Task scheduling method and device, electronic equipment and storage medium
By integrating resources from different nodes, the problem of insufficient resources in private cloud computing clusters has been solved, enabling the priority use of idle resources without modifying the cluster, thereby reducing costs and improving utilization.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- SHUXING TECH (BEIJING) CO LTD
- Filing Date
- 2022-09-02
- Publication Date
- 2026-06-23
AI Technical Summary
In existing technologies, private cloud computing clusters cannot efficiently utilize idle resources when resources are insufficient, resulting in low utilization of computing resources and loss of cost control. Furthermore, upgrading to a multi-cluster solution requires significant manpower and architectural changes.
By integrating resources from different nodes, including idle resources in the cluster, idle resources from other clusters within the enterprise, mixed deployment resources, and public cloud resources, these resources are virtualized as ordinary machines from the cluster's perspective. Tasks are then prioritized and scheduled to high-priority nodes to ensure their normal operation.
It enables task scheduling without modifying the current cluster when resources are insufficient, prioritizing the use of idle resources within the enterprise, reducing usage costs and improving resource utilization.