Task scheduling method and device, electronic equipment and storage medium

By integrating resources from different nodes, the problem of insufficient resources in private cloud computing clusters has been solved, enabling the priority use of idle resources without modifying the cluster, thereby reducing costs and improving utilization.

CN117687746BActive Publication Date: 2026-06-23SHUXING TECH (BEIJING) CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
SHUXING TECH (BEIJING) CO LTD
Filing Date
2022-09-02
Publication Date
2026-06-23

AI Technical Summary

Technical Problem

In existing technologies, private cloud computing clusters cannot efficiently utilize idle resources when resources are insufficient, resulting in low utilization of computing resources and loss of cost control. Furthermore, upgrading to a multi-cluster solution requires significant manpower and architectural changes.

Method used

By integrating resources from different nodes, including idle resources in the cluster, idle resources from other clusters within the enterprise, mixed deployment resources, and public cloud resources, these resources are virtualized as ordinary machines from the cluster's perspective. Tasks are then prioritized and scheduled to high-priority nodes to ensure their normal operation.

Benefits of technology

It enables task scheduling without modifying the current cluster when resources are insufficient, prioritizing the use of idle resources within the enterprise, reducing usage costs and improving resource utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117687746B_ABST
    Figure CN117687746B_ABST
Patent Text Reader

Abstract

The application discloses a task scheduling method and device, electronic equipment and storage medium, wherein the method comprises: obtaining resource requirement information and cluster information of a task to be scheduled; determining whether the parameters of a first node meet the scheduling condition according to the resource requirement information, wherein the parameters of the first node are determined by the idle physical resources in a target cluster, and the target cluster is a cluster corresponding to the cluster information; when the parameters of the first node do not meet the scheduling condition, determining whether the parameters of a second node meet the scheduling condition according to the resource requirement information, wherein the parameters of the second node are determined by Buffer resources; when the parameters of the second node do not meet the scheduling condition, determining whether the parameters of a third node meet the scheduling condition according to the resource requirement information, wherein the parameters of the third node are determined by mixed resources; and when the parameters of the third node do not meet the scheduling condition, scheduling the task to be scheduled to a public cloud node, so that the public cloud node executes the task to be scheduled.
Need to check novelty before this filing date? Find Prior Art