A construction method for filling and replacing a soil cave solidified in a fluid state
The automated construction method of fluidized solidified soil has solved the problems of high material cost and uneven filling in karst cave backfilling, achieved uniformity and stability of karst cave filling material, reduced exploration costs, and improved construction efficiency and foundation stability.
Patent Information
- Application Number
- CN202410047669.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-12
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2044-01-12
AI Technical Summary
Existing karst cave backfilling construction methods suffer from high material costs, uneven filling, and difficulty in grouting control. Furthermore, groundwater and sediment slurry can easily dilute the backfill material, affecting the quality of karst cave backfilling.
An automated construction method using fluidized solidified soil is employed. Through a control system and equipment, fluidized solidified soil is quantitatively injected and uneven slurry in the karst cave is extracted. The fluidity and self-compacting properties of the fluidized solidified soil are utilized to achieve uniformity and stability of the karst cave filling material.
It reduces the cost of engineering materials, improves the quality of karst cave filling and construction efficiency, reduces exploration costs, is environmentally friendly, and ensures the uniformity of the filling and the stability of the foundation.
Smart Images

Figure CN117702718B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of engineering construction technology, and more specifically, to a method for filling and replacing karst caves with fluidized solidified soil. Background Technology
[0002] The construction of underground projects, such as subways and underground buildings, increases the likelihood and frequency of encountering irregular underground sealed spaces and irregular shapes, such as soil caves and karst caves. In order to ensure the safety and structural strength of underground projects, it is necessary to use low-grade concrete or cement mortar for backfilling.
[0003] Existing backfilling methods for karst caves primarily involve layered compaction of materials such as gravel and lime-stabilized soil. This requires well-graded sandy soil or gravel to achieve high dry density and good mechanical properties. Alternatively, low-grade concrete or mortar can be used for backfilling. During the backfilling process, the contents of the karst cave must be classified and filled in layers: fully filled karst caves require cement grouting for reinforcement; partially filled karst caves require different filling methods depending on their height, such as cement grouting, cement mortar, or C15 plain concrete plus cement grouting; and unfilled karst caves require different filling methods depending on their height, such as cement grouting, cement mortar, or C15 plain concrete plus cement grouting.
[0004] The aforementioned methods for backfilling karst caves have several drawbacks. First, they require a large amount of building materials, leading to excessively high material costs. Second, the layered grouting method demands precise control over pressure and flow rate. When encountering irregularly shaped, narrow, or deep karst caves, it becomes difficult to fully fill them, resulting in uneven filling and even voids, thus affecting the quality of the backfill. Furthermore, in actual construction, the karst caves to be filled typically contain groundwater and sediment at the bottom. Using direct grouting, the injected material directly impacts the groundwater and sediment, causing the backfill material to disperse, dilute, and fail to form a cohesive shape, ultimately resulting in an uneven filling and impacting the grouting quality.
[0005] In this case, in order to achieve the technical effect of uniformity of the filling material in the karst cave, a karst cave replacement filling construction process is designed. During the filling process of the karst cave, the uneven slurry in the karst cave is continuously extracted, so that the filling material in the karst cave is a solidified product of uniform slurry. Summary of the Invention
[0006] To realize the construction process of replacement filling of karst caves, this invention provides a construction method for filling and replacing karst caves with fluidized solidified soil. While realizing the automated production of fluidized solidified soil, it meets the construction process of filling karst caves and extracting uneven slurry from the karst caves. It makes full use of the fluidity and self-compacting properties of fluidized solidified soil, provides feasibility for extracting uneven slurry from karst caves, and can reliably, uniformly and stably fill karst caves, so that the filling material of the karst caves is uniform and the filling quality of the karst caves is guaranteed.
[0007] The technical solution of this invention is as follows: A method for filling and replacing karst caves with fluidized solidified soil includes a control system, fluidized solidified soil preparation equipment, and grouting equipment. Both the fluidized solidified soil preparation equipment and the grouting equipment are connected to and controlled by the control system. The fluidized solidified soil preparation equipment and the grouting equipment are connected to each other. The fluidized solidified soil prepared by the fluidized solidified soil preparation equipment flows from the fluidized solidified soil preparation equipment through the grouting equipment to backfill the karst cave. The control system obtains the weight data of each fluidized solidified soil preparation device through sensors, and controls the working status of the feeding device in the fluidized solidified soil preparation device according to the preset data, so as to prepare fluidized solidified soil with the same mix ratio in a timely and quantitative manner. The control system obtains the weight data of each grouting device through sensors, and controls the grouting and pumping actions of the grouting device according to the preset data, so that the grouting device cycles several times to fill the bottom of the karst cave with fluidized solidified soil and pump out the grout from the top of the karst cave.
[0008] This invention utilizes fluidized solidified soil to fill karst caves. In order to improve the uniformity of the filling material in the karst caves, during the intervals between the layered injection of fluidized solidified soil, the slurry from the upper part of the karst caves is extracted and used as raw material for fluidized solidified soil. Finally, it is back-injected into the karst caves. In this way, the filling material of the karst caves can be made uniform, the filling quality can be guaranteed, the engineering material cost can be reduced, and it is environmentally friendly.
[0009] In order to achieve automated control, a fluidized solidified soil karst cave filling and replacement construction system is set up. This system includes a control system for controlling the operation of each piece of equipment, fluidized solidified soil preparation equipment for producing fluidized solidified soil, and injection equipment for injecting fluidized solidified soil into the bottom of the karst cave.
[0010] Because this construction method utilizes the fluidity and temporary configuration properties of the solidified fluid, in order to enable the solidified fluid to fill the karst cave and raise the original contents of the karst cave during the grouting process, the solidified fluid has a relatively large specific gravity. Therefore, weight is used as the index parameter of the control system to control each piece of equipment. Weight sensors are set at each stage to obtain weight data for control.
[0011] The above-mentioned method for filling and replacing karst caves with fluidized solidified soil includes the following construction process: Step S1. Prepare and connect the construction equipment; Step S2. Feed materials and prepare fluidized solidified soil according to the set standards; Step S3. The fluidized solidified soil is transported to the injection hole and injected into the bottom of the karst cave; Step S4. After injecting a certain amount of fluidized solidified soil, stop, extract the slurry from the upper part of the karst cave through the slurry extraction hole, and use the slurry from the upper part of the karst cave as one of the raw materials to prepare fluidized solidified soil; Step S5. Inject fluidized solidified soil into the bottom of the karst cave through the injection hole; Step S6. Repeat steps S4 to S5 until the specific gravity of the extracted grout from the upper part of the karst cave is the same as or similar to that of the fluidized solidified soil. Stop extracting the grout from the upper part of the karst cave and continue to inject the fluidized solidified soil to the designed height requirement of the karst cave.
[0012] The construction method of filling karst caves using fluidized bed solidified soil according to this invention includes: utilizing on-site materials, producing fluidized bed solidified soil using fluidized bed solidified soil preparation equipment, and injecting the fluidized bed solidified soil into the bottom of the karst cave using its fluidity and strength. This elevates the original contents of the karst cave, including groundwater and sediment, so that the groundwater, sediment, and some of the previously injected fluidized bed solidified soil become the upper slurry of the karst cave. The upper slurry of the karst cave is extracted and used as raw material for fluidized bed solidified soil, which is then reused to produce more fluidized bed solidified soil for backfilling the karst cave. Through continuous extraction and injection, the contents of the karst cave are completely replaced, and low-cost fluidized bed solidified soil with the same or similar specific gravity is used for backfilling. This ensures that the backfill material of the karst cave is uniform and free of voids, guaranteeing the quality of the karst cave backfill.
[0013] The above-mentioned method for filling and replacing karst caves with fluidized solidified soil includes a raw material pool for holding the raw materials of fluidized solidified soil and a mixing device for generating fluidized solidified soil. The raw materials of fluidized solidified soil are mixed to form fluidized solidified soil mixed raw materials. The fluidized solidified soil mixed raw materials are transported to the mixing device through a feeding device. According to the preset mixing ratio, a curing agent is added to the mixing device and stirred evenly to form fluidized solidified soil.
[0014] Fluidized solidified soil is a new type of geotechnical engineering material. Its raw materials are locally sourced soil or other industrial and mining waste. Depending on the project requirements, special cementitious materials (i.e., solidifying agents) adapted to the characteristics of the soil and rock are added, along with necessary water and additives. The mixture is then thoroughly mixed using a specific mixer to form a mixture that can be transported through pipelines or pumped and can be poured for construction. After pouring or filling and curing, it solidifies into an engineering material with certain strength, water stability, low permeability, and long-term stability.
[0015] Furthermore, the raw materials for preparing fluidized solidified soil are placed in the raw material pool. The raw materials for fluidized solidified soil include slurry from the upper part of the karst cave, soil, and water. Different building materials are placed in different storage spaces, and the different storage spaces are connected by a feeding device. The feeding device is connected to and controlled by the control system. The control system controls the working state of the feeding device, so that the slurry from the upper part of the karst cave, soil, and water are mixed and stirred to form a fluidized solidified soil mixture with a fixed specific gravity.
[0016] The fluidized solidified soil output from the fluidized solidified soil preparation equipment has a constant specific gravity. To avoid increasing the complexity of the mixing equipment by adjusting the raw material ratio during mixing, and to improve safety (for example, the dosage of a certain component might exceed the set amount, requiring the addition of other components according to the ratio, ultimately causing the raw material in the mixing equipment to exceed the safe capacity), the raw materials need to be configured in the raw material tank. This involves adjusting the ratio of the slurry, soil, and water in the upper part of the karst cave to form a fluidized solidified soil mixture with a fixed specific gravity. The control system controls the operation of the feeding equipment connecting the different storage spaces containing the slurry, soil, and water in the upper part of the karst cave. By operating and shutting down the feeding equipment, the ratio of the mixed slurry, soil, and water in the upper part of the karst cave varies, thus forming a fluidized solidified soil mixture with a fixed specific gravity.
[0017] Furthermore, a specific gravity metering device is installed in the raw material pool. The specific gravity metering device sends the real-time specific gravity data of the raw materials in the raw material pool to the control system. According to the preset proportion data, the control system starts or shuts down the feeding equipment connected to the raw material pool and the storage space for placing soil or water, respectively controlling the amount of soil and water entering the raw material pool, so that the real-time specific gravity data transmitted by the specific gravity metering device in the raw material pool reaches the preset data of the control system. The control system outputs a control signal to shut down the feeding equipment connected to the raw material pool and the storage space for placing soil or water.
[0018] A specific gravity metering device and a stirring device are installed in the raw material pool. The stirring device ensures that the raw materials in the raw material pool are mixed evenly. The specific gravity metering device is connected to the control system and sends real-time specific gravity data to the control system. After receiving the specific gravity data, the control system compares it and outputs a control signal to control the working status of the feeding equipment, so that the specific gravity of the mixture formed by the slurry, soil and water in the upper part of the karst cave in the raw material pool (i.e. the received real-time specific gravity data) reaches the preset value, and finally forms a fluid solidified soil mixture raw material with a fixed specific gravity.
[0019] Furthermore, the mixing equipment includes a mixer, which is connected to the raw material tank via a slurry pump and to the curing agent storage space via a transmission device. Both the slurry pump and the transmission device are connected to and controlled by the control system. The slurry pump is equipped with a weight metering device, and the end of the transmission device is also equipped with a weight metering device. The weight metering device is connected to the control system and sends a real-time weight signal to the control system.
[0020] The mixer mixes the fluidized solidified soil mixture with the curing agent, and this mixing process is controlled by a control system. The control system obtains the weight of the fluidized solidified soil mixture and the weight of the curing agent entering the mixer from the weighing device, compares them with preset data, and controls the working status of the slurry pump and the conveying equipment to achieve the effect of controlling the fixed weight and fixed specific gravity of the materials in the mixer.
[0021] The above-mentioned method for filling and replacing karst caves with fluidized solidified soil includes a grouting equipment consisting of a pumping pipe and an injection pipe. The bottom position of the pumping pipe varies with the height of the contents of the karst cave, while the bottom position of the injection pipe is set at the bottom of the karst cave. A grouting pump is installed between the fluidized solidified soil preparation equipment and the grouting pipe. The fluidized solidified soil produced by the fluidized solidified soil preparation equipment flows into the bottom of the karst cave through the grouting pipe under the action of the grouting pump. A slurry pump is installed between the raw material pool where the fluidized solidified soil is placed and the slurry pumping pipe. The slurry in the upper part of the karst cave flows into the raw material pool through the slurry pumping pipe.
[0022] Furthermore, the grouting equipment also includes an exhaust pipe, the bottom of which is positioned above the grout in the upper part of the cave.
[0023] The interior of a karst cave contains substances, commonly groundwater and sedimentary mud, both of which can be extracted using large mud pumps. The mud pump is positioned between the karst cave and the slurry pool, while the extraction pipe extends into the cave. At regular intervals, the top position of the cave's contents is determined using measuring tools such as a measuring rope. The extraction pipe is then inserted into the upper part of the slurry within the cave, and the large mud pump extracts the contents into the slurry pool.
[0024] The grouting pipe is a channel for introducing fluidized solidified soil into the bottom of the karst cave. Since this invention requires the replacement of the contents of the karst cave, the injection of the grouting pipe is necessary to raise the original contents of the karst cave, such as groundwater and sediment slurry. On the other hand, the fluidized solidified soil is the filling material for backfilling the karst cave. The grouting pipe needs to go as deep as possible into the bottom of the karst cave to better fill the cave. Therefore, the grouting pipe needs to go deep into the bottom of the karst cave.
[0025] The vent pipe is a channel for venting excess gas from the cave. It also plays an auxiliary role in controlling the stability of grouting and pumping. Gas accumulates in the upper part of the cave (to maintain stable pressure inside the cave), and its bottom position changes as the contents of the cave rise. Therefore, the bottom positions of both the vent pipe and the pumping pipe need to change with the grouting process.
[0026] Furthermore, the injection mud pump is equipped with a weight metering device or a flow metering device. The weight metering device or flow metering device records the real-time amount of injected fluidized solidified soil and sends it to the control system. If the real-time amount of fluidized solidified soil is equal to the unit injection amount preset by the control system, the control system controls the injection mud pump to stop working.
[0027] Furthermore, the slurry pump is equipped with a gravity metering device. The gravity metering device sends the real-time gravity data of the slurry in the upper part of the cave to the control system. The control system compares the real-time gravity data with the gravity data of the fluidized solidified soil. If the real-time gravity data of the slurry in the upper part of the cave is less than that of the fluidized solidified soil, the control system starts the injection slurry pump. If the real-time gravity data of the slurry in the upper part of the cave is equal to or close to that of the fluidized solidified soil, the control system stops the operation of the slurry pump and starts the injection slurry pump until the cave reaches the designed height requirement.
[0028] The backfilling of the karst cave employs a layered pressure grouting method, ensuring that the fluidized solidified soil is accurately compacted, permeated, and consolidated, and that it flows fully to all parts of the karst cave bottom. Therefore, the grouting of the fluidized solidified soil needs to be carried out in stages. Furthermore, because this invention requires the extraction of grout from the upper part of the karst cave to improve the uniformity of the filling material, it cannot be completed in one go and must be extracted in stages to prevent unevenness caused by the scattering of the fluidized solidified soil from being incompletely eliminated. Therefore, a sensing device is needed to control the amount of fluidized solidified soil injected in a single batch. Simultaneously, to monitor whether the grout in the upper part of the karst cave reaches the same specific gravity as the fluidized solidified soil, the grout pump used for extraction needs to be equipped with a specific gravity sensor to obtain real-time specific gravity data of the grout in the upper part of the karst cave, thereby determining when to stop injecting the fluidized solidified soil.
[0029] According to the above-described solution, the beneficial effects of this invention are as follows: 1. The method of using fluidized solidified soil to backfill karst caves raises the position of groundwater and sediment slurry at the bottom of the karst cave cavity during the grouting process. This sediment is then extracted and prepared as backfill material. The grouting is stopped when the specific gravity of the extracted slurry is equal to or close to that of the prepared fluidized solidified soil, and the grouting and backfilling of the karst cave continues. This ensures the uniformity and quality of the backfill material in the karst cave, and also avoids the complex and difficult karst cave topographic exploration process (the internal conditions of karst caves may be complex, including irregular shapes, caves of varying sizes, rock fissures, etc. To roughly understand the internal environment, large-scale exploration and monitoring are required, but due to the high cost of monitoring, it is difficult to apply on a large scale). This method saves on the costs of detailed, complex, and expensive underground exploration.
[0030] 2. Since the original contents of the karst cave are all replaced during the backfilling process, some of the fluidized solidified soil injected in the initial stage may also be extracted and replaced. In this way, almost all factors affecting the uniformity of the karst cave filling are extracted and eliminated. Therefore, the difficulty of controlling the injection of fluidized solidified soil into the karst cave is reduced. In addition, the specific gravity of the fluidized solidified soil is greater than that of the original contents of the karst cave, and its own fluidity is good. It can achieve self-compactment and self-hardening under the action of gravity and its own physicochemical reaction. There is no need to consider the unevenness caused by the impact of fluidized solidified soil with other substances. Only the stability of fluidized solidified soil during grouting needs to be considered, which reduces the difficulty of pressure and flow control in the grouting process.
[0031] 3. Layered pressure grouting allows the karst cave filling material formed by the fluidized solidified soil to be compacted, penetrated and consolidated. The fluidized solidified soil itself has excellent fluidity and self-compacting properties, which can ensure the complete filling of the karst cave, improve construction efficiency and foundation stability.
[0032] 4. It is environmentally friendly. The raw materials of the fluidized solidified soil used to fill the karst cave come from the construction site and the original contents of the karst cave. Only a solidifying agent and water are added to form it. The preparation and solidification processes do not produce harmful substances, have little impact on the underground environment, and meet environmental protection standards.
[0033] 5. The overall implementation system's control system, through feedback data from the weight and density measuring devices, can automatically produce fluidized solidified soil from the original contents of the karst cave, and can also automatically inject fluidized solidified soil and extract slurry from the upper part of the karst cave, saving construction costs and improving construction efficiency. Attached Figure Description
[0034] To more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0035] Figure 1 A schematic diagram of the construction system for filling and replacing karst caves in fluidized solidified soil.
[0036] Figure 2 This is a schematic diagram of the karst cave under construction conditions.
[0037] The following are the labeling elements in the figure: 1. Slurry tank; 2. Mud tank; 3. Raw material mud pump; 4. Clean water pump; 5. Slurry pump; 6. Mixer; 7. Screw conveyor; 8. Material cylinder; 9. Injection mud pump; 10. Pumping mud pump; 11. Grouting pipe; 12. Pumping pipe; 13. Vent pipe; 14. Fluidized solidified soil; 15. Karst cave; 16. Grout above the karst cave. Detailed Implementation
[0038] To make the technical problems to be solved, the technical solutions, and the beneficial effects of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0039] A method for filling and replacing karst caves with fluidized solidified soil, such as Figure 1 As shown, it includes a control system, a fluidized solidified soil preparation device, and a grouting device. Both the fluidized solidified soil preparation device and the grouting device are connected to and controlled by the control system. The fluidized solidified soil preparation device and the grouting device are connected. The fluidized solidified soil produced by the fluidized solidified soil preparation device flows from the fluidized solidified soil preparation device through the grouting device to backfill the karst cave.
[0040] The control system obtains the weight data of each fluidized solidified soil preparation device through sensors, and controls the working status of the feeding device in the fluidized solidified soil preparation device according to the preset data, so as to prepare fluidized solidified soil with the same mix ratio in a timely and quantitative manner.
[0041] The control system obtains the weight data of each grouting device through sensors, and controls the grouting and pumping actions of the grouting device according to the preset data, so that the grouting device cycles several times to fill the bottom of the karst cave with fluidized solidified soil and pump out the grout from the top of the karst cave.
[0042] The fluidized solidified soil preparation equipment includes a raw material tank for holding the raw materials of fluidized solidified soil and a mixing device for producing fluidized solidified soil. The raw materials of fluidized solidified soil are placed in the raw material tank. After mixing, the raw materials of fluidized solidified soil form a fluidized solidified soil mixture. The fluidized solidified soil mixture is transported to the mixing device through a feeding device. According to the preset mixing ratio, a curing agent is added to the mixing device and stirred evenly to form fluidized solidified soil.
[0043] In this embodiment, the raw material pool includes a slurry pool 1 and a solid material pool. The slurry pool 1 contains slurry extracted from the upper part of the karst cave. The solid material pool is a mud pool 2, containing slurry material taken from the construction site (with a specific gravity greater than the slurry from the upper part of the karst cave or greater than the preset specific gravity of the fluidized solidified soil mixture). In another embodiment, the solid material pool is a yellow mud pool 2, containing yellow mud (with a specific gravity greater than the slurry from the upper part of the karst cave or greater than the preset specific gravity of the fluidized solidified soil mixture). In other embodiments, the solid material pool contains dehydrated mud cakes (formed by flocculation and dehydration of soil or waste soil materials taken from the construction site), and the mud cakes are loaded into the slurry pool 1 using forklifts, loaders, etc.
[0044] The slurry in the upper part of the karst cave usually does not meet the specific gravity requirements of the fluidized solidified soil mixture. Therefore, it is necessary to add slurry materials with a higher specific gravity, yellow mud slurry, or mud cake, and then add water. After stirring, the specific gravity of the mixture meets the requirements of the fluidized solidified soil mixture. Only then can it be transferred to the mixing equipment through the feeding equipment. Therefore, in addition to the slurry tank 1 and the solidified material tank, a water tank can also be set up, or the slurry tank 1 can be connected to the water system of the construction site through a flow pump.
[0045] If the solid material tank is a mud tank 2 or a yellow mud tank 2, a raw material mud pump 3 is installed between the slurry tank 1 and the solid material tank. The control system is connected to and controls the working status of the raw material mud pump 3. A clean water pump 4 is installed between the construction site water system or a clean water tank and the slurry tank 1. In this embodiment, the clean water pump 4 is connected to the construction site water system, and the control system is connected to and controls the clean water pump 4. Both the raw material mud pump 3 and the clean water pump 4 are equipped with a weight metering device, which sends flow rate data to the control system. A stirring structure and a specific gravity metering device are installed inside the slurry tank 1.
[0046] The control system receives real-time specific gravity data from the specific gravity metering device, compares the real-time specific gravity data with preset specific gravity data, and calculates the required weight of mud material, yellow mud slurry or mud cake, as well as the required weight of clean water. Based on the calculation results, a control signal is generated and sent to the raw material mud pump 3 and the clean water pump 4. The raw material mud pump 3 starts and transports the mud or yellow mud slurry in the solid material tank to the slurry tank 1 until the data recorded by the weight metering device reaches the calculated value, and then stops. The clean water pump 4 starts and transports clean water to the slurry tank 1 until the data recorded by the weight metering device reaches the calculated value, and then stops. If the solid material tank contains mud cake, after the control system outputs the calculated value, manual operation tools are used to transport the mud cake to the slurry tank 1.
[0047] The mixing equipment includes a mixer 6, which is connected to the raw material tank via a slurry pump 5. The mixer 6 is also connected to the curing agent storage space via a transmission device. Both the slurry pump 5 and the transmission device are connected to and controlled by the control system. The slurry pump 5 is equipped with a weight metering device, and the end of the transmission device is also equipped with a weight metering device. The weight metering device is connected to the control system and sends a real-time weight signal to the control system.
[0048] In this embodiment, the slurry tank 1 is connected to the mixer 6. A slurry pump 5 is installed to transport the fluidized solidified soil mixture in the slurry tank 1 to the mixer 6. The slurry pump 5 is equipped with a weight metering device, which sends real-time weight data to the control system. This weight data represents the weight of the fluidized solidified soil mixture flowing into the mixer 6. The control system controls the working state of the slurry pump 5 according to the real-time weight data. If the real-time weight data reaches the preset weight data, the control system controls the slurry pump 5 to shut down, and the fluidized solidified soil mixture stops flowing into the mixer 6.
[0049] The storage space for the curing agent is a material cylinder 8. A screw conveyor 7 is installed between the material cylinder 8 and the mixer 6 to transport the curing agent. A weight measuring device is installed at the end of the screw conveyor 7. The weight measuring device sends real-time weight data to the control system. This weight data represents the weight of the curing agent flowing into the mixer 6. The control system controls the working state of the screw conveyor 7 according to the real-time weight data. If the real-time weight data reaches the preset weight data, the control system controls the screw conveyor 7 to shut down, and the curing agent stops flowing into the mixer 6.
[0050] The mixer 6 is also equipped with a gas input device. The gas input device inputs high-pressure gas into the bottom of the mixer 6 through a gas valve, so that no sedimentation occurs in the mixer 6 during the mixing process, and the material in the mixer 6 is mixed more evenly.
[0051] In other embodiments, a fluidized solidified soil storage tank is also provided between the mixer 6 and the karst cave. The fluidized solidified soil produced by the mixer 6 is temporarily stored in this storage tank. To prevent the fluidized solidified soil from settling or separating, the storage tank is also equipped with a stirring device that stirs the soil at regular intervals. The storage tank is connected to the grouting pipe 11 via a grouting pump 9. Under the action of the grouting pump 9, the fluidized solidified soil flows into the bottom of the karst cave through the grouting pipe 11.
[0052] like Figure 2As shown, the karst cave 15 has several through holes formed by drilling equipment, including grouting holes, slurry extraction holes, and venting holes. Steel pipes are inserted into these through holes, with different insertion depths for different types of through holes. Grouting pipes 11 are inserted into the grouting holes, with their bottoms extending to the bottom of the karst cave, allowing the fluidized solidified soil 14 to fill the cave from the bottom. The number, structure, and type of grouting pipes 11 are not limited and are determined according to the size of the karst cave and the construction schedule requirements; multiple sets of grouting pipes can be used. Slurry extraction pipes 12 are inserted into the slurry extraction holes, with their bottoms located in the grout 16 above the karst cave, ensuring that the grout in the upper part of the karst cave can be extracted by the slurry pump 10. The number, structure, and type of slurry extraction pipes 12 are not limited and are determined according to the size of the karst cave and the construction schedule requirements; multiple sets of slurry extraction pipes can be used. A vent is inserted into a vent pipe 13, with the bottom of the vent pipe 13 positioned above the contents of the cave, specifically above the slurry in the upper part of the cave, allowing gases within the cave to escape through the vent pipe 13. The number, structure, and type of the vent pipes 13 are not limited and are determined based on the size of the cave and the construction schedule; multiple sets of vent pipes are possible. In addition, monitoring equipment, such as a measuring rope for measuring the liquid level within the cave, can be installed inside and near the vent pipe 13.
[0053] The discharge port of mixer 6 is connected to the karst cave via grouting pump 9 and grouting pipe 11, or the discharge port of fluidized solidified soil storage tank is connected to the karst cave via grouting pump 9 and grouting pipe 11. After grouting pump 9 is started, fluidized solidified soil is injected into the bottom of the karst cave along grouting pipe 11. Grouting pump 9 is equipped with a weight metering device or flow metering device to record the real-time usage of injected fluidized solidified soil and send it to the control system. When the fluidized solidified soil usage data received by the control system reaches a set fixed value, the control system controls grouting pump 9 to stop working and starts pumping pump 10. Pumping pump 10 starts, and the slurry above the karst cave is extracted from the karst cave and transported through pipeline to slurry tank 1 of the raw material pool. Pumping pump 10 is equipped with a weight metering device or flow metering device to record the real-time extraction volume of slurry above the karst cave and send it to the control system. When the real-time extraction volume of slurry from the upper part of the karst cave received by the control system reaches the set fixed value, the control system controls the slurry pump 10 to stop working.
[0054] The slurry pump 10 is equipped with a specific gravity metering device, which sends real-time specific gravity data of the slurry above the karst cave to the control system. The control system compares this data with the specific gravity data of the fluidized solidified soil. If the real-time specific gravity data of the slurry above the karst cave is less than that of the fluidized solidified soil, the control system automatically starts the injection slurry pump 9 after stopping the operation of the slurry pump 10. If the real-time specific gravity data of the slurry above the karst cave is equal to that of the fluidized solidified soil (or if the real-time specific gravity data of the slurry above the karst cave is within a certain threshold range including the specific gravity data of the fluidized solidified soil), the control system stops the slurry pump 10 and starts the injection slurry pump until the karst cave reaches the designed height requirement.
[0055] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A method for filling and replacing karst caves with fluidized solidified soil, characterized in that, Step S1. Prepare and connect the construction equipment, which includes a control system, a fluidized solidified soil preparation device, and a grouting device. Both the fluidized solidified soil preparation device and the grouting device are connected to and controlled by the control system, and the fluidized solidified soil preparation device and the grouting device are connected to each other. Step S2. Feed materials and prepare fluidized solidified soil according to the set standards. The control system obtains the weight data of each fluidized solidified soil preparation device through the sensor, and controls the working status of the feeding device in the fluidized solidified soil preparation device according to the preset data, so as to prepare fluidized solidified soil with the same mix ratio in a timely and quantitative manner. Step S3. The fluidized solidified soil is transported to the injection hole and injected into the bottom of the karst cave. The fluidized solidified soil prepared by the fluidized solidified soil preparation equipment flows from the fluidized solidified soil preparation equipment through the injection equipment to backfill the karst cave. Step S4. After injecting a certain amount of fluidized solidified soil, stop, extract the slurry from the upper part of the karst cave through the slurry extraction hole, and use the slurry from the upper part of the karst cave as one of the raw materials to prepare fluidized solidified soil; Step S5. Inject fluidized solidified soil into the bottom of the karst cave through the injection hole; Step S6. Repeat steps S4 to S5 until the specific gravity of the extracted grout from the upper part of the karst cave is the same as or close to that of the fluidized solidified soil. Stop extracting the grout from the upper part of the karst cave and continue to inject fluidized solidified soil to the designed height requirement of the karst cave. The control system obtains the weight data of each injection device through the sensor and controls the grouting and pumping actions of the injection device according to the preset data, so that the injection device cycles several times to fill the bottom of the karst cave with fluidized solidified soil and extract the grout from the upper part of the karst cave.
2. The method for filling and replacing karst caves with fluidized solidified soil according to claim 1, characterized in that, The fluidized solidified soil preparation equipment includes a raw material tank for holding the raw materials of fluidized solidified soil and a mixing device for producing fluidized solidified soil. The raw materials of fluidized solidified soil are placed in the raw material tank. After mixing, the raw materials of fluidized solidified soil form a fluidized solidified soil mixture. The fluidized solidified soil mixture is transported to the mixing device through a feeding device. According to the preset mixing ratio, a curing agent is added to the mixing device and stirred evenly to form fluidized solidified soil.
3. The method for filling and replacing karst caves with fluidized solidified soil according to claim 2, characterized in that, The raw materials for preparing fluidized solidified soil are placed in the raw material pool. The raw materials for fluidized solidified soil include slurry from the upper part of the karst cave, soil and water. Different building materials are placed in different storage spaces. The different storage spaces are connected by a feeding device. The feeding device is connected to and controlled by the control system. The control system controls the working state of the feeding device so that the slurry, soil and water from the upper part of the karst cave are mixed and stirred to form a fluidized solidified soil mixture with a fixed specific gravity.
4. The method for filling and replacing karst caves with fluidized solidified soil according to claim 3, characterized in that, A specific gravity metering device is installed in the raw material pool. The specific gravity metering device sends the real-time specific gravity data of the raw materials in the raw material pool to the control system. The control system starts or stops the feeding equipment connected to the raw material pool and the storage space for soil or water according to the preset ratio data. It controls the amount of soil and water entering the raw material pool respectively, so that the real-time specific gravity data transmitted by the specific gravity metering device in the raw material pool reaches the preset data of the control system. The control system outputs a control signal to shut down the feeding equipment connected to the raw material pool and the storage space for soil or water.
5. The method for filling and replacing karst caves with fluidized solidified soil according to claim 2, characterized in that, The mixing equipment includes a mixer, which is connected to the raw material tank via a slurry pump. The mixer is also connected to the curing agent storage space via a transmission device. Both the slurry pump and the transmission device are connected to and controlled by the control system. The slurry pump is equipped with a weight metering device, and the end of the transmission device is also equipped with a weight metering device. The weight metering device is connected to the control system and sends a real-time weight signal to the control system.
6. The method for filling and replacing karst caves with fluidized solidified soil according to claim 1, characterized in that, The grouting equipment includes a pumping pipe and an injection pipe. The bottom position of the pumping pipe changes with the height of the contents of the karst cave, while the bottom position of the injection pipe is set at the bottom of the karst cave. A grouting pump is installed between the fluidized solidified soil preparation equipment and the grouting pipe. The fluidized solidified soil produced by the fluidized solidified soil preparation equipment flows into the bottom of the karst cave through the grouting pipe under the action of the grouting pump. A slurry pump is installed between the raw material pool where the fluidized solidified soil is placed and the slurry pumping pipe. The slurry in the upper part of the karst cave flows into the raw material pool through the slurry pumping pipe.
7. The method for filling and replacing karst caves with fluidized solidified soil according to claim 6, characterized in that, The grouting equipment also includes an exhaust pipe, the bottom of which is positioned above the grout in the upper part of the cave.
8. The method for filling and replacing karst caves with fluidized solidified soil according to claim 6, characterized in that, The grouting mud pump is equipped with a weight metering device or a flow metering device. The weight metering device or flow metering device records the real-time amount of fluidized solidified soil injected and sends it to the control system. If the real-time amount of fluidized solidified soil is equal to the unit grouting amount preset by the control system, the control system controls the grouting mud pump to stop working.
9. A method for filling and replacing karst caves with fluidized solidified soil according to claim 6, characterized in that, The slurry pump is equipped with a specific gravity metering device, which sends real-time specific gravity data of the slurry above the karst cave to the control system. The control system compares the real-time specific gravity data with the specific gravity data of the fluidized solidified soil. If the real-time specific gravity data of the slurry above the karst cave is less than that of the fluidized solidified soil, the control system starts the injection slurry pump. If the real-time specific gravity data of the slurry above the karst cave is equal to or close to that of the fluidized solidified soil, the control system stops the operation of the slurry pump and starts the injection slurry pump until the karst cave reaches the designed height requirement.
Citation Information
Patent Citations
Filling and replacing construction system for flow-state solidified soil karst cave
CN221627056U