperature air preheater 4 is equipped with cold-end heat exchange elements.
[0071] In one or more of the above embodiments, the first low-temperature heat exchanger 11 and the second low-temperature heat exchanger 21 are heat pipe heat exchangers.
[0072] Specifically, the first low-temperature heat exchanger 11 and the second low-temperature heat exchanger 21 use heat pipes as heat exchange elements, with the hot end of the heat pipe located on the flue gas side and the cold end of the heat pipe located on the circulating water side.
[0073] In one or more of the above embodiments, the low-temperature heat exchanger can also be arranged between the electrostatic precipitator 19 and the induced draft fan 20, and can also be divided into multiple groups, and arranged separately between the electrostatic precipitator 19 and the low-temperature air preheater 4, between the electrostatic precipitator 19 and the induced draft fan 20, and after the induced draft fan 20.
[0074] To better understand the technical solution of this invention, the flow direction of the medium within the system is described below:
[0075] Reference Figure 3 The dual-air preheater-furnace coupled flue gas waste heat utilization system provided by this invention contains four media: flue gas, feedwater, cold air, and circulating water. The flow directions of the four media are as follows:
[0076] Flue gas flow direction: (1)→(2)→(3)→(4)→(5)→(6). Among them, in (2)→(3), the flue gas is divided into two paths. One path enters the high-temperature air preheater 3 to exchange heat with the air, and the other path enters the flue gas bypass 5 to exchange heat with the feed water. In (3)→(5), it exchanges heat with the circulating water and is finally used to heat the cold air discharged by the primary fan 14 and the secondary fan 15.
[0077] Airflow direction: I→II→III→IV. A primary air heater 12 and a secondary air heater 13 are arranged on (I)→(II) to absorb the heat of the circulating water to heat the cold air discharged from the primary fan 14 and the secondary fan 15. On (II)→(IV), the heat of the flue gas is used to heat the cold air discharged from the primary fan 14 and the secondary fan 15 for secondary and tertiary heating.
[0078] Water flow direction: ①→②. The water supply is divided into two paths. One path is heated by the high-pressure heating system 7 and finally enters the boiler. The other path enters the water supply bypass, exchanges heat with the high-temperature heat exchanger 6, and then enters the boiler.
[0079] The circulating water flows between (I) and (II). The circulating water absorbs heat in the first low-temperature heat exchanger 11 and then splits into two paths. One path of circulating water releases heat in the primary air heater 12, and the other path of circulating water releases heat in the secondary air heater 13. Both are used to heat the cold air discharged by the primary fan 14 and the secondary fan 15.
[0080] To better understand the technical solution of this invention, the following is a description of the parameters:
[0081] Taking a 2×1000MW power plant unit as an example, the boiler is an ultra-supercritical double reheat tower boiler, and the steam turbine is a five-cylinder, four-exhaust, 11-stage regenerative extraction turbine (4 high-pressure, 6 low-pressure, 1 deaerator). The main parameters of the unit are shown in Table 1 below, the relevant design parameters are shown in Table 2 below, and the main parameters of the waste heat utilization scheme are shown in Table 3 below.
[0082] Table 1. Main parameters of the unit (boiler side)
[0083]
[0084] Table 2 Relevant Design Parameters
[0085]
[0086]
[0087] Table 3 Main parameters of waste heat utilization scheme
[0088]
[0089] In this embodiment of the invention, the dual air preheater-boiler coupled flue gas waste heat utilization system includes: a flue, the inlet of which is connected to the boiler; a high-temperature air preheater, a low-temperature air preheater, a first heat exchange component, and a second heat exchange component installed on the flue; the low-temperature air preheater being located between the high-temperature air preheater and the second heat exchange component; the flue for conveying flue gas discharged from the boiler; the first heat exchange component for heating feedwater supplied to the boiler using the flue gas in the flue; the second heat exchange component for primary heating of cold air supplied to the boiler using the flue gas in the flue; the low-temperature air preheater for secondary heating of the cold air supplied to the boiler using the flue gas in the flue; and the high-temperature air preheater for tertiary heating of the cold air supplied to the boiler using the flue gas in the flue. This invention solves the problem of low-temperature corrosion of the heating surfaces of the condensate heater and the low-temperature heat exchanger, thereby improving the safety of the unit.
[0090] It should also be noted that the various specific technical features described in the above embodiments can be combined in any suitable manner without contradiction. To avoid unnecessary repetition, the embodiments of the present invention will not describe the various possible combinations separately.
[0091] In addition, the functional modules in the various embodiments of this application can be integrated together to form an independent part, or each module can exist independently, or two or more modules can be integrated to form an independent part.
[0092] It should also be noted that the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus. Unless otherwise specified, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes that element.
[0093] The above are merely embodiments of this application and are not intended to limit the scope of this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the scope of the claims of this application.
Claims
1. A dual-air preheater-furnace coupled flue gas waste heat utilization system, characterized in that, include: Flue (1), the inlet end of flue (1) is connected to the boiler, and a high temperature air preheater (3), a low temperature air preheater (4), a first heat exchange component and a second heat exchange component are installed on flue (1). The low temperature air preheater (4) is located between the high temperature air preheater (3) and the second heat exchange component. A flue is used to transport flue gas discharged from a boiler. The first heat exchange component is used to heat the feedwater delivered to the boiler using the flue gas in the flue (1); The second heat exchange component is used to heat the cold air delivered to the boiler using the flue gas from the flue (1); Low-temperature air preheater (4) is used to reheat the cold air delivered to the boiler using the flue gas in the flue (1); High-temperature air preheater (3) is used to heat the cold air delivered to the boiler three times using the flue gas in the flue (1); The first heat exchange assembly includes: a flue bypass (5), a high-temperature heat exchanger (6), a high-pressure heater (7), a feed water pump (8), a main feed water line (P1), a first feed water branch line (P2), and a second feed water branch line (P3); One end of the main water supply line (P1) and one end of the first water supply branch line (P2) are respectively connected to the water pump (8), and the other end of the main water supply line (P1) and the other end of the second water supply branch line (P3) are respectively connected to the boiler. The high-pressure heater (7) is installed on the main water supply line (P1). The other end of the first water supply branch line (P2) is connected to the input end of the high-temperature heat exchanger (6), and the other end of the second water supply branch line (P3) is connected to the output end of the high-temperature heat exchanger (6). The high-temperature heat exchanger (6) is installed in the flue bypass (5). The input end of the flue bypass (5) is connected to the input end of the high-temperature air preheater (3), and the output end of the flue bypass (5) is connected to the input end of the low-temperature air preheater (4). The second heat exchange assembly includes: a first low-temperature heat exchanger (11), a primary air heater (12), a secondary air heater (13), a primary fan (14), a secondary fan (15), a first circulating water main line (P4), a second circulating water main line (P5), a first circulating water branch line (P6), a second circulating water branch line (P7), a first air supply duct (P8), a second air supply duct (P9), a second low-temperature heat exchanger (21), and a third circulating water main line (P10). The first low-temperature heat exchanger (11) is installed on the flue (1). The input end of the first air supply duct (P8) is connected to the primary air fan (14), the input end of the second air supply duct (P9) is connected to the secondary air fan (15), and the output end of the first air supply duct (P8) and the output end of the second air supply duct (P9) are connected to the boiler. The primary air heater (12) is installed on the first air supply duct (P8), and the secondary air heater (13) is installed on the second air supply duct (P9). The input end of the first circulating water main line (P4) and the input end of the first circulating water branch line (P6) are connected to the input end of the first low-temperature heat exchanger (11). The output end of the first circulating water main line (P4) is connected to the input end of the primary air heater (12), and the output end of the first circulating water branch line (P6) is connected to the input end of the primary air heater (12). The second circulating water main (P5) is connected to the input end of the secondary air heater (13), the input end of the second circulating water main (P5) is connected to the output end of the primary air heater (12), the input end of the second circulating water branch (P7) is connected to the output end of the secondary air heater (13), the output end of the second circulating water main (P5) and the output end of the second circulating water branch (P7) are connected to the output end of the first low temperature heat exchanger (11), the output end of the second circulating water main (P5) and the output end of the second circulating water branch (P7) are connected to the input end of the second low temperature heat exchanger (21), the output end of the second low temperature heat exchanger (21) is connected to the input end of the third circulating water main (P10), and the output end of the third circulating water main (P10) is connected to the output end of the first low temperature heat exchanger (11).
2. The dual air preheater-furnace coupled flue gas waste heat utilization system according to claim 1, characterized in that, The first heat exchange component also includes: a flue gas baffle (9) and a first valve (10); The flue gas baffle (9) is installed inside the flue bypass (5), the high temperature heat exchanger (6) is installed at one end near the input end of the flue bypass (5), and the flue gas baffle (9) is installed at one end near the output end of the flue bypass (5); the first valve (10) is installed on the second water supply branch (P3).
3. The dual-air preheater-furnace coupled flue gas waste heat utilization system according to claim 1, characterized in that, The ratio of the diameter of the flue (1) to the diameter of the flue bypass (5) is 3:
1.
4. The dual air preheater-furnace coupled flue gas waste heat utilization system according to claim 1, characterized in that, The second heat exchange assembly also includes: a circulating water pump (18), a second valve (16), and a third valve (17). A circulating water pump (18) and a second valve (16) are sequentially installed along the direction of circulating water delivery on the first circulating water main (P4), and a third valve (17) is installed on the first circulating water branch (P6).
5. The dual air preheater-furnace coupled flue gas waste heat utilization system according to claim 1, characterized in that, The output end of the flue (1) is connected to the desulfurization tower. A denitrification system (2) is also installed on the flue. The denitrification system (2) is installed before the high temperature air preheater (3). An electrostatic precipitator (19) and an induced draft fan (20) are installed between the first low temperature heat exchanger (11) and the second low temperature heat exchanger (21).
6. The dual air preheater-furnace coupled flue gas waste heat utilization system according to any one of claims 1-5, characterized in that, The high-temperature air preheater (3) and the low-temperature air preheater (4) are rotary air preheaters.
7. The dual air preheater-furnace coupled flue gas waste heat utilization system according to any one of claims 1-5, characterized in that, The first low-temperature heat exchanger (11) and the second low-temperature heat exchanger (21) are heat pipe heat exchangers.
Citation Information
Patent Citations
Boiler flue gas waste heat utilization system and thermal generator set
CN210153769U
Gradient utilization deep coupling system for smoke, air and blowdown waste heat of coal-fired boiler
CN210197332U
Coupling type air preheating system with matched energy levels
CN219571984U
