Hydraulic turbine system and method of controlling the same

The design of the hydraulic turbine system solved the overpressure problem caused by the elevation difference in urban heating projects, achieved stable and efficient water temperature utilization, reduced the construction cost and time cost of the pressure relief station, and enabled high-flow heating.

CN117704467BActive Publication Date: 2026-11-20JIANGSU HEHAI URBAN ENERGY CONSERVATION RES INST CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311746700.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-18
Publication Date
2026-11-20
Estimated Expiration
2043-12-18

AI Technical Summary

Technical Problem

In existing urban heating projects, the difference in elevation causes overpressure problems at the user end. Pressure relief stations result in water temperature drop and reduced efficiency, and the construction of pressure relief stations is costly.

Method used

The system employs a hydraulic turbine system, including a turbine unit, a heating mechanism, and a protection mechanism. Through the combined design of turbine pumps and booster pumps, it ensures water pressure balance and flow stability. A lithium bromide heat pump is used for stepwise heating, and protection components are set up for overpressure and pressure protection.

Benefits of technology

It improves the utilization efficiency of influent water temperature and the efficiency of pressure reduction treatment, reduces the cost and time of building pressure reducing stations, and realizes high-flow-rate heating.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117704467B_ABST
    Figure CN117704467B_ABST
Patent Text Reader

Abstract

The application discloses a hydraulic turbine system and a control method thereof. The hydraulic turbine system comprises a water turbine unit, a heat supply mechanism and a protection mechanism. The water turbine unit comprises a plurality of water turbines. Each water turbine comprises a turbine pump and a first booster pump. The input end of the turbine pump is connected with the input end of the hydraulic turbine system. The output end of the first booster pump is connected with the output end of the hydraulic turbine system. The heat supply mechanism comprises a plurality of heat supply components. Each heat supply component comprises a first heat pump unit, a booster unit and a second heat pump unit. The first heat pump unit, the booster unit and the second heat pump unit are connected in sequence along the water flow direction. The protection mechanism comprises a first protection component and a second protection component. Through the design of the water turbine unit, the pressure balance and the flow stability of water after passing through the heat supply mechanism can be ensured. Compared with the pressure isolation mode of the traditional pressure isolation station, the mode can ensure the temperature quality of the water and improve the temperature utilization effect of the water.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of energy recovery technology, and in particular to a hydraulic turbine system and its control method. Background Technology

[0002] Urban heating refers to the delivery and distribution of heating media from centralized urban heating sources to heat users. It comprises three parts: heat sources, heating networks, and heat users. Depending on the heat source, it can be categorized as a thermal power plant, centralized heating, boiler rooms, decentralized boiler rooms, industrial waste heat, etc. In urban heating projects, due to the location of the heat source, overpressure problems at the user end are easily encountered during the transportation of the heating media caused by differences in elevation.

[0003] Currently, in order to solve the overpressure problem at the user end, a dedicated pressure isolation station is needed to ensure the pressure balance and flow stability of the heat pump water. However, after the pressure is isolated by the pressure isolation station, the water temperature quality decreases, which will affect the utilization effect of the water. At the same time, the pressure isolation process of the pressure isolation station will take a certain amount of time, which will affect the processing efficiency. Summary of the Invention

[0004] The technical problem to be solved by this invention is: in order to solve the problem of poor water utilization in existing urban heating projects, this invention provides a hydraulic turbine system and its control method, which can improve the temperature utilization effect of water inlet by improving the pressure isolation method in urban heating projects.

[0005] The technical solution adopted by this invention to solve its technical problem is: a hydraulic turbine system, comprising: a turbine unit, a heating mechanism, and a protection mechanism. The turbine unit includes: multiple turbines, each turbine including: a turbine pump and a first booster pump. The input end of the turbine pump is connected to the input end of the hydraulic turbine system, and the output end of the first booster pump is connected to the output end of the hydraulic turbine system. The heating mechanism includes: multiple heating components, each heating component including: a first heat pump unit, a booster unit, and a second heat pump unit. The booster unit and the second heat pump unit are connected sequentially along the water flow direction. The input end of the first heat pump unit is connected to the output end of the turbine pump, and the output end of the second heat pump unit is connected to the input end of the first booster pump. The protection mechanism includes a first protection component and a second protection component. The input end and output end of the first protection component are respectively connected to the input end and the output end of the hydraulic turbine system, and the input end and output end of the second protection component are respectively connected to the output end of the turbine pump and the input end of the first booster pump.

[0006] Therefore, the design of the turbine unit ensures pressure balance and stable flow of water after passing through the heating system. Compared with the pressure reduction method of traditional pressure reducing stations, this method can ensure the temperature quality of the incoming water, improve the temperature utilization effect of the incoming water, and improve the pressure reduction efficiency of the incoming water. At the same time, it reduces the construction cost and construction time cost of building pressure reducing stations. The heating system can heat the water after pressure reduction by the turbine pump for external heating. Multiple parallel heating components can achieve high-flow-rate water heating. The first protection mechanism realizes overpressure protection of the entire hydraulic turbine system when the pressure P1 at the input end and P2 at the output end suddenly change. The second protection mechanism realizes pressure protection of the heating system when the turbine pump output is insufficient.

[0007] Furthermore, the turbine pump is provided with a first electric switching valve at its input end, a first switching valve at its output end, a second switching valve at its input end, and a first check valve and a second electric switching valve sequentially arranged along the water flow direction at its output end. Therefore, when the pressure P1 at the input end of the hydraulic turbine system is less than the pressure P2 at the output end of the hydraulic turbine system, the first and second electric switching valves are opened, and the turbine pump and the first booster pump operate normally. The turbine pump is used to convert the kinetic energy of the water entering the hydraulic turbine system into mechanical energy to achieve pressure reduction treatment of the water entering the hydraulic turbine system, ensuring that the water after pressure reduction treatment can meet the pressure requirements of the heating mechanism. At the same time, the converted mechanical energy can drive the first booster pump to achieve energy saving. The first booster pump is used to increase the pressure of the water exiting the heating mechanism to provide greater power, ensuring that the water exiting the heating mechanism after pressure treatment can reach the designated destination. When the pressure P1 at the input end of the hydraulic turbine system is greater than the pressure P2 at the output end of the hydraulic turbine system, the first and second electric switching valves are closed, and the turbine pump and the first booster pump stop operating. The first check valve has a one-way conduction function, ensuring that the water can only flow from the output end of the first booster pump to the output end of the hydraulic turbine system.

[0008] Furthermore, the first heat pump unit includes a plurality of first lithium bromide heat pumps, which are sequentially connected along the water flow direction. Thus, the first lithium bromide heat pumps are used to heat the incoming water and provide external heating; the plurality of first lithium bromide heat pumps enable a step-by-step heating process for the incoming water.

[0009] Furthermore, the pressurization unit includes: multiple second pressurization pumps and second check valves, which are arranged in parallel. The input ends of the multiple second pressurization pumps and the second check valves are all connected to the output end of the first heat pump unit, and the output ends of the multiple second pressurization pumps and the second check valves are all connected to the input end of the second heat pump unit. Thus, the second pressurization pumps pressurize the water at the output end of the first heat pump unit, ensuring that the water continues to flow in the direction of water flow after passing through the first heat pump unit. The second check valves have a one-way conduction function, ensuring that the water flow can only flow from the first heat pump unit to the second heat pump unit and cannot backflow, thus protecting the first and second heat pump units and extending their service life.

[0010] Furthermore, the second heat pump unit includes multiple second lithium bromide heat pumps, which are sequentially connected along the water flow direction. Thus, the second lithium bromide heat pumps are used to heat the incoming water and provide external heating; the multiple second lithium bromide heat pumps enable staged heating of the incoming water.

[0011] Further, the first protection component includes: a third check valve and a third electrically operated switch valve, one end of the third check valve being connected to one end of the third electrically operated switch valve, the other end of the third check valve being connected to the input end of the hydraulic turbine system, and the other end of the third electrically operated switch valve being connected to the output end of the hydraulic turbine system; the second protection component includes: a fourth electrically operated switch valve and a third switch valve, one end of the fourth electrically operated switch valve being connected to one end of the third switch valve, the other end of the fourth electrically operated switch valve being connected to the input end of the first booster pump, and the other end of the third switch valve being connected to the output end of the turbine pump; a fifth pressure sensor is provided between the third switch valve and the turbine pump. Therefore, when the pressure P1 at the input end of the hydraulic turbine system is greater than the pressure P2 at the output end of the hydraulic turbine system, the third check valve is activated, and the first protection component provides overpressure protection against sudden changes in the input and output pressures of the hydraulic turbine system. When the input pressure P1 is less than the output pressure P2, the third check valve is not activated, and the entire hydraulic turbine system operates normally. When the output pressure P5 of the turbine pump, the input pressure P3 of the heating component, and the output pressure P4 of the heating component are all greater than the maximum pressure P that the heating component can withstand, the fourth electric switching valve and the third switching valve are opened, and the second protection component provides pressure protection for the heating component. When the output pressure P5 of the turbine pump, the input pressure P3 of the heating component, and the output pressure P4 of the heating component are all less than the maximum pressure P that the heating component can withstand, the fourth electric switching valve and the third switching valve are closed, and the heating component operates normally. The output pressure P5 of the turbine pump is monitored in real time by the fifth pressure sensor.

[0012] Furthermore, a first flow meter and a first pressure sensor are sequentially installed between the input end of the hydraulic turbine system and the third check valve along the water flow direction. Thus, the pressure P1 at the input end of the hydraulic turbine system is monitored in real time by the first pressure sensor, and the flow rate Q1 at the input end of the hydraulic turbine system is monitored in real time by the first flow meter.

[0013] Furthermore, a second pressure sensor and a second flow meter are sequentially installed between the output end of the hydraulic turbine system and the third electric switching valve along the water flow direction. Thus, the pressure P2 at the output end of the hydraulic turbine system is monitored in real time via the second pressure sensor, and the flow rate Q2 at the output end of the hydraulic turbine system is monitored in real time via the second flow meter.

[0014] Furthermore, the input end of the heating component is sequentially equipped with a fourth check valve, a third pressure sensor, and a fifth electrically operated valve along the water flow direction, and the output end of the heating component is sequentially equipped with a fifth check valve, a fourth pressure sensor, and a sixth electrically operated valve along the water flow direction. Thus, the third pressure sensor can monitor the pressure P3 at the input end of the heating component in real time, and the fourth pressure sensor can monitor the pressure P4 at the output end of the heating component in real time. When neither the input pressure P3 nor the output pressure P4 meets the pressure requirements of the heating component, the fifth and sixth electrically operated valves are closed; when both the input pressure P3 and the output pressure P4 meet the pressure requirements, the fifth and sixth electrically operated valves are opened. The fourth and fifth check valves have a one-way flow function, ensuring that the incoming water can only flow from the input end to the output end of the heating component, preventing backflow.

[0015] A control method for a hydraulic turbine system includes the following steps: S1. Obtain the pressure P1 at the input end of the hydraulic turbine system and the pressure P2 at the output end of the hydraulic turbine system. If P1 > P2, then execute step S2. If the pressure P1 < P2, then execute step S3. S2. The turbine pump and the first booster pump are shut down, the first protection component performs overpressure protection, and the water entering the hydraulic turbine system flows directly to the output of the hydraulic turbine system through the first protection component. S3. The first protection component does not perform overvoltage protection, and starts the turbine pump and the first booster pump; S4. Let P be the maximum pressure that the heating component can withstand. Obtain the pressure P3 at the input end of the heating component, the pressure P4 at the output end of the heating component, and the pressure P5 at the output end of the turbine pump. If P3 > P, P4 > P, and P5 > P, then execute step S5. If P3 < P, P4 < P, and P5 < P, then execute step S6. S5. The heating component is shut down, the second protection component performs pressure protection, and the water at the output of the turbine pump flows directly to the first booster pump through the second protection component. S6. The second protection component does not perform pressure protection and the heating component is turned on.

[0016] Compared with the prior art, the beneficial effects of the present invention are: 1. The present invention, through the design of the water turbine unit, can ensure the pressure balance and flow stability of the water after passing through the heating mechanism. Compared with the pressure reduction method of the traditional pressure reduction station, this method can ensure the temperature quality of the incoming water, improve the temperature utilization effect of the incoming water, and also improve the pressure reduction treatment efficiency of the incoming water. At the same time, it reduces the construction cost and construction time cost of building the pressure reduction station.

[0017] 2. The present invention can heat water after it has been depressurized by a turbine pump through a heating mechanism for external heating; multiple heating components connected in parallel can achieve heating of large flow rates of incoming water.

[0018] 3. The present invention achieves overpressure protection for the entire hydraulic turbine system by means of a first protection mechanism to prevent sudden changes in the input pressure P1 and output pressure P2 of the hydraulic turbine system, and achieves pressure protection for insufficient turbine pump output and heating mechanism by means of a second protection mechanism. Attached Figure Description

[0019] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0020] Figure 1 This is a system diagram of the hydraulic turbine system of the present invention; Figure 2 This is a system diagram of the water turbine of the present invention; Figure 3 This is a system diagram of the heating assembly of the present invention; Figure 4 for Figure 1 Enlarged schematic diagram of a local structure at point A; Figure 5 for Figure 1 Enlarged schematic diagram of the local structure at point B; Figure 6 for Figure 1 Enlarged schematic diagram of the local structure at point C; Figure 7 for Figure 1 Enlarged schematic diagram of the local structure at point D; Figure 8 This is a flowchart of the control method for the hydraulic turbine system of the present invention.

[0021] In the diagram: 1. Turbine unit; 2. Turbine; 201. Turbine pump; 2011. First electric switch valve; 2012. First switch valve; 202. First booster pump; 2021. Second switch valve; 2022. First check valve; 2023. Second electric switch valve; 203. Amplifier motor; 3. Input end of hydraulic turbine system; 301. First pressure sensor; 302. First flow meter; 303. Sludge removal pump; 304. Constant pressure pump; 305. Makeup water tank; 4. Output end of hydraulic turbine system; 401. Second pressure sensor; 402. Second flow meter; 5. Heating mechanism; 6. Heating components; 601. 602. Fourth check valve; 603. Third pressure sensor; 604. Fifth electric switch valve; 605. Fourth pressure sensor; 606. Sixth electric switch valve; 7. First heat pump unit; 701. First lithium bromide heat pump; 8. Booster unit; 801. Second booster pump; 801. Sixth check valve; 802. Second check valve; 9. Second heat pump unit; 901. Second lithium bromide heat pump; 10. First protection component; 11. Second protection component; 12. Third check valve; 13. Third electric switch valve; 14. Fourth electric switch valve; 15. Third switch valve; 16. Fifth pressure sensor. Detailed Implementation

[0022] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, illustrating only the basic structure of the invention, and therefore only show the components relevant to the invention.

[0023] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," and "circumferential," etc., indicating orientation or positional relationships, are based on the orientation or positional relationships shown in the accompanying drawings and are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the invention. Furthermore, features defined with "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this invention, unless otherwise stated, "a plurality of" means two or more.

[0024] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0025] like Figures 1 to 7 As shown, a hydraulic turbine system includes: a turbine unit 1, a heating mechanism 5, and a protection mechanism. The turbine unit 1 includes multiple turbines 2, each turbine 2 including a turbine pump 201 and a first booster pump 202. The input end of the turbine pump 201 is connected to the input end 3 of the hydraulic turbine system, and the output end of the first booster pump 202 is connected to the output end 4 of the hydraulic turbine system. The heating mechanism 5 includes multiple heating components 6, each heating component 6 including a first heat pump unit 7, a booster unit 8, and a second heat pump unit 9. The first heat pump unit 7 and the booster unit 8... The second heat pump unit 9 is connected sequentially along the water flow direction. The input end of the first heat pump unit 7 is connected to the output end of the turbine pump 201. The output end of the second heat pump unit 9 is connected to the input end of the first booster pump 202. The protection mechanism includes: a first protection component 10 and a second protection component 11. The input end and output end of the first protection component 10 are connected to the input end 3 and the output end 4 of the hydraulic turbine system, respectively. The input end and output end of the second protection component 11 are connected to the output end of the turbine pump 201 and the input end of the first booster pump 202, respectively. Therefore, the design of the two turbine units ensures the pressure balance and stable flow of the water after passing through the heating mechanism 5. Compared with the pressure reduction method of the traditional pressure reducing station, this method can ensure the temperature quality of the incoming water, improve the temperature utilization effect of the incoming water, and improve the pressure reduction efficiency of the incoming water. At the same time, it reduces the construction cost and construction time cost of building the pressure reducing station. The heating mechanism 5 can heat up the water after the pressure reduction treatment by the turbine pump 201 for external heating. Multiple parallel heating components 6 can achieve the heating treatment of large flow of incoming water. The first protection mechanism realizes the overpressure protection of the entire hydraulic turbine system when the pressure P1 at the input end 3 and the pressure P2 at the output end 4 of the hydraulic turbine system suddenly changes. The second protection mechanism realizes the pressure protection of the heating mechanism 5 when the turbine pump 201 output is insufficient.

[0026] In other words, the temperature of water after pressure reduction treatment at the pressure reducing station needs to be converted twice, while the temperature of water after pressure reduction treatment by turbine group 2 does not need to be converted twice. Therefore, the temperature quality of the incoming water can be ensured and the temperature utilization efficiency of the incoming water can be improved.

[0027] In this embodiment, a first electric switching valve 2011 is provided at the input end of the turbine pump 201, a first switching valve 2012 is provided at the output end of the turbine pump 201, a second switching valve 2021 is provided at the input end of the first booster pump 202, and a first check valve 2022 and a second electric switching valve 2023 are sequentially provided at the output end of the first booster pump 202 along the water flow direction. Therefore, when the pressure P1 at the input end 3 of the hydraulic turbine system is less than the pressure P2 at the output end 4 of the hydraulic turbine system, the first electric switching valve 2011 and the second electric switching valve 2023 are opened, and the turbine pump 201 and the first booster pump 202 operate normally. The turbine pump 201 is used to convert the kinetic energy of the water entering the hydraulic turbine system input end 3 into mechanical energy to achieve pressure reduction treatment of the water entering the hydraulic turbine system input end 3, ensuring that the pressure-reduced water can meet the pressure requirements of the heating mechanism 5. Simultaneously, the converted mechanical energy can drive the first booster pump 202 to achieve energy saving. The booster pump 202 is used to increase the pressure of the water at the output end of the heating mechanism 5 to provide greater power and ensure that the water at the output end of the heating mechanism 5 can reach the designated destination after being pressurized. When the pressure P1 at the input end 3 of the hydraulic turbine system is greater than the pressure P2 at the output end 4 of the hydraulic turbine system, the first electric switch valve 2011 and the second electric switch valve 2023 are closed, and the turbine pump 201 and the first booster pump 202 stop operating. The first check valve 2022 has a one-way conduction function to ensure that the water can only flow from the output end of the first booster pump 202 to the output end of the hydraulic turbine system.

[0028] Specifically, an amplitude transformer motor 203 is also provided between the turbine pump 201 and the first booster pump 202. The shaft of the turbine pump 201 is connected to the shaft of the booster pump through the amplitude transformer motor 203. This consumes part of the mechanical energy of the turbine pump 201 and uses this part of the mechanical energy for the boosting operation of the first booster pump 202 to achieve energy saving.

[0029] In this embodiment, the first heat pump unit 7 includes a plurality of first lithium bromide heat pumps 701, which are connected sequentially along the water flow direction. Thus, the first lithium bromide heat pumps 701 are used to heat the incoming water and provide external heating; the plurality of first lithium bromide heat pumps 701 can achieve a step-by-step heating process for the incoming water.

[0030] In this embodiment, the pressurization unit 8 includes: multiple second pressurization pumps 801 and second check valves 802. The second pressurization pumps 801 and second check valves 802 are arranged in parallel. The input ends of the second pressurization pumps 801 and second check valves 802 are connected to the output ends of the first heat pump unit 7, and the output ends of the second pressurization pumps 801 and second check valves 802 are connected to the input ends of the second heat pump unit 9. Thus, the second pressurization pumps 801 pressurize the water at the output end of the first heat pump unit 7, ensuring that the water can continue to flow in the direction of water flow after passing through the first heat pump unit 7. The second check valves 802 have a one-way conduction function, ensuring that the water flow can only flow from the first heat pump unit 7 to the second heat pump unit 9 and cannot backflow, thus protecting the first heat pump unit 7 and the second heat pump unit 9 and extending their service life.

[0031] Specifically, the output end of the second booster pump 801 is also equipped with a sixth check valve 8011. The sixth check valve 8011 has unidirectional conductivity, ensuring that the water flow can only flow from the first heat pump unit 7 to the second heat pump unit 9 and that backflow cannot occur. This can protect the second booster pump 801 and extend its service life.

[0032] In this embodiment, the second heat pump unit 9 includes a plurality of second lithium bromide heat pumps 901, which are connected sequentially along the water flow direction. Thus, the second lithium bromide heat pumps 901 are used to heat the incoming water and provide external heating; the plurality of second lithium bromide heat pumps 901 can achieve a step-by-step heating process for the incoming water.

[0033] In this embodiment, the first protection component 10 includes a third check valve 12 and a third electric switching valve 13. One end of the third check valve 12 is connected to one end of the third electric switching valve 13, and the other end of the third check valve 12 is connected to the input terminal 3 of the hydraulic turbine system. The other end of the third electric switching valve 13 is connected to the output terminal 4 of the hydraulic turbine system. The second protection component 11 includes a fourth electric switching valve 14 and a third switching valve 15. One end of the fourth electric switching valve 14 is connected to one end of the third switching valve 15, and the other end of the fourth electric switching valve 14 is connected to the input terminal of the first booster pump 202. The other end of the third switching valve 15 is connected to the output terminal of the turbine pump 201. A fifth pressure sensor 16 is provided between the third switching valve 15 and the turbine pump 201. Therefore, when the pressure P1 at the input end 3 of the hydraulic turbine system is greater than the pressure P2 at the output end 4 of the hydraulic turbine system, the third check valve 12 is activated, and the first protection component 10 provides overpressure protection against sudden changes in the pressure P1 at the input end 3 of the hydraulic turbine system and the pressure P2 at the output end 4 of the hydraulic turbine system. When the pressure P1 at the input end 3 of the hydraulic turbine system is less than the pressure P2 at the output end 4 of the hydraulic turbine system, the third check valve 12 is not activated, and the entire hydraulic turbine system operates normally. When the pressure P5 at the output end of the turbine pump 201, the pressure P3 at the input end of the heating component 6, and the pressure P2 at the output end of the heating component 6 are less than the pressure P2 at the output end of the heating component 6, the third check valve 12 is not activated, and the entire hydraulic turbine system operates normally. When the pressure P4 at the output end is greater than the maximum pressure P that the heating component 6 can withstand, the fourth electric switch valve 14 and the third switch valve 15 are opened, and the second protection component 11 realizes the pressure protection of the heating component 6. When the pressure P5 at the output end of the turbine pump 201, the pressure P3 at the input end of the heating component 6, and the pressure P4 at the output end of the heating component 6 are all less than the maximum pressure P that the heating component 6 can withstand, the fourth electric switch valve 14 and the third switch valve 15 are closed, and the heating component 6 operates normally. The pressure P5 at the output end of the turbine pump 201 is monitored in real time by the fifth pressure sensor 16.

[0034] In this embodiment, a first flow meter 302 and a first pressure sensor 301 are sequentially arranged between the hydraulic turbine system input terminal 3 and the third check valve 12 along the water flow direction. A second pressure sensor 401 and a second flow meter 402 are sequentially arranged between the hydraulic turbine system output terminal 4 and the third electric switch valve 13 along the water flow direction. Thus, the first pressure sensor 301 monitors the pressure P1 at the hydraulic turbine system input terminal 3 in real time, the first flow meter 302 monitors the flow rate Q1 at the hydraulic turbine system input terminal 3 in real time, the second pressure sensor 401 monitors the pressure P2 at the hydraulic turbine system output terminal 4 in real time, and the second flow meter 402 monitors the flow rate Q2 at the hydraulic turbine system output terminal 4 in real time.

[0035] Specifically, multiple sludge pumps 303 are also installed between the hydraulic turbine system input terminal 3 and the first flow meter 302. These multiple sludge pumps 303 are connected in parallel to each other and are used for sludge treatment of the water entering the hydraulic turbine system input terminal 3. This ensures that impurities in the water do not enter the turbine 2, heating component 6, first protection component 10, and second protection component 11, thereby improving the service life of the turbine 2, heating component 6, first protection component 10, and second protection component 11.

[0036] Specifically, a constant pressure pump 304 and a water supply tank 305 are sequentially arranged between the first flow meter 302 and the first pressure sensor 301 along the water flow direction. The pump can automatically replenish water according to the change of flow rate Q1 at the input end 3 of the hydraulic turbine system, ensuring water sufficiency and avoiding water waste and reducing water resource waste.

[0037] In this embodiment, the input end of the heating component 6 is provided with a fourth check valve 601, a third pressure sensor 602 and a fifth electric switch valve 603 in sequence along the water flow direction, and the output end of the heating component 6 is provided with a fifth check valve 604, a fourth pressure sensor 605 and a sixth electric switch valve 606 in sequence along the water flow direction. Therefore, the third pressure sensor 602 can monitor the pressure P3 at the input end of the heating component 6 in real time, and the fourth pressure sensor 605 can monitor the pressure P4 at the output end of the heating component 6 in real time. When neither the pressure P3 at the input end of the heating component 6 nor the pressure P4 at the output end of the heating component 6 meets the pressure requirements of the heating component 6, the fifth electric switch valve 603 and the sixth electric switch valve 606 are closed. When both the pressure P3 at the input end of the heating component 6 and the pressure P4 at the output end of the heating component 6 meet the pressure requirements of the heating component 6, the fifth electric switch valve 603 and the sixth electric switch valve 606 are opened. The fourth check valve 601 and the fifth check valve 604 have a one-way conduction function, ensuring that the water can only flow from the input end of the heating component 6 to the output end of the heating component 6 and that backflow cannot occur.

[0038] like Figure 8 As shown, a control method for a hydraulic turbine system includes the following steps: S1. Obtain the pressure P1 at the input end 3 of the hydraulic turbine system and the pressure P2 at the output end 4 of the hydraulic turbine system. If P1 > P2, then execute step S2. If the pressure P1 < P2, then execute step S3. S2. Turn off turbine pump 201 and first booster pump 202. First protection component 10 performs overpressure protection. Water entering the hydraulic turbine system input terminal 3 flows directly to the hydraulic turbine system output terminal 4 through the first protection component 10. S3. The first protection component 10 does not perform overpressure protection, and the turbine pump 201 and the first booster pump 202 are turned on. S4. Let the maximum pressure that the heating component 6 can withstand be P. Obtain the pressure P3 at the input end of the heating component 6, the pressure P4 at the output end of the heating component 6, and the pressure P5 at the output end of the turbine pump 201. If P3 > P, P4 > P, and P5 > P, then execute step S5. If P3 < P, P4 < P, and P5 < P, then execute step S6. S5. The heating component 6 is shut down, the second protection component 11 performs pressure protection, and the water at the output end of the turbine pump 201 flows directly to the first booster pump 202 through the second protection component 11. S6. The second protection component 11 does not perform pressure protection and turns on the heating component 6.

[0039] Specifically, P1 > P2, on the one hand, is caused by the power failure of the heat source station, which leads to a decrease in pressure P3 at the output end 4 of the hydraulic turbine system; on the other hand, it is caused by the power failure of the relay pump station or the leakage of the long-distance pipeline, which leads to a decrease in the flow rate Q1 at the input end 3 of the hydraulic turbine system or the flow rate Q2 at the output end 4 of the hydraulic turbine system. P3 < P, P4 < P, and P5 < P are caused by insufficient output of turbine pump 201.

[0040] In summary, the present invention, through the design of two sets of water turbines, can ensure the pressure balance and stable flow of water after passing through the heating mechanism 5. Compared with the pressure reduction method of traditional pressure reducing stations, this method can ensure the temperature quality of the incoming water, improve the temperature utilization effect of the incoming water, and improve the pressure reduction efficiency of the incoming water. At the same time, it can reduce the construction cost and construction time cost of building pressure reducing stations. The heating mechanism 5 can heat up the water after pressure reduction treatment by turbine pump 201 for external heating. Multiple parallel heating components 6 can achieve the heating treatment of large flow of incoming water. The first protection mechanism realizes the overpressure protection of the entire hydraulic turbine system when the pressure P1 at the input end 3 and the pressure P2 at the output end 4 of the hydraulic turbine system change suddenly. The second protection mechanism realizes the pressure protection of the heating mechanism 5 when the turbine pump 201 outputs insufficiently.

[0041] The above description is based on the preferred embodiments of the present invention. Through the above description, those skilled in the art can make various changes and modifications without departing from the technical concept of the present invention. The technical scope of the present invention is not limited to the contents of the specification, but must be determined by the scope of the claims.

Claims

1. A hydraulic turbine system, characterized in that, include: The turbine unit (1) comprises: Multiple water turbines (2), each of the water turbines (2) comprising: Turbine pump (201) and first booster pump (202), wherein the input end of the turbine pump (201) is connected to the input end (3) of the hydraulic turbine system, and the output end of the first booster pump (202) is connected to the output end (4) of the hydraulic turbine system; Heating mechanism (5), the heating mechanism (5) includes: Multiple heating components (6), each of the heating components (6) comprising: The first heat pump unit (7), the booster unit (8), and the second heat pump unit (9) are connected in sequence along the water flow direction. The input end of the first heat pump unit (7) is connected to the output end of the turbine pump (201), and the output end of the second heat pump unit (9) is connected to the input end of the first booster pump (202). The protection mechanism includes: The first protection component (10) and the second protection component (11) are connected to the input terminal (3) and the output terminal (4) of the hydraulic turbine system, respectively. The input terminal and the output terminal of the second protection component (11) are connected to the output terminal of the turbine pump (201) and the input terminal of the first booster pump (202), respectively. The first protection component (10) includes: The third check valve (12) and the third electric switch valve (13) are connected, with one end of the third check valve (12) connected to one end of the third electric switch valve (13), the other end of the third check valve (12) connected to the input end (3) of the hydraulic turbine system, and the other end of the third electric switch valve (13) connected to the output end (4) of the hydraulic turbine system. The second protection component (11) includes: A fourth electric switching valve (14) and a third switching valve (15), one end of the fourth electric switching valve (14) is connected to one end of the third switching valve (15), the other end of the fourth electric switching valve (14) is connected to the input end of the first booster pump (202), and the other end of the third switching valve (15) is connected to the output end of the turbine pump (201). A fifth pressure sensor (16) is provided between the third switching valve (15) and the turbine pump (201).

2. The hydraulic turbine system according to claim 1, characterized in that, The turbine pump (201) is provided with a first electric switch valve (2011) at its input end, and a first switch valve (2012) is provided at its output end. The first booster pump (202) is provided with a second switch valve (2021) at its input end. The first booster pump (202) is provided with a first check valve (2022) and a second electric switch valve (2023) in sequence along the water flow direction at its output end.

3. The hydraulic turbine system according to claim 1, characterized in that, The first heat pump unit (7) includes: Multiple first lithium bromide heat pumps (701) are connected sequentially along the water flow direction.

4. The hydraulic turbine system according to claim 1, characterized in that, The booster unit (8) includes: Multiple second booster pumps (801) and second check valves (802) are arranged in parallel. The input ends of the multiple second booster pumps (801) and second check valves (802) are all connected to the output end of the first heat pump unit (7). The output ends of the multiple second booster pumps (801) and second check valves (802) are all connected to the input end of the second heat pump unit (9).

5. The hydraulic turbine system according to claim 1, characterized in that, The second heat pump unit (9) includes: Multiple second lithium bromide heat pumps (901) are connected in sequence along the water flow direction.

6. The hydraulic turbine system according to claim 1, characterized in that, A first flow meter (302) and a first pressure sensor (301) are sequentially arranged between the input end (3) of the hydraulic turbine system and the third check valve (12) along the water flow direction.

7. The hydraulic turbine system according to claim 1, characterized in that, A second pressure sensor (401) and a second flow meter (402) are sequentially arranged between the output end (4) of the hydraulic turbine system and the third electric switch valve (13) along the water flow direction.

8. The hydraulic turbine system according to claim 1, characterized in that, The heating component (6) is provided with a fourth check valve (601), a third pressure sensor (602) and a fifth electric switch valve (603) in sequence along the water flow direction at the input end, and a fifth check valve (604), a fourth pressure sensor (605) and a sixth electric switch valve (606) in sequence along the water flow direction at the output end of the heating component (6).

9. The control method for a hydraulic turbine system according to any one of claims 1-8, characterized in that, Includes the following steps: S1. Obtain the pressure P1 at the input end (3) of the hydraulic turbine system and the pressure P2 at the output end (4) of the hydraulic turbine system. If P1 > P2, then execute step S2. If the pressure P1 < P2, then execute step S3. S2. Turn off the turbine pump (201) and the first booster pump (202). The first protection component (10) performs overpressure protection. The water entering the hydraulic turbine system input terminal (3) flows directly to the hydraulic turbine system output terminal (4) through the first protection component (10). S3. The first protection component (10) does not perform overvoltage protection and turns on the turbine pump (201) and the first booster pump (202). S4. Let the maximum pressure that the heating component (6) can withstand be P. Obtain the pressure P3 at the input end of the heating component (6), the pressure P4 at the output end of the heating component (6), and the pressure P5 at the output end of the turbine pump (201). If P3 > P, P4 > P, and P5 > P, then execute step S5. If P3 < P, P4 < P, and P5 < P, then execute step S6. S5. The heating component (6) is turned off, the second protection component (11) performs pressure protection, and the water at the output end of the turbine pump (201) flows directly to the first booster pump (202) through the second protection component (11). S6. The second protection component (11) does not perform pressure protection and turns on the heating component (6).

Citation Information

Patent Citations

  • Energy recycling booster pump and application thereof

    CN103939356A

  • Turbine type green energy-saving heat supply and pressure-isolating system and using method thereof

    CN110068045A