An underground space pile foundation support structure construction method and an adjustable connecting member
By using detachable connecting components consisting of steel brackets, embedded parts, and steel hinges, the problems of heavy weight, limited construction procedures, and environmental pollution associated with traditional reinforced concrete connecting components are solved. This achieves a lightweight and efficient pile foundation construction method, reducing material waste, noise, and vibration, and shortening the construction cycle.
Patent Information
- Application Number
- CN202410117518.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-26
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2044-01-26
AI Technical Summary
Traditional reinforced concrete connecting members have problems in pile foundation construction, such as heavy weight, limited construction procedures, inability to reuse materials, construction noise and vibration pollution, which affect construction progress and the environment.
Steel brackets are used as connecting components. They are detachably connected to the ring beam and inclined pile heads through embedded parts. Combined with steel hinges and locking bolts, the steel brackets can be detached and adjustable, reducing material waste and improving construction efficiency.
Steel bracket connecting components are lightweight and high-strength, have high construction efficiency, reduce noise and vibration, are reusable, have short construction cycles, are environmentally friendly, and allow for flexible adjustment of the construction sequence, thus improving construction efficiency and environmental quality.
Smart Images

Figure CN117702797B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of pile foundation construction technology, and in particular to a connecting member for retaining piles and inclined piles. Background Technology
[0002] With the increase in the number and height of high-rise buildings, the foundation depth also increases. Since the 1990s, numerous super high-rise buildings have emerged, placing higher and stricter demands on foundation pit excavation technology. This means not only ensuring the stability of the slopes but also meeting deformation control requirements to ensure the safety of surrounding buildings, underground pipelines, roads, and other structures.
[0003] Inclined steel-concrete composite piles or concrete piles, used as retaining structures in foundation pit engineering, not only increase the working space inside the pit but also reduce the cost of the support system, demonstrating significant application and promotion value. (Reference) Figure 1 Before excavating the underground foundation pit, vertical retaining piles (both steel and concrete piles) need to be driven into the foundation as the retaining structure. Then, inclined piles are driven into the retaining piles near the pit, with the tops of the inclined piles connected to the tops of the retaining piles by pouring reinforced concrete connecting members. The top concrete of the inclined piles is removed to expose the internal reinforcing steel; a reinforcing cage is installed between the top steel of the inclined piles and the retaining piles, and then concrete is poured to fix the tops of the two piles. The inclined piles support and reinforce the retaining piles. The foundation pit is then excavated, and the inclined piles are removed after the foundation pit construction is completed.
[0004] However, reinforced concrete structural supports have the following disadvantages in actual construction: 1. Reinforced concrete structural supports are heavy and have a large layout area. The reinforced concrete connecting members between the retaining piles and inclined piles cannot be set to a long size, which limits the construction spacing between the retaining piles and inclined piles. In order to avoid the inclined piles interfering with the construction of the retaining piles, the retaining piles can only be constructed first and then the inclined piles. The construction sequence is limited and affects the construction progress; 2. The reinforced concrete connecting members between the retaining piles and inclined piles need to be removed after construction. The materials of the reinforced concrete structural supports cannot be reused. The installation and removal of the reinforced concrete connecting members require a long construction period. When the reinforced concrete connecting members are demolished by blasting or chiseling, noise, vibration and flying debris will be generated, which will have a significant impact on the construction environment; 3. The construction process of reinforced concrete structural supports is long. After the reinforced concrete structural supports are poured, it takes a long time to wait for the pre-compliance standards to be met.
[0005] In response to the aforementioned technologies, and in order to optimize pile foundation construction, the applicant has designed a construction method for underground space pile foundation support structures and an adjustable connecting component. Summary of the Invention
[0006] On the one hand, this application provides a construction method for underground space pile foundation support structure, adopting the following technical solution: Step 1, Pile construction; complete the construction of retaining piles and inclined piles in the construction area; Step 2, ring beam construction; pour ring beams around the retaining piles and pre-embed embedded parts in the ring beams; Step 3: Install steel brackets between the ring beam and the inclined pile for connection; one end of the steel bracket is detachably connected to the embedded part on the ring beam, and the other end of the steel bracket is detachably connected to the head of the inclined pile by installing a steel hinge. Step 4: Earthwork excavation and construction of the foundation slab; Step 5: Recycle the steel brackets.
[0007] By adopting the above technical solution, steel brackets are used to replace traditional reinforced concrete connecting components to connect the retaining piles and inclined piles. Steel bracket connecting components are lightweight and high-strength, and can be directly assembled between the retaining piles and inclined piles. Compared to casting reinforced concrete connecting components, the construction efficiency is higher and the construction period is shorter. In step three, the two ends of the steel bracket are detachably fixed to the ring beam and the head of the inclined pile respectively through the pre-embedded connecting box steel hinge. After the construction of the underground space support structure is completed, step five can be carried out to remove and recycle the steel brackets. The steel brackets can be reused, reducing resource waste. Furthermore, removing the steel brackets is faster than removing reinforced concrete connecting components, and the removal process does not generate significant noise, vibration, or flying debris.
[0008] Optionally, in step one, the construction sequence of retaining piles and inclined piles is not fixed; when constructing retaining piles first, the construction shall be carried out in accordance with conventional construction methods; when constructing inclined piles first, the actual sample shall be laid out according to the construction drawings to determine the construction position of the retaining piles, and then the inclined piles shall be constructed. After the inclined piles are constructed, the retaining piles shall be constructed, ensuring that the distance between the inclined piles and the retaining piles does not interfere with the operation of the retaining pile construction equipment.
[0009] By adopting the above technical solution and using steel brackets as connecting components, compared with traditional reinforced concrete connecting components, steel bracket connecting components are lighter in weight and stronger. The length of the steel brackets can be set to be longer, and the distance between the retaining piles and the inclined piles can be set to be greater. This can avoid interference between the construction of the inclined piles and the construction of the retaining piles. In this way, the construction sequence of the retaining piles and the inclined piles can be flexibly adjusted. The construction unit can flexibly adjust the construction procedure according to the actual working conditions, which helps to shorten the construction cycle.
[0010] Optionally, in step one, the inclined pile construction process includes: S111, moving the pile driver to the construction position; S112, turning on the power unit, adjusting the construction angle, hoisting a pile section to the designated position, pressing the pile into the soil layer, and exposing the pile head; S113, hoisting down another pile section, welding or bolting the pile head of the next pile section to the pile head of the previous pile section to form a whole, continuously applying pressure, and continuing to drive the pile to expose the pile head of the second pile section; S114, repeating step S113 until all the inclined piles are driven in, and driving the last pile section to the design elevation; Step five also includes recovering the inclined piles by cutting them off at the weld or removing the connecting bolts, and recovering each section of the inclined pile in segments.
[0011] By adopting the above technical solution, the inclined piles are pressed into the soil section by section during construction. After the underground space reinforcement construction is completed, the inclined piles can be dismantled and recycled for reuse, which can reduce construction losses.
[0012] Optionally, step three includes: S31, installing a steel bracket, one end of which is detachably connected to the embedded part on the ring beam, and the other end of which is detachably connected to the head of the inclined pile by installing a steel hinge head; S32, installing an upper support beam, one end of which is rotatably installed on the upper side of the steel bracket near the steel hinge head, the rotation axis of the upper support beam being a horizontal axis perpendicular to the length direction of the steel bracket, and the other end of the upper support beam being fixed to the retaining pile; Step four also includes installing the lower support beam. After the earthwork is excavated to a certain depth, the lower support beam is installed. One end of the lower support beam is rotatably installed on the lower side of the steel bracket near the steel hinge head. The rotation axis of the lower support beam is a horizontal axis perpendicular to the length direction of the steel bracket. The other end of the lower support beam is fixed to the foundation pit wall.
[0013] By adopting the above technical solution, adding upper and lower support beams on the upper and lower sides of the steel bracket can enhance the support effect of the steel bracket on the foundation pit wall.
[0014] Optionally, for multi-level underground space construction, the following steps are also included: Step six, repeating steps one to five to complete the construction of the next level of space; in step five, when constructing inclined piles, the inclined piles exposed outside the bottom slab are removed, and then the inclined piles buried in the soil are pressed to the elevation using pile driving equipment.
[0015] By adopting the above technical solutions, the excavation and support can be carried out simultaneously during the construction of multi-story underground spaces, which can better control the deformation of the foundation pit walls and help improve the construction efficiency of multi-story underground spaces.
[0016] On the other hand, this application also provides an adjustable connecting member for use in the above-mentioned construction method, which adopts the following technical solution: An adjustable connecting member includes a steel bracket and a steel hinge head; the steel hinge head includes a pile connecting component fixed to an inclined pile and a beam connecting component fixed to the steel bracket, wherein the pile connecting component and the beam connecting component are ball-jointed. The beam connecting component includes an abutment seat, a lateral fixing seat, and a locking bolt. The abutment seat is abutted against the lower side of the steel bracket and slides against the bottom of the steel bracket. There are two lateral fixing seats, which are located on both sides of the steel bracket. The lateral fixing seats have through-holes for installing the locking bolt. The locking holes on the two lateral fixing seats are symmetrical about the steel bracket. The end of the locking bolt abuts against the steel bracket. The tail of the locking bolt is offset toward the side of the steel bracket away from the steel hinge head. The steel bracket has a positioning groove corresponding to the tail of the locking bolt. One side wall of the positioning groove is perpendicular to the axis of the locking bolt.
[0017] By adopting the above technical solution, the pile connection component and the beam connection component are connected by a ball joint. The ball joint connection component can meet the requirements of universal rotation and universal load-bearing, which helps the inclined pile to better support the steel bracket and retaining pile. The abutment seat abuts against the bottom of the steel bracket. The lateral fixing seat fixed on the abutment seat can limit the position of the abutment seat and the steel bracket in the width direction. The position of the abutment seat can be adjusted along the length direction of the steel bracket so as to flexibly adjust according to the distance between the retaining pile and the inclined pile. After the position of the abutment seat is properly adjusted, the locking bolt is tightened to abut against the positioning groove on the steel bracket. On the one hand, this cooperates with the support of the inclined pile to lock the support component. On the other hand, the tightening of the locking bolt can apply prestress to the inclined pile and the steel bracket.
[0018] Optionally, the steel bracket has multiple positioning grooves evenly arranged along its length, with the positioning grooves arranged adjacent to each other; the lateral fixing seat has multiple locking holes with parallel axes, and multiple locking bolts are arranged accordingly.
[0019] By adopting the above technical solution, the positioning grooves are opened adjacent to each other, which allows for more flexible adjustment of the positioning grooves corresponding to the locking bolts. This helps the locking bolts to fit tightly against the groove walls, ensuring structural stability and prestress. The multiple locking holes and locking bolts can improve structural stability.
[0020] Optionally, the lateral fixing seat is slidably mounted on the abutment seat, and the sliding direction of the lateral fixing seat is perpendicular to the axis of the steel bracket along its length.
[0021] By adopting the above technical solution, the distance between the lateral fixing seats can be slidably adjusted. On the one hand, the spacing between the lateral fixing seats can be adjusted to accommodate steel brackets of different sizes, which can unify the structure of the pile connection components and facilitate unified production. On the other hand, the displacement of the lateral fixing seats can be adjusted, which also helps to ensure that the locking bolts are aligned with the groove wall of the positioning groove, ensuring that the pile connection components and the steel brackets are firmly fixed.
[0022] Optionally, the main body of the steel bracket is an H-beam or an I-beam, and longitudinal reinforcing ribs and transverse reinforcing ribs are fixed on the web of the main body of the steel bracket; end panels with closed end faces are fixed at both ends of the H-beam along its length, and through holes for mounting bolts are provided on the end panels for connection; the positioning groove is formed on the transverse reinforcing ribs.
[0023] By adopting the above technical solution, the steel bracket can be connected through end panels. After the end panels abut, high-strength bolts are inserted for connection, and the overall length of the steel bracket can be adjusted according to construction needs.
[0024] Optionally, the pile connection component is a metal sleeve designed to correspond to the profile of the inclined pile. One end of the metal sleeve is closed and ball-jointed with the beam connector, while the other end of the metal sleeve is open for insertion into the end of the inclined pile. A through hole for mounting bolts is provided on the closed end of the sleeve of the pile connection component.
[0025] By adopting the above technical solution, a sleeve is selected for the pile connection component, which can be quickly inserted and fixed to the inclined pile, thus improving installation efficiency. The sleeve is tightly fixed to the inclined pile head, which helps the inclined pile stably support the retaining pile. The pile connection component and the inclined pile head are detachably fixed with bolts, and the disassembly and assembly of the pile connection component are convenient, which helps to smoothly recover the pile connection component and reduce unnecessary waste.
[0026] In summary, this application includes at least one of the following beneficial technical effects: 1. The present application discloses a construction method for underground space pile foundation support structure, which uses steel brackets as connecting components for retaining piles and inclined piles, and designs that the two ends of the steel brackets can be detachably fixed to the ring beam and the pile head of the inclined pile, so that the steel brackets can be repeatedly recycled and reused, effectively reducing material waste; at the same time, the disassembly and assembly process of the steel brackets does not require blasting or violent chiseling, and the disassembly and assembly process will not generate too much noise or vibration, nor will it generate flying debris, which can effectively improve construction efficiency and improve the construction environment.
[0027] 2. By using steel brackets as connecting components, the lighter weight and more controllable strength of steel structures help increase the distance between retaining piles and inclined piles. On this basis, the construction of retaining piles and inclined piles does not interfere with each other. The construction unit can flexibly adjust the construction sequence of inclined piles and retaining piles according to the actual working conditions, which helps to rationally arrange the construction process and shorten the construction cycle. 3. By using the locking bolts to obliquely abut against the positioning groove wall on the steel bracket, the entire steel hinge head can be fixed by the tightening force of the locking bolts and the reaction force of the inclined pile, while prestressing can be applied to the entire pile support structure, which can better prevent the deformation of the foundation pit wall. 4. This application also discloses an adjustable connecting member, the length of which can be adjusted according to the distance between the retaining pile and the inclined pile, the beam connecting component can be adjusted along the length of the steel bracket, and the overall structure can be fixed and prestressed by tightening the locking bolts, which can reliably support the retaining pile. Attached Figure Description
[0028] Figure 1 This is a structural schematic diagram of a traditional reinforced concrete support member in the background art of this application; Figure 2 This is a flowchart illustrating the construction method of underground space pile foundation support structure in the embodiments of this application; Figure 3 This is a schematic diagram of the underground space pile foundation support structure in the embodiments of this application. Figure 1 ; Figure 4 This is a structural schematic diagram of the embedded parts; Figure 5 This is a schematic diagram of the underground space pile foundation support structure in the embodiments of this application. Figure 2 ; Figure 6 This is a schematic diagram of the underground space pile foundation support structure in the embodiments of this application. Figure 3 ; Figure 7 This is a schematic diagram of the overall structure of the adjustable connecting component in the embodiments of this application; Figure 8 yes Figure 7 AA section view; Figure 9 yes Figure 7 BB cross-sectional view.
[0029] Attached Figure Descriptions: 1. Retaining pile; 2. Inclined pile; 3. Concrete connecting component; 4. Steel bracket; 41. H-beam; 42. Longitudinal reinforcing rib; 43. Transverse reinforcing rib; 44. Transverse positioning plate; 45. Positioning groove; 46. End panel; 47. Hinge ear plate; 5. Embedded part; 51. Anchor plate; 52. Threaded steel bar; 6. Steel swivel head; 61. Beam connecting component; 62. Pile connecting component; 63. Abutment seat; 631. T-shaped adjusting groove; 632. Guide slide; 64. Lateral fixing seat; 641. Installation through hole; 642. Locking hole; 643. Guide slider; 65. Locking bolt; 66. Fixing bolt; 7. Ring beam; 81. Upper support beam; 82. Lower support beam; 9. Base plate force transmission band. Detailed Implementation
[0030] The following is in conjunction with the appendix Figure 2-9 This application will be described in further detail.
[0031] On the one hand, this application discloses a construction method for underground space pile foundation support structure, referring to Figure 2 and Figure 3 ,include: Step 1: Pile construction. A physical sample is laid out in the construction area according to the construction drawings, and the retaining piles 1 and inclined piles 2 are constructed according to the design requirements.
[0032] The construction sequence of retaining pile 1 and inclined pile 2 can be adjusted according to the site conditions. When constructing retaining pile 1 first, construct retaining pile 1 and inclined pile 2 in sequence according to the conventional construction method; when constructing inclined pile 2 first, determine the construction position of retaining pile 1 according to the actual layout on the construction drawings, and then construct inclined pile 2 with the construction position of retaining pile 1 as the reference. The distance between inclined pile 2 and retaining pile 1 should be such that the inclined pile 2 pressed to the elevation does not interfere with the operation of the retaining pile 1 construction equipment. After the construction of inclined pile 2 is completed, the construction of retaining pile 1 can be carried out.
[0033] Inclined pile 2 adopts steel pipe concrete pile. The construction process of inclined pile 2 includes: S111, according to the design requirements, move the pile driver to the construction position; S112, turn on the power unit, adjust the construction angle of the pile driver, hoist a pile section to the designated position, and use the pile driver to press the pile into the soil layer, exposing the pile head; S113, hoist the next pile section, and the pile head of the next pile section is detachably connected to the pile head of the previous pile section with bolts. Use the pile driver to continuously apply pressure and continue to drive the pile to expose the pile head of the next pile section; S114, repeat step S113 until all the designed number of inclined piles 2 are driven in, and the last pile section is driven to the design elevation.
[0034] Step 2, construction of ring beam 7. Excavate a trench around the retaining pile 1 to the bottom elevation of ring beam 7, fabricate the reinforcing steel bars and embedded parts 5 of ring beam 7, install the reinforcing steel bars and embedded parts 5 in the trench, and then pour ring beam 7 around the retaining pile 1.
[0035] refer to Figure 4 The embedded part 5 includes an anchor plate 51 and threaded steel bars 52. One end of the threaded steel bar 52 is threaded for easy connection to steel components. Multiple threaded steel bars 52 are vertically inserted through the anchor plate 51 and welded to it. The threaded steel bars 52 are arranged in a rectangular pattern on the anchor plate 51. The unthreaded portion of the threaded steel bar 52 is located at one end of the anchor plate 51 for pre-embedding and fixing in the ring beam 7; the threaded end of the threaded steel bar 52 is located at the other end of the anchor plate 51, with the threaded end exposed for connecting to steel components.
[0036] Step 3: After the ring beam 7 reaches its design strength, install steel brackets 4 between the ring beam 7 and the inclined pile 2 for connection. Step 3 includes: S31, installing steel brackets 4. One end of the steel bracket 4 is connected and fixed to the exposed threaded head of the embedded part 5 on the ring beam 7 and abuts against the anchor plate 51 of the embedded part 5. The other end of the steel bracket 4 is detachably connected to the pile head of the inclined pile 2 by installing steel hinged head 6.
[0037] Step 4: Earthwork excavation and foundation slab construction. Excavate the earthwork down to the bottom of the foundation slab subbase, and then construct the foundation slab, columns, walls, beams, and slabs.
[0038] Step 5: Recover steel bracket 4 and inclined pile 2.
[0039] After the base plate force transmission belt 9 reaches its design strength, remove the steel bracket 4 and the inclined piles 2 above the base plate, and recover the steel bracket 4 and inclined piles 2. Use hoisting equipment to fix the inclined piles 2, then remove the bolt connection structure at both ends of the steel bracket 4 and remove the steel bracket 4; after the steel bracket 4 is removed, remove the connecting bolts at the joint of the uppermost inclined pile 2, use hoisting equipment to send the inclined pile 2 to the storage area, and remove the inclined piles 2 above the base plate in sequence from top to bottom.
[0040] For multi-level underground space construction, in step five, when constructing inclined pile 2, the inclined pile 2 that is completely exposed outside the bottom slab is removed. Then, proceed to step six, repeating steps one through five to complete the construction of the next level of space.
[0041] The pile foundation support structure can also be supplemented with an upper support beam 81, see reference. Figure 5 Step three also includes: S32, installing the upper support beam 81. One end of the upper support beam 81 is rotatably mounted on the upper side of the steel bracket 4 near the steel hinge head 6. The rotation axis of the upper support beam 81 is a horizontal axis perpendicular to the length direction of the steel bracket 4. The other end of the upper support beam 81 is fixed to the retaining pile 1. Bolt connectors are pre-installed on the retaining pile 1, and the end of the upper support beam 81 is fixed by bolt connectors. During construction, the installation step of the upper support beam 81 is added, and the upper support beam 81 enhances the support effect of the inclined pile 2 on the retaining pile 1.
[0042] The pile foundation support structure can be further enhanced with a lower support beam 82, as shown in the reference. Figure 6 In step four, after excavating to a certain depth (leaving space for the installation of the lower support beam 82), the lower support beam 82 is installed. One end of the lower support beam 82 is rotatably mounted on the lower side of the steel bracket 4 near the steel hinge head 6, and the rotation axis of the lower support beam 82 is a horizontal axis perpendicular to the length direction of the steel bracket 4. The other end of the lower support beam 82 is fixed to the foundation pit wall, and bolt connectors are pre-embedded in the foundation pit wall. The lower support beam 82 is fixed by bolt connectors. After that, the earthwork is excavated to the bottom of the foundation slab cushion layer.
[0043] The implementation principle of the construction method for underground space pile foundation support structure disclosed in this application is as follows: by using steel brackets 4 as connecting components for retaining piles 1 and inclined piles 2, and designing that the two ends of the steel brackets 4 can be detachably fixed to the ring beam 7 and the pile heads of the inclined piles 2, the steel brackets 4 can be repeatedly recycled and reused, effectively reducing material waste; at the same time, the disassembly and assembly process of the steel brackets 4 does not require blasting or violent chiseling, and the disassembly and assembly process will not generate too much noise or vibration, nor will it generate flying debris, which can effectively improve construction efficiency and improve the construction environment.
[0044] This application also discloses an adjustable connecting member for the above-mentioned pile foundation support structure construction method, with reference to... Figure 7 , including steel bracket 4 and steel flexible head 6.
[0045] refer to Figure 7 and Figure 8 The main body of the steel bracket 4 is an H-beam 41. Longitudinal reinforcing ribs 42 and transverse reinforcing ribs 43 are welded and fixed perpendicularly to the web of the H-beam 41. Longitudinal reinforcing ribs 42 and transverse reinforcing ribs 43 are symmetrically arranged on both sides of the web. The upper and lower ends of the longitudinal reinforcing ribs 42 are welded and fixed to the flanges on the upper and lower sides of the H-beam 41, respectively. Multiple longitudinal reinforcing ribs 42 are equidistantly arranged along the length of the H-beam 41. End panels 46 with closed end faces are welded and fixed to both ends of the H-beam 41. The two ends of the transverse reinforcing ribs 43 are welded and fixed to the end panels 46 at both ends of the H-beam 41, respectively. Two transverse reinforcing ribs 43 are arranged longitudinally. Through holes 641 are provided on the end panels 46 at both ends of the steel bracket 4 for bolts to be inserted for connection and fixation.
[0046] refer to Figure 8 and Figure 9 The steel hinge head 6 includes a pile connection component 62 that is fixed to the inclined pile 2 and a beam connection component 61 that is fixed to the steel bracket 4. The pile connection component 62 and the beam connection component 61 are connected by a ball joint.
[0047] refer to Figure 7 The pile connection component 62 is a single-end closed metal sleeve that is fitted onto the inclined pile 2, which can be fitted onto the pile head of the inclined pile 2 more efficiently. High-strength bolts are pre-embedded at the end of the inclined pile 2. The closed end of the inclined support sleeve is opened through a hole corresponding to the pre-embedded high-strength bolt on the inclined pile 2. The pre-embedded bolt passes through the through hole on the sleeve and then the nut is screwed on to connect and fix the inclined support sleeve to the inclined pile 2.
[0048] refer to Figure 7 and Figure 8The beam connecting component 61 includes an abutment seat 63, a lateral fixing seat 64, a locking bolt 65, and a fixing bolt 66. The abutment seat 63 is abutted against the lower side of the steel bracket 4 and slides against the bottom of the steel bracket 4. The lateral fixing seat 64 is slidably mounted on the upper end face of the abutment seat 63. The abutment seat 63 has a T-shaped adjustment groove 631 with an inverted T-shaped cross-section along a direction perpendicular to the long axis of the steel bracket 4. The upper end of the T-shaped adjustment groove 631 penetrates the upper end face of the abutment seat 63. The bolt head of the fixing bolt 66 is slidably inserted into the T-shaped adjustment groove 631. The lateral fixing seat 64 has a through hole corresponding to the fixing bolt 66. 641, after the fixing bolt 66 passes through the mounting through hole 641, tighten the nut to fix the position of the lateral fixing seat 64; the upper end face of the abutment seat 63 is provided with a rectangular guide groove 632 parallel to the T-shaped adjustment groove 631, and the lower end of the adjustment seat is provided with a rectangular guide slider 643 that slides and cooperates with the guide groove 632; there are two lateral fixing seats 64, which are located on both sides of the steel bracket 4 respectively, and the lateral fixing seats 64 are provided with locking holes 642 for installing locking bolts 65.
[0049] refer to Figure 8 and Figure 9 Multiple positioning grooves 45 are equidistantly formed on the outer sidewall of the transverse reinforcing rib on the lower side of the steel bracket 4, along its own length, to form a transverse positioning plate 44. The positioning grooves 45 are right-angled grooves with a right-angled profile. The tail of the locking bolt 65 is offset towards the side closer to the embedded part 5 so that the locking bolt 65 abuts vertically against the groove wall of the positioning groove 45. The locking hole 642 is set as an oblique hole, and the central axis of the locking hole 642 is perpendicular to the groove wall of the positioning groove 45 on the side closer to the embedded part 5. Multiple locking holes 642 are set on the lateral fixing seat 64 along the length of the transverse positioning plate 44, and the multiple locking holes 642 are equidistantly set along the length of the transverse positioning plate 44. The abutment seat 63 is slid relative to the steel bracket 4 to a suitable position so that the inclined brace sleeve and the inclined pile 2 can be smoothly fitted. Then, the two lateral fixing seats 64 are adjusted to fit against the two sides of the steel bracket 4. First, the fixing bolt 66 is tightened to fix the position of the lateral fixing seat 64, and then the locking bolt 65 is tightened. The inclined pile 2 provides a reaction force to fix the entire steel hinge head 6.
[0050] The implementation principle of an adjustable connecting component disclosed in this application is as follows: the length of the steel bracket 4 can be adjusted according to the distance between the retaining pile 1 and the inclined pile 2, the beam connecting component 61 can be adjusted along the length direction of the steel bracket 4, and the overall structure can be fixed and prestressed by tightening the locking bolt 65, which can reliably support the retaining pile 1.
[0051] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.
Claims
1. A construction method for underground space pile foundation support structure, characterized in that, include: Step 1, pile construction; complete the construction of retaining piles (1) and inclined piles (2) in the construction area; the construction sequence of retaining piles (1) and inclined piles (2) is not fixed; when constructing retaining piles (1) first, construct according to conventional construction methods; when constructing inclined piles (2) first, lay out the actual sample according to the construction drawing, determine the construction position of retaining piles (1), and then construct inclined piles (2). After the construction of inclined piles (2) is completed, the construction of retaining piles (1) is carried out to ensure that the distance between inclined piles (2) and retaining piles (1) does not interfere with the operation of the retaining pile (1) construction equipment; Step 2, construction of ring beam (7); pour ring beam (7) around retaining pile (1) and pre-embed embedded parts (5) in ring beam (7); Step 3: Install steel brackets (4) between the ring beam (7) and the inclined pile (2) for connection; one end of the steel bracket (4) is detachably connected to the embedded part (5) on the ring beam (7), and the other end of the steel bracket (4) is detachably connected to the pile head of the inclined pile (2) by installing a steel hinge head (6); the steel hinge head (6) includes a pile connection component (62) fixed to the inclined pile (2) and a beam connection component (61) fixed to the steel bracket (4), and the pile connection component (62) and the beam connection component (61) are ball-jointed; the beam connection component (61) includes an abutment seat (63), a lateral fixing seat (64) and a locking bolt (65); the abutment seat (63) abuts against the steel bracket (7) and the inclined pile (2). 4) slides on the lower side and against the bottom of the steel bracket (4). There are two side fixing seats (64) and they are set on both sides of the steel bracket (4). The side fixing seats (64) have a through-hole (642) for installing locking bolts (65). The locking holes (642) on the two side fixing seats (64) are symmetrical about the steel bracket (4). The end of the locking bolt (65) abuts against the steel bracket (4). The tail of the locking bolt (65) is offset towards the side of the steel bracket (4) away from the steel hinge head (6). The steel bracket (4) has a positioning groove (45) corresponding to the tail of the locking bolt (65). One side of the groove wall of the positioning groove (45) is perpendicular to the axis of the locking bolt (65). Step 4: Earthwork excavation and construction of the foundation slab; Step 5, recycle the steel cow leg (4).
2. The construction method for an underground space pile foundation support structure according to claim 1, characterized in that: In step one, the construction process of inclined pile (2) includes: S111, moving the pile driver to the construction position; S112, turning on the power device, adjusting the construction angle, hoisting a section of pile to the designated position, pressing the pile into the soil layer, and exposing the pile head; S113, hoisting down a section of pile, welding or bolting the pile head of the next section of pile to the pile head of the previous section of pile to form a whole, continuously applying pressure, and continuing to drive the pile to expose the pile head of the second section of pile; S114, repeating step S113 until all inclined piles (2) are driven in, and the last section of pile is driven to the design elevation; Step 5 also includes recovering the inclined piles (2), cutting off the inclined piles (2) from the weld or removing the connecting bolts, and recovering each section of the inclined piles (2) in segments.
3. The construction method for an underground space pile foundation support structure according to claim 1, characterized in that: Step 3 includes: S31, installing steel bracket (4), one end of steel bracket (4) is detachably connected to the embedded part (5) on the ring beam (7), and the other end of steel bracket (4) is detachably connected to the head of the inclined pile (2) by installing steel hinge head (6); S32, installing upper support beam (81), one end of upper support beam (81) is rotatably installed on the upper side of steel bracket (4) near the steel hinge head (6), the rotation axis of upper support beam (81) is a horizontal axis perpendicular to the length direction of steel bracket (4), and the other end of upper support beam (81) is fixed on retaining pile (1); Step four also includes installing the lower support beam (82). After the earthwork is excavated to a certain depth, the lower support beam (82) is installed. One end of the lower support beam (82) is rotatably installed on the lower side of the steel bracket (4) near the steel hinge head (6). The rotation axis of the lower support beam (82) is a horizontal axis perpendicular to the length direction of the steel bracket (4). The other end of the lower support beam (82) is fixed to the foundation pit wall.
4. The construction method for an underground space pile foundation support structure according to claim 1, characterized in that: For multi-level underground space construction, it also includes: Step 6, repeating steps 1 to 5 to complete the construction of the next level of space; in step 5, when constructing the inclined pile (2), the inclined pile (2) exposed outside the bottom plate is removed, and then the inclined pile (2) buried in the soil is pressed to the elevation using the pile pressing equipment.
5. An adjustable connecting member applied to the construction method according to any one of claims 1-4, characterized in that: It includes a steel bracket (4) and a steel hinge (6); the steel hinge (6) includes a pile connection component (62) that is fixed to the inclined pile (2) and a beam connection component (61) that is fixed to the steel bracket (4), and the pile connection component (62) and the beam connection component (61) are ball-jointed; The beam connecting component (61) includes an abutment seat (63), a lateral fixing seat (64), and a locking bolt (65). The abutment seat (63) is abutted against the lower side of the steel bracket (4) and slides against the bottom of the steel bracket (4). There are two lateral fixing seats (64) and they are located on both sides of the steel bracket (4). The lateral fixing seats (64) have a through-hole (642) for installing the locking bolt (65). The locking holes (642) on the two lateral fixing seats (64) are symmetrical about the steel bracket (4). The end of the locking bolt (65) abuts against the steel bracket (4). The tail of the locking bolt (65) is offset toward the side of the steel bracket (4) away from the steel hinge head (6). The steel bracket (4) has a positioning groove (45) corresponding to the tail of the locking bolt (65). One side of the positioning groove (45) is perpendicular to the axis of the locking bolt (65).
6. An adjustable connecting member according to claim 5, characterized in that: The steel bracket (4) has multiple positioning grooves (45) evenly arranged along its own length direction, and the positioning grooves (45) are arranged adjacent to each other; the lateral fixing seat (64) has multiple locking holes (642) with parallel axes, and multiple locking bolts (65) are arranged accordingly; the lateral fixing seat (64) is slidably installed on the abutment seat (63), and the sliding direction of the lateral fixing seat (64) is perpendicular to the axis of the steel bracket (4) along its length direction.
7. An adjustable connecting member according to claim 5, characterized in that: It also includes an upper support beam (81) and a lower support beam (82). One end of the upper support beam (81) and the lower support beam (82) are respectively rotatably installed on the upper and lower sides of the steel bracket (4) near the steel hinge head (6). The rotation axis of the upper support beam (81) and the lower support beam (82) is a horizontal axis perpendicular to the length direction of the steel bracket (4).
8. An adjustable connecting member according to claim 5, characterized in that, The main body of the steel bracket (4) is an H-beam (41) or an I-beam. The web of the main body of the steel bracket (4) is fixed with longitudinal reinforcing ribs (42) and transverse reinforcing ribs (43). The two ends of the H-beam (41) in the length direction are fixed with end panels (46) with closed end faces. The end panels (46) are provided with through holes (641) for connecting bolts. The positioning groove (45) is opened on the transverse reinforcing ribs (43).
9. An adjustable connecting member according to claim 5, characterized in that, The pile connection component (62) is a metal sleeve designed to correspond to the contour of the inclined pile (2). One end of the metal sleeve is closed and ball-jointed with the beam connector, while the other end of the metal sleeve is open for insertion into the end of the inclined pile (2). A through hole (641) for mounting bolts is provided on the closed end of the sleeve of the pile connection component (62).
Citation Information
Patent Citations
Combined inclined supporting system for foundation pit engineering
CN212175804U
Environment-friendly cable support for cable well
CN216312598U
Connecting structure of foundation pit coping beam and offset inclined pile inclined throwing support
CN219011226U