A power grid resource dynamic threshold early warning method and system based on big data

By using big data analysis to calculate the dynamic thresholds of power grid resources, the problem of false alarms and missed alarms in the passive operation and maintenance mode of power grid resources has been solved, realizing proactive early warning and fault location of power grid resources, and improving the accuracy of early warning and power supply reliability of power grid resources.

CN117710143BActive Publication Date: 2026-11-24STATE GRID ELECTRIC POWER RES INST +3
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311678402.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-08
Publication Date
2026-11-24
Estimated Expiration
2043-12-08

AI Technical Summary

Technical Problem

In existing technologies, the operation and maintenance of power grid resources mainly adopts a passive operation and maintenance mode, which is difficult to adapt to the dynamic changes of power grid resources, resulting in false alarms and missed alarms. It lacks the ability to provide timely early warning and location of potential power grid resource hazards, and fails to fully utilize the value of power grid resource data.

Method used

A big data-based dynamic threshold early warning method for power grid resources is adopted. Through data aggregation, classification, processing and early warning modules, boundary thresholds, dynamic load thresholds and timing deviation thresholds are calculated to realize a multi-dimensional combination strategy for power grid resources, adaptively set dynamic thresholds, and perform early warning and fault location.

Benefits of technology

It enables the identification and early warning of potential power grid resource hazards before a fault occurs, improving the accuracy and efficiency of early warning, enhancing power supply reliability and user experience, and improving the service management level of power supply companies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117710143B_ABST
    Figure CN117710143B_ABST
Patent Text Reader

Abstract

This invention discloses a dynamic threshold early warning method and system for power grid resources based on big data. The data aggregation module aggregates multi-source, multi-modal data of power grid resources; the data classification module uses the K-means algorithm to aggregate historical daily data into k clusters; the data calculation module calculates the boundary threshold, dynamic load threshold, and time-series deviation threshold of power grid resources and obtains a dynamic fusion threshold; and the early warning module performs comprehensive early warning analysis. This method establishes a proactive early warning mode for power grid resources with a prevention-oriented approach, fully utilizing and realizing the value of power grid resource data to identify, warn of, and promptly address potential power grid resource hazards before faults occur. It achieves dynamic early warning of power grid resources, improves power supply reliability, enhances the accuracy of early warning threshold settings and the robustness of dynamic early warning strategies, and improves the efficiency of power grid resource early warning. It effectively assists in formulating power grid emergency repair decisions, improves users' electricity experience, protects users' interests, and enhances the service management level of power supply companies.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a method for early warning of potential hazards in power grid resources, and more particularly to a method and system for early warning of dynamic thresholds for power grid resources based on big data. Background Technology

[0002] With the continuous advancement of the construction of new power systems, the power supply structure and power grid structure are constantly being adjusted, the scale of power grid resources is growing larger and larger, the operating characteristics of the power system have undergone significant changes, and the system security situation is becoming increasingly severe. Therefore, higher standards and demands are placed on the daily management of massive power grid resources. Timely detection of potential hazards in power grid resources, rapid and accurate early warning, and timely handling of potential hazards directly affect users' electricity experience and interests, and are related to the operating performance and service level of power supply companies. However, the current power grid resource operation and maintenance system mainly adopts a passive operation and maintenance mode of alarming and repairing after a fault occurs. This causes power grid resource operation and maintenance personnel to spend most of their time and energy dealing with simple and repetitive "passive firefighting" problems, which is not only inefficient but also often leads to vicious chain reactions. The method of setting fixed static upper and lower thresholds for power grid resources based on expert experience is difficult to adapt to the complex dynamic early warning and judgment needs of power grid resources. When the scenarios and states of various power grid resources change, the thresholds of various indicators of power grid resources should also change accordingly. It is difficult to adapt to the dynamic changes of power grid resources, which will lead to false alarms and missed alarms in power grid resource early warning, which is not conducive to effective early warning and timely repair of potential power grid resource hazards. The dynamic thresholds of power grid resources are mainly set according to the maximum or minimum values ​​of historical data, which takes into account fewer factors and has insufficient accuracy in threshold setting, making it difficult to adapt to the complex dynamic early warning and judgment needs of power grid resources. Currently, there is a lack of capability to provide early warnings and resolve potential hazards in power grid resources before faults occur, a lack of ability to locate and analyze operational and maintenance risks, and a lack of strategies for setting power grid resource thresholds from multiple dimensions and for setting dynamic thresholds based on spatiotemporal data changes. This fails to meet the needs of power grid resource early warning and assessment in complex dynamic environments and to ensure the accuracy of dynamic early warning thresholds for power grid resources. Furthermore, with the construction and development of new power systems, a large amount of data is constantly being generated and accumulated, but the application of this data is limited to some basic analytical applications, failing to fully utilize and realize the value of power grid resource data. Summary of the Invention

[0003] Purpose of the invention: The purpose of this invention is to provide a method and system for dynamic threshold early warning of power grid resources based on big data, which can locate, analyze and issue early warnings of faults before they occur.

[0004] Technical solution: The power grid resource dynamic threshold early warning method based on big data described in this invention includes the following steps:

[0005] S01: The data aggregation module aggregates multi-source, multi-modal data of power grid resources;

[0006] S02: The data classification module uses the K-means algorithm, based on the decision coefficient. To evaluate the clustering effect when different k values ​​are used, the k value is selected by the inflection point of the correlation between the k value and the overall clustering error P, and historical daily data are aggregated into k clusters for classification.

[0007] S03: The data processing module calculates the boundary threshold deviation coefficient between each data point and the maximum and minimum values ​​based on the clustering data of similar devices obtained in S02. The threshold is adaptively set to a reasonable operating range to obtain the power grid resource boundary threshold;

[0008] S04: The data processing module arranges the power grid resource data according to time sequence and calculates the dynamic average load of the power grid resource data. And calculate the reasonable operating range of the dynamic load threshold to obtain the dynamic load threshold of the power grid resources;

[0009] S05: The data processing module arranges the power grid resource data according to time sequence, calculates the maximum and minimum values ​​of the composite deviation threshold, and calculates the time sequence deviation redundancy coefficient. Then, the reasonable operating range of the timing deviation threshold algorithm is calculated to obtain the timing deviation threshold for power grid resources;

[0010] S06: The data processing module retrieves the boundary thresholds, dynamic load thresholds, time-series deviation thresholds, and weights of various algorithms from the power grid resource data for the most recent three days of the prediction date, and calculates the maximum value of the final fused dynamic threshold based on the above data. and minimum value ;

[0011] S07: The early warning module determines whether the power grid resource operation monitoring indicators exceed the maximum value of the dynamic threshold after final fusion. and minimum value And issue a warning to the user.

[0012] Furthermore, step S02 includes the following steps:

[0013] (1) Take the k points that are farthest apart from each other in the historical daily data as the initial points for clustering;

[0014] (2) For each sample in the dataset Calculate its Euclidean distance to the k cluster centers using formula (1). And assign them to the cluster corresponding to the cluster center with the smallest distance:

[0015] (1)

[0016] in, It is a vector representation of each sample in the dataset. Let i be the cluster center, i be the i-th similarity day, and j be the j-th cluster center;

[0017] (3) For each class Its cluster centers are recalculated using formula (2). As a new cluster center:

[0018] (2)

[0019] in, It is a cluster formed through clustering. Cluster The number of samples in the middle, Cluster The samples in;

[0020] (4) Repeat steps 2 and 3 above until the cluster centers are stable;

[0021] (5) Define a set of approximate values ​​for k, denoted as The overall error P for clustering with different K values ​​is calculated according to formula (3):

[0022] (3)

[0023] in, This represents the cluster center of the j-th cluster; This represents the number of sample points in the j-th cluster; j ranges from 1 to... ; This represents the value of the m-th sample point in the j-th cluster; m ranges from 1 to... ;

[0024] (6) Select a suitable k value by judging the trend of P value using formula (4), and solidify k clusters:

[0025] (4)

[0026] in, Take the value of k The overall error of clustering, where n is the total number of P-values. Take the value of k The overall clustering error is determined by setting the initial value of a to 1 and continuously increasing the value of a. This is used to determine the turning point in the relationship between the value of k and the overall clustering error P, select the value of k, and solidify the k clusters. The threshold of γ is selected based on the trend of the set value of P.

[0027] Furthermore, step S03 includes the following steps:

[0028] (1) Calculate the boundary threshold deviation coefficient between each data point of the same type of equipment and the maximum and minimum values ​​using formula (5). :

[0029] (5)

[0030] in, This represents the j-th data point in the k-th type of power grid resource. , For the k-th type of power grid resources The maximum and minimum values ​​in the data;

[0031] (2) The maximum value of the boundary threshold is obtained by adaptively setting the threshold within a reasonable operating range using formula (6). and minimum value :

[0032] (6)

[0033] Among them, the k-th type of power grid resources are taken as a whole. The maximum and minimum values ​​among the data are denoted as follows: , , This represents the i-th data point in the k-th type of power grid resource.

[0034] Furthermore, step S04 includes the following steps:

[0035] (1) The average load of the data between time points is denoted as ,Will The average load of the data between time points is denoted as ,…,Will The average load of the data between time points is denoted as The dynamic average load of power grid resource data is calculated using formula (7). :

[0036] (7)

[0037] in, For the i-th time in the power grid resource data, The larger the subscript, the further away the historical data is from the predicted date. For prediction date , In power grid resource data The average load corresponding to the data at each time point, where n represents the n time periods into which the clustered power grid resource data is divided according to the time series.

[0038] (2) The maximum value of the dynamic load threshold is obtained by calculating the reasonable operating range of the dynamic load threshold using formula (8). and minimum value :

[0039] (8)

[0040] Among them, the k-th type of power grid resources are taken as a whole. The maximum and minimum values ​​among the data are denoted as follows: , , This represents the i-th data in the k-th type of power grid resources.

[0041] Furthermore, step S05 includes the following steps:

[0042] (1) As time changes, the time-series deviation threshold of power grid resource data will fluctuate, resulting in deviation redundancy. The data should be arranged according to time sequence. Weights are set within one year. , Weights are set between years. , Weighting is set for years or more. The maximum value of the composite deviation threshold is calculated using formulas (9) and (10). and minimum value :

[0043] (9)

[0044] (10)

[0045] in, This represents the i-th data in the power grid resources. , The maximum and minimum values ​​among n data points related to power grid resources. This is the default value;

[0046] (2) To reflect the magnitude of this fluctuation, the timing deviation redundancy coefficient is calculated using formula (11). :

[0047] (11)

[0048] (3) Changes in the number of devices mean that historical daily data cannot be directly used to determine the threshold. It is necessary to adjust the data according to the time series, taking into account the device load, and arrange the data according to the time sequence. Weights are set within one year. , Weights are set between years. , Weighting is set for years or more. The maximum value of the timing deviation threshold is obtained by calculating the reasonable operating range of the timing deviation threshold algorithm using formula (12). and minimum value :

[0049] (12)

[0050] in, This is the default value. , for The corresponding historical data of power grid resources, including their maximum and minimum values ​​during this period. For the corresponding kth class Historical load information of power grid resources during the time period. This represents the actual load situation of power grid resources in category k.

[0051] Furthermore, step S06 includes the following steps:

[0052] (1) Take the power grid resource data of the three most recent days of the forecast date and use the boundary threshold algorithm, dynamic load threshold algorithm and time series deviation threshold algorithm to calculate the corresponding thresholds respectively. , , , , , Compare the three maximum values ​​and the three minimum values ​​separately. The three maximum values ​​are denoted as... , , The three minimum values ​​are denoted as follows: , , ;

[0053] (2) The weights used when calculating the maximum dynamic threshold using formulas (13) and (14) Weights used when calculating the minimum dynamic threshold :

[0054] (13)

[0055] (14)

[0056] in, for , , The average value, for , , The average value;

[0057] (3) By combining the weights of various algorithms with boundary thresholds, dynamic load thresholds, and timing deviation thresholds. and The maximum dynamic threshold value after final fusion is calculated using formulas (15) and (16). and minimum value :

[0058] (15)

[0059] (16).

[0060] Furthermore, based on the power grid resource early warning assessment results, users can refer to assessment information from other channels and arrange personnel for inspections to further comprehensively assess power grid resource faults, locate power grid faults, determine fault handling plans, and complete the processing of power grid resource early warning information and fault repair work.

[0061] A big data-based dynamic threshold early warning system for power grid resources includes:

[0062] The data aggregation module is used for the aggregation of multi-source and multi-modal data of power grid resources;

[0063] The data classification module classifies the multi-source, multi-modal data on power grid resources that are aggregated by the data aggregation module.

[0064] The data processing module calculates boundary thresholds, dynamic load thresholds, and time-series deviation thresholds based on the classification of multi-source and multi-modal data of power grid resources, and merges the three thresholds to form a dynamic threshold.

[0065] The early warning module monitors power grid operation indicators based on dynamic thresholds obtained from the data processing module and issues early warnings to users.

[0066] Furthermore, the data source terminals for the multi-source, multi-modal data of power grid resources include: a new generation dispatching technology support system, a new generation centralized control station system, a distribution automation system, a substation automation system, an electricity consumption information collection system, a marketing business application system, a power grid resource business platform, a data platform, and a new generation equipment asset lean management system; the equipment for collecting the multi-source, multi-modal data of power grid resources includes: main primary power equipment of the transmission network, main overhead primary power equipment of the distribution network, main substation primary power equipment of the distribution network, main low-voltage primary power equipment of the distribution network, main power grid control systems and relay protection and safety automatic devices, main online monitoring equipment of the power grid, main automation equipment of the power grid, main communication equipment of the power grid, and other power grid resources.

[0067] Furthermore, the data classification module classifies the historical daily data of all power grid resources.

[0068] Beneficial Effects: Compared with existing technologies, this invention has the following significant advantages: 1. It establishes a proactive early warning mode for power grid resources based on prevention, fully utilizes and realizes the value of power grid resource data, unifies and effectively integrates power grid resource data, and realizes a proactive early warning mode that identifies, warns, and promptly handles potential power grid resource hazards before a fault occurs; 2. It proposes a multi-factor combination strategy of boundary threshold, dynamic load threshold, and time-series deviation threshold, realizing dynamic early warning of power grid resources and improving power supply reliability; 3. It implements a multi-factor threshold fusion adjustment method for power grid resources based on dynamic weights, improving the accuracy of power grid resource early warning threshold settings and the robustness of dynamic early warning strategies, thereby improving the efficiency of power grid resource early warning; 4. It effectively assists in formulating power grid emergency repair decisions, improving users' electricity experience and protecting users' interests; 5. It improves the service management level of power supply companies. Attached Figure Description

[0069] Figure 1 This is a schematic diagram of the process of the present invention;

[0070] Figure 2 This is a flowchart illustrating the data classification process;

[0071] Figure 3 This is a schematic diagram of the dynamic threshold fusion algorithm. Detailed Implementation

[0072] The technical solution of the present invention will be further described below with reference to the accompanying drawings.

[0073] A big data-based dynamic threshold early warning system for power grid resources includes: a data aggregation module for aggregating multi-source and multi-modal data of power grid resources; a data classification module for classifying the multi-source and multi-modal data of power grid resources aggregated by the data aggregation module; a data processing module for calculating boundary thresholds, dynamic load thresholds, and time-series deviation thresholds based on the classification of the multi-source and multi-modal data of power grid resources, and fusing the three thresholds to form a dynamic threshold; and an early warning module for monitoring power grid operation indicators and issuing early warnings to users based on the dynamic thresholds obtained by the data processing module.

[0074] like Figure 1 The method for dynamic threshold early warning of power grid resources based on big data, as shown, includes the following steps:

[0075] S01: The data aggregation module aggregates multi-source and multi-modal data of power grid resources. Through standardized fusion processing of multi-source and multi-modal data of power grid resources, it overcomes the problems of large scale, wide range, dispersed location and multiple data sources of power grid resources, and obtains the data required for early warning and judgment of power grid resources. The data sources of multi-source and multi-modal data of power grid resources mainly include: the new generation dispatching technology support system, the new generation centralized control station system, the distribution automation system, the substation automation system, the electricity consumption information collection system, the marketing business application system, the power grid resource business platform, the data platform and the new generation equipment asset lean management system; among them, the equipment for aggregating multi-source and multi-modal data of power grid resources includes: (1) the main transmission network Primary power equipment includes: transformers, busbars, generators, transformer windings, circuit breakers, disconnectors, grounding disconnectors, loads, parallel reactors, parallel capacitors, series reactors, series compensation devices, parallel compensation devices, current transformers, voltage transformers, surge arresters, wave traps, combined filters, filter capacitors, AC filters, arc suppression devices, grounding resistors, smoothing reactors, DC filters, converter valves, converter transformers, DC voltage transformers, DC current transformers, DC circuit breakers, DC disconnectors, DC grounding disconnectors, DC surge arresters, grounding electrodes, DC wave traps, and DC busbars; (2) The main overhead primary power equipment of the distribution network includes: Pole-mounted transformers, pole-mounted circuit breakers, pole-mounted load switches, pole-mounted disconnect switches, pole-mounted reclosers, pole-mounted drop-out fuses, line surge arresters, line fault indicators, pole-mounted capacitors, pole-mounted voltage transformers, pole-mounted current transformers, and pole-mounted sectionalizers; (3) Primary power equipment in the main substations of the distribution network, specifically including: distribution transformers, station transformers, grounding transformers, circuit breakers, disconnect switches, load switches, fuses, jumper wires, busbars, reactors, current transformers, voltage transformers, power capacitors, surge arresters, grounding resistors, fault indicators, substation cables, and AC filters; (4) Primary low-voltage power equipment in the main substations of the distribution network, specifically including: low-voltage pole-mounted switches and low-voltage pole-mounted fuses. Low-voltage fuses, low-voltage pole-mounted capacitors, low-voltage reactive power compensation devices, low-voltage pole-mounted surge arresters, low-voltage meter boxes, low-voltage fuse boxes, wall brackets, low-voltage distribution boxes, low-voltage residual current protectors, low-voltage cable junction boxes, low-voltage cable terminal boxes, low-voltage capacitors, low-voltage switches, low-voltage busbars, low-voltage distribution panels, low-voltage switch cabinets, low-voltage power electronic equipment, low-voltage energy storage devices and anti-islanding devices; (5) Main power grid control systems, relay protection and safety automatic devices, specifically including: converter station control systems, fault recorders, protection fault information system substations, relays, converter station protection systems, converter station control and protection systems, AC protection devices, DC system protection devices and safety automatic devices;(6) Main online monitoring equipment for power grids, specifically including: tower monitoring equipment, conductor monitoring equipment, meteorological environment monitoring equipment, transmission video / image monitoring equipment, transformer / reactor / converter transformer monitoring equipment, capacitor type equipment monitoring equipment, metal oxide surge arrester monitoring equipment, circuit breaker / GIS (Geographic Information System) monitoring equipment, substation video / image monitoring equipment, and cable body monitoring equipment; (7) Main automation equipment for power grids, specifically including: automation systems, remote terminal units (RTU), remote terminal units (FTU), remote terminal units (DTU), remote terminal units (TTU), remote energy terminals, phasor measurement devices, secondary system security protection equipment, clock synchronization devices, computer equipment, storage devices, power supply equipment, remote acquisition equipment, power acquisition equipment, dispatch simulation screen, and large screen; (8) Main communication equipment for power grids, specifically including: communication equipment rooms, communication cabinets, communication optical cables, communication optical cable segments, communication optical paths, communication equipment rooms, communication power supplies, transmission systems, and PCM (Pulse Code) equipment. Modulation (pulse code modulation) access systems, terminal communication access systems, power line carrier machines, data networks, switching networks and communication network management systems; (9) other power grid resources, specifically including historical data and power grid resource models.

[0076] S02: As Figure 2 The K-means algorithm is used, and the data classification module classifies data based on the decision coefficients. To evaluate the clustering effect for different values ​​of k, the value corresponding to the largest silhouette coefficient is selected as the final number of clusters, and historical daily data is aggregated into k clusters. The specific steps include the following:

[0077] (1) Take the k points that are farthest apart from each other in the historical daily data as the initial points for clustering;

[0078] (2) For each sample in the dataset Calculate its Euclidean distance to the k cluster centers using formula (1). And assign them to the cluster corresponding to the cluster center with the smallest distance:

[0079] (1)

[0080] in, It is a vector representation of each sample in the dataset. Let i be the cluster center, i be the i-th similarity day, and j be the j-th cluster center;

[0081] (3) For each class Its cluster centers are recalculated using formula (2). As a new cluster center:

[0082] (2)

[0083] in, It is a cluster formed through clustering. Cluster The number of samples in the middle, Cluster The samples in;

[0084] (4) Repeat steps 2 and 3 above until the cluster centers are stable;

[0085] (5) Define a set of approximate values ​​for k, denoted as The overall error P for clustering with different K values ​​is calculated according to formula (3):

[0086] (3)

[0087] in, This represents the cluster center of the j-th cluster; This represents the number of sample points in the j-th cluster; j ranges from 1 to... ; This represents the value of the m-th sample point in the j-th cluster; m ranges from 1 to... ;

[0088] (6) Select a suitable k value by judging the trend of P value using formula (4), and solidify k clusters:

[0089] (4)

[0090] in, Take the value of k The overall error of clustering, where n is the total number of P-values. Take the value of k The overall clustering error is determined by setting the initial value of a to 1 and continuously increasing the value of a. This is used to determine the turning point in the relationship between the value of k and the overall clustering error P, select the value of k, and solidify the k clusters. The threshold of γ is selected based on the trend of the set value of P.

[0091] S03: Based on the clustering data of similar equipment obtained in S02, analyze the operating range and early warning threshold, and calculate the basic boundary threshold of power grid resources, including the following steps:

[0092] (1) When calculating the basic boundary threshold of power grid resource data, the data closer to the boundary can better reflect the size of the boundary threshold. In order to reflect the weight of its influence on the size of the basic boundary threshold, the boundary threshold deviation coefficient between each data and the maximum and minimum values ​​is calculated by formula (5). :

[0093] (5)

[0094] in, This represents the j-th data point in the k-th type of power grid resource. , For the k-th type of power grid resources The maximum and minimum values ​​in the data;

[0095] (2) Based on big data technology, through effective analysis of historical data, the normal operating range of information resource indicators is obtained, and the threshold is adaptively set to a reasonable operating range according to the analysis results using formula (6), and the maximum value of the boundary threshold is obtained. and minimum value :

[0096] (6)

[0097] Among them, the k-th type of power grid resources are taken as a whole. The maximum and minimum values ​​among the data are denoted as follows: , , This represents the i-th data in the k-th type of power grid resources.

[0098] S04: Calculate the dynamic load threshold of power grid resources, including the following steps:

[0099] (1) Arrange the power grid resource data according to time sequence. The average load of the data between time points is denoted as , Will The average load of the data between time points is denoted as ,…, Will The average load of the data between time points is denoted as The dynamic average load of power grid resource data is calculated using formula (7). :

[0100] (7)

[0101] in, For the i-th time in the power grid resource data, The larger the subscript, the further away the historical data is from the predicted date. For prediction date , In power grid resource data The average load corresponding to the data at each time point, where n represents the n time periods into which the clustered power grid resource data is divided according to the time series.

[0102] (2) Using the boundary threshold algorithm and dynamic load factor, the reasonable operating range of the dynamic load threshold is calculated by formula (8), and the maximum value of the dynamic load threshold is obtained. and minimum value :

[0103] (8)

[0104] Among them, the k-th type of power grid resources total The maximum and minimum values ​​among the data are denoted as follows: , , This represents the i-th data in the k-th type of power grid resources.

[0105] S05: Calculate the power grid resource time series deviation threshold, including the following steps:

[0106] (1) As time changes, the time-series deviation threshold of power grid resource data will fluctuate, resulting in deviation redundancy. The data should be arranged according to time sequence. Weights are set within one year. , Weights are set between years. , Weighting is set for years or more. The maximum value of the composite deviation threshold is calculated using formulas (9) and (10). and minimum value :

[0107] (9)

[0108] (10)

[0109] in, This represents the i-th data in the power grid resources. , The maximum and minimum values ​​among n data points related to power grid resources. This is the default value;

[0110] (2) To reflect the magnitude of this fluctuation, the timing deviation redundancy coefficient is calculated using formula (11). :

[0111] (11)

[0112] (3) Changes in the number of devices mean that historical daily data cannot be directly used to determine the threshold. It is necessary to adjust the data according to the time series, taking into account the device load, and arrange the data according to the time sequence. Weights are set within one year. , Weights are set between years. , Weighting is set for years or more. The reasonable operating range of the timing deviation threshold algorithm is calculated using formula (12), and the maximum value of the timing deviation threshold is obtained. and minimum value :

[0113] (12)

[0114] in, This is the default value. , for The corresponding historical data of power grid resources, including their maximum and minimum values ​​during this period. For the corresponding kth class Historical load information of power grid resources during the time period. This represents the actual load situation of power grid resources in category k.

[0115] S06: Set the dynamic integration threshold for power grid resources, such as Figure 3 The steps shown are as follows:

[0116] (1) Take the power grid resource data of the three most recent days of the forecast date and use the boundary threshold algorithm, dynamic load threshold algorithm and time series deviation threshold algorithm to calculate the corresponding thresholds respectively. , , , , , Compare the three maximum values ​​and the three minimum values ​​separately. The three maximum values ​​are denoted as... , , The three minimum values ​​are denoted as follows: , , ;

[0117] (2) The weights used when calculating the maximum dynamic threshold using formulas (13) and (14) Weights used when calculating the minimum dynamic threshold :

[0118] (13)

[0119] (14)

[0120] in, for , , The average value, for , , The average value;

[0121] (3) By combining the weights of various algorithms with boundary thresholds, dynamic load thresholds, and timing deviation thresholds. and The maximum dynamic threshold value after fusion is calculated using formulas (15) and (16). and minimum value :

[0122] (15)

[0123] (16);

[0124] S07: The early warning module determines whether the power grid resource operation monitoring indicators exceed the maximum value of the dynamic threshold after final fusion. and minimum value And issue a warning to the user.

[0125] Based on the power grid resource early warning and assessment results, users refer to assessment information from other channels and arrange personnel for inspections to further comprehensively assess power grid resource faults, locate power grid faults, determine fault handling plans, and complete the processing of power grid resource early warning information and fault repair work.

Claims

1. A method for dynamic threshold early warning of power grid resources based on big data, characterized in that, Includes the following steps: S01: The data aggregation module aggregates multi-source, multi-modal data of power grid resources; S02: The data classification module uses the K-means algorithm, based on the decision coefficient. To evaluate the clustering effect when different k values ​​are used, the k value is selected by the inflection point between the k value and the overall clustering error P, and historical daily data is aggregated into k clusters for classification. S03: The data processing module calculates the boundary threshold deviation coefficient between each data point and the maximum and minimum values ​​based on the clustering data of similar devices obtained in S02. The threshold is adaptively set to a reasonable operating range to obtain the power grid resource boundary threshold; S04: The data processing module arranges the power grid resource data according to time sequence and calculates the dynamic average load of the power grid resource data. And calculate the reasonable operating range of the dynamic load threshold to obtain the dynamic load threshold of the power grid resources; S05: The data processing module arranges the data according to time sequence, calculates the maximum and minimum values ​​of the composite deviation threshold, and calculates the time sequence deviation redundancy coefficient. Then, the reasonable operating range of the timing deviation threshold algorithm is calculated to obtain the timing deviation threshold for power grid resources; S06: The data processing module retrieves the boundary thresholds, dynamic load thresholds, time-series deviation thresholds, and weights of various algorithms from the power grid resource data for the most recent three days of the prediction date, and calculates the maximum value of the final fused dynamic threshold based on the above data. and minimum value ; S07: The early warning module determines whether the power grid resource operation monitoring indicators exceed the maximum value of the dynamic threshold after final fusion. and minimum value And issue a warning to the user; Step S02 includes the following steps: (1) Take the k points that are farthest apart from each other in the historical daily data as the initial points for clustering; (2) For each sample in the dataset Calculate its Euclidean distance to the k cluster centers. They are then assigned to the cluster corresponding to the cluster center with the smallest distance; (3) For each class Recalculate its cluster centers As a new cluster center; (4) Repeat steps 2 and 3 above until the cluster centers are stable; (5) Define a set of approximate values ​​for k, denoted as Calculate the overall error P of clustering with different k values; (6) Select a suitable k value by judging the trend of P value using formula (4), and solidify k clusters: (4) in, Take the value of k The overall error of clustering, where n is the total number of P-values. Take the value of k The overall error of the clustering is determined by setting the initial value of a to 1 and the threshold of γ to be selected based on the trend of the set P value.

2. The method for dynamic threshold early warning of power grid resources based on big data according to claim 1, characterized in that, The data source terminals for the multi-source, multi-modal data of power grid resources in step S01 include: dispatching technical support system, centralized control station system, distribution automation system, substation automation system, electricity consumption information collection system, marketing business application system, power grid resource business platform, data platform, and equipment asset lean management system; the equipment for collecting the multi-source, multi-modal data of power grid resources includes: main primary power equipment of transmission network, main overhead primary power equipment of distribution network, main substation primary power equipment of distribution network, main low-voltage primary power equipment of distribution network, main power grid control system and relay protection and safety automatic device, main online monitoring equipment of power grid, main automation equipment of power grid, main communication equipment of power grid, and other power grid resources.

3. The method for dynamic threshold early warning of power grid resources based on big data according to claim 1, characterized in that, Step S03 includes the following steps: (1) Calculate the boundary threshold deviation coefficient between each data point of the same type of equipment and the maximum and minimum values ​​using formula (5). : (5) in, This represents the j-th data point in the k-th type of power grid resource. , For the k-th type of power grid resources The maximum and minimum values ​​among the data; (2) By adaptively setting the threshold within a reasonable operating range using formula (6), the maximum value of the boundary threshold is obtained. and minimum value : (6) Among them, the k-th type of power grid resources are taken as a whole. The maximum and minimum values ​​among the data are denoted as . , , This represents the i-th data in the k-th type of power grid resources.

4. The method for dynamic threshold early warning of power grid resources based on big data according to claim 1, characterized in that, Step S04 includes the following steps: (1) The average load of the data between time points is denoted as ,Will The average load of the data between time points is denoted as ,…,Will The average load of the data between time points is denoted as The dynamic average load of power grid resource data is calculated using formula (7). : (7) in, For the i-th time in the power grid resource data, The larger the subscript, the further away the historical data is from the predicted date. For prediction date , In power grid resource data The average load corresponding to the data at each time point, where n represents the n time periods into which the clustered power grid resource data is divided according to the time series. (2) Calculate the reasonable operating range of the dynamic load threshold using formula (8) to obtain the maximum value of the dynamic load threshold. and minimum value : (8) Among them, the k-th type of power grid resources are taken as a whole. The maximum and minimum values ​​among the data are denoted as . , , This represents the i-th data in the k-th type of power grid resources.

5. The method for dynamic threshold early warning of power grid resources based on big data according to claim 1, characterized in that, Step S05 includes the following steps: (1) Arrange the data according to time sequence, according to Weights are set within one year. , Weights are set between years. , Weighting is set for years or more. The maximum value of the composite deviation threshold is calculated using formulas (9) and (10). and minimum value : (9) (10) in, This represents the i-th data in the power grid resources. , The maximum and minimum values ​​among n data points related to power grid resources. This is the default value; (2) The magnitude of the fluctuation is reflected by the timing deviation redundancy coefficient calculated by formula (11). : (11) (3) Calculate the reasonable operating range of the timing deviation threshold algorithm using formula (12) to obtain the maximum dynamic threshold value. and minimum value : (12) in, This is the default value. , for The corresponding historical data of power grid resources, including their maximum and minimum values ​​during that period. For the corresponding kth class Historical load information of power grid resources during the time period. This represents the actual load situation of power grid resources in category k.

6. The method for dynamic threshold early warning of power grid resources based on big data according to claim 1, characterized in that, Step S06 includes the following steps: (1) Take the power grid resource data of the three most recent days of the forecast date and use the boundary threshold algorithm, dynamic load threshold algorithm and time series deviation threshold algorithm to calculate the corresponding thresholds respectively. , , , , , Compare the three maximum values ​​and the three minimum values ​​separately. The three maximum values ​​are denoted as... , , The three minimum values ​​are denoted as follows: , , ; (2) The weights used when calculating the maximum dynamic threshold using formulas (13) and (14) Weights used when calculating the minimum dynamic threshold : (13) (14) in, for , , The average value, for , , The average value; (3) By combining the weights of various algorithms with boundary thresholds, dynamic load thresholds, and timing deviation thresholds. and The maximum dynamic threshold value after final fusion is calculated using formulas (15) and (16). and minimum value This forms a final dynamic threshold for real-time fault warning: (15) (16)。 7. An early warning system for the power grid resource dynamic threshold early warning method based on big data as described in any one of claims 1-6, characterized in that, include: The data aggregation module is used for the aggregation of multi-source and multi-modal data of power grid resources; The data classification module classifies the multi-source, multi-modal data on power grid resources that are aggregated by the data aggregation module. The data processing module calculates boundary thresholds, dynamic load thresholds, and time-series deviation thresholds based on the classification of multi-source and multi-modal data of power grid resources, and merges the three thresholds to form a dynamic threshold. The early warning module monitors power grid operation indicators based on dynamic thresholds obtained from the data processing module and issues early warnings to users. The aforementioned data aggregation module aggregates multi-source, multi-modal data of power grid resources; The data classification module uses the K-means algorithm, based on the decision coefficient. To evaluate the clustering effect when different k values ​​are used, the k value is selected by the inflection point between the k value and the overall clustering error P, and historical daily data is aggregated into k clusters for classification. The data processing module calculates the boundary threshold deviation coefficient between each data point and the maximum and minimum values ​​based on the data of similar devices obtained by K-means clustering. By adaptively setting thresholds within a reasonable operating range, the boundary thresholds of power grid resources are obtained. Power grid resource data is then arranged according to time sequence, and the dynamic average load of the power grid resource data is calculated. The dynamic load threshold of the power grid is obtained by calculating the reasonable operating range of the dynamic load threshold. The data is arranged according to time sequence, and the maximum and minimum values ​​of the composite deviation threshold are calculated, as well as the time sequence deviation redundancy coefficient. Then, the reasonable operating range of the time-series deviation threshold algorithm is calculated to obtain the time-series deviation threshold for power grid resources. The boundary threshold, dynamic load threshold, time-series deviation threshold, and weights of various algorithms for the most recent three days of power grid resource data are taken. Based on the above data, the maximum value of the final fused dynamic threshold is calculated. and minimum value ; The aforementioned early warning module determines whether the power grid resource operation monitoring indicators exceed the maximum value of the final fused dynamic threshold. and minimum value And issue a warning to the user; The K-means algorithm specifically includes the following steps: (1) Take the k points that are farthest apart from each other in the historical daily data as the initial points for clustering; (2) For each sample in the dataset Calculate its Euclidean distance to the k cluster centers. They are then assigned to the cluster corresponding to the cluster center with the smallest distance; (3) For each class Recalculate its cluster centers As a new cluster center; (4) Repeat steps 2 and 3 above until the cluster centers are stable; (5) Define a set of approximate values ​​for k, denoted as Calculate the overall error P of clustering with different k values; (6) Select a suitable k value by judging the trend of P value using formula (4), and solidify k clusters: (4) in, Take the value of k The overall error of clustering, where n is the total number of P-values. Take the value of k The overall error of the clustering is determined by setting the initial value of a to 1 and the threshold of γ to be selected based on the trend of the set P value.

8. The early warning system according to claim 7, characterized in that, The data sources for the multi-source, multi-modal data of power grid resources include: dispatching technical support system, centralized control station system, distribution automation system, substation automation system, electricity consumption information collection system, marketing business application system, power grid resource business platform, data platform, and equipment asset lean management system; the equipment for collecting the multi-source, multi-modal data of power grid resources includes: main primary power equipment of transmission network, main overhead primary power equipment of distribution network, main substation primary power equipment of distribution network, main low-voltage primary power equipment of distribution network, main power grid control system and relay protection and safety automatic device, main online monitoring equipment of power grid, main automation equipment of power grid, main communication equipment of power grid, and other power grid resources.

9. The early warning system according to claim 7, characterized in that, The data classification module categorizes the historical daily data of all power grid resources.

Citation Information

Patent Citations

  • Electric network metering early-warning system and method based on load characteristic pre-estimation

    CN105825298A

  • Clustering and neural network-based power quality prediction method for a power distribution network containing a distributed power supply

    CN109871976A