Power distribution network emergency scene mobile multi-end interconnected equipment power supply management and control method

By constructing a mobile multi-terminal interconnected equipment scheduling model, and combining energy storage emergency vehicles with standard operating procedures (SOPs), the access location and power scheduling of energy storage emergency vehicles were optimized, solving the problem of insufficient power supply capacity of energy storage emergency vehicles and improving the emergency power supply level and the emergency management and control capabilities of the system.

CN117748487BActive Publication Date: 2026-11-20STATE GRID HUNAN ELECTRIC POWER COMPANY LIMITED +2
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202311744994.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2026-11-20
Estimated Expiration
2043-12-19

AI Technical Summary

Technical Problem

Existing energy storage emergency vehicles have limited battery capacity, making it difficult to meet the long-term power supply needs of faulty distribution networks. Furthermore, there are challenges in rationally selecting the access location and dispatch strategy of energy storage emergency vehicles in emergency scenarios to balance power supply capacity and system economy.

Method used

By constructing an optimal scheduling model for mobile multi-terminal interconnected equipment oriented to line faults, and combining energy storage emergency vehicles with smart soft switches (SOPs), the access location and power scheduling of energy storage emergency vehicles are optimized with the goal of minimizing load loss rate. A multi-port architecture including SOPs, energy storage emergency vehicles, DC-DC modules, and AC-DC modules is constructed.

Benefits of technology

It improved the continuous power supply capability of emergency vehicles, optimized the emergency power supply level, reduced the system's power failure rate and energy loss, and enhanced the emergency management and control capability of the distribution network.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117748487B_ABST
    Figure CN117748487B_ABST
Patent Text Reader

Abstract

This invention provides a power supply management method for mobile multi-terminal interconnected equipment in emergency scenarios of power distribution networks. The multi-terminal interconnected equipment includes an energy storage emergency vehicle, a DC-DC module, and an AC-DC module. Control is achieved through the following methods: collecting and processing power distribution network line fault information after a fault occurs; estimating the fault duration T based on the fault severity and scale, and obtaining corresponding power prediction data using the prediction curves of distributed power sources and loads; constructing an optimal scheduling model for mobile multi-terminal interconnected equipment oriented towards line faults; solving the obtained model to obtain the fault location where the mobile multi-terminal interconnected equipment needs to access and the port power command of the mobile multi-terminal interconnected equipment; and realizing load power supply under line fault conditions. This invention, by constructing an optimal scheduling model for mobile multi-terminal interconnected equipment oriented towards line faults, solves for the access location and scheduled power of the mobile multi-terminal interconnected equipment with the objective of minimizing the power outage rate; effectively improving the load support capability of the emergency vehicle.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of power grid control technology, and in particular relates to a power supply management and control method for mobile multi-terminal interconnected equipment in emergency scenarios of distribution networks. Background Technology

[0002] Currently, some domestic and international scholars are focusing on existing system resources, such as energy storage, photovoltaics, wind power, or new energy vehicles, to achieve emergency power supply targets for power system loads during line faults by regulating these resources. However, due to the spatial distribution of resources, these control methods are often difficult to apply efficiently to emergency scenarios involving long-distance faults. In contrast, emergency vehicles have attracted much attention due to their flexibility, mobility, safety, and reliability.

[0003] However, due to space limitations, existing energy storage emergency vehicles can only accommodate a limited capacity of energy storage batteries, resulting in insufficient continuous emergency power supply capabilities to meet the long-term power supply needs of faulty distribution networks. Soft OpenPoint (SOP), a new type of power electronic device, possesses the ability to interconnect and regulate power, enabling the allocation of loads from multiple points. Combining energy storage emergency vehicles with SOPs leverages the flexibility of the emergency vehicle and the interconnectivity of the SOP. However, ensuring the uniqueness of the access location for each SOP-equipped energy storage emergency vehicle while selecting advantageous nodes, and setting reasonable objectives based on actual emergency scenarios to balance the contradictions between redundant dispatching of SOP-equipped energy storage emergency vehicles, load power supply, energy loss, and overall system economy, are urgent problems to be solved. Summary of the Invention

[0004] The purpose of this invention is to provide a power supply management method for mobile multi-terminal interconnected equipment in emergency scenarios of power distribution networks, thereby improving the emergency power supply level of the power system by enhancing the continuous power supply capability of energy storage emergency vehicles.

[0005] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is a power supply management method for mobile multi-terminal interconnected equipment in emergency scenarios of power distribution networks, which specifically includes the following steps: S1. Collect and process fault information of distribution network lines after a fault occurs; S2. Estimate the duration T of the line fault based on the degree and scale of the fault, and obtain the corresponding power prediction data using the prediction curves of distributed power sources and loads. S3. Construct an optimal scheduling model for mobile multi-terminal interconnected equipment oriented towards line faults, with the minimum load loss rate as the objective function. S4. Solve the model obtained in S3 to obtain the fault location that the mobile multi-terminal interconnection equipment needs to access and the port power command of the mobile multi-terminal interconnection equipment; realize load power supply under line fault.

[0006] Furthermore, the information collected in S1 includes the location and number of broken wires.

[0007] Furthermore, the specific steps of S1 are as follows: S101. Encode all branches in the network topology using natural numbers 1 to N, and obtain the branch codes of all N faulty lines; S102. Construct a T×N 0-1 variable branch disconnection matrix based on encoding. The matrix represents the on / off status of the Nth branch in the Tth hour during the duration of the fault, with the on / off variable value of the normal line being 1 and the on / off variable value of the faulty line being 0. S103. Assign initial values ​​to the branch circuit interruption variable matrix according to the fault conditions.

[0008] Furthermore, S2 specifically refers to: S201. Treat the distributed power supply access point and each load node as PQ nodes, and use active power variables and reactive power variables to represent them. S202, Read the power prediction data of both; S203. Based on power prediction data, form a distributed power source matrix, a load active power matrix, and a reactive power matrix.

[0009] Furthermore, the specific steps of S3 are as follows: S301. Constructing the network model: By inputting the network structure using a branch flow model, a topology with M nodes and N branches is formed. Upstream matrix and a Downstream matrix; set basic power flow safety constraints: ; in, This is a matrix of squared node voltages. , These represent the lower and upper squares of the node voltage, respectively. Let be the square of the node current. , These are the lower and upper limits of the square of the node current, respectively. The active power flowing through the branch circuit. , These are the lower and upper limits of the active power allowed to flow through this branch, respectively. The reactive power flowing through the branch circuit. , These are the lower and upper limits of the reactive power allowed to flow through this branch, respectively. Constructing a branching flow model: ; Among them, Ω k→i Ω represents the set of branches flowing into this node. i→j This represents the set of branches flowing out of this node; The active power matrix input from the upstream power grid. The reactive power matrix input from the upstream power grid. For active power matrix, This is the reactive power matrix; Current node branch resistance, For the current node branch reactance; It is the active power constant matrix of distributed power sources. It is the active power constant matrix of the load. It is the reactive power constant matrix of distributed power sources. The reactive power constant matrix of the load.

[0010] S302. Establish feasible domain constraints and working status constraints for scheduling mobile multi-terminal interconnected equipment; S303. Using the location of the mobile multi-terminal interconnection equipment and the power of the scheduling as decision variables, and with the minimum load loss rate as the objective function, construct an optimal scheduling model F for mobile multi-terminal interconnection equipment oriented towards line faults: ; in, Indicates the duration of the disconnection. This indicates the load amount represented by the load forecast curve; ω represents the actual load borne by the distribution network in an emergency scenario, and H represents the energy loss in emergency power supply; α ω β and ω γ These represent the economic loss coefficient due to power outage, the loss cost coefficient, and the dispatching fee, respectively; M represents the number of dispatching operations for the mobile multi-terminal interconnected equipment.

[0011] Furthermore, the specific steps of S302 are as follows: Based on the feasible scheduling domain of mobile multi-terminal interconnected equipment determined in step S301, a T×N access location judgment variable matrix is ​​introduced. When the mobile multi-terminal interconnected equipment accesses the fault location coded as 'a', where a = 1, 2, ..., 6, the control variable is... The value is 1, indicating the control variable is not connected to the fault location. The value is 0; the constraints on the feasible region of the variable matrix and the scheduling of mobile multi-terminal interconnected equipment are: ; The constraints on the working status of mobile multi-terminal interconnected equipment include: ; in, Indicates the first mobile multi-terminal interconnected device The active power output from each port; Indicates the first mobile multi-terminal interconnected device The reactive power output of each port; Indicates the first mobile multi-terminal interconnected device Apparent power output from each port, This indicates the output power of the energy storage battery.

[0012] Furthermore, the energy loss H in S303 includes operating losses and line losses: ; Among them, H line For distribution network line losses; H S For the working losses of mobile multi-terminal interconnected equipment; η sop To improve the port power transmission efficiency of mobile multi-terminal interconnected equipment, S sop For mobile multi-terminal interconnected equipment, the port transmits apparent power.

[0013] Furthermore, the mobile multi-terminal interconnected equipment includes a standard operating procedure (SOP), an energy storage emergency vehicle, a DC-DC module, and an AC-DC module.

[0014] Furthermore, the number of SOP ports of the mobile multi-terminal interconnection equipment is three or more; and it includes at least one DC-DC module and two AC-DC modules; wherein the DC-DC module is connected to the original energy storage battery and shares a DC side with the AC-DC module.

[0015] Compared with the prior art, the beneficial effects of the present invention include: This invention provides a method for power supply management and control of mobile multi-terminal interconnected equipment in emergency scenarios of power distribution networks. It proposes a novel architecture for mobile multi-terminal interconnected equipment, overcoming the shortcomings of traditional energy storage emergency vehicles. Leveraging the flexibility and mobility of emergency vehicles and the interconnectivity and mutual support characteristics of standard operating procedures (SOPs), it not only meets the power regulation needs under normal operating conditions of the power distribution network but also effectively solves the problem of insufficient continuous power supply capacity of energy storage emergency vehicles under fault conditions, thereby improving the reliability of power supply in the power system. Furthermore, by constructing an optimal scheduling model for mobile multi-terminal interconnected equipment oriented towards line faults, it solves for the access location and scheduling power of mobile multi-terminal interconnected equipment with the objective of minimizing the power outage rate. This effectively improves the load support capacity of emergency vehicles and is of great significance for enhancing the emergency management and control capabilities of power distribution networks. Attached Figure Description

[0016] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0017] Figure 1 This is a schematic diagram of an emergency scenario involving a broken line in this embodiment; Figure 2 It is an architecture diagram of the invention of a mobile multi-terminal interconnected device; Figure 3 These are the photovoltaic power output forecast curve and the total load forecast curve in this embodiment; Figure 4 This is the actual active power load curve of the mobile multi-terminal interconnected equipment of the present invention compared with that of a traditional energy storage emergency vehicle; Figure 5 This is the actual reactive load curve of the mobile multi-terminal interconnected equipment of the present invention compared with that of a traditional energy storage emergency vehicle; Figure 6 This invention compares the active load support performance of the mobile multi-terminal interconnected equipment with that of traditional energy storage emergency vehicles. Figure 7 This invention compares the reactive load support performance of the mobile multi-terminal interconnected equipment with that of traditional energy storage emergency vehicles. Detailed Implementation

[0018] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.

[0019] This invention provides a method for power supply management and control of mobile multi-terminal interconnected equipment in emergency scenarios of power distribution networks, such as... Figure 2The mobile multi-terminal interconnection equipment includes a System-on-Pack (SOP), an energy storage emergency vehicle, a DC-DC module, and an AC-DC module. The topologies of the DC-DC and AC-DC modules shown in the diagram are merely examples and can be transformed into other topologies capable of DC-DC and AC-DC conversion. To fully utilize the energy storage battery and ensure interconnection within the distribution network, the introduced SOP has three or more ports, including at least one DC-DC module and two AC-DC modules. The DC-DC module is connected to the existing energy storage battery and shares a DC side with the AC-DC module. The AC side of the AC-DC module is used as the output terminal and connected to the busbar (or substation) of the load node. In actual operation, the energy storage battery and the SOP work together, allowing the mobile multi-terminal interconnection equipment to provide power while also transmitting power to replace faulty lines.

[0020] Example 1 The access location and power output of mobile multi-terminal interconnected equipment are controlled using the following method: S1. Collect and process distribution network line fault information after a fault occurs. Obtain the location and number of broken lines, encode all network branches, and consider the fault location as the scheduling feasible domain of mobile multi-terminal interconnection equipment. This embodiment takes an IEEE 33-node distribution network with 6 line faults as an example. The line fault locations and information are as follows: Figure 1 As shown in the diagram, the tie switch is a device that transfers the load of a faulty power source to another power source; as an emergency device, it can only be activated after a fault occurs.

[0021] S101. Use natural numbers 1 to 6 to encode all branches in the network topology and obtain the branch codes of all 6 faulty lines.

[0022] S102, Construct a based on encoding 0-1 variable branch break matrix This matrix represents the open / closed state of the Nth branch during the Tth hour of the fault's duration, with 0 defined as open and 1 as closed. The open / closed variable value for a normal line is 1, and the open / closed variable value for a faulty line is 0.

[0023] S103. Assign initial values ​​to the branch circuit interruption variable matrix according to the fault conditions.

[0024] S2. Combining fault experience and historical data, estimate the duration T of the line fault based on the fault degree and scale, and obtain the corresponding power prediction data using the prediction curves of distributed power sources and loads.

[0025] Taking a fault duration of T=4 from 8:00 to 11:00 as an example, the distributed power supply access point and each load node are considered as PQ nodes, both represented by active power and reactive power variables. The power prediction data for both are read, with the positive direction as the outflow node. The power prediction curves for both are shown below. Figure 3 As shown.

[0026] Based on the predicted data, active and reactive power matrices for distributed generation and loads are generated. For a 33-node power network, a 4x33 active power constant matrix for distributed generation and loads is formed. , and reactive power constant matrix , The distributed power sources mentioned above refer to independent power sources that are compatible with the actual environment, such as photovoltaic, wind, and hydropower.

[0027] S3. Construct an optimal scheduling model for mobile multi-terminal interconnected equipment oriented towards line faults, with the minimum load loss rate as the objective function. Set decision variables such as node voltage, branch current, branch active power, and reactive power, and give the corresponding safety constraints. Establish a scheduling model for mobile multi-terminal interconnected equipment, and set feasible region constraints and working state constraints for scheduling mobile multi-terminal interconnected equipment.

[0028] S301. Constructing the network model: The network structure is entered using a branch flow model. For a topology with 33 nodes and 36 branches, a... Upstream matrix and a Downstream matrix. Set basic power flow safety constraints: ; In the formula, Let be the square matrix of the node voltages, and be... The decision variable matrix; , These are the upper and lower limits of the square of the node voltage, respectively. The constant matrix; The square of the node current, with dimension . The decision variable matrix; , These are the upper and lower limits of the square of the node current, respectively. The constant matrix; The active power of the branch circuit is... The decision variable matrix; , These are the upper and lower limits of the active power allowed to flow through this branch, respectively. The constant matrix; The reactive power flowing through the branch circuit is... The decision variable matrix; , These represent the upper and lower limits of the reactive power allowed to flow through this branch, respectively. The constant matrix; According to the distflow model: ; Among them, Ω k→i Ω represents the set of branches flowing into this node. i→j This represents the set of branches flowing out of this node; The active power matrix input from the upstream power grid is... The decision variable matrix; The reactive power matrix input from the upstream power grid is... The decision variable matrix; Current node branch resistance, This represents the current node branch reactance.

[0029] S302. Establish feasible domain constraints and operational state constraints for scheduling mobile multi-terminal interconnected equipment. Because the fault time is relatively long, while the movement time of the mobile multi-terminal interconnected equipment is relatively short and can be ignored, based on the feasible domain for scheduling the mobile multi-terminal interconnected equipment determined in step S301, the following constraints are introduced: Access location determination variable matrix When a mobile multi-terminal interconnected device accesses a fault location coded as a (a=1,2,…,6), If the result is 1, then the result is 0. Therefore, the constraint between the judgment variable matrix and the feasible region constraint for scheduling mobile multi-terminal interconnected equipment is: ; The constraints on the working status of mobile multi-terminal interconnected equipment include: ; In the formula, Indicates the first mobile multi-terminal interconnected device ( =1, 2, 3) active power output from ports; Indicates the first mobile multi-terminal interconnected device The reactive power output of each port; Indicates the first mobile multi-terminal interconnected device The apparent power output of each port is taken as 150kVA. Port 3 of the apparent SOP is connected to the energy storage battery, and the energy storage battery output power... The maximum value is 50kVA. Further, this will form the output of mobile multi-terminal interconnected equipment. Active power matrix and Reactive power matrix .

[0030] S303. This invention uses the location of mobile multi-terminal interconnection equipment access and the power of scheduling as decision variables, and constructs an optimal scheduling model F for mobile multi-terminal interconnection equipment oriented towards line faults with the minimum load loss rate as the objective function. Its objective function is as follows: ; In the formula, This indicates the load amount represented by the load forecast curve; This indicates the actual load borne by the distribution network in an emergency scenario. H represents the energy loss during emergency power supply; ω α ω β and ω γ These represent the power outage economic loss coefficient, loss cost coefficient, and dispatching cost, respectively; M represents the number of dispatches for the mobile multi-terminal interconnection equipment. Since the mobile multi-terminal interconnection equipment is not ideal, energy loss should include both the operating loss of the mobile multi-terminal interconnection equipment and line loss, as shown in the following formula: (6) In the formula, H line For distribution network line losses; H S For the working losses of mobile multi-terminal interconnected equipment; η sop To improve the port power transmission efficiency of mobile multi-terminal interconnected equipment, S sop This invention enables the transmission of apparent power through ports in mobile, multi-terminal interconnected equipment. Considering that energy storage emergency vehicles require inverters for grid connection, this invention ensures that the inverter efficiency matches that of the standard operating procedure (SOP).

[0031] S4. The model constructed in step S3 is solved using the GUROBI commercial solver to obtain the fault location that the mobile multi-terminal interconnection equipment needs to access, and at the same time, the port power command of the mobile multi-terminal interconnection equipment (including three-phase active power and reactive power) is given. This power command is input into the control system of the mobile multi-terminal interconnection equipment, and the load node at the corresponding access location of the mobile multi-terminal interconnection equipment is adjusted to control the power flow, thereby realizing load power supply under line fault.

[0032] This invention provides a mobile multi-terminal interconnection equipment and its emergency management method for line faults. Starting from actual line faults, it considers the shortcomings of traditional energy storage emergency vehicles and solves for the scheduling location and output power of the mobile multi-terminal interconnection equipment with the goal of minimizing power outage rate. Based on existing equipment in energy storage emergency vehicles, this method introduces multi-port SOP equipment, effectively improving the emergency vehicle's load support capability and having significant implications for enhancing the resilience and emergency management capabilities of the power distribution network.

[0033] Example 2 To verify the effectiveness of the method involved in this invention, this embodiment sets up a comparison between the effects of mobile multi-terminal interconnection equipment and energy storage emergency vehicles, and conducts the verification on an IEEE 33-node network considering tie switches. Scenario 1: Three energy storage emergency vehicles with a port capacity of 150kVA and a maximum charge / discharge power of 50kW for their energy storage batteries are dispatched in an emergency scenario with six line faults, serving as a control group; Scenario 2: Three mobile multi-terminal interconnection equipment with the same SOP port capacity of 150kVA and a maximum charge / discharge power of 50kW for their energy storage batteries are dispatched in the same emergency scenario, with the access location and output power provided by the optimal dispatch model of mobile multi-terminal interconnection equipment for line faults in this invention.

[0034] As shown in Table 1, compared to energy storage emergency vehicles that connect to the distribution network at a single point to support the load, mobile multi-terminal interconnection equipment can connect to different load nodes, enabling interconnection and mutual support within the distribution network. Furthermore, mobile multi-terminal interconnection equipment requires fewer dispatching operations, reducing action time and increasing efficiency in practical applications.

[0035] Table 1. Emergency Vehicle Access (Node) Locations ; according to Figure 4 and Figure 5 The active and reactive load curves for the actual support of mobile multi-terminal interconnected equipment and energy storage emergency vehicles; and Figure 6 This embodiment compares the active power load support effects of the mobile multi-terminal interconnection equipment and the energy storage emergency vehicle. It shows that by connecting two load nodes, the mobile multi-terminal interconnection equipment can act as a line dispatching power source, supporting more active power load in the distribution network and reducing the system's power outage rate. Figure 7 It can be seen that by connecting two load nodes, the mobile multi-terminal interconnection equipment can act as a line dispatching power source. The mobile multi-terminal interconnection equipment can support more reactive loads in the distribution network and ensure the needs of some reactive loads.

[0036] The various embodiments in this specification are described in a related manner. Similar or identical parts between embodiments can be referred to mutually. Each embodiment focuses on describing the differences from other embodiments. In particular, the system embodiments are basically similar to the method embodiments, so the description is relatively simple; relevant parts can be referred to the descriptions of the method embodiments.

[0037] The above description is merely a preferred embodiment of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention are included within the scope of protection of the present invention.

Claims

1. A method for power supply control of mobile multi-terminal interconnected equipment in emergency scenarios of power distribution networks, characterized in that, Specifically, the following steps are included: S1. Collect and process fault information of distribution network lines after a fault occurs; S2. Estimate the duration T of the line fault based on the degree and scale of the fault, and obtain the corresponding power prediction data using the prediction curves of distributed power sources and loads. S3. Using the minimum load loss rate as the objective function, construct an optimal scheduling model for mobile multi-terminal interconnected equipment oriented towards line faults. The specific steps are as follows: S301. Constructing the network model: By inputting the network structure using a branch flow model, a topology with M nodes and N branches is formed. Upstream matrix and a Downstream matrix; set basic power flow safety constraints: ; in, This is a matrix of squared node voltages. , These represent the lower and upper squares of the node voltage, respectively. Let be the square of the node current. , These are the lower and upper limits of the square of the node current, respectively. The active power flowing through the branch circuit. , These are the lower and upper limits of the active power allowed to flow through this branch, respectively. The reactive power flowing through the branch circuit. , These are the lower and upper limits of the reactive power allowed to flow through this branch, respectively. Constructing a branching flow model: ; Among them, Ω k→i Ω represents the set of branches flowing into this node. i→j This represents the set of branches flowing out of this node; The active power matrix input from the upstream power grid. The reactive power matrix input from the upstream power grid. For active power matrix, This is the reactive power matrix; Current node branch resistance, For the current node branch reactance; It is the active power constant matrix of distributed power sources. It is the active power constant matrix of the load. It is the reactive power constant matrix of distributed power sources. The reactive power constant matrix of the load; S302. Establish feasible domain constraints and working status constraints for scheduling mobile multi-terminal interconnected equipment; S303. Using the location of the mobile multi-terminal interconnection equipment and the power of the scheduling as decision variables, and with the minimum load loss rate as the objective function, construct an optimal scheduling model F for mobile multi-terminal interconnection equipment oriented towards line faults: ; in, Indicates the duration of the disconnection. This indicates the load amount represented by the load forecast curve; ω represents the actual load borne by the distribution network in an emergency scenario, and H represents the energy loss in emergency power supply; α ω β and ω γ These represent the economic loss coefficient due to power outage, the loss cost coefficient, and the dispatching fee, respectively; M represents the number of dispatching operations for the mobile multi-terminal interconnected equipment. S4. Solve the model obtained in S3 to obtain the fault location that the mobile multi-terminal interconnection equipment needs to access and the port power command of the mobile multi-terminal interconnection equipment; realize load power supply under line fault.

2. The power supply control method for mobile multi-terminal interconnected equipment in emergency power distribution scenarios according to claim 1, characterized in that, The information collected in S1 includes the location and number of broken wires.

3. The power supply control method for mobile multi-terminal interconnected equipment in emergency power distribution scenarios according to claim 1, characterized in that, The specific steps of S1 are as follows: S101. Encode all branches in the network topology using natural numbers 1 to N, and obtain the branch codes of all N faulty lines; S102. Construct a T×N 0-1 variable branch disconnection matrix based on encoding. The matrix represents the on / off status of the Nth branch in the Tth hour during the duration of the fault, with the on / off variable value of the normal line being 1 and the on / off variable value of the faulty line being 0. S103. Assign initial values ​​to the branch circuit interruption variable matrix according to the fault conditions.

4. The power supply control method for mobile multi-terminal interconnected equipment in emergency power distribution scenarios according to claim 1, characterized in that, Specifically, S2 is: S201. Treat the distributed power supply access point and each load node as PQ nodes, and use active power variables and reactive power variables to represent them. S202, Read the power prediction data of both; S203. Based on power prediction data, form a distributed power source matrix, a load active power matrix, and a reactive power matrix.

5. The power supply control method for mobile multi-terminal interconnected equipment in emergency power distribution scenarios according to claim 1, characterized in that, The specific steps of S302 are as follows: Based on the feasible scheduling domain of the mobile multi-terminal interconnected equipment determined in step S301, a T×N access location judgment variable matrix is ​​introduced. When the mobile multi-terminal interconnected equipment accesses the fault location coded as 'a', where a = 1, 2, ..., 6, the control variable is... The value is 1, indicating the control variable is not connected to the fault location. The value is 0; the constraints on the feasible region of the variable matrix and the scheduling of mobile multi-terminal interconnected equipment are as follows: ; The constraints on the working status of mobile multi-terminal interconnected equipment include: ; in, Indicates the first mobile multi-terminal interconnected device The active power output from each port; Indicates the first mobile multi-terminal interconnected device The reactive power output of each port; Indicates the first mobile multi-terminal interconnected device Apparent power output from each port, This indicates the output power of the energy storage battery.

6. The power supply control method for mobile multi-terminal interconnected equipment in emergency power distribution scenarios according to claim 1, characterized in that, In S303, energy loss H includes operating loss and line loss: ; Among them, H line For distribution network line losses; H S For the working losses of mobile multi-terminal interconnected equipment; η sop To improve the port power transmission efficiency of mobile multi-terminal interconnected equipment, S sop For mobile multi-terminal interconnected equipment, the port transmits apparent power.

7. The power supply control method for mobile multi-terminal interconnected equipment in emergency power distribution scenarios according to any one of claims 1 to 6, characterized in that, The mobile multi-terminal interconnected equipment includes a standard operating procedure (SOP), an energy storage emergency vehicle, a DC-DC module, and an AC-DC module.

8. The power supply control method for mobile multi-terminal interconnected equipment in emergency power distribution scenarios according to claim 7, characterized in that, The number of SOP ports of the mobile multi-terminal interconnection equipment is three or more; and it includes at least one DC-DC module and two AC-DC modules; The DC-DC module is connected to the original energy storage battery and shares a DC side with the AC-DC module.

Citation Information

Patent Citations

  • ESV-SOP and multi-resource cooperative power supply recovery method considering road network-power grid coupling

    CN118761641A