Complex product production energy consumption limit method based on supply chain cluster device network

By constructing a supply chain cluster equipment network model and an industrial IoT gateway, and using Petri nets to monitor energy consumption and establish a specific energy efficiency model, the problem of energy consumption statistics and limit setting in the manufacturing process of complex products has been solved, and unified monitoring of energy consumption and determination of the optimal solution have been achieved.

CN117707085BActive Publication Date: 2026-11-24CHONGQING UNIV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202311783211.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2026-11-24
Estimated Expiration
2043-12-22

AI Technical Summary

Technical Problem

Existing technologies lack unified energy consumption statistics standards and methods in the manufacturing process of complex products, making it difficult to effectively monitor the energy consumption of multiple manufacturing and logistics systems. This results in inaccurate energy consumption statistics and difficulty in setting energy consumption limits.

Method used

Construct a supply chain cluster equipment network model, define three coupled systems, develop an industrial IoT gateway, use Petri nets to build a real-time energy consumption monitoring model, establish a specific energy efficiency model, and combine the specific energy, cost, and time of the manufacturing scheme to determine the energy consumption limit of the product.

Benefits of technology

It enables unified energy consumption monitoring and energy consumption limit setting for complex product manufacturing processes, improves the accuracy and efficiency of energy consumption statistics, and determines the comprehensive optimal manufacturing scheme for products.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117707085B_ABST
    Figure CN117707085B_ABST
Patent Text Reader

Abstract

This invention proposes a method for limiting energy consumption in the production of complex products based on a supply chain cluster equipment network. First, a supply chain cluster equipment network model for complex products is constructed; an industrial IoT gateway for product production services is developed; based on this, an energy consumption monitoring model for the supply chain cluster equipment network of complex products is constructed; second, considering the efficiency, reliability, and logistics buffer capacity of manufacturing units, a specific energy efficiency model for the supply chain cluster equipment network of complex products is constructed; finally, combining the product's specific energy, cost, and manufacturing time, the optimal manufacturing scheme is determined, and energy consumption limits are set for the product accordingly. This invention effectively solves the problem of energy consumption statistics and limits for manufacturing enterprises throughout the entire process of product and component manufacturing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of energy consumption limits in product manufacturing, and in particular to a method for limiting energy consumption in complex product manufacturing supported by a supply chain cluster equipment network. Background Technology

[0002] As a pillar of the national economy and a major energy consumer, the manufacturing industry is facing an urgent need for transformation. Especially with the rise of green trade, the manufacturing sector faces not only the optimization of internal energy management but also the adaptation to external market environmental standards. Therefore, from the perspective of product manufacturing, promoting the low-carbon operation of the manufacturing system is particularly crucial. This includes real-time monitoring of the energy consumption of products and their components throughout the entire manufacturing process and scientifically and rationally formulating energy consumption limits for product manufacturing, thereby contributing to the country's low-carbon development goals.

[0003] In recent years, some researchers at home and abroad have conducted research on energy consumption statistics and energy consumption limits in the entire product manufacturing process from the perspective of the entire product manufacturing life cycle. The literature "Xiong W, Huang H, Li L, et al. Energy Consumption Evaluation in Stamping Workshops via a Discrete Event Simulation-Based Approach[J]. International Journal of Precision Engineering and Manufacturing-Green Technology, 2022, 9(6): 1543-1562." establishes a theoretical model and a discrete event simulation model based on the energy flow and material flow of the workshop, so as to calculate the various components of energy consumption based on production-related data and predict the total energy required by the workshop when production conditions change. The invention patent "Comprehensive Energy Consumption Monitoring and Management System" (CN202310206561.6) discloses a comprehensive energy consumption monitoring and management system; the system includes a data acquisition module, a unit classification module, an energy consumption curve analysis module, and an anomaly analysis module. The literature “Cai W, Liu F, Xie J, et al. An energy management approach for the mechanical manufacturing industry through developing a multi-objective energy benchmark[J]. Energy Conversion and Management, 2017, 132: 361-371.” proposes a multi-objective energy limit setting method based on energy consumption prediction and comprehensive evaluation. The invention patent “A method for determining the standard energy consumption limit of a workpiece based on the inherent specific energy of a CNC machine tool” (CN201910943650.2) discloses a method for determining the standard energy consumption limit of a workpiece; this method first obtains the inherent specific energy of the machine tool, and then determines the standard energy consumption limit for different characteristics accordingly. Finally, it integrates multiple standard energy consumption limit values ​​for workpieces with different characteristics to obtain the overall standard energy consumption limit of the workpiece.

[0004] In summary, current research primarily focuses on energy consumption statistics and energy limit setting for individual manufacturing systems during the manufacturing process of mechanical products or semi-finished products. However, this type of research still faces two significant problems. On the one hand, due to the complexity of energy consumption behavior among product manufacturing enterprises, the accuracy of existing tools in energy consumption statistics is challenged, and the statistical methods lack unified standards and clarity. On the other hand, existing research does not pay sufficient attention to the full-process energy consumption statistics and energy limit setting for complex products and their components involving multiple manufacturing enterprises.

[0005] To address these challenges, there is an urgent need to provide a method for limiting the energy consumption of complex products supported by a network of equipment in a supply chain cluster. Summary of the Invention

[0006] In view of the above-mentioned shortcomings of the existing technology, the purpose of this invention is to provide a method for limiting energy consumption in the production of complex products based on a supply chain cluster equipment network, which aims to overcome the problem of realizing unit product energy consumption statistics and energy consumption limits when multiple manufacturing systems and logistics systems are involved.

[0007] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is as follows:

[0008] A method for limiting energy consumption in the production of complex products based on a supply chain cluster equipment network, characterized by comprising the following steps:

[0009] Step S1: Construct a supply chain cluster equipment network model for complex products: Based on the collaborative relationship between multiple manufacturing systems of complex products, integrate the relevant manufacturing and logistics systems with the product material flow as the main line;

[0010] Step S2: Develop an industrial IoT gateway for product manufacturing services: Develop an industrial IoT gateway based on three differentiated coupling systems: data coupling system, time-period coupling system, and end-to-end coupling system.

[0011] Step S3: Construct a real-time energy consumption monitoring model for time-coupled systems and full-process coupled systems: This model is based on Petri nets. On the one hand, it can map the operating status of each device in the manufacturing and logistics system; on the other hand, it can reflect the dynamic changes in energy consumption at different production stages, and realize real-time monitoring of energy efficiency in the production process.

[0012] Step S4: Construct a specific energy efficiency model for the supply chain cluster equipment network of complex products: Based on the statistical energy consumption data of each system, introduce the blocking rate and hunger rate of the manufacturing unit to characterize the impact of parameters such as the processing efficiency, reliability and logistics buffer capacity of the manufacturing unit, and then construct a specific energy efficiency model for the supply chain cluster equipment network.

[0013] Step S5: Formulate a unit product energy consumption limit strategy: Based on the established specific energy efficiency model, calculate the specific energy of different manufacturing schemes for the product; by combining the manufacturing cost and manufacturing time of each scheme, determine the comprehensive optimal manufacturing scheme for the product, and set the product's energy consumption limit accordingly.

[0014] Furthermore, step S1 specifically includes:

[0015] Considering the collaborative relationships among the diverse manufacturing systems of complex products, a supply chain cluster equipment network model for complex products is constructed, with product material flow as the main line.

[0016] From the perspective of the relationship between the supply chain cluster equipment network of complex mechanical products and the product component manufacturing system and logistics system, three types of coupled systems can be distinguished: data-coupled systems, time-coupled systems, and end-to-end coupled systems. The data-coupled system refers to a system where the manufacturing system and the supply chain cluster equipment network only have information and logistics interactions; the time-coupled system refers to a system where the manufacturing system or logistics system and the supply chain cluster equipment network also have collaborative interactions during the manufacturing process; and the end-to-end coupled system refers to a system where the manufacturing system and the equipment network platform are integrated and managed together.

[0017] Furthermore, step S2 specifically includes:

[0018] Given that devices are typically equipped with different types of sensors, an Industrial Internet of Things (IIoT) gateway is built to effectively collect heterogeneous manufacturing data and transfer it to a supply chain cluster of complex products. The main modules of an IIoT gateway include: import interface, data mode, data conversion, and export interface.

[0019] The main functions of the four types of modules are as follows:

[0020] First, the on-site manufacturing data generated by manufacturing equipment and sensors is extracted from machine control software or standardized data servers and transmitted to the industrial IoT gateway through an import interface based on the time frequency specified by the product manufacturer.

[0021] Secondly, a service-oriented data model is developed to organize all collected manufacturing data. This model defines specific data items that need to be transferred to the supply chain cluster equipment network platform based on the relationship between the supply chain cluster equipment network and three differentiated coupled systems. Specifically, for data-coupled manufacturing systems, basic information about the manufacturing system is required, including the specific location of equipment, types of standard parts that can be produced, and costs. For time-coupled manufacturing systems, in addition to providing basic information, a list of manufacturing resources, processing plans, and expected processing results are required based on orders / tasks. Real-time process data and processing results must also be provided during task execution. For fully coupled manufacturing systems, long-term access to the supply chain cluster equipment network platform for complex products is required, providing real-time data on processing equipment, auxiliary equipment, and environmental service facilities.

[0022] Third, based on the data model, the conversion module will convert the manufacturing data collected from the import interface into a format acceptable to the supply chain cluster equipment network platform for complex products;

[0023] Finally, the transformed capability and availability data are exported to the supply chain cluster equipment network platform for complex products via the export interface.

[0024] Furthermore, step S3 specifically includes:

[0025] In the supply chain cluster equipment network of complex products, raw materials are transformed into products through data coupling systems such as component manufacturing systems, time coupling systems such as parts manufacturing systems and logistics systems, and full-process coupling systems such as assembly systems.

[0026] Given that the relationship between data-coupled systems such as component manufacturing systems and complex product supply chain clusters is limited to information and logistics interaction, and that the energy consumption information of these systems can be directly viewed on the platform without the need for real-time energy consumption monitoring, Petri nets can be used to construct a real-time energy consumption monitoring model for time-dependent and end-to-end coupled systems.

[0027] Furthermore, step S4 specifically includes:

[0028] The energy consumption of the data coupling system of the complex product supply chain cluster equipment network can be directly read from the platform, but the energy consumption of its time-coupled system and the whole-process coupled system is also affected by parameters such as manufacturing unit processing efficiency, reliability, and logistics buffer capacity.

[0029] Given that manufacturing unit reliability and logistics buffer capacity primarily affect manufacturing unit processing efficiency indirectly through their impact on blockage or starvation rates, a specific energy efficiency model for the supply chain cluster equipment network of complex products is established by coupling the energy consumption of the manufacturing system, the energy consumption of the manufacturing unit as statistically analyzed in step S3, the energy consumption of workpiece allocation, and the energy consumption of workpiece transfer with data read from the platform.

[0030]

[0031] In the formula, E F A specific energy efficiency model representing a network of equipment in a supply chain cluster for complex products; BL F i represents the blocking rate of the manufacturing system for part i; ST F i represents the starvation rate of the assembly system caused by the logistics system of part i; P″ d (WIP)″ represents the average occupancy of the storage and transportation system in the supply chain cluster equipment network per unit time; (PR)″ represents the productivity of the supply chain cluster equipment network; E″ b1 E″ represents the energy consumed in manufacturing the components required for the product. b2 This represents the energy consumed in transferring products between enterprises / companies; ω Fj ,ω Fj ′,ω Fh ,ω Fh ′,ω Fu ,ω Fu ′ represents the inherent energy efficiency factor of the assembly manufacturing system and the parts manufacturing system (equivalent); This indicates the processing speed after a blockage occurs in the parts manufacturing system; These represent the processing speeds of the assembly system after a starvation event occurs due to the parts' logistics system; c Fu This indicates the normal processing speed of each manufacturing system.

[0032] Furthermore, step S5 specifically includes:

[0033] Based on the established energy efficiency model of the supply chain cluster equipment network for complex products, the specific energy efficiency R of different manufacturing schemes for the products is calculated. m Specific energy E m By combining the manufacturing cost C of each solution m Manufacturing time T m The evaluation matrix is ​​constructed as shown in Table 1:

[0034] Table 1 Evaluation Matrix

[0035]

[0036] Due to the evaluation objective (E) m Cm T m Since the dimensions and metrics of the decision matrix differ, it is necessary to standardize the decision matrix.

[0037]

[0038] In the formula, i = 1, 2, ..., m; j = 1, 2, 3

[0039] According to the above formula, all indicators are transformed into dimensionless types, thus enabling the acquisition of the standardized matrix Y.

[0040] Then, the entropy weight w for each evaluation target is calculated. j :

[0041]

[0042]

[0043] In the formula,

[0044] Based on entropy weight w j And the standardized matrix Y, construct the weighted normalized matrix Z:

[0045] Z = (Z ij ) n×3 =(y ij *w j (5)

[0046] Determine the positive ideal solution z for each indicator. + Negative ideal solution z - And calculate the distance between each sample and the positive ideal solution. Distance from the negative ideal solution

[0047] z + =max{z 1j ,z 2j ,;…z mj} (6)

[0048] z - =min{z 1j ,z 2j ,;…z mj} (7)

[0049]

[0050]

[0051] Finally, calculate the relative fitting progress C. i

[0052]

[0053] The larger the relative progress, the closer it is to 1, the better the corresponding product manufacturing plan.

[0054] Compared with the prior art, the present invention has the following beneficial effects:

[0055] 1. This invention creatively approaches the issue from a supply chain perspective, constructing a supply chain cluster equipment network model and defining three differentiated coupling systems; it develops an industrial IoT gateway, defines the data types transferred from each system to the equipment network, and provides a unified data exchange standard for different systems; based on this, it constructs an energy consumption monitoring model for the product manufacturing process, solving the problem of energy consumption statistics for manufacturing enterprises in the product manufacturing process.

[0056] 2. This invention establishes for the first time a specific energy efficiency model for a complex product supply chain cluster equipment network, fully considering the impact of parameters such as manufacturing unit processing efficiency, reliability, and logistics buffer capacity on the energy consumption of the product and its components during the manufacturing process. Based on this, by utilizing the specific energy efficiency, manufacturing cost, and time of different manufacturing schemes, the comprehensive optimal manufacturing scheme for the product is determined, thereby determining the energy consumption limit for the product's production and solving the problem of energy consumption limits for enterprises in the product manufacturing process. Attached Figure Description

[0057] Figure 1 This is a flowchart of the method for limiting energy consumption in the production of complex products based on a supply chain cluster equipment network, as described in this invention.

[0058] Figure 2 This is a schematic diagram of a structured model of a dual-part product supply chain cluster equipment network constructed according to an embodiment of the present invention.

[0059] Figure 3 The workflow of the industrial IoT gateway constructed for embodiments of the present invention.

[0060] Figure 4 This invention provides a real-time energy consumption monitoring model for time-coupled and full-process coupled systems. Detailed Implementation

[0061] To make the objectives, technical solutions, and advantages of this invention clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of the invention.

[0062] See Figure 1 This invention provides a method for limiting energy consumption in the production of complex products based on a supply chain cluster equipment network, comprising the following steps:

[0063] Step S1: Construct a supply chain cluster equipment network model for complex products. Based on the collaborative relationships among the diverse manufacturing systems of complex products, this step integrates related manufacturing and logistics systems with product material flow as the main thread. On this basis, three differentiated coupling systems are defined to describe the interaction methods between different manufacturing and logistics systems and the supply chain cluster equipment network. Specifically, these include:

[0064] Considering the collaborative relationships among diverse manufacturing systems for complex products, a supply chain cluster equipment network model for complex products is constructed, with product material flow as the main thread. This model primarily focuses on information exchange and processing collaboration within the enterprise / factory and equipment-level manufacturing systems of the product and its components. Information exchange includes production progress information, production quality information, production energy consumption information, and logistics information; processing collaboration includes process planning and process parameter design based on upstream and downstream processing information.

[0065] From the perspective of the relationship between the supply chain cluster equipment network of complex products and the product component manufacturing system and logistics system, they can be divided into three types of coupled systems: data coupled system, time-period coupled system, and full-process coupled system.

[0066] Among them, the data coupling system refers to the manufacturing system and the supply chain cluster equipment network that only have information and logistics interaction; the time coupling system refers to the manufacturing system or logistics system and the supply chain cluster equipment network that also have collaborative interaction in the manufacturing process; and the full coupling system refers to the integrated management of the manufacturing system and the equipment network platform.

[0067] Step S2: Develop an Industrial IoT Gateway for Product Manufacturing Services: Based on the three differentiated coupling systems mentioned above, develop an industrial IoT gateway. On the one hand, define the data types transferred from each system to the device network; on the other hand, provide a unified data exchange standard for different manufacturing and logistics systems. Specifically, this includes:

[0068] Given that devices are typically equipped with different types of sensors, it is necessary to build industrial IoT gateways to effectively collect heterogeneous manufacturing data and transfer it to the supply chain cluster device network platform for complex products.

[0069] The main modules of an industrial IoT gateway include: import interface, data mode, data conversion, and export interface.

[0070] The main functions of the four types of modules are as follows:

[0071] First, the on-site manufacturing data generated by manufacturing equipment and sensors is extracted from machine control software or standardized data servers and sent to the industrial IoT gateway through an import interface based on the time frequency specified by the product manufacturer.

[0072] Secondly, a service-oriented data model should be developed to organize all collected manufacturing data. This data model can define specific data items that need to be transferred to the supply chain cluster equipment network platform based on the relationship between the supply chain cluster equipment network and the three differentiated coupled systems mentioned above. Specifically, for data-coupled manufacturing systems, basic information about the manufacturing system needs to be provided, including the specific location of the equipment, the types of standard parts that can be produced, and costs (energy costs, time costs, and monetary costs). For time-coupled manufacturing systems, in addition to providing basic information, a list of manufacturing resources, processing plans, and expected processing results for completing the processing tasks should be provided based on orders / tasks. Real-time process data and processing results should also be provided during task execution. For fully coupled manufacturing systems, long-term access to the supply chain cluster equipment network platform for complex products is required, providing real-time data on processing equipment, auxiliary equipment, and environmental service facilities.

[0073] Third, based on the data model, the conversion module will convert the manufacturing data collected from the import interface into a format acceptable to the supply chain cluster equipment network platform for complex products.

[0074] Finally, the transformed capability and availability data are exported to the supply chain cluster equipment network platform for complex products via the export interface.

[0075] Step S3: Construct a real-time energy consumption monitoring model for time-coupled and full-process coupled systems. This model is based on Petri nets. On the one hand, it can map the operating status of each device in the manufacturing and logistics system; on the other hand, it can reflect the dynamic changes in energy consumption at different production stages, enabling real-time monitoring of energy efficiency in the production process. Specifically, this includes:

[0076] In the supply chain cluster network of complex products, raw materials are transformed into products through data coupling systems such as component manufacturing systems, time coupling systems such as parts manufacturing systems and logistics systems, and full-process coupling systems such as assembly systems.

[0077] Given that the relationship between data-coupled systems such as component manufacturing systems and complex product supply chain clusters is limited to information and logistics interaction, and that the energy consumption information of these systems can be directly viewed on the platform without the need for real-time energy consumption monitoring, Petri nets can be used to construct a real-time energy consumption monitoring model for time-dependent and end-to-end coupled systems.

[0078] In this model, the energy consumption of a component manufacturing system can be monitored by updating the identifier of the total energy consumption state library of the system through three transitions in the Petri net: "start of roughing", "start of semi-finishing" and "start of finishing".

[0079] During the transportation and warehousing phases of a logistics system, energy consumption monitoring can also be achieved by updating the identifier of the total energy consumption status of the logistics system through the "transportation start" and "warehousing start" transitions in the Petri net.

[0080] The energy consumption of each assembly process in the assembly system can also be monitored using a similar method.

[0081] Ultimately, real-time energy consumption monitoring of time-coupled systems and full-process coupled systems is achieved through a comprehensive transition point, "system energy consumption statistics".

[0082] Step S4: Construct a specific energy efficiency model for the supply chain cluster equipment network of complex products: Based on the statistical energy consumption data of each system, the blocking rate and starvation rate of manufacturing units are introduced to characterize the impact of parameters such as processing efficiency, reliability, and logistics buffer capacity of the manufacturing units, thereby constructing a specific energy efficiency model for the supply chain cluster equipment network. Specifically, this includes:

[0083] The energy consumption of the data coupling system of the complex product supply chain cluster equipment network can be directly read from the platform, but the energy consumption of its time-coupled system and the whole-process coupled system is also affected by parameters such as manufacturing unit processing efficiency, reliability, and logistics buffer capacity.

[0084] Given that manufacturing unit reliability and logistics buffer capacity primarily affect manufacturing unit processing efficiency indirectly through their impact on blockage or starvation rates, a specific energy efficiency model for the supply chain cluster equipment network of complex products is established by coupling the energy consumption of the manufacturing system, the energy consumption of the manufacturing unit as statistically analyzed in step S3, the energy consumption of workpiece allocation, and the energy consumption of workpiece transfer with data read from the platform.

[0085]

[0086] In the formula, E F A specific energy efficiency model representing a network of equipment in a supply chain cluster for complex products; BL Fi ST represents the blocking rate of the manufacturing system for part i; Fi P″ represents the starvation rate of the assembly system caused by the logistics system of part i; d (WIP)″ represents the average occupancy of the storage and transportation system in the supply chain cluster equipment network per unit time; (PR)″ represents the productivity of the supply chain cluster equipment network; E″ b1 E″ represents the energy consumed in manufacturing the components required for the product. b2 This represents the energy consumed in transferring products between enterprises / companies; ω Fj ,ω Fj ′,ω Fh ,ω Fh ′,ωFu ,ω Fu ′ represents the inherent energy efficiency factor of the assembly manufacturing system and the parts manufacturing system (equivalent); This indicates the processing speed after a blockage occurs in the parts manufacturing system; These represent the processing speeds of the assembly system after a starvation event occurs due to the parts' logistics system; c Fu This indicates the normal processing speed of each manufacturing system.

[0087] Step S5: Formulate a unit product energy consumption limit strategy: Based on the established specific energy efficiency model, calculate the specific energy of different manufacturing schemes for the product. By combining the manufacturing cost and manufacturing time of each scheme, determine the comprehensive optimal manufacturing scheme for the product, and set the product's energy consumption limit accordingly. Specifically, this includes:

[0088] Based on the established energy efficiency model of the supply chain cluster equipment network for complex products, the specific energy efficiency R of different manufacturing schemes for the products is calculated. m Specific energy E m By combining the manufacturing cost C of each solution m Manufacturing time T m The evaluation matrix is ​​constructed as shown in Table 1:

[0089] Table 1 Evaluation Matrix

[0090]

[0091] Due to the evaluation objective (E) m C m T m Since the dimensions and metrics of the decision matrix differ, it is necessary to standardize the decision matrix.

[0092]

[0093] In the formula, i = 1, 2, ..., m; j = 1, 2, 3

[0094] According to the above formula, all indicators are transformed into dimensionless types, thus enabling the acquisition of the standardized matrix Y.

[0095] Then, the entropy weight w for each evaluation target is calculated. j :

[0096]

[0097]

[0098] In the formula,

[0099] Based on entropy weight w j And the standardized matrix Y, construct the weighted normalized matrix Z:

[0100] Z = (Z ij ) n×3 =(y ij *w j (5)

[0101] Determine the positive ideal solution z for each indicator. + Negative ideal solution z - And calculate the distance between each sample and the positive ideal solution. Distance from the negative ideal solution

[0102] z + =max{z 1j ,z 2j ,;…z mj} (6)

[0103] z - =min{z 1j ,z 2j ,;…z mj} (7)

[0104]

[0105]

[0106] Finally, calculate the relative fitting progress C. i

[0107]

[0108] The larger the relative progress, the closer it is to 1, the better the corresponding product manufacturing plan. Therefore, the specific energy of this manufacturing plan can be obtained, and thus used as the energy consumption limit per unit product.

[0109] Example:

[0110] The following example, a dual-component product supply chain cluster equipment network, illustrates the method of this invention. The dual-component product supply chain cluster equipment network consists of an assembly system, two component manufacturing systems, a logistics system, and multiple component manufacturing systems.

[0111] See Figure 1 The present invention provides a method for limiting energy consumption in the production of complex products based on a supply chain cluster equipment network, comprising the following steps:

[0112] Step S1: Considering the collaborative relationship between the multiple manufacturing systems of complex products, a supply chain cluster equipment network model for complex products is constructed with the product material flow as the main line.

[0113] This invention, considering the relationship between the supply chain cluster equipment network of complex products and the product component manufacturing and logistics systems, can categorize them into three types of coupled systems: data-coupled systems, time-coupled systems, and end-to-end coupled systems. Data-coupled systems refer to component manufacturing systems, where the relationship between these systems and the supply chain cluster equipment network is limited to information and logistics interactions. Time-coupled systems refer to component manufacturing and logistics systems, where the relationship also includes collaborative interactions during the manufacturing process. End-to-end coupled systems refer to assembly systems and complete machine manufacturing systems, where these systems are integrated and managed together with the equipment network platform. In summary, a supply chain cluster equipment network model for dual-component products can be constructed, such as... Figure 2 As shown.

[0114] Depend on Figure 2 As can be seen, the supply chain cluster equipment network for dual-component products can be represented at the factory / enterprise level manufacturing system as follows: one product manufacturing plant / enterprise responsible for component assembly, two component manufacturing plants / enterprises responsible for component manufacturing, two component logistics enterprises undertaking component transportation tasks, and multiple component manufacturing plants / enterprises engaged in component manufacturing. At the equipment level, the supply chain cluster equipment network for dual-component products consists of different equipment, including component assembly equipment belonging to the end-to-end coupling system, and component manufacturing and logistics equipment belonging to the time-period coupling system. It is important to note that since the data coupling system only has information and logistics interaction relationships with the supply chain cluster equipment network, the equipment level should not contain related component manufacturing equipment.

[0115] Step S2: Given that devices are typically equipped with different types of sensors, it is necessary to build an industrial IoT gateway to effectively collect heterogeneous manufacturing data and transfer it to the supply chain cluster device network platform for complex products.

[0116] The main modules of the industrial IoT gateway include: import interface, data mode, data conversion, and export interface, and its workflow is as follows: Figure 3 As shown. By Figure 3 It can be seen that the main functions of the four modules in the Industrial Internet of Things (IIoT) gateway are as follows: First, the on-site manufacturing data generated by manufacturing equipment and sensors is extracted from machine control software or standardized data servers and sent to the IIoT gateway through an import interface based on the time frequency specified by the product manufacturer. Second, a service-oriented data model is developed to organize all collected manufacturing data. Then, based on the data model, the conversion module converts the manufacturing data collected from the import interface into a format acceptable to the supply chain cluster equipment network platform for complex products. Finally, the converted capability and availability data are exported to the supply chain cluster equipment network platform for complex products through an export interface.

[0117] Step S3: In the supply chain cluster equipment network of complex products, raw materials are transformed into products through data coupling systems such as component manufacturing systems, time coupling systems such as parts manufacturing systems and logistics systems, and full-process coupling systems such as assembly systems.

[0118] Given that the relationship between data-coupled systems such as component manufacturing systems and complex product supply chain cluster equipment networks is limited to information and logistics interaction, and that the energy consumption information of this system can be directly viewed on the platform without the need for real-time energy consumption monitoring, Petri nets can be used to construct a system oriented towards... Figure 2 Real-time energy consumption monitoring models for time-coupled systems and full-process coupled systems, such as Figure 4 As shown.

[0119] Depend on Figure 4 It can be seen that the roughing, semi-finishing, and finishing stages of the part manufacturing system (A) can be monitored by updating the identifiers of the Pe1 locations triggered by the three transitions "t1-2", "t1-4", and "t1-6" in the Petri net; the energy consumption monitoring of the part manufacturing system (B) can be achieved by capturing the identifiers of the Pe2 locations triggered by the three transitions "t2-2", "t2-4", and "t2-6".

[0120] In the transportation and warehousing phases of logistics system (A), energy consumption monitoring can be achieved by updating the identifier of the Pe3 warehouse through the two transitions “t3-1” and “t3-3” in the Petri net; energy consumption monitoring of logistics system (B) can be achieved by capturing the two transitions “t4-1” and “t4-3” to update the identifier of the Pe4 warehouse.

[0121] The energy consumption of the first and second assembly processes of the assembly system can also be achieved by updating the identifier of the Pe5 library through the two transitions “t5-2” and “t5-4”, respectively.

[0122] Ultimately, the energy consumption monitoring of the time-coupled system and the full-process coupled system is achieved by updating the identifier of the Pe library through the "t6-1" transition.

[0123] The annotation definition of this model is shown in Table 2-6.

[0124] Table 2 Parts Manufacturing System (A)

[0125]

[0126] Table 3 Parts Manufacturing System (B)

[0127]

[0128] Table 4 Logistics System (A)

[0129]

[0130] Table 5 Logistics System (B)

[0131]

[0132] Table 6 Assembly System

[0133]

[0134] Step S4: The energy consumption of the data coupling system of the complex product supply chain cluster equipment network can be directly read from the platform, but the energy consumption of its time-period coupling system and the whole-process coupling system is also affected by parameters such as manufacturing unit processing efficiency, reliability, and logistics buffer capacity.

[0135] Given that manufacturing unit reliability and logistics buffer capacity primarily affect manufacturing unit processing efficiency indirectly through their impact on blockage or starvation rates, a specific energy efficiency model for the supply chain cluster equipment network of complex products is established by coupling the energy consumption of the manufacturing system, the energy consumption of the manufacturing unit as statistically analyzed in step S3, the energy consumption of workpiece allocation, and the energy consumption of workpiece transfer with data read from the platform.

[0136]

[0137] In the formula, E F This represents the specific energy efficiency model of the equipment network in the supply chain cluster of this dual-component product; BL F1 and BL F2 ST represents the blocking rate of the manufacturing system for part A and part B, respectively; F1 and ST F2 P″ represents the starvation rate of the assembly system caused by the logistics systems of part A and part B, respectively; d (WIP)″ represents the average occupancy of the storage and transportation system in the dual-component product supply chain cluster equipment network per unit time; (PR)″ represents the productivity of the dual-component product supply chain cluster equipment network; E″ b1 E″ represents the energy consumed in manufacturing the components required for the product. b2 This represents the energy consumed in transferring the product between the three enterprises / companies; ω Fi ,ω Fi ′,ω Fj ,ω Fj ′,ω Fh ,ω Fh ′,ω Fu ,ω Fu ′ represents the inherent energy efficiency factor of the assembly manufacturing system and the two part manufacturing systems (equivalent); and These represent the processing speeds of parts A and B respectively after blockages occur in their manufacturing systems. and These represent the processing speeds of the assembly system after starvation occurs in the logistics systems of parts A and B, respectively; c Fu This indicates the normal processing speed of each manufacturing system.

[0138] Step S5: Based on the established specific energy efficiency model of the dual-part product supply chain cluster equipment network, calculate R for different product manufacturing schemes. m Specific energy E m The energy consumption for the production of the product's components is provided by the component manufacturers; the energy consumption data for the production of parts comes from the real-time power acquisition information of equipment such as the Baoji SK50C three-speed manual CNC lathe and the Qiaofeng VH85 machining center; the energy consumption for the logistics of parts comes from the electric transportation equipment in the park, and the data is collected from the historical charging records of the charging piles in the park's energy management system; since the product assembly is done manually, the assembly energy consumption is mainly reflected in the auxiliary energy consumption (lighting, ventilation, heating and cooling) of the assembly plant, and this part of the energy consumption comes from the enterprise energy management system of the assembly plant.

[0139] By combining the manufacturing cost C of each solution m Manufacturing time T m Construct an evaluation matrix:

[0140] Table 7 Evaluation Matrix

[0141]

[0142] Due to the evaluation objective (E) m C m T m Since the dimensions and metrics of the decision matrix differ, it is necessary to standardize the decision matrix.

[0143]

[0144] In the formula, i = 1, 2, ..., m; j = 1, 2, 3

[0145] According to the above formula, all indicators are transformed into dimensionless types, thus enabling the acquisition of the standardized matrix Y.

[0146] Next, the entropy weight w for each evaluation target is calculated. j :

[0147]

[0148]

[0149] In the formula,

[0150] Based on entropy weight w j And the standardized matrix Y, construct the weighted normalized matrix Z:

[0151] Z = (Z ij ) n×3 =(y ij *w j (5)

[0152] Determine the positive ideal solution z for each indicator. + Negative ideal solution z - And calculate the distance between each sample and the positive ideal solution. Distance from the negative ideal solution

[0153] z + =max{z 1j ,z 2j ,;…z mj} (6)

[0154] z - =min{z 1j ,z 2j ,…z mj} (7)

[0155]

[0156]

[0157] Finally, calculate the relative fitting progress C. i

[0158]

[0159] Among them, the relative bonding progress C1 of scheme R1 is 0.4670; the relative bonding progress C2 of scheme R2 is 0.5347; the relative bonding progress C3 of scheme R3 is 0.5933; and the relative bonding progress C4 of scheme R4 is 0.4766. Compared with the other schemes, scheme R3 is the best overall. Therefore, the specific energy of scheme R3 can be obtained as the energy consumption limit for this unit of product.

[0160] In summary, this invention innovatively constructs a supply chain cluster equipment network model for complex products from a supply chain perspective, defining three different coupled systems; it develops an industrial IoT gateway, defines the data types from each system to the equipment network, and provides a unified data exchange standard for these systems; based on this, it constructs an energy consumption monitoring model for the product manufacturing process and further establishes a specific energy efficiency model for the supply chain cluster equipment network of complex products; finally, by comprehensively considering the specific energy efficiency, manufacturing cost, and time of different manufacturing schemes, it determines the comprehensive optimal manufacturing scheme and energy consumption limit for the product; effectively solving the problem of energy consumption statistics and energy consumption limits for manufacturing enterprises throughout the entire process of product and component manufacturing.

[0161] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit the technical solutions. Those skilled in the art should understand that any modifications or equivalent substitutions to the technical solutions of the present invention without departing from the spirit and scope of the present invention should be covered within the scope of the claims of the present invention.

Claims

1. A method for limiting energy consumption in the production of complex products based on a supply chain cluster equipment network, characterized in that, Includes the following steps: Step S1: Construct a supply chain cluster equipment network model for complex products: Based on the collaborative relationship between multiple manufacturing systems of complex products, integrate the relevant manufacturing and logistics systems with the product material flow as the main line; Step S2: Develop an industrial IoT gateway for product manufacturing services: Develop an industrial IoT gateway based on three differentiated coupling systems: data coupling system, time-period coupling system, and end-to-end coupling system. Step S3: Construct a real-time energy consumption monitoring model for time-coupled systems and full-process coupled systems: This model is based on Petri nets. On the one hand, it can map the operating status of each device in the manufacturing and logistics system; on the other hand, it can reflect the dynamic changes in energy consumption at different production stages, and realize real-time monitoring of energy efficiency in the production process. Step S4: Construct a specific energy efficiency model for the supply chain cluster equipment network of complex products: Based on the statistical energy consumption data of each system, introduce the blocking rate and hunger rate of the manufacturing unit to characterize the impact of the processing efficiency, reliability and logistics buffer capacity of the manufacturing unit, and then construct a specific energy efficiency model for the supply chain cluster equipment network. Step S5: Formulate a unit product energy consumption limit strategy: Based on the established specific energy efficiency model, calculate the specific energy of different manufacturing schemes for the product; by combining the manufacturing cost and manufacturing time of each scheme, determine the comprehensive optimal manufacturing scheme for the product, and set the energy consumption limit for the product accordingly. Specifically, step S3 includes: In the supply chain cluster equipment network of complex products, raw materials are transformed into products through a data coupling system, a time-sharing coupling system, and a full-process coupling system; wherein, the data coupling system includes a component manufacturing system, the time-sharing coupling system includes a parts manufacturing system and a logistics system, and the full-process coupling system includes an assembly system; Given that the relationship between the data coupling system and the complex product supply chain cluster equipment network is limited to the interaction of information and logistics, and that the energy consumption information of the data coupling system can be directly viewed on the platform without the need for real-time energy consumption monitoring, a real-time energy consumption monitoring model for time-period coupling systems and full-process coupling systems is constructed using Petri nets. Specifically, step S4 includes: The energy consumption of the data coupling system of the complex product supply chain cluster equipment network is directly read from the platform, but the energy consumption of its time-coupled system and the whole-process coupled system is also affected by parameters such as the processing efficiency, reliability and logistics buffer capacity of the manufacturing unit. Given that manufacturing unit reliability and logistics buffer capacity primarily affect manufacturing unit processing efficiency indirectly through their impact on blockage or starvation rates, a specific energy efficiency model for the supply chain cluster equipment network of complex products is established by coupling data from the platform with manufacturing system energy consumption, manufacturing unit energy consumption statistics from step S3, workpiece-allocated energy consumption, and workpiece transfer energy consumption data: (1) In the formula, A specific energy efficiency model representing a network of equipment in a supply chain cluster for complex products; This represents the blocking rate of the manufacturing system for part i; This represents the starvation rate of the assembly system caused by the logistics system of part i. This represents the distributed power consumption of the supply chain cluster equipment network per unit time. This indicates the average occupancy of storage and transportation systems within the supply chain cluster equipment network; Indicates the productivity of the supply chain cluster equipment network; This indicates the energy consumed in manufacturing the components required for the product; This indicates the energy consumed in transferring products between enterprises / companies; All are represented as inherent energy efficiency factors of assembly manufacturing systems and parts manufacturing systems; This indicates the processing speed after a blockage occurs in the parts manufacturing system; These represent the processing speed of the assembly system after a starvation event occurs due to the parts logistics system. This indicates the normal processing speed of each manufacturing system.

2. The method for limiting energy consumption in complex product manufacturing based on a supply chain cluster equipment network according to claim 1, characterized in that, Step S1 specifically includes: Considering the collaborative relationships among the diverse manufacturing systems of complex products, a supply chain cluster equipment network model for complex products is constructed, with product material flow as the main line. From the perspective of the relationship between the supply chain cluster equipment network of complex products and the product component manufacturing system and logistics system, they can be divided into three types of coupled systems: data coupled system, time-period coupled system, and full-process coupled system. Among them, the data coupled system is a manufacturing system that only has information and logistics interaction with the supply chain cluster equipment network; the time-period coupled system is a manufacturing system or logistics system that has information interaction, logistics interaction, and collaborative interaction in the manufacturing process with the supply chain cluster equipment network; and the full-process coupled system is a manufacturing system that is integrated into the equipment network platform for integrated management.

3. The method for limiting energy consumption in complex product manufacturing based on a supply chain cluster equipment network according to claim 1, characterized in that, Step S2 specifically includes: Given that devices are typically equipped with different types of sensors, an Industrial Internet of Things (IIoT) gateway is built to effectively collect heterogeneous manufacturing data and transfer it to a supply chain cluster of complex products. The main modules of an IIoT gateway include: import interface, data mode, data conversion, and export interface. The main functions of the four types of modules are as follows: First, the on-site manufacturing data generated by manufacturing equipment and sensors is extracted from machine control software or standardized data servers and transmitted to the industrial IoT gateway through an import interface based on the time frequency specified by the product manufacturer. Secondly, a service-oriented data model is developed to organize all collected manufacturing data. This model defines specific data items that need to be transferred to the supply chain cluster equipment network platform based on the relationship between the supply chain cluster equipment network and three differentiated coupling systems. Specifically, for data-coupled systems, basic information about the manufacturing system is required, including the specific location of the equipment, the types of standard parts that can be produced, and costs. For time-coupled systems, in addition to providing basic information about the manufacturing system, a list of manufacturing resources, processing plans, and expected processing results are required based on orders / tasks. Real-time process data and processing results must also be provided during task execution. For end-to-end coupled systems, the supply chain cluster equipment network platform for complex products provides real-time data on processing equipment, auxiliary equipment, and environmental service facilities. Third, based on the data model, the conversion module will convert the manufacturing data collected from the import interface into a format acceptable to the supply chain cluster equipment network platform for complex products; Finally, the transformed capability and availability data are exported to the supply chain cluster equipment network platform for complex products via the export interface.

4. The method for limiting energy consumption in complex product manufacturing based on a supply chain cluster equipment network according to claim 1, characterized in that, Step S5 specifically includes: Based on the established energy efficiency model of the supply chain cluster equipment network for complex products, different manufacturing schemes for the products are calculated. Specific energy By combining the manufacturing costs of each solution Manufacturing time The evaluation matrix is ​​constructed as shown in Table 1: Table 1 Evaluation Matrix <![CDATA[E m ]]> <![CDATA[C m ]]> <![CDATA[T m ]]> <![CDATA[R1 ]]> <![CDATA[x 11 ]]> <![CDATA[x 12 ]]> <![CDATA[x 13 ]]> <![CDATA[R2 ]]> <![CDATA[x 21 ]]> <![CDATA[x 22 ]]> <![CDATA[x 23 ]]> ︙ ︙ ︙ ︙ <![CDATA[R i ]]> <![CDATA[x i1 ]]> <![CDATA[x i2 ]]> <![CDATA[x i3 ]]> ︙ ︙ ︙ ︙ <![CDATA[R m ]]> <![CDATA[x m1 ]]> <![CDATA[x m2 ]]> <![CDATA[x m3 ]]> Due to the evaluation objectives , , Since the dimensions and metrics are different, the decision matrix needs to be standardized: (2) In the formula, ; According to the above formula, all indicators are transformed into dimensionless types, thus enabling the acquisition of a standardized matrix. ; Then, the entropy weight of each evaluation target is calculated. : (3) (4) In the formula, ; ; Based on entropy weight and standardized matrix Construct the weighted normalized matrix : (5) Determine the positive ideal solution for each indicator. Negative ideal solution And calculate the distance between each sample and the positive ideal solution. Distance from the negative ideal solution : (6) (7) (8) (9) Finally, calculate the relative stitching progress. (10) The larger the relative progress, the closer it is to 1, the better the corresponding product manufacturing plan.

Citation Information

Patent Citations

  • Workpiece standard energy consumption limit determination method based on inherent specific energy of numerical control machine tool

    CN110826156A

  • Comprehensive energy consumption monitoring management system

    CN116070967A

  • Multi-coupling hybrid flow industrial process modeling and simulation method

    CN106168769A

  • Energy efficiency evaluation method for cooling, heating and power multi-energy flow coupling comprehensive energy

    CN114266471A